SANPAN PLUMBING BATHROOM & KITCHEN PLUMBING TOTAL SOLUTION PLUMBING PREASSEMBLE INSTALLATION SYSTEM SUSTAINABLE ADVANCED TECHNIQUE PROPOSED COMPANY FROM CONCEPT TO MANAGEMENT & OPERATION TECHNICAL PRESENTATION - GENERAL HALIM HANI ALSALAMAH INTERNATIONAL TRADING & MARKETING EST TEL: +971 50 4417129 EMAIL: HALIMHANI@EIM.AE - SANPANEIM@EIM.AE P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Upload: halim-hani-08-sanpan

Post on 15-Apr-2017

95 views

Category:

Environment


2 download

TRANSCRIPT

SANPAN PLUMBING BATHROOM & KITCHEN PLUMBING TOTAL SOLUTION

PLUMBING PREASSEMBLE INSTALLATION SYSTEM SUSTAINABLE ADVANCED TECHNIQUE

PROPOSED COMPANY FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI ALSALAMAH INTERNATIONAL TRADING & MARKETING EST

TEL: +971 50 4417129 EMAIL: [email protected] - [email protected]

P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e1

SUBJECT: SANPAN PLUMBING - TECHNICAL PRESENTATION Dear, SANPAN PLUMBING is a Total Plumbing & Sanitary Solution…. Sustainable Advanced Plumbing Engineering, 5 years free Maintenance, Challenging the Reduce Cost Factor to luxury quality ranges…. is Unique WorldWide… It shall be our pleasure if you like what you see and we are ready for all support…

Suggestion Creating a Technical Center in Dubai supported by Dubai Municipality is a must to approve plumbing system and to provide assistance & information to Planners, Architects, Contractors and Plumbers…. We shall be glad to hear from you…..

With my best regards

Halim Hani Halim Hani Executive Founder

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e2

A. SANPAN PLUMBING ADVANTAGES

SANPAN PLUMBING facilitate the position of bathrooms in coordination with structure design… SANPAN PLUMBING provide free design services for Architects & Consultants… SANPAN PLUMBING System will control the quality of Plumbing Works in the project... SANPAN PLUMBING system will improve the direct Cost-Cutting in Plumbing Invoice, and indirect Cost-Cutting of Total Construction cost at Different sub-contracting works level… SANPAN PLUMBING System add value to the quality of the Real Estate Project... SANPAN PLUMBING solution is a promotion item in Real Estate marketing… SANPAN PLUMBING help to sale the properties as individual unit’s off-plan… SANPAN is a cause to increase the Sales volume for Sanitary & Plumbing Products… SANPAN operation shall impose the installation of your products in the projects involved… SANPAN key element shall admit MANUFACTURER MANAGEMENT to control volume of production…

FACILITATE ARCHITECTURE & PLUMBING DESIGN PROCEDURE

ARCHITECTS & MEP CONSULTANTS ADVANTAGE SANPAN PLUMBING system facilitate the position of bathrooms in coordination with structure design without any complication… Hi-Tech Specification, approved, Eco-Plumbing and Green-Plumbing…

In Buildings Bathroom in Typical floors are independent… Plumbing Shafts in Typical Floors are built-in individually in each Bathroom… No holes in the bathroom floors & Kitchens… Post-Tensioned floor Slabs is easy design in safe way… No installation in Bathroom Walls, means no chasing and breaking… Thermal Block is easy designed and use in safe way … No Installation of Drainage & Water supply in Bathroom Ceiling… No Leakage in ceiling… No noise, Sound Acoustic is perfect design in safe way… Simple Coordination with MEP and Others… High Performance Special TrapSOVENT in the Shaft…. Hygienic Special WallDrain Hi Tech specification…

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e3

DIRECT & INDIRECT COST-CUTTING CONTRACTORS ADVANTAGE SANPAN PLUMBING system shall improve the direct Cost-Cutting in Plumbing Invoice, and indirect Cost-Cutting of Total Construction cost at Different sub-contracting works level… Direct Cost-Cutting in plumbing Invoice:

20 % - 30 % Cost-Cutting of the plumbing Total Cost 60 % reduce number of Labor Force for Plumbing works… 30 % Cost-Cutting in reducing Materials Quantity {Water Supply and Drainage}… Easy Installing Water supply & Drainage system before or after Bathroom tiling

procedure… 1 % materials maximum wastage… 6 times faster in installation procedure… 40 % Cost-Cutting in Bathroom VC units (wall Hang type)…

Indirect Cost-Cutting Civil Work Invoice:

70 % - 80 % Cost-Cutting for Civil works Related to Plumbing .. Reduce the number of Labor Force for Civil works… 1 single Opening in each Bathroom for Vertical Drainage & Water Supply… Cost-Cutting for making and adjusting 5 Holes & Openings in Bathroom Floor Slabs {Very

costly operation and danger in Post Tensioned Floor slabs case}… Cost-Cutting for non-Chasing & Repairing Block works inside bathrooms… Cost-Cutting for non-adjusting plaster works…

Indirect Cost-Cutting in Electrical works Invoice:

Reduce number of Labor Force for electrical works… Cost-Cutting 80 % in electrical works inside bathrooms… Cost-Cutting of electrical Installation & materials related to Bathrooms {Provision & built-in

safe Electrical BusBar Trunking system suitable for advanced Hi tech Bathroom {lighting Circuit, Electronic flush cistern and Electronic accessories.

Indirect Cost-Cutting in Tiling Works Invoice Reduce number of Labor Force for Tiling works… Speed the installation of tiles Cost-Cutting for the advantage of installing tiles before or after plumbing works Cost-Cutting for the advantage of prefabricating readymade Tiles panels as per engineer

choice…

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e4

DIRECT & INDIRECT COST-CUTTING DEVELOPERS ADVANTAGE SANPAN PLUMBING system shall improve the direct Cost-Cutting in Plumbing Invoice, and indirect Cost-Cutting of Total Construction cost at Different sub-contracting works level…

Direct Cost-Cutting in plumbing Invoice: 20 % - 30 % Cost-Cutting of the plumbing Total Cost… 60 % reduce number of Labor Force for Plumbing works… 30 % Cost-Cutting in reducing Materials Quantity {Water Supply and Drainage}… Installing Water supply & Drainage system before or after Bathroom tiling procedure… 1 % materials maximum wastage… 6 times faster in installation procedure… 40 % in Bathroom VC units {wall Hang type}…

Indirect Cost-Cutting Civil Work Invoice: 70 % - 80 % Cost-Cutting for Civil works Related to Plumbing .. Reduce the number of Labor Force for Civil works… 1 single Opening in each Bathroom for Vertical Drainage & Water Supply… Cost-Cutting for making and adjusting 5 Holes & Openings in Bathroom Floor Slabs

{Very costly operation and danger in Post Tensioned Floor slabs case}… Cost-Cutting for non-Chasing & Repairing Block works inside bathrooms… Cost-Cutting for non-adjusting plaster works…

Indirect Cost-Cutting in Electrical works Invoice:

Reduce number of Labor Force for electrical works… Cost-Cutting 80 % in electrical works inside bathrooms… Cost-Cutting of electrical Installation & materials related to Bathrooms {Provision &

built-in safe Electrical BusBar Trunking system suitable for advanced Hi tech Bathroom {lighting Circuit, Electronic flush cistern & Electronic accessories}…

Indirect Cost-Cutting in Tiling Works Invoice Reduce number of Labor Force for tiling works… Speed the installation of Tiles… Cost-Cutting in installing tiles before or after plumbing works Cost-Cutting in prefabricating readymade Tiles panels as per engineer choice…

Indirect Cost-Cutting in Interior design invoice Cost-Cutting for facilitate the Interior design works… Speed up the installation of Bathrooms interior Design …

Direct Benefit and New incomes from Plumbing maintenance invoice

Direct benefit & New incomes for 4 years plumbing maintenance contract {Sanpan provide 5 years free maintenance…

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e5

SALES FIGURES INCREASE MANUFACTURERS ADVANTAGE SANPAN PLUMBING System is a cause for MANUFACTURER to increase the Sales volume for Sanitary & Plumbing Products… Being Part of SANPAN Operation shall allow the installation of Production in the projects involved, and shall admit MANUFACTURER MANAGEMENT to control volume of production… The Global Bathroom Industry facing many issues, such as the economy, the environment and increased competition, the ability of companies to grow their businesses is becoming even tougher. The Manufacturer Bathroom Company are employing a wide range of business strategies to increase revenue and profit. These issues and strategies used to counteract them are discuss every day, and are illustrate in each Board of directors meeting to find the best solution for selling the products and increase the ROI.

It is so vital that The Manufacturer knowledge is up-to-date on the latest Solution for Ceramic technology and construction growing….

While some Companies may grapple with driving growth in a new market… Some others are looking for new avenues to increase share in a stalled Market … Others are looking for mature market… The Manufacturer Business needs to think about getting the most out of its market place. If companies are not increasing turnover every year, business is shrinking in real terms. Many businesses simply try to pick up extra sales wherever they can… While this opportunistic approach can be effective in the early days, it is unlikely to sustain longer-term growth. In general, the epidemic of lifestyle increased the demand for Ceramic of High quality by the public…

It is imperative that we have the chance to find a place on-top of the latest solutions in Bathroom Business by introducing SANPAN PLUMBING SYSTEM, offering and designing an advance management operation can realistically provide low operating costs & improve incomes, giving a competitive edge in the market… THE MANUFACTURER COMPANY can offer this industry more element keys from all the different verticals & horizontal angles to run a successful Business…. However, it need more join and support to involve a direct service to the Real estate industry… Developing new solutions to distribute Sanitary & Plumbing Products of high quality...

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e6

B. BUSINESS DIVERSITY Without any doubt Plumbing & Sanitary works is the critical items in the Construction Business...

WHILE OTHERS DON’T TAKE MUCH CARE DURING DESIGNING THE PLUMBING SYSTEM…

WHILE OTHERS DON’T TAKE MUCH CARE DURING SPECIFYING THE PLUMBING MATERIALS…

WHILE OTHERS DON’T TAKE MUCH CARE DURING THE INSTALLATION OF THE PLUMBING WORKS…

IT’S REQUIRE FROM OTHERS MORE MAINTENANCE AT HIGHER COST DURING THE OCCUPATION….

As a Result, SANPAN PLUMBING provide a Total Plumbing & Sanitary Solution…. Advanced Plumbing Engineering, 5 years free Maintenance, Challenging the Reduce Cost Factor to luxury quality ranges…. is Unique WorldWide…

SANPAN PLUMBING is the way to next level in advanced business solution, while other threats the need for cost containment are paramount concern, SANPAN PLUMBING shall move beyond this stage, & upscale the level of Business from efficiency to effectiveness by the choice of:

SUBCONTRACTING-DEALS (Strong affiliate to high performance in construction)…

CONTRACTING/ BARTER-DEALS (Strong affiliate to Add Asset Value)…

PROPERTY INVESTMENT-DEALS (Strong affiliate to secure Mortgage payment)…

ACQUISITION-DEALS (Strong affiliate to Acquire diversifies Business related to Plumbing) SANPAN PLUMBING Proposed Project from Concept to Management and Operation shall Derive Consequently the Impact Economy Conclusion to Positive results on Each Contrast signed:

SubContracting reflects an increasing in Company profit…

Contracting /Barter reflects an increasing in Company Assets…

Property Investment reflects increasing additional Revenue…

Acquisition Contracts reflects high control on materials (Price, Stock & Quality)… The Considerable plans are one of the reasons why such decision shall provide popular approach to Invest & Finance in SANPAN PLUMBING... It is to the parameter of cost & profit comparing to Finance-Engineering Methods that are more conventional. The finished results of SANPAN PLUMBING Growth shall maintain Sustainable, Clean, and Green… Stable & Safe long investment to look at….

Therefore, we are inviting you to review our file In order to look at carefully and determine a business opportunity for a mutual benefit...

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e7

C. HISTORY Based in UAE, Abu Dhabi {HALIM HANI-EXECUTIVE FOUNDER OF} ALSALAMAH INTERNATIONAL TRADING &

MARKETING EST/ HANISAN COMPANY LTD, LLC are Plumbing contractors and Suppliers that offers system design, development, installation & service programs for property owners across the country , and over the past 30 years has earned a reputation for developing landmark plumbing products and ideas with joint efforts of international partner.

SINCE 1977 HANICO first project was TOUAM HOSPITAL in ALAIN to install the plumbing & sanitary works, heating & Gas Inhalation system, I982 “ HANICO & ALSALAMAH International Trading & Marketing Est.” joint together and been the Sole Agent, Stockiest and distributor for:

GEBERIT of Switzerland for plumbing system… LAUFEN of Austria for Luxury Ceramic Bathroom… DORNBRACHT of Germany for Design-Armaturen and Accessories… DERIPLAST of Italy for HDPE Pressure Pipes & Fittings… ITAP of Italy for Brass & Metal valves & Plumbing Accessories.

1980 The First Luxury Sanitary & Plumbing Show Room in Abu Dhabi… 1987 Our Second Luxury Show Room in Abu Dhabi.. 1991 Our PreAssemble/Prefab Plumbing WorkShop Facility… 1995 The First Plumbing & Sanitary Technical Show Room in the Arabian Gulf…

As Professional plumbing Contractors, provides total package Plumbing solution, that same standard of excellence philosophy to the plumbing engineering.

Supplying & installing Plumbing facilities to the buildings in The United Arab Emirates generally & at Abu Dhabi Emirate mainly. By aligning client’s goals & objectives with plumbing development expertise, the firm adds significant value to every project it undertakes.

{HALIM HANI-EXECUTIVE FOUNDER OF} ALSALAMAH INTERNATIONAL TRADING & MARKETING EST/

HANISAN COMPANY LTD, LLC professional guidance ranges from Designing, Materials Describing, Evaluating, Fabrication, Supplying & Delivering, Erecting & Installing, commissioning & maintaining oversight.

With its vast experience in plumbing development, {HALIM HANI-EXECUTIVE FOUNDER OF} ALSALAMAH INTERNATIONAL TRADING & MARKETING EST/ HANISAN COMPANY LTD, LLC manage complexes, multiphase projects requiring expertise in plumbing total solution… Moreover, has complete more than 300 projects for supply and install plumbing works of every type, size and scope, including hospitals, hotels, residential buildings, office buildings, Industrial projects, villas, in addition supplying semi finished and prefabricated plumbing products to a myriad numbers of projects.

{HALIM HANI-EXECUTIVE FOUNDER OF} ALSALAMAH INTERNATIONAL TRADING & MARKETING EST/

HANISAN COMPANY LTD, LLC well know the ability to complete complex project on time and on or under budget. Our Tradition of building lasting business relation and our spirit of teamwork provide a smooth development process.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e8

D. WHAT IS SANPAN PLUMBING SYSTEM ? SANPAN PLUMBING a New Plumbing PreAssemble Installation Technique… SANPAN PLUMBING an Advanced Plumbing System, Revolution in Designing & Installation… allowing Fast & Complete simple Installation of Total Plumbing & Sanitary Works & Materials to the Building shell stage of: high rise Buildings, Multi Complex, Villas, Hospitals, Hotels, Airports, Public Areas...Etc… As well for Bathrooms & kitchen Renovation, Etc...

SANPAN Technical Solution Make Possible the Piping installation Procedure

***BEFORE OR AFTER TILING PROGRESS***

SANPAN Technical Solution Convert Holes & Openings in a Bathroom to : ***Single Small Core Penetration for Plumbing Riser IN POST TENSIONED SLABS***

01- The Modular system adapts individually to every situation 02- The installation work is simplified and considerably speeded up 03- Time consuming and difficult work is transfer from building site to workshop 04- Reduces 60 % of usual plumbing workforce 05- Prefab & PreAssemble Double Wall System 06- Manifold System connecting Water supply running in PreAssembling Double wall 07- Concealed Cistern & Horizontal Drainage running in PreAssembling Double wall 08- Individual & Separate Shaft for each Bathroom & Kitchen 09- Modifying and shifting the FloorDRAIN to a WallDRAIN 10- Shifting FloorTrap to TrapSovent fixed in the shaft Connected to Single Stack Drainage 11- Static & Noise Insulation 12- Free Maintenance for 5 Years 13- High ROI

The finished results of SANPAN PLUMBING ADVANCED PLUMBING PREASSEMBLE TECHNIQUE maintain Sustainable, Clean, and Green, Stable & Safe long term investment to look at….

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e9

E. SANPAN PLUMBING PREASSEMBLE SYSTEM The PreAssemble philosopphy Mastering the Management & Operation development progress

of SANPAN PLUMBING System :

1. PreAssemble Wall GI Framing system 2. PreAssemble Shaft GI Framing system 3. PreAssemble PreWall GI Framing System {Include Drainage & Water supply Network} 4. PreAssemble PreShaft GI Framing System {Include Drainage & Water supply Network} 5. PreAssemble Supporting Elements for Wc , Bidet, WashBasin, BathTub, WallDrain 6. PreAssemble TrapSovent & Vertical Stack Drainage pipes 7. PreAssemble Water Supply Manifold Collector & Distributor 8. PreAssemble Water Meter Manifold Collector & Distributor 9. PreAssemble Tiles on PreCut Gypsum PanelBoard Cladding 10. PreAssemble Water Pumps Package 11. PreAssemble Water Treatment 12. PreAssemble Roof Water Tanks 13. PreAssemble Solar Water Heater

F. SANPAN PLUMBING TOTAL OPERATION PROCEDURE: 01 - PLANNING & Interior DESIGNING 02 - ENGINEERING 03 - MATERIALS 04 - PREPARATION & PREFABRICATION AT WORKSHOP 05 - DELIVERY TO SITE 06 - INSTALLATION AT SITE 07 - SERVICES & MAINTENANCE AFTER HANDING OVER

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e10

G. POST TENSION SLABS IS DESIGNED SAFTLY BY ENGINEERS

SANPAN TECHNICAL SOLUTION REDUCE NUMBER OF HOLES & OPENINGS

IN A POST TENSION SLAB What would happen if you cut one of the cables in a Post Tensioned Floor In a Building …..????? practically nothing , I mean the floor won't collapse , what will happen is that the Bending moment will increase & a deflection occurs , it won't collapse just because engineers take a large factor of safety almost 2 times when they design such slabs. But what about Coring & Cutting large Number of Holes & Openings for Bathrooms In a Building ….?????? Then you have to worry…….

Cut It Out

Often it is necessary to cut holes in concrete floor slabs. For slabs reinforced with rebar or wire mesh, this is considered fairly routine. However, for post-tensioned (PT) slabs, this can be mistakenly regarded as difficult, expensive, and dangerous. This misconception is perpetuated because the field procedures and hardware used to create openings and penetrations are not well understood; a concern sometimes given as a reason for not using PT construction in a particular application. Cutting openings in PT slabs does require care and caution because of the possibility a PT tendon may get cut. Tendons carry a high amount of force, usually around 27,000 pounds for a 1/2-inch-diameter strand, and must be dimensioned in a controlled manner to assure performance and safety. However, with the proper knowledge of structural behavior, repair hardware, and PT field practices, retrofitting openings and other penetrations in PT slabs is not only feasible, but achievable safely and economically.

However, good judgment should be exercised. A large number of small openings in a

concentrated area can have a significant impact on slab strength and stiffness.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e11

H. INSTALLATION BEFORE TILING THE PREWALL FRAME STRUCTURE DISPLAY BEFORE TILING Where the domestic market has grown quite steadily in recent years from a realization that consumers appreciated a 'furnished' appearance for their bathrooms, with a good range of cupboards, drawers and shelves for storage and display, in the healthcare and public facilities environment, the technology has been adopt, for very different reasons.

THE BATHROOM DISPLAY

SANPAN PLUMBING Reduce The Large Numbers of Holes & Openings in POST TENSION SLABS

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e12

I. INSTALLATION AFTER TILING THE BATHROOM DISPLAY AFTER TILING

The aim here is to make bathroom facilities as streamlined as possible, so the PREASSEMBLE make The Installation of the Frame work much easier while cladding and tiling with molded Marble Countertop, antiqued brass handles and carved pilasters, from smooth floor to ceiling panels made of a durable laminate From a hygiene viewpoint is much easier to keep clean and free site than the array of awkward shapes and odd nooks and crannies inevitably created by traditional mounted Installation….

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e13

J. SANPAN PLUMBING - BUSINESS ELEMENT

Engineering Hi-Tech Engineering in Designing & Planning Shall meet all ISO Certificate required

Purchase Power Selective Materials of best quality with advantage prices

Industry Advanced Technology in Fabrication & PreAssembling Products & Materials

Logistic Coordination in Packaging and Delivery to site

Operation & Installation Educated & Professional skilled people in Management and Installation

Maintenance 5 Years Free Maintenance

Investment New solutions for Barter/Buying, Renting/Leasing/Selling the purchased space units

Acquisition Acquisition of Small Manufacturers producing materials related to SanPan Concept

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e14

K. FIELDS OF APPLICATION SANPAN PLUMBING is a full Plumbing Solution & Service on Design and Contracting To perform modern bathrooms in the property and real estate Sector with high Efficiency… Good for:

HIGH RISE BUILDINGS RESIDENTIAL BUILDINGS VILLAS OFFICE BUILDINGS HOTELS HOSPITALS PUBLIC AREA SHOPPING CENTERS TRANSPORT TERMINALS CIVIL PROJECT INDUSTRIAL PROJECTS STEEL STRUCTURE PROJECT

SANPAN PLUMBING Solution system shall provide very Advanced Knowhow Keys for major projects in Plumbing & Sanitary new Technology, Engineering & Installation… SANPAN Total Plumbing Solution system shall provide and perform high quality of 7 years free maintenance and supply 10 years defect guarantee for high quality products

SANPAN PLUMBING Total Solution shall provide Universal application for both new & renovation work Suitable for onsite installation, or prefabrication in the manufacturing Facility, Adaptable

to the demands of the Property & Can be combine with all kind pipes system …

RENOVATION & REVITALIZATION SANPAN PLUMBING System is Ideal for renovation & Revitalization of existing bathrooms and kitchens due to the Hi-Tech plumbing Engineering, The task of renovating a bathroom may seem formidable, especially if you are thinking about relocating the toilet, the shower or the wash basin. The freedom to have installed the System anywhere around the Bathroom at the same time, the installation systems’ Flexibility and adaptability give you the freedom to create individual

features.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e15

L. MARKETS TARGET SANPAN PLUMBING shall serve all Emirates in the United Arab Emirates Market as:

ABU DHABI , ALAIN, ALGHARBIYAH DUBAI SHARJAH RAS ALKHEIMAH AJMAN FUJAIRAH UM ALQUWAN

SANPAN PLUMBING shall extend to reach different destination worldwide as:

GCC Countries: Qatar, Saudia, Kuwait Muscat, Bahreïn…

ARAB Countries: Lebanon, Egypt, Iraq, Jordan, Libya Algeria Tunisia Etc…

GLOBAL Countries: Africa, America, Australia, Europe, Asia, Etc….

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e16

M. AVERAGE SELLING BATHROOM FOR :{ AED - +?} INCLUDE: ENGINEERING, DESIGN & DECORATION, FABRICATION & DELIVERY, INSTALLATION, MAINTENANCE 01 PreWall System Galvanized Steel Framing 02 Fixture Galvanized Steel Support 03 Waterproof Gypsum panels 04 Cold and Hot Water system inside Bathroom 05 Cold Water project Main Pipe network 06 Drainage system inside bathrooms 07 TrapSovent for Drainage Risers applicable ( for high rise building 4 floor - 50 +) 08 Ball System for Drainage risers applicable ( for villas 4 floors and less) 09 Drainage Project Main Pipe network 10 WallDrain cover 11 Rubber Connection 12 Clips and support system 13 Bathroom Vitreous China Fixtures 14 Bathroom chromium Mixers 15 Bathroom Accessories 16 Mirror ( additional Option) 17 Shower Cabinet (Additional Option) 18 Bathroom Appliances (Additional Option) 19 Pumps for drainage (Additional Option) 20 Pumps for water supply (Additional Option) 21 Water heater central boiler or individual or Solar Water Heater (Additional Option) 22 Roof water tanks (Additional Option) 23 Central Water Filter (Additional Option) 24 Valves For Main Pipes (Additional Option) 25 Tiles Floor and wall ( Additional Option) 26 Pharmaceutical boxes embedded (Additional Option) 27 Lighting (Additional Option) 28 Ventilator (Additional Option) 29 Waterproof Gypsum false Ceiling (Additional Option) 30 Waterproof membranes (Additional Option) 31 Prefabricated walls (Additional Option) 32 Bathroom Door (Additional Option) 33 Manholes cover (Additional Option)

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e17

N. PLANNING & DESIGNING When we think about SANPAN PLUMBING System engineering, computer aided Design quickly forms part of the Planning procedure. Accurate plans and a perfect fit are Essential to this type of construction good design software shall ensure that we make best use Of the space available, and end up with a range of component parts that do what we expect Them to, and fit together as we intended.

The most progressive engineering products are linking their systems to software that will only Help with design, but also calculate the type and number of elements required, and cut them to Size, so that when they arrive on site, they simply have to fit together.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e18

O. ENGINEERING SYSTEM SANPAN PLUMBING System value engineering delivers cost-efficient, state of the Art solution throughout every phase of the development process.

SANPAN PLUMBING System utilizes a design and construction management Process that has

been perfect over 20 years of developing to produce more than 70 % of the Plumbing job at workshop and reduce the numbers of labors at site with a premier control Before delivering materials to the

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e19

P. PREASSEMBLE PREWALLS & PRESHAFTS SYSTEM SANPAN PLUMBING PREASSEMBLE WALLS & SHAFTS SYSTEM permits not only the erection of usual Installation against the wall but also the construction of Room walls (e.g. partitions).

The PreAssemble Wall Categories: 1. THE PREASSEMBLE PREWALL SYSTEM 2. THE PREASSEMBLE PREWALL & PRESHAFT SYSTEM 3. THE FREE STANDING PREASSEMBLE WALL SYSTEM 4. THE FREE STANDING PREASSEMBLE WALL & SHAFT SYSTEM 5. THE DOUBLE FUNCTION PREASSEMBLE WALL SYSTEM 6. THE PUBLIC DURABILITY PREASSEMBLE WALL & PARTITION

SANPAN PLUMBING PREASSEMBLE WALLS & SHAFTS SYSTEM is a Construction technique, which can provide considerable savings in time and disruption, The PREASSEMBLE WALL delivery to site shall not support only the Bath, Basin, Toilet, Bidet , But to diversify a mirror installation for a kitchen suitable for hotels rooms, and studios in furnished apartments building and Facilitate the Interior design creation…

Problems of the past, such as slotted walls and hence poor sound insulation, and unnecessary Costs owing to the large number of people involved, will no longer be encounter in the future…

The toilet cistern, hot and cold water pipes & fittings, drainage system, the plumbing Installation for the bathroom & the kitchen, all sewage & waste pipes Are concealed behind the Prefab/PreWall, which The full height of the room or just sufficiently high Is good to carry the bathroom & Kitchen elements…

SANPAN PREASSEMBLE WALLS & SHAFTS SYSTEM PERMITS: Individual assembly on site Preparation of kits specifically adapted to the project Prefabrication of complete unit

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e20

1. THE PREASSEMBLE PREWALL SYSTEM

2. THE PREASSEMBLE PREWALL & PRESHAFT SYSTEM

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e21

3. THE FREE STANDING PREASSEMBLE WALL THE FREE STANDING PREASSEMBLE WALL SYSTEM A SELF SUPPORTING FRAME WORK A further refinement on the Prewall Free Standing installation is the self-supporting frame work; this type of frame does not require a wall for support, so it liberates the architect from the constraints of the existing walls.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e22

4. THE FREE STANDING PREASSEMBLE WALL & SHAFT

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e23

5. THE DOUBLE FUNCTION PREASSEMBLE WALL SYSTEM BATHROOM / KITCHENETTE FUNCTION

The Double Function Prewall is goof for Furnished Apartment & for 3-4 Star Hotel

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e24

6. THE PUBLIC DURABILITY PREASSEMBLE WALL & PARTITION TERMINALS – EXHIBITIONS – OFFICES – SHOPPING MALLS Another advantage of Pre-wall construction in public buildings is that it renders the bathroom facility much more vandal-resistant. There are no exposed fittings to attack, and the hard, smooth surface gives little encouragement to indulge destructive urges!

In the hospital environment, for example, the construction of multiple cubicles for toilets or showers, or partitioning between urinals and hand washing facilities, can be achieve quickly and easily without the need to build walls. A large area can be broken up into smaller units, to make best use of the available space, with all the necessary water, power and waste facilities brought to just the point where they are needed, with a minimum of disruption, mess and noise.

Whether this inner wall is full or half height, access to the elements behind is important, for maintenance and repair. This may be achieve through traditional access panels that unscrew and/or flaps, which swivel and lift

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e25

Q. THE RENOVATION BATHROOM

THE GUEST BATHROOM - PREWALL - PRESHAFT

A complete Basic System in modular forms for Bathroom Renovation the sanitary installations in rooms consisting of:

Support system Plumbing elements Water supply waste water system Cladding Tiling Fixture Installation Decoration

TOILET BATHROOM The Task of Renovating a Bathroom may seem Formidable, especially if you are thinking about relocating the Toilet, Shower or washbasin.

SANPAN PLUMBING SYSTEM gives the freedom to install the Sanitary Fixture anywhere around the Bathroom. At The Same Time, The Installation system’s flexibility and adaptability give the freedom to create individual features – Such as a recess for storing toiletries or towels…

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e26

R. ELECTRICITY SAFETY IN MODERN BATHROOM There are special requirements for electrical installations in bathrooms as most electrical work

must comply with Electricity Building Regulations.

Electricity Building Regulation in Bathrooms requires additional protection to be provided for

all circuits of the location by the use of one or more RCDs having the characteristics specified in

the Spec Regulation. This means that all circuits, including lighting, electric showers, heated

towel rails, whirlpool Bathtub, Shaving Devices, electronic wash basin mixer, electronic

Concealed Cistern, Devices etc. require RCD protection not exceeding 30 mA.

RCD, or residual current device, is a life-saving device which is designed to prevent from getting

a fatal electric shock if any touch something live, such as a bare wire. It can also provide some

protection against electrical fires.

All these devices require wiring system applied to the highest safety…

the electrical Wiring installations in location containing a fixed Unit (bath tub, shower, Etc..)

and to the surrounding zones is embedded in walls, Floors & Ceilings where it is exposed to

leakage and damage…

SANPAN DOUBLE WALL SYSTEM SHALL PROVIDE SAFE WIRING SYSTEM FACILITY TO CONNECT ALL DEVICES

REQUIRED IN BATHROOMS & KITCHENS COMPLY WITH ELECTRICAL BUILDING REGULATION...

The file is Under design & Preparation for Electricity Building Regulations Approval at

next stage …

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e27

S. TECHNICAL SEPARATION SEPARATION OF EACH APARTMENT & FLOOR Each bathroom and kitchen functions separately, thanks to the engineering and the installation

of SANPAN PLUMBING SYSTEM

All bathrooms & kitchen piping network system and connection inside the flat are provided from the same floor level as there is no connection between the upper & lower floor ….

STATIC AND NOISE INSULATION The Engineering in the separation of units with the form of modular and pipe insulation leaves

the sound much to be desire with regard to static and noise insulation. Prewall installation marks a major technological step forward.

The systems developed by our Company with the Joint effort of our Partners permit rational installation in any building situation for new or renovation work…

RELIABLE PROTECTION AGAINST THE SPREADING OF FIRE Holes in walls and ceilings as well as installation ducts can favor the spreading of fires in a building if they are not closed correctly and in accordance with standards. Products of one of our Major Strategic partner Geberit introduce the Rohrschott 90 plus fire protection sleeve closes the pipe opening in the event of fire and prevents the spreading of smoke , fire and heat to other rooms or parts of the building. Geberit Rohschott 90 plus can be used with all Geberit drainage systems

High Level of safety and Comfort Through integral systems Versatile use of Geberit Rohrschott90 plus Complete system with System pipe brackets and insulation materials

SAVING Saving in MONEY Quality in demands Long life for the property Saving Time in installation 5 YEARS Free maintenance Saving in maintenance Cost Adding value to the property Saving in wall repairing due to the prefab wall Saving in water Cost due to the control of water in WC flush cistern No wonder increasing numbers of luxury and comfortable bathrooms as well private healthcare

providers are embracing the pre-wall philosophy…

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e28

T. MATERIALS SANPAN PLUMBING System searches to install the best Materials available and approved by us to meet our requirement;

10 years Guarantee against Manufacturer Defect. 5 years Free Maintenance

1. ASSEMBLE PREWALL & FRAMING SYSTEM Galvanized Framing system cut & assemble to dimensions Galvanized Support system for Sanitary Fixtures Concealed Cistern Panel Board waterproof in Gypsum or Calcium Silicate cut to size

2. FIXTURE SYSTEM

Wall mounted Fixture in white color

Faucet & Robinetteries in chromium plated

Accessories in chromium Plated

3. DRAINAGE SYSTEM Drainage – HDPE pipes and fittings butt welding system Drainage System Main Riser – TrapSovent System FloorTrap - Free Maintenance Junction & Adjustable at shaft part of TrapSovent Wall Floor Drain

4. WATER SUPPLY SYSTEM Cold Water Inside Bathroom– Mepla/PEX pipes Hot Water Inside Bathroom – Mepla/PEX pipes Water Supply network pipe system and raiser in HDPE Central Hot Water Circulation for each unit apartment

5. COMMON INSTALLATION Water Lifting Pumps Booster Pumps / Pressure pumps Submersible Pumps for Drainage Water Filter System Roof Water Tank Solar System for Hot Water Central Boiler for Hot water System

6. TILES Colored Mosaic and Ceramic tiles cut to size Tiles fixed on panel board cut to size

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e29

U. PREPARATION, PREFABRICATION & PRE-ASSEMBLING AT WORKSHOP

PREASSEMBLING & PREFABRICATION The Prefab Plumbing system & The PreAssemble System permits simple, fast and complete construction of sanitary installations to the building shell stage in installation area of new buildings and in the modernization of olds buildings

The Modular system adapts individually to every situation.

The installation work with the Prefab-Assemble plumbing system is simplified and considerably speeded up.

Time consuming and difficult work is transfer from the building side to the workshop.

With The PreWall Installation System and The Prefab –PreAssemble Plumbing system, the installer is able to provide all services for the entire installation from one place.

The PreWall Installation System and The Prefab –PreAssemble Plumbing system keeps the cost down because the plumbing units are prefabricated & preassembled and all the complicated steps of the installation process have been take care of at the factory.

This means that installation on site takes considerably less time with less labor cost.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e30

V. DELIVERY TO SITE All installation material pipes &fittings, built in parts & mounting devices for installation of PreWall mounted plumbing fixtures & the tow are encase in self-supporting modules of top quality. These prefabricated plumbing modules to be deliver ready-to-install in the building site.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e31

W. INSTALLATION AT SITE MAIN DRAINAGE INSTALLATION UNDERGROUND

The Ideal material for the drainage in the household, in the industry and in the laboratory, made systematic or prefabricated, HDPE is fast install HDPE can be installing rigidly with relatively low effort in concrete.

Owing to the flexibility, the easy processing & the abrasion resistance HDPE drainage system Is ideal for concreting. As in Domestic drainage system, the quality of the materials is the main criterion for underground Application. In addition to the attack from the outside are also Subject to attacks from inside

The number of people involved in the building work is reducing and coordination is simpler. The only remaining work consists of tile laying and electrical installation

MAIN DRAINAGE SUSPENDING INSTALLATION Suspending Pipes & Fittings to collect Main Riser Drainage Stack and branch out the flow to the Main drainage Collector

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e32

DRAINAGE / MAIN RISER SYSTEM So Good, SOVENT – TRAPSOVENT

THE SOVENT FOR HIGH RISE BUILDINGS SOVENT, a Single stack drainage system substantially increase the performance of a soil & waste drainage system, and thus to eliminate a separate vent stack and reduce the diameter of the stacks in high-rise buildings. The specially designed branch inlet fitting reduces the pneumatic pressure fluctuations in stacks preventing the Siphonage of traps. This versatile drainage system with the engineered design offers an economical and high-performance alternative to conventional drainage systems….

Then Geberit, the European leaders in pipe work and sanitary systems have cleared the way for

integration of their HDPE 110 mm SOVENT fitting to the International market. This fitting has been tried and tested in thousands of installations worldwide for over many years, and specially In Abu Dhabi Emirates where more than 500 buildings has been installed by SOVENT SYSTEM, but like many innovative products Having been successfully evaluated by the British Board of Agreement, Engineers and installers can have complete confidence in this clever and higher effective solution, to traditional branch and waste connections, to vertical stacks.

The SOVENT system is particularly more effective for buildings of over 5-storeys such as hotels, Commercial high-rise buildings, and high-rise Mix use complex where it can create considerable cost savings as well as enhanced Drainage performance

The reduction of stack sizes compared to a secondary ventilated system is best illustrate by example that a typical 160mm SOVENT stack could accommodate twice as many apartments per stack when using the SOVENT system.

The SOVENT is designed with six capped off connection positions with the optimum installation configuration determined for each situation.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e33

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e34

THE TRAPSOVENT SINGLE STACK FOR HIGH RISE BUILDINGS THE TRAPSOVENT is a modified and developed copy of the original SOVENT, The FloorTrap Connected direct to one of the six capped… Has been developed by MR. HALIM HANI CREATOR OF

SANPAN PLUMBING to meet the need of good plumbing system…

THE TRAPSOVENT are been installed and tested in Abu Dhabi for the last 14 years proven high performance and minimum maintenance.

In addition to its cost saving and improved performance, THE TRAPSOVENT system saves space and offers versatility of branch joining positions for easier onsite pre-fabrication.

THE TRAPSOVENT like the rest of the HDPE range is maintenance free and offers improved acoustic Performance,

THE TRAPSOVENT fixed in high Rise Buildings proved its high performance in using single stack system for Soil and waste drainage system

THE TRAPSOVENT is the ideal solution for high-rise large-scale projects where cost & labor force is major considerations.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e35

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e36

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e37

THE BALL DRAINAGE SYSTEM FOR VILLAS & LOW RISE BUILDINGS THE BALL DRAINAGE SINGLE STACK SYSTEM is particularly more effective for buildings less than 5-storeys such as Villas, Buildings, Hotels, laboratories, industrial plant etc... Where it can create considerable cost savings as well as enhanced Drainage performance…

THE BALL DRAINAGE SINGLE STACK SYSTEM substantially increase the performance of a soil and waste drainage system, and thus to eliminate a separate vent stack and reduce the diameter of the stacks in the shafts.

The specially designed branch inlet fitting reduces the pneumatic pressure fluctuations in stacks preventing the Siphonage of traps.

This versatile drainage system with the engineered design offers an economical and high-performance alternative to conventional drainage systems

THE BALL DRAINAGE SINGLE STACK SYSTEM compared to a secondary ventilated system is best illustrating by example that a typical 110m stack could accommodate twice as many apartments per stack when using the BALL DRAINAGE fitting…

THE BALL DRAINAGE fitting is designed with 4 – 3 –2 capped off connection positions with the optimum installation configuration determined for each situation.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e38

SPECIAL FLOOR DRAIN INSIDE BATHROOM The Innovative Geberit Shower for floor even showers Transfer the drain unit from the floor to the Wall. The Result: simplified planning and Installation with an Attractive optic

GEBERIT SHOWER ELEMENT – CONSISTENT SYSTEM TECHNOLOGY Geberit Shower elements are an integral component of the SanPan Installation System, Drainage Pipes are guided in the Prewall – Sound insulation and fire protection subjects are solved within the framework of the Geberit System Technology. Flexibility: SanPan System offer enormous flexibility in Bathroom design Safe Sealing: Geberit Shower elements are equipped ex-factory with flexible connections for composite sealing. Thus censuring simple and durably reliable sealing.

WALL DRAIN ELEMENT to replace FLOOR DRAIN ELEMENT

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e39

MAIN COLD & HOT WATER NETWORKING SYSTEM The Installation and quality of cold and hot water networking system to the floors require well study design as many parameters must be consider and many possible solutions exist.

SANPAN PLUMBING System engineering consider the relation of the pipes quality in relation with the plumbing design of the building, The pressure requirements not only at the upper floor but also throughout the building, flow demand, booster pump capacity and control, pipe and valve materials, riser locations, pressure zones, pressure-regulating stations, Water heater storage capacity and recovery, Water heater locations, domestic hot water Circulation or pipe temperature maintenance, Space requirement, Acoustic & Energy efficiency.

At the same time, quality of networking pipes is required to meet the pressure and less maintenance.

SanPan Plumbing System use HDPE pressure pipes for all the networking system to the main point connection inside the bathrooms, and kitchens.

SanPan Plumbing System Connect a main collector for each housing unit and branch out Cold & Hot water pipes to each Bathroom at a secondary collector positioned in the pre-wall system

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e40

INSTALLATION PROCEDURE OF INSIDE BATHROOM SYSTEM Surface mounted supply & waste pipes on holes no longer meet the demands of Architectural design and aesthetics. Pipes to be lay in “wall channels “decades ago. Cement block or brick walls had to be chase out laboriously with hammer and chisel, to allow the pipes to be lain in wall channels. This created a lot of rubble and the channels had to be making once more at great expense… There is another safety consideration: Hot water may need to be circulating at a temperature of 60o, but pipes as hot would deliver a very nasty scald if unprotected.

SanPan Plumbing System, The PreWall construction technique enables potentially dangerous hot water supplies to be secure behind a smooth facade that will give good insulation against extremes of temperature.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e41

X. TILING & INTERIOR DESIGN For some, the world is round, for others square but SANPAN PLUMBING SYSTEM combine round & square in one Choice, we preferred the square tiles to shape a round Bathroom….. A clear and pure shape of the Materials choice that wins favor with its elegance wherever It appears…. It is easy to succumb to it – each detail shall be create with love and joy of life and gives the space an individual character then we choose our selection of Materials

The Tiles is cut, shaped and Pre-Assembled in our workshops facilities, then Mounted on Pre-Cut Gypsum Panel Board

Ceramic Tiles Cut To Size River Stone Wood Water Resistant Mosaic Tiles

This elegant solution between the tiles and the River Stone confirms that even greatly combining shapes may meet the highest demands for contemporary trends in bathrooms.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e42

Y. SERVICES & MAINTENANCE AFTER HANDING OVER SANPAN PLUMBING System Select the best choice of materials to provide 5 years free maintenance for plumbing engineering and installation, and 10 years Manufacturer guarantee for materials defect…..

PERFECTIVE VERTICAL PIPING INSTALLATION SANPAN PLUMBING System integrates the TrapSOVENT System in Vertical Drainage to keep the drainage flow to its high performance for Easy inspection in order to maintain & clean accidently blockage… SANPAN PLUMBING System Direct the Main Water Supply network piping from Main Manifold collector & distributor board to connect the main Bathroom….

PERFECT HORIZONTAL PIPING INSTALLATION FOR DRAINAGE & WATER SUPPLY SANPAN PLUMBING System allow the installation of Horizontal Drainage System in Bathrooms

BEFORE OR AFTER tiling procedure, to perform the use of minimum connection and butt welding for the HDPE pipes and fittings … SANPAN PLUMBING System allows the installation of Water Supply Network Piping Running in the PreWall system to secure and to prevent any leakage in the system and to provide high functional security, easy maintenance & high performance use.

MAINTENANCE AND SERVICE POSE NO PROBLEM SANPAN PLUMBING System although Provide the cistern placed in the PreWall, the manufacturing technology absolutely excludes the risk of leakage as the cistern is blown from one piece of top-quality plastic and then subjected to the pressure test. All other functional parts can be access at any time when the push button is removing. The push buttons offer two different amounts of flush water, which helps you save a lot of water and not only protect the environment but also paying money for nothing.

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e43

Z. EDUCATION, KNOWLEDGE & TRAINING

RESEARCH PALEAF - Acoustic experience to produce Single product for different application

Heat insulation

Cold insulation

Sound insulation

Water proof Insulation

Fire retardant

DEVELOPMENT & INNOVATION TRAPSOVENT THE 160 MM SOVENT

THE 110 MM TRAPSOVENT

THE 160 MM TRAPSOVENT

PRE-INSULATED HDPE PIPES AND FITTINGS {Insulated Double Containment Pipes & Fittings} for:

WATER SUPPLY

DRAINAGE

SEWAGE

CHILLED WATER

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e44

AA. TRAINING

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e45

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e46

BB. TECHNICAL SHOWROOM a) TECHNICAL SHOWROOM

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e47

b) TECHNICAL SHOWROOM

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e48

c) TECHNICAL SHOWROOM

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e49

d) TECHNICAL SHOWROOM

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e50

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e51

CC. CERTIFICATES & APPROVALS ABU DHABI MUNICIPALITY DRAINAGE DEPARTMENT 1992 SOVENT APPROVAL AND RECOMMENDATION

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e52

DEPARTMENT OF SOCIAL SERVICES AND COMMERCE BUILDING (DSSCB) SOVENT APPROVAL AND RECOMMENDATION

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e53

DEPARTMENT OF SOCIAL SERVICES AND COMMERCE BUILDING (DSSCB) HDPE WATER TANKS APPROVAL

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e54

REFERENCES PROJECTS & PRESENT OFFICIAL DOCUMENTATION GEBERIT HDPE & SOVENT

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e55

GEBERIT MAGAZINE -HDPE & SOVENT PROJECT ABU DHABI (PAGE 1)

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e56

GEBERIT MAGAZINE -HDPE & SOVENT PROJECT ABU DHABI (PAGE 02)

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e57

GEBERIT MAGAZINE - HDPE & SOVENT PROJECT ABU DHABI (PAGE 03

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e58

MEP MAGAZINE – DUBAI , UAE

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e59

MEP MAGAZINE – DUBAI , UAE

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e60

THE WORLD ECONOMIC FORUM – DAVOS THE DEPARTMENT OF ECONOMY OF ABU DHABI INVITATION

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e61

AUTOMATED PEOPLE MOVERS APM07 (AUSTRIA) 2007

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e62

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e63

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e64

DD. INDICATION LIST OF PROJECTS - REFERENCE

Project : MEENA HOTEL

Building Hotel : Ground Floor + Mezzanine + 10 Typical Floors +Roof 111 Suites (1 bedroom, 1 kitchenette, 1 bathroom )-

Coffee shop and Restaurant, Main Kitchen ,Restaurant and bar, laundry

Project: REGENCY HOTEL

Building Hotel Ground Floor + Mezzanine + 14 Typical Floors + Roof *200 Hotel room2, Cafe shop, and Restaurant, Main

Kitchen, laundry

Project: Commercial building : Arab Bank for Investment and Foreign Trade (Arbift) ALMASRAF

Basement + Ground Floor + Mezzanine + 6 Office Floor +Mechanical Floor + 11 Typical Floors + Penthouse Floor + roof

*Bank office *33 Apartments + penthouse

Project : 2 Commercial building : Private Department For HH SHEIKH ZAYED

Ground Floor + Mezzanine + 6 Typical Floors + Roof, Apartments

Project : Commercial building : SH. SAQUAR HAMDAN AL FALAHI

Building: Ground Floor + Mezzanine + 18 Typical Floors + Roof * Apartments

Project : Commercial building : Mr. SALEM HUMAID DAHAK AL MANSOURI

Ground Floor + Mezzanine + 18 Typical Floors + Roof * 144 Apartments

Building : Basement + Ground Floor + Mezzanine + 15 Typical Floors +Roof * 91 Apartments

Project : PRIVATE RESIDENCE: H.E. AHMAD SAEED AL BADI

VILLA Ground Floor + 1 & 2 Floor + Mech. Floor + Roof

Project : Commercial building : Mr. HAMAD MOHAMMED ALBADI

BUILDING: Basement +Ground floor +Mezzanine + Office + 15Typical Floor +Roof * Apartments

Project : Commercial building : H.E. AHMED SAEED ALBADI

BUILDING: Ground Floor +Mezzanine +12 Typical Floors * Apartments

Project : Commercial building : Mr. MUBARAK MATAR ALMUHEIRY

BUILDING: Ground Floor +Mezzanine +18 Typical Floors + Roof * Apartments

Project : Commercial building : Al FALAH Tower for H.E. AWAD BIN TARIF AL KUTBI

BUILDING: Ground Floor + Mezzanine + 15 Typical Floors + Roof *31 Apartments

Project : Commercial building : Mr. ATEIK BIN MATAR BIN FRAIH AL QUBAISI

BUILDING: Basement + Ground Floor + Mezzanine. + 18 Typical Floors +Roof *49 Apartments

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e65

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e66

Project : COMMERCIAL BUILDING: Mr. SAIF BIN BKHEIT AL MUHAIRBY

BUILDING: Ground Floor + Mezzanine + 16 Typical Floors + Roof + Top Roof Apartments

Project: Commercial Building: Mr. MUBARAK MOHAMMAD AKHOU SHEEMAH AL MUREIKHI

BUILDING: Basement + Ground Floor + Mezzanine + 15 Typical Floors + Roof + Top Roof *Aparts

Project : COMMERCIAL BUILDING: Mrs. HEIRS OF MOHAMMAD KHALIFAH SAIF AL HAMILY

BUILDING: Basement + Ground Floor + Mezzanine + 15 Typical Floors + Roof + Top Roof *Apartments

Project : COMMERCIAL BUILDING: H.E. SHEIKH SUROUR BIN SULTAN AL DHAIRI

BUILDING: Basement + Ground Floor + Mezzanine + 19 Typical Floors + Roof + Top Roof *Apartments

Project : COMMERCIAL BUILDING: H.H. SHEIKH KHALIFAH BIN ZAYED AL NAHYAN

BUILDING: Basement + Ground Floor + Mezzanine + 15 Typical Floors + Roof + Top Roof*Apartments

Project : COMMERCIAL BUILDING: Mr. THANI MOHAMMAD AL MAZROUI

BUILDING: Basement + Ground Floor + Mezzanine + 15 Typical Floors + Roof + Top Roof*Apartments

Project : SUSPENDING VILLAS: H.H. SHEIKH SEIF BIN MOHAMMAD AL NAHYAN - KHALIDYA

( old ALAHLYAH PRISUNIC )

VILLAS / BUILDING: 18 Suspending Duplex VILLAS - Ground Floor + Mezzanine + 6 floors

Project : COMMERCIAL BUILDING: Mr. ZYAD ALASKARI - ELECTRA Street

BUILDING: Ground Floor + 10 floor offices + roof *Offices

Project : COMMERCIAL BUILDING : Mr. MUBARAK BIN ALI

BUILDING: Ground Floor + Mezzanine + 9 Typical Floors + Roof + Top Roof*Apartments

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e67

INDEX & REFERENCE A. DIRECT & INDIRECT CUTTING-COST

B. BUSINESS DIVERSITY

C. HISTORY

D. WHAT IS SANPAN|PJSC PLUMBING SYSTEM ?

E. SANPAN PLUMBING PREASSEMBLE SYSTEM

F. SANPAN PLUMBING TOTAL OPERATION PROCEDURE:

G. POST-TENSION SLABS IS DESIGNED SAFTLY BY ENGINEERS

H. INSTALLATION BEFORE TILING THE PREWALL FRAME STRUCTURE DISPLAY BEFORE TILING THE BATHROOM DISPLAY

I. INSTALLATION AFTER TILING THE BATHROOM DISPLAY AFTER TILING

J. SANPAN|PJSC - BUSINESS ELEMENT

K. FIELDS OF APPLICATION RENOVATION & REVITALIZATION

L. MARKETS TARGET

M. AVERAGE SELLING BATHROOM FOR :{ AED - +?????} INCLUDE:

N. PLANNING & DESIGNING

O. ENGINEERING SYSTEM

P. PREASSEMBLE PREWALLS & PRESHAFTS SYSTEM 1. THE PREASSEMBLE PREWALL SYSTEM 2. THE PREASSEMBLE PREWALL & PRESHAFT SYSTEM 3. THE FREE STANDING PREASSEMBLE WALL 4. THE FREE STANDING PREASSEMBLE WALL & SHAFT 5. THE DOUBLE FUNCTION PREASSEMBLE WALL SYSTEM 6. THE PUBLIC DURABILITY PREASSEMBLE WALL & PARTITION

Q. THE RENOVATION BATHROOM TOILET BATHROOM

R. TECHNICAL SEPARATION SEPARATION OF EACH APARTMENT & FLOOR STATIC AND NOISE INSULATION SAVING

S. MATERIALS

T. PREPARATION, PREFABRICATION & PRE-ASSEMBLING AT WORKSHOP PRE-ASSEMBLING & PREFABRICATION

U. DELIVERY TO SITE

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e68

V. INSTALLATION AT SITE MAIN DRAINAGE INSTALLATION UNDERGROUND MAIN DRAINAGE SUSPENDING INSTALLATION DRAINAGE / MAIN RISER SYSTEM

THE SOVENT FOR HIGH RISE BUILDINGS

THE TRAPSOVENT SINGLE STACK FOR HIGH RISE BUILDINGS

THE BALL DRAINAGE SYSTEM FOR VILLAS & LOW RISE BUILDINGS

SPECIAL FLOOR DRAIN INSIDE BATHROOM

GEBERIT SHOWER ELEMENT – CONSISTENT SYSTEM TECHNOLOGY

WALL DRAIN ELEMENT to replace FLOOR DRAIN ELEMENT

MAIN COLD & HOT WATER NETWORKING SYSTEM

INSTALLATION PROCEDURE OF INSIDE BATHROOM SYSTEM

W. TILING & INTERIOR DESIGN

X. SERVICES & MAINTENANCE AFTER HANDING OVER PERFECTIVE VERTICAL PIPING INSTALLATION PERFECT HORIZONTAL PIPING INSTALLATION FOR DRAINAGE & WATER SUPPLY MAINTENANCE AND SERVICE POSE NO PROBLEM

Y. EDUCATION, KNOWLEDGE & TRAINING

RESEARCH PALEAF - Acoustic experience to produce Single product for different application

DEVELOPMENT & INNOVATION TRAPSOVENT

PRE-INSULATED HDPE PIPES AND FITTINGS

{insulated double containment Pipes & Fittings} for:

Z. TRAINING

AA. TECHNICAL SHOWROOM a) TECHNICAL SHOWROOM b) TECHNICAL SHOWROOM c) TECHNICAL SHOWROOM d) TECHNICAL SHOWROOM

BB. CERTIFICATES & APPROVALS ABU DHABI MUNICIPALITY DRAINAGE DEPARTMENT 1992 SOVENT APPROVAL AND RECOMMENDATION DEPARTMENT OF SOCIAL SERVICES AND COMMERCE BUILDING (DSSCB)

SOVENT APPROVAL AND RECOMMENDATION DEPARTMENT OF SOCIAL SERVICES AND COMMERCE BUILDING (DSSCB)

HDPE WATER TANKS APPROVAL

SANPAN|PJSC PREASSEMBLING PLUMBING & SANITARY SYSTEM SOLUTION

SUSTAINABLE ADVANCED INSTALLATION TECHNIQUE FROM CONCEPT TO MANAGEMENT & OPERATION

TECHNICAL PRESENTATION - GENERAL

HALIM HANI

SANPAN PLUMBING {PROPOSED COMPANY} Tel: +971 50 4417129 - Tel: +971 2 6456 856 - Fax: +971 2 6457 567

- EMAIL: [email protected] - EMAIL: [email protected] P.O.BOX: 43944 - ABU DHABI - UNITED ARAB EMIRATES

Pag

e69

CC. REFERENCES PROJECTS & PRESENT OFFICIAL DOCUMENTATION

GEBERIT HDPE & SOVENT GEBERIT MAGAZINE -HDPE & SOVENT PROJECT ABU DHABI (PAGE 01) GEBERIT MAGAZINE -HDPE & SOVENT PROJECT ABU DHABI (PAGE 02) GEBERIT MAGAZINE -HDPE & SOVENT PROJECT ABU DHABI (PAGE 03) THE WORLD ECONOMIC FORUM – DAVOS THE DEPARTMENT OF ECONOMY OF ABU DHABI

INVITATION AUTOMATED PEOPLE MOVERS APM07 (AUSTRIA) 2007 LIST OF PROJECTS REFERENCE