HALEU Production at the Savannah River Site (SRS)
Bill BatesSRNL, Deputy Associate Laboratory DirectorNuclear Materials Management
GAIN-EPRI-NEI HALEU WebinarApril 28-29, 2020
![Page 2: HALEU Production at the Savannah River Site (SRS) · SRNL and Savannah River Site Overview • Operated since mid -1950’s – SRNL and SRS have Integrated Fuel Cycle Management](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016209362f11c5ea4412e39/html5/thumbnails/2.jpg)
Keep going for information on SRNL family colors.
SRNL and Savannah River Site Overview• Operated since mid-1950’s
– SRNL and SRS have Integrated Fuel Cycle Management Capabilities
• Produced 301MT 4.95% LEU from 2003 to 2011 (TVA)– Recycling of HEU and LEU Spent Nuclear Fuel (SNF)– Flowsheets analyzed and validated at SRNL
• 2020 SNF Recycling Operations– High Flux Isotope Reactor (HFIR) Fuel– Material Test Reactor (MTR) Fuels– Liquid HEU Target Material
• Currently Storing HEU Solution (~2MT 19.75% eq) – Awaiting Decision on Next Steps
• Blend-down to 4.95% -OR-• Dump as Waste –OR-• Produce HALEU?
2
H-Canyon
![Page 3: HALEU Production at the Savannah River Site (SRS) · SRNL and Savannah River Site Overview • Operated since mid -1950’s – SRNL and SRS have Integrated Fuel Cycle Management](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016209362f11c5ea4412e39/html5/thumbnails/3.jpg)
• Spent Fuel Recycling:– Recovered U is Blended Down– Loaded into LR-230s (Type B)– Transported to Commercial Fuel Vendor– Vendor Fabricates Fuel for Commercial Power Generation
Low Enriched Uranium Production
3
![Page 4: HALEU Production at the Savannah River Site (SRS) · SRNL and Savannah River Site Overview • Operated since mid -1950’s – SRNL and SRS have Integrated Fuel Cycle Management](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016209362f11c5ea4412e39/html5/thumbnails/4.jpg)
Capability to Produce HALEU• ~2MT 19.75% HALEU (equiv.) in Tanks
– Uranyl Nitrate Solution• Significantly More Can be Produced
– DOE Aluminum Spent Fuel (SRS, INL)• ~19MT & 13MT eq. respectively
• Evaluated Advanced & Research Reactor Specifications– Can Meet ASTM-C1462-00 (2013) for Advanced Reactors– Additional Laboratory Validation and Demonstration in Progress
4
SRS L-BasinHigh Flux Isotope Reactor Fuel ElementMTR Research Reactor Fuel
![Page 5: HALEU Production at the Savannah River Site (SRS) · SRNL and Savannah River Site Overview • Operated since mid -1950’s – SRNL and SRS have Integrated Fuel Cycle Management](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016209362f11c5ea4412e39/html5/thumbnails/5.jpg)
Repurposing to Produce HALEU
• Scopes of Work – LR-230 Shipping Package License– Minor Flowsheet & Plant Modifications– NEPA – Record of Decision– Criticality & Safety Analysis– Natural Uranium (NU) Supply Contract– Staffing– Procedures & Training
• Decision Timing
• Could Produce ~2MT (19.75%) HALEU in Late FY22• Could Start Production ~1-1.5MT/yr in FY23• Could Produce HALEU to Specified Enrichment
5
LR-230 Trailer
![Page 6: HALEU Production at the Savannah River Site (SRS) · SRNL and Savannah River Site Overview • Operated since mid -1950’s – SRNL and SRS have Integrated Fuel Cycle Management](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016209362f11c5ea4412e39/html5/thumbnails/6.jpg)
SRS SNF Recycling Overview Continued
6
![Page 7: HALEU Production at the Savannah River Site (SRS) · SRNL and Savannah River Site Overview • Operated since mid -1950’s – SRNL and SRS have Integrated Fuel Cycle Management](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016209362f11c5ea4412e39/html5/thumbnails/7.jpg)
“70 Ton” Cask (used for Fuel Movement)
SNF Movement from Storage Basin to Recycling Facility
Cask Car in “Tunnel”
7
![Page 8: HALEU Production at the Savannah River Site (SRS) · SRNL and Savannah River Site Overview • Operated since mid -1950’s – SRNL and SRS have Integrated Fuel Cycle Management](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016209362f11c5ea4412e39/html5/thumbnails/8.jpg)
Research and Test Reactor SNF Recycling Capability
Overhead View of a typical Cell (half of Section shown)
8
Spent fuel bundle loading into Dissolver