halifax, 31 oct – 3 nov 2011ict accessibility for all asok chatterjee vice president, industry...

7
Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document No: GSC16-PLEN-64 Source: ATIS Contact: Asok Chatterjee, [email protected] GSC Session: PLENARY Agenda Item: 6.1

Upload: nora-boone

Post on 24-Dec-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Asok ChatterjeeVice President, Industry Relations,

Ericsson

ATIS Activities on IMT Standards

Document No:

GSC16-PLEN-64

Source: ATIS

Contact: Asok Chatterjee, [email protected]

GSC Session:

PLENARY

Agenda Item:

6.1

Page 2: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-64

Highlight of Current Activities (1)• ATIS interfaces with ITU-R directly as a Sector Member.• The primary ATIS committee addressing IMT is the

Wireless Technologies and Systems Committee (WTSC).• The Radio Interface activities for IMT are handled by the

RAN subcommittee of WTSC (WTSC-RAN).• Core Network activities for IMT are handled by the

G3GSN subcommittee of WTSC (WTSC-G3GSN).• ATIS WTSC continues to draft and review Change

Requests for submission to 3GPP.• ATIS transposes 3GPP specifications for three IMT-2000

and IMT-Advanced Radio interfaces in ITU-R Rec. M.1457 and ITU-T Rec. Q.1741:– CDMA-DS,– CDMA-TDD, and – TDMA-SC.

2

Page 3: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-64

Highlight of Current Activities (2)• A large number of the member companies of WTSC are

working on the IMT issues through 3GPP as well as through ATIS Sector Member input.

• ATIS, as a 3GPP Organizational Partner (OP), is an LTE-Advanced Transposing Organization and Global Core Specification (GCS) proponent in support of ITU-R M.[RSPEC].

• ATIS continues to discuss WP5D IMT activities, as well as WP5A activities on Broadband Wireless Access (which includes IMT technologies), and produce input contributions as a Sector Member.

• ATIS intends to participate in the development of the IMT.UPDATE report on the future growth of Broadband Wireless and its spectrum requirements.

3

Page 4: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-64

Next Steps/Actions

• ATIS will:– Continue to support the evolution of IMT-Advanced

technologies,– Transpose 3GPP specifications in support of ITU-R

IMT-2000 and IMT-Advanced (M.1457, M.[RSPEC]) and ITU-T (Q.1741) activities,

– Contribute to the development of the IMT Handbook in ITU-R WP5D and,

– Support development of PPDR Recommendations and Reports.

4

Page 5: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-64

Proposed Resolution

• No changes proposed to existing Resolution (GSC-15/1) at this time.

5

Page 6: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-64

Supplementary Slides

6

Page 7: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-64Recent Activities on IMT in ATIS (for IMT Task Force Report)

ATIS WTSC along with TIA TR-45.3 submitted the Meeting X notification and the Meeting X+1 Roadmap input for TDMA-SC toward M.1457-11 to ITU-R WP5D.

ATIS coordinated the Certification Form B input among the OPs for M.[IMT.RSPEC] and submitted to ITU-R WP5D on behalf of the GCS proponent

ATIS provided a coordination roll to the other 5 OPs for the input to WP5D, supplying templates and examples of the required input

ATIS as an LTE-Advanced Transposing Organization, submitted its transpositions along with Certification Form C for M.[IMT.RSPEC] to ITU-R WP5D.

ATIS submitted a clarification contribution concerning what is the GCS for LTE-Advanced which was accepted by WP5D.

ATIS submitted 3GPP request to add two additional specifications with a correction to a third to M.[IMT.RSPEC] for information and subsequently provided the specifications.

7