handed over mattel project 13 june 2010
TRANSCRIPT
![Page 1: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/1.jpg)
The My School ProjectYear 2010
![Page 2: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/2.jpg)
Report
The success of the My School Project in Thailand
Handed Over date : 13 June 2010Grant File No. : 9735
![Page 3: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/3.jpg)
Project Location : Chiangrai Prov., Thailand
School Name : Ban Ka Lae Primary school.
This report will present the project in term of before and after project and the helping
hands of the volunteer from staffs of Mattel Bangkok Co.,Ltd., teachers,students,
villager and the My School team on the project.
![Page 4: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/4.jpg)
Before : Existing school bldg. for Grade 6
We call it “the Oven room.”
![Page 5: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/5.jpg)
The My School Team changed the bldg. structure
![Page 6: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/6.jpg)
Volunteer from Mattel Bkk and the My School team installing the school walls.
![Page 7: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/7.jpg)
Paint the school bldg.
![Page 8: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/8.jpg)
![Page 9: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/9.jpg)
Students help painting their school.
![Page 10: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/10.jpg)
The studentsGrade 3 – 4 team.
![Page 11: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/11.jpg)
![Page 12: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/12.jpg)
![Page 13: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/13.jpg)
One group nailed the wall.
Other group painted the school.
![Page 14: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/14.jpg)
We worked as a team.
![Page 15: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/15.jpg)
We almost got it done.
![Page 16: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/16.jpg)
![Page 17: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/17.jpg)
![Page 18: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/18.jpg)
![Page 19: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/19.jpg)
![Page 20: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/20.jpg)
Installing the white board.
![Page 21: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/21.jpg)
Here is the new class room , we got it done in one day.
![Page 22: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/22.jpg)
Logo
![Page 23: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/23.jpg)
Side view.
![Page 24: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/24.jpg)
BeforeThere are 2 ( oven) class rooms
at this Bldg.
![Page 25: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/25.jpg)
The second Bldg. that we renovated and changed it to this look.
After
![Page 26: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/26.jpg)
Side view of the 2nd Bldg. that we renovated
![Page 27: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/27.jpg)
Inside the 2nd Bldg., We run the Art on the wall Project. The Project was done by Art teacher .
![Page 28: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/28.jpg)
Art on the Wall Project at the second room
![Page 29: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/29.jpg)
![Page 30: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/30.jpg)
Before
After
![Page 31: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/31.jpg)
Assembly the book shelves to put in the library.
![Page 32: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/32.jpg)
![Page 33: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/33.jpg)
Making Desks & chairs for students.
![Page 34: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/34.jpg)
![Page 35: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/35.jpg)
Desks & Chairs in the class room.
![Page 36: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/36.jpg)
We also donated computer desks to school.
![Page 37: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/37.jpg)
Donated Television to school.
![Page 38: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/38.jpg)
Donated children play ground equipment to school
![Page 39: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/39.jpg)
The children come to school at 6.00 am to play and back home by 8.00 pm.
![Page 40: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/40.jpg)
![Page 41: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/41.jpg)
![Page 42: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/42.jpg)
Handed Over ceremony by Mattel Bangkok staffs.
![Page 43: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/43.jpg)
Handed over ceremony on Sunday 13 June 2010
![Page 44: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/44.jpg)
Giving donation to villager.
![Page 45: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/45.jpg)
Thank you gift from student to Mattel volunteer.
![Page 46: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/46.jpg)
![Page 47: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/47.jpg)
![Page 48: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/48.jpg)
![Page 49: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/49.jpg)
![Page 50: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/50.jpg)
Mattel Bangkok staffs and students wearing the hill tribe costume
![Page 51: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/51.jpg)
We received these photos of students in each new class room one week lather from a
school.
![Page 52: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/52.jpg)
![Page 53: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/53.jpg)
![Page 54: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/54.jpg)
![Page 55: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/55.jpg)
![Page 56: Handed Over Mattel Project 13 June 2010](https://reader035.vdocuments.mx/reader035/viewer/2022062319/555ba6fdd8b42ab9568b50fb/html5/thumbnails/56.jpg)
I would like to thank every one involved in giving the grant No. 9735 to
the My School Project.
This grant will give better education opportunity , better future to more than 50
student daily at Ban Ka Lea school , Chiangrai Prov. Thailand ,
for at least 10 years
Thank you so much for your kind hearted.Vachirapa Chankajornthe My School Team.