Former NAS Moffett Field
Hangar 1 Removal Action UpdateHangar 1 Removal Action UpdateHangar 1 Removal Action UpdateHangar 1 Removal Action Update
Bryce Bartelma, PGNavy BRAC PMO West
May 12, 2011RAB Meeting
1
Presentation Overview
P j t Obj ti• Project Objective• Progress Update
Biological Monitoring Scaffolding Installation Biological Monitoring Storm Water Protection Air Monitoring Hi t i Miti ti
Scaffolding Installation Roof, Redwood, Siding &
Window Removal Washing & CM15 Coating Historic Mitigation
Structural Steel Repairs
• Future Activities
Washing & CM15 Coating
• Schedule• Questions
2
Project Objective
• Control release of PCBs from Hangar 1 in accordance with EE/CA (July 2008) and Action Memorandum (December 2008)(December 2008)Demolition of interior structuresRemoval of contaminated sidingRemoval of contaminated sidingApplication of weather-resistant coating to steel frame
3
Continued Biological Monitoring
• Weekly observation of Burrowing OwlsI ti f bi l i l ti it i id• Inspection of biological activity inside and outside of hangar
• Weekly reports to NASA and regulatorsWeekly reports to NASA and regulators• No observed impacts to protected
species
Owl Buffer Fence
4
Continued Storm Water Protection
S di t d• Sediment removed from storm water trench and pluggedp gg
• Plastic liner placed over bare soil areas
l b l d• Silt barriers placed around storm drains
• Paved areas• Paved areas vacuumed prior to storm events
5
Continued Air Monitoring
• Continuous air monitoring during• Continuous air monitoring during removal action activities
• Three levels of air monitoringW k– Workers
– Work areas– Site perimeter
• Monitoring coordinated with NASA• Weekly reports provided to agencies
and public p• Data demonstrates control of air
emissions• NASA conducting air monitoring at
6
NASA conducting air monitoring at nearby buildings
Turnover of Historic Artifacts to NASA
7
Hangar 1 Interactive CD
• Provides interviews andProvides interviews and narrated history
• Navy and NASA working together to develop final CD
• Copies to be available to• Copies to be available to RAB, local schools, and library. Additional copies
il bl f havailable for purchase from the Moffett Field Museum
8
Structural Steel RepairsStructural Steel Repairs
• Structural engineers inspectStructural engineers inspect and document missing steel
• Replaced 5 steel members• Inspected by Navy, Exeltech
and AMEC on 2/28/11
9
Scaffolding InstallationScaffolding Installation
10
Quick DeckQuick Deck®® –– Suspended ScaffoldSuspended Scaffold
• Stable platform for workers to access upperworkers to access upper roof area of hangar
• Better control of contaminants (use of plastic sheeting)
11
Swing StageSwing Stage®®
• Added safety measure allowing two additional workers to assist interior workers with removal ofworkers with removal of panels, redwood, and windows
l l d• Materials are lowered to ground for ultimate disposal off-sitep
• Wind screens and monitors, air samplers & BMPs at g o nd s face
12
BMPs at ground surface
Mansard Roof Panels, Redwood Decking, Mansard Roof Panels, Redwood Decking, and Silver Siding Removaland Silver Siding Removalgg
• Mansard RoofFi t d l• First mansard panel removed from Zone 1 on April 21p
• Redwood decking and silver siding removal
13
Damaged Corrugated WindowsDamaged Corrugated Windows
• NASA determined windows not feasible to keep due to deteriorating conditionkeep due to deteriorating condition
• Navy will salvage a small number of corrugated window panes that are in good g p gcondition for NASA
14
Washing & Coating Washing & Coating –– CarbomasticCarbomastic 1515
• Initiated Zone 1 washing and icoating
• Capture and treatment of wash water containing PCBwash water containing PCB dust
• Single application of 4-6 mils f d bof CM 15 provides better
service life and encapsulation propertiesp p
15
Future Activities
• Continued biological & air monitoringmonitoring
• Scaffold installation in northern zones
• Continued siding removal, hi f t l dwashing of steel and
coating • Continued Community
16
Continued Community Outreach
ScheduleSchedule
• Fieldwork in zones 1 – 6 OngoingC l t fi ld k• Complete fieldwork, confirmation sampling and demobilize Early 20122012
• Submit After Action Completion Report p pSpring/Summer 2012
17
Questions?
Point of Contact:
Scott Anderson, P.E.BRAC EnvironmentalBRAC Environmental
Coordinator(619) 532-0938( )