hai · potable water system notes ... repair or replace any or all such work, ... the proposed...
TRANSCRIPT
H CH
AI
LIV
EN
O 1966
Oliv
enha
in R
oad
Mun
icip
al W
ater
Dis
tric
t
Enc
inita
s,C
A 9
2024
(76
0)75
3-64
66
N
OTES AN
D ABBREVIATIO
NS
2 G-2
ABBREVIATIONS
AC ASPHALT CONCRETE OR
ASBESTOS CEMENT
ACI AMERICAN CONCRETE
INSTITUTE
ACP ASBESTOS CEMENT PIPE
ANG ANGLE
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
APPROX APPROXIMATELY
ASTM AMERICAN SOCIETY OF
TESTING AND MATERIALS
AWWA AMERICAN WATER WORKS
ASSOCIATION
BC BEGIN CURVE
BG BELOW GRADE
BOW BACK OF WALL
BVC BEGIN VERTICAL CURVE
C, CATV CABLE TV
CA CONCRETE ANCHOR OR
CALIFORNIA
CBC CALIFORNIA BUILDING CODE
CI CAST IRON
CL CENTERLINE OR CLASS
CLR CLEAR OR CLEARANCE
CLSM CONTROLLED LOW STRENGTH
MATERIAL
CML CEMENT MORTAR LINED
COE CITY OF ENCINITAS
COMM COMMUNICATION
CONC CONCRETE
CONN CONNECT
CONT CONTINUOUS
CY CUBIC YARDS
DBL DOUBLE
DG DISINTEGRATED GRANITE
DI DRAIN INLET OR DUCTILE IRON
DIA DIAMETER
DR DIMENSION RATIO
DWG(S) DRAWING(S)
D/W DRIVEWAY
(E) EXISTING
E ELECTRIC, EAST OR EASTING
EA EACH
EAS EMULSION-AGGREGATE
SLURRY
EASMT EASEMENT
EC END CURVE
ELEV, EL ELEVATION
EVC END VERTICAL CURVE
EW EACH WAY
EX, EXIST EXISTING
FCA FLANGED COUPLING ADAPTER
FEB FLOW EQUALIZATION BASIN
FG FINISH GRADE
FL FLOW LINE
FLG FLANGE
FO FIBER OPTIC
FOW FRONT OF WALL
FS FINISHED SURFACE
FT (OR ') FOOT/FEET
G GAS
GA GAUGE
GB GRADE BREAK
GP GUARD POST
GV GATE VALVE
H, HORIZ HORIZONTAL
HDC HIGH DEFLECTION COUPLING
HGL HYDRAULIC GRADE LINE
HP HIGH POINT, HIGH PRESSURE,
OR HORSE POWER
HWL HIGH WATER LEVEL
IE, INV INVERT ELEVATION
IN (OR ") INCH
IRR IRRIGATION
L LENGTH
LB POUNDS
LF LINEAR FOOT
LWL LOW WATER LEVEL
MAX MAXIMUM
MFR MANUFACTURER
MIN MINIMUM
(N) NEW
N NORTH OR NORTHING
NTS NOT TO SCALE
NO NUMBER
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OMWD OLIVENHAIN MUNICIPAL
WATER DISTRICT
OR OFFICIAL RECORD
OSHA OCCUPATIONAL SAFETY &
HEALTH ADMINISTRATION
PB PULL BOX
PED PEDESTAL
PP POWER POLE
PSI POUNDS PER SQUARE INCH
PT POINT
PUE PUBLIC UTILITY EASEMENT
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL
INTERSECTION
PW POTABLE WATER
R RADIUS
R/W RIGHT OF WAY
RCP REINFORCED CONCRETE PIPE
REINF REINFORCED/REINFORCEMENT
REQD REQUIRED
RG ROUGH GRADING
ROS RECORD OF SURVEY
RPBP REDUCED PRESSURE
BACKFLOW PREVENTER
RW RECYCLED WATER
S SLOPE OR SOUTH
SCH SCHEDULE
SD STORM DRAIN
SDRSD SAN DIEGO REGIONAL
STANDARD DRAWINGS
SF SQUARE FEET
SHT SHEET
SPECS SPECIFICATIONS
SQ SQUARE
SS, SST STAINLESS STEEL
SSPWC STANDARD SPECIFICATIONS
FOR PUBLIC WORKS
CONSTRUCTION
ST STREET
STA STATION
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
SWPPP STORM WATER POLLUTION
PREVENTION PLAN
t THICKNESS
T TELEPHONE
T&B TOP AND BOTTOM
TB THRUST BLOCK
TBD TO BE DETERMINED
TC TOP OF CURB
TEMP TEMPORARY
TG TOP OF GRATING
THK THICK
TP TOP OF PAVEMENT
TSL THICKENED SLUDGE
TYP TYPICAL
UG UNDERGROUND
UNK UNKNOWN
UNO UNLESS NOTED OTHERWISE
V, VERT VERTICAL
W WEST OR WIDTH
W, WTR WATER
W/ WITH
W/O WITHOUT
WM WATER METER
WO WORK ORDER
WWM WELDED WIRE MESH
& AND
± PLUS OR MINUS
WORK TO BE DONE
THE WORK INCLUDES BUT IS NOT NECESSARILY LIMITED TO THE FOLLOWING:
INSTALLATION OF ONE NEW PREFABRICATED PRESSURE REDUCING STATION AND
APPURTENANCES INCLUSIVE OF GEOTEXTILE PLACEMENT, CONSTRUCTION OF A
CONCRETE PAD, AND PLACEMENT AND COMPACTION OF BACKFILL; DEMOLITION
OF THE EXISTING PRESSURE REDUCING STATION; PROCUREMENT AND
INSTALLATION OF NEW 10-INCH PIPE TOGETHER WITH ALL RESTRAINTS, THRUST
BLOCKS, VALVES, APPURTENANCES, AND CONNECTIONS TO THE EXISTING
SYSTEMS; REMOVAL AND DISPOSAL OF PORTIONS OF ASBESTOS CEMENT PIPE;
REPLACEMENT OF DAMAGED TRAFFIC CONTROL LOOPS, PAVEMENT, STRIPING,
AND MARKINGS; DEWATERING; TRAFFIC CONTROL; AND ALL INCIDENTAL WORK
NECESSARY TO CONSTRUCT THE WORK IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
SPECIFICATIONS AND DRAWINGS
IN ORDER OF PRECEDENCE:
1. CONTRACT DRAWINGS
2. CONTRACT SPECIFICATIONS
3. OLIVENHAIN MUNICIPAL WATER DISTRICT STANDARD SPECIFICATIONS AND
DRAWINGS FOR THE CONSTRUCTION OF WATER MAINS AND FACILITIES
(LATEST EDITION). REVISIONS THERETO, AS CONTAINED IN THESE
PROJECT SPECIFIC DRAWINGS AND SPECIFICATIONS, SHALL TAKE
PRECEDENCE OVER THE STANDARD SPECIFICATIONS AND DRAWINGS.
4. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (LATEST
EDITION).
5. CITY OF CARLSBAD, ENGINEERING STANDARDS, VOLUME 3, DRAWINGS
AND SPECIFICATIONS
6. SAN DIEGO REGIONAL STANDARD DRAWINGS (LATEST EDITION).
POTABLE WATER SYSTEM NOTES
1. POTABLE WATER WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
DETAILS AND MATERIALS AS SPECIFIED IN THE MOST RECENT EDITION OF THE
OLIVENHAIN MUNICIPAL WATER DISTRICT (DISTRICT) STANDARD
SPECIFICATIONS AND DRAWINGS FOR THE CONSTRUCTION OF WATER MAINS
AND FACILITIES, INCLUDING ALL AMENDMENTS ADOPTED PRIOR TO THE
DISTRICT APPROVAL DATE ON THESE PLANS. CONTRACTOR SHALL HAVE A COPY
OF THE STANDARD SPECIFICATIONS ON THE JOB SITE AT ALL TIMES.
2. THE SUBMISSION AND REVIEW OF ALL SUBMITTALS AS REQUIRED BY THE
STANDARD SPECIFICATIONS ARE TO BE ACCOMPLISHED PRIOR TO THE
PRE-CONSTRUCTION MEETING WITH THE DISTRICT'S INSPECTOR.
3. UNLESS OTHERWISE NOTED, CONNECTIONS TO EXISTING MAINS SHALL BE MADE
DRY. THE TIME AND DURATION OF ANY SHUTDOWNS OF EXISTING MAINS SHALL
BE SUBJECT TO APPROVAL BY THE DISTRICT. DISTRICT SHALL BE NOTIFIED TWO
WEEKS MINIMUM IN ADVANCE OF ANY SHUTDOWN.
4. THE CONTRACTOR SHALL COORDINATE WITH DISTRICT ALL ARRANGEMENTS FOR
HIGH-LINING TEMPORARY SERVICES PRIOR TO SHUTDOWNS. NO SHUTDOWNS
WILL BE SCHEDULED ON A MONDAY OR FRIDAY.
5. CONTRACTOR SHALL REVIEW ALL PROPOSED TRENCH WORK WITH CAL/OSHA. A
COPY OF EXEMPTION LETTER OR TRENCHING PERMIT, IF REQUIRED, SHALL BE
SUBMITTED TO THE DISTRICT PRIOR TO CONSTRUCTION.
6. NO WORK MAY BEGIN OR PROCEED WITHOUT DIRECTION OF DISTRICT'S
INSPECTOR. CONTRACTOR SHALL NOTIFY THE DISTRICT INSPECTIONS
DEPARTMENT 48 HOURS PRIOR TO THE BEGINNING OF WORK TO ARRANGE FOR
INSPECTION OF THE PROJECT.
7. THE CONTRACTOR MUST CALL "DIG ALERT OF SOUTHERN CALIFORNIA" TO HAVE
UNDERGROUND SERVICE UTILITIES LOCATED PRIOR TO CONSTRUCTION. THIS
CALL WILL BE MADE AT LEAST 48 HOURS IN ADVANCE PRIOR TO ANY WORK
BEING PERFORMED IN PUBLIC RIGHT-OF-WAY. (DIG ALERT PHONE:
800-227-2600).
8. ALL EXISTING FACILITIES WHICH MAY AFFECT PROJECT CONSTRUCTION, I.E.,
LINE CROSSINGS, LINE PARALLELING, OR PROPOSED CONNECTIONS SHALL BE
FIELD VERIFIED BEFORE ANY CONSTRUCTION BEGINS.
9. THE CONTRACTOR SHALL FURNISH AND INSTALL PER THE STANDARD
SPECIFICATIONS THE APPROPRIATE BURIED UTILITY WARNING AND
IDENTIFICATION TAPE ABOVE ALL PUBLIC WATER LINES INCLUDING WATER
LATERALS LOCATED IN PUBLIC RIGHT-OF-WAY.
10. WHERE ELEVATIONS AND GRADES ARE NOT SHOWN ON THE WATER MAIN
PROFILE, TOP OF PIPE PROFILE IS 48-INCHES BELOW CENTERLINE OF FINISH
GRADE OF STREET.
11. ALL DEFLECTIONS (HORIZONTAL AND VERTICAL) SHALL BE MADE BY USE OF
JOINT COUPLINGS WITH 4° MAXIMUM DEFLECTION PER COUPLING (2° PER
JOINT). NO BENDING (CURVING) OF PIPE SHALL BE PERMITTED.
12. MANUAL AIR RELEASES SHALL BE INSTALLED AT ALL HIGH POINTS AND
BLOW-OFFS AT ALL LOW POINTS IN THE WATER MAIN PROFILE. PLACE MANUAL
AIR RELEASES AND BLOW-OFFS WITHIN METER BOX AND LOCATE BEHIND CURB
UNLESS OTHERWISE APPROVED BY DISTRICT’S REPRESENTATIVE. FIRE
HYDRANTS MAY BE USED IN LIEU OF A MANUAL AIR RELEASE OR BLOW-OFF
WHEN LOCATED AT OR NEAR HIGH OR LOW POINTS, AS APPROVED BY THE
DISTRICT’S REPRESENTATIVE.
13. INSTALL A MINIMUM 1-INCH WATER SERVICE TO EACH LOT. METER TO BE
LOCATED 5-FEET FROM A SIDE LOT LINE. A 3/4-INCH HIGH LETTER "W" SHALL BE
CHISELED IN TOP OF EXISTING CURB OR IMPRINTED IN NEW CURB AT ALL
WATER SERVICE CROSSINGS.
14. METER BOXES SHALL NOT BE PLACED WITHIN DRIVEWAYS OR SIDEWALKS
WITHOUT THE DISTRICT’S PRIOR WRITTEN CONSENT.
15. ALL WATER SERVICES FOR IRRIGATION, MULTIPLE RESIDENTIAL COMPLEXES,
COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL HAVE APPROVED BACKFLOW
PREVENTION DEVICE ON CUSTOMER'S SIDE OF WATER METER.
16. CONTRACTOR SHALL TIE OFF ALL VALVE LOCATIONS AND PROVIDE WRITTEN
DIMENSIONS TO INSPECTOR IMMEDIATELY UPON INSTALLATION OF VALVES.
17. LINE VALVES, WHERE REQUIRED AT STREET INTERSECTIONS SHALL BE LOCATED
AT THE TEE WHENEVER POSSIBLE.
18. FIRE HYDRANTS, AS APPROVED BY THE APPROPRIATE FIRE DISTRICT AND
MEETING THE DISTRICT’S STANDARD SPECIFICATIONS, ARE TO BE INSTALLED AT
LOCATIONS SPECIFIED BY THE FIRE DISTRICT.
19. ALL DESIGN CHANGES TO THE WATER SYSTEM SHALL BE APPROVED BY THE
DISTRICT REPRESENTATIVE IN WRITING PRIOR TO CONSTRUCTION AND
ACCEPTANCE OF THE CHANGE.
20. THE WATER SYSTEM SHALL BE PRESSURE TESTED IN ACCORDANCE WITH THE
PROCEDURES IN THE OMWD STANDARD SPECIFICATIONS. THE CLASS OF PIPE
SHALL BE USED AS THE DESIGNATED WORKING PRESSURE FOR TESTING ALL
PIPE, VALVES (CLOSED) AND APPURTENANCES.
21. PIPELINES AND APPURTENANCES SHALL BE DISINFECTED IN ACCORDANCE WITH
SECTION 15041 OF THE OMWD STANDARD SPECIFICATIONS PRIOR TO TIE-IN OR
CONNECTION TO EXISTING SYSTEM FACILITIES. BACTERIOLOGIC QUALITY TEST
RESULTS SHALL CONFORM TO THE CRITERIA SPECIFIED IN THAT SPECIFICATION.
22. CONTRACT RECORD DRAWINGS MUST BE SUBMITTED PRIOR TO FINAL
ACCEPTANCE OF WORK. THE PLANS MUST PROVIDE POST CONSTRUCTION
VERIFICATION OF THE LOCATION AND ELEVATION OF PIPES AND
APPURTENANCES.
23. CONTRACTOR SHALL GUARANTEE ALL WORK FOR A PERIOD OF ONE (1) YEAR
AFTER THE DATE OF ACCEPTANCE FOR THE PROJECT. CONTRACTOR SHALL
REPAIR OR REPLACE ANY OR ALL SUCH WORK, TOGETHER WITH ANY OTHER
WORK WHICH MAY BE DISPLACED IN SO DOING THAT MAY PROVE DEFECTIVE IN
WORKMANSHIP AND/OR MATERIALS WITHIN THE ONE-YEAR PERIOD FROM THE
DATE OF ACCEPTANCE WITHOUT EXPENSE WHATSOEVER TO THE DISTRICT,
ORDINARY WEAR AND TEAR, UNUSUAL ABUSE OR NEGLECT EXCEPTED.
24. ALL IRRIGATION METERS SHALL BE SERVED WITH RECYCLED WATER UNLESS
PREVIOUSLY APPROVED IN WRITING BY THE DISTRICT.
25. ALL BURIED FITTINGS AND VALVES SHALL BE WAX TAPE WRAPPED IN
ACCORDANCE WITH OMWD STANDARD SPECIFICATIONS.
GENERAL NOTES
1. ALL EXISTING UTILITIES INDICATED ON THE DRAWINGS ARE SHOWN DIAGRAMMATICALLY AND
APPROXIMATELY AND ARE BASED ON AS-BUILT DRAWINGS AND THE ORIGINAL CONSTRUCTION
DRAWINGS. THE CONTRACTOR SHALL POTHOLE ALL CROSSING UTILITIES AND PARALLEL UTILITIES
THAT ARE LOCATED WITHIN 5 FEET OF THE PROPOSED PIPE ALIGNMENT AND VERIFY THE SIZE,
MATERIAL, HORIZONTAL & VERTICAL LOCATION, BEARING, AND INCLINATION OF ALL EXISTING
UTILITIES PRIOR TO ANY DEMOLITION WORK OR INSTALLATION OF NEW WORK. CONDUCT
POTHOLING ACTIVITIES AFTER ALIGNMENT STAKING AND PRIOR TO SAW CUTTING OF PAVEMENTS.
THE CONTRACTOR SHALL SCHEDULE THE WORK TO INCLUDE A PERIOD OF TEN WORKING DAYS FOR
DESIGN REVISIONS, AT NO ADDITIONAL COST TO THE DISTRICT, IN LOCATIONS WHERE ADVANCE
POTHOLING IS SPECIFICALLY NOTED ON THE DRAWINGS AND UTILITY CONFLICTS ARE DISCOVERED
DURING THE COURSE OF POTHOLING. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY
MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES AT THE WORK SITE.
2. THE CONTRACTOR SHALL FIELD VERIFY THE DEPTHS OF EXISTING SEWER MAINS THAT CROSS
UNDER, AND WITHIN 3 FEET OF, THE PROPOSED PIPELINE BY MEASURING THE DEPTH TO INVERT OF
EACH NEAREST MANHOLE LOCATED ON EITHER SIDE OF THE PROPOSED PIPELINE.
3. THE CONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL SAFETY DEVICES, INCLUDING
SHORING, AND SHALL BE RESPONSIBLE FOR COMPLIANCE WITH ALL LOCAL, STATE, AND FEDERAL
SAFETY AND HEALTH STANDARDS, LAWS, AND REGULATIONS. THE CONTRACTOR SHALL ASSUME
SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL
APPLY CONTINUOUSLY AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS.
4. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES THAT CROSS OR PARALLEL THE PROPOSED
WORK IN ACCORDANCE WITH THE STANDARDS OF THE UTILITY OWNER, THE DISTRICT, OR THE
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION. THE METHOD OF UTILITY SUPPORT OR
PROTECTION SHALL BE APPROVED BY THE DISTRICT. THE MINIMUM VERTICAL SEPARATION
BETWEEN CROSSING UTILITIES SHALL BE 1 FOOT UNLESS OTHERWISE APPROVED BY THE DISTRICT.
5. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES REQUIRED TO PROTECT ADJACENT
PROPERTIES AND IMPROVEMENTS DURING ALL PROJECT OPERATIONS. DAMAGED OR DESTROYED
ITEMS SHALL BE REPAIRED OR REPLACED TO THE CONDITION EXISTING PRIOR TO WORK BY THE
CONTRACTOR AT NO COST TO THE DISTRICT.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY MONUMENTATION AND/OR BENCHMARKS
WHICH WILL BE DISTURBED OR DESTROYED BY CONSTRUCTION. SUCH POINTS SHALL BE
REFERENCED AND REPLACED WITH APPROPRIATE MONUMENTATION BY A LICENSED LAND
SURVEYOR OR A REGISTERED CIVIL ENGINEER AUTHORIZED TO PRACTICE LAND SURVEYING. A
CORNER RECORD OR RECORD OF SURVEY, AS APPROPRIATE, SHALL BE FILED BY THE LICENSED
LAND SURVEYOR OR REGISTERED CIVIL ENGINEER AS REQUIRED BY THE LAND SURVEYOR'S ACT.
THE CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY MONUMENTS THAT ARE LOCATED WITHIN
10 FEET OF THE CENTERLINE OF CONSTRUCTION BY COVERING THE MONUMENTS WITH 1-INCH
THICK STEEL PLATE DURING EXCAVATION AND BACKFILL OPERATIONS OR SHALL EMPLOY
ALTERNATIVE PROTECTION MEASURES NECESSARY TO AVOIR DISTURBANCE OR DAMAGE TO THE
MONUMENTS. ALTERNATIVE PROTECTION MEASURES SHALL BE SUBMITTED FOR DISTRICT REVIEW
AND APPROVAL IN ACCORDANCE WITH SECTION 01300.
7. THESE DOCUMENTS HAVE BEEN PREPARED FOR A SPECIFIC PROJECT AND SHALL NEITHER BE
ALTERED NOR REUSED FOR ANY OTHER PURPOSE. ALSO, THESE DOCUMENTS DO NOT REPRESENT
AS-BUILT CONDITIONS. IF THESE DOCUMENTS ARE ALTERED INTENTIONALLY OR
UNINTENTIONALLY, OR REUSED WITHOUT THE DESIGN ENGINEER'S WRITTEN APPROVAL, IT WILL BE
AT THE SOLE RISK AND RESPONSIBILITY OF THE USER. THE ACT OF ALTERING OR REUSING IS
CONSTRUED AS INDEMNIFYING AND HOLDING THE DESIGN ENGINEERING FIRM AND ITS
EMPLOYEES HARMLESS FROM ALL CLAIMS, DAMAGES, AND EXPENSES, INCLUDING ATTORNEY FEES,
ARISING OUT OF SUCH ACT.
8. CONTRACTOR SHALL COORDINATE THEIR CONSTRUCTION STAGING AREAS WITH THE DISTRICT
PRIOR TO MOBILIZATION.
9. WORK HOURS SHALL BE BETWEEN THE HOURS OF 7:00 AM TO 5:00 PM, MONDAY THROUGH FRIDAY.
NO WORK OF ANY KIND, INCLUDING WARMING UP OR MOVEMENT OF EQUIPMENT IS PERMITTED
OUTSIDE THESE HOURS OF OPERATION.
10. THE CONTRACTOR SHALL FURNISH TO THE ENGINEER OF WORK AS-BUILT PLANS FOR ALL NEW
IMPROVEMENTS SHOWN ON THESE PLANS.
11. FINISH GRADE OF NEW CONCRETE PAVING SHALL CONFORM TO EXISTING SITE GRADES OR AS
SHOWN ON THESE DRAWINGS AS DIRECTED BY THE ENGINEER. STRAIGHT GRADES SHALL BE
MAINTAINED BETWEEN FINISH ELEVATIONS AS SHOWN.
12. ALL SURPLUS EXCAVATED SOIL AND DEBRIS SHALL BE LEGALLY DISPOSED OFF SITE. ALL COSTS
FOR TRANSPORTATION AND DISPOSAL SHALL BE INCLUDED IN THEIR APPURTENANT ITEMS OF
WORK. ESTIMATED QUANTITIES FOR EARTHWORK AND IMPORTED MATERIALS ARE APPROXIMATE
AND CONTRACTOR SHALL DEVELOP HIS/HER OWN ESTIMATES FOR BIDDING PURPOSES.
13. IF ASBESTOS CEMENT PIPE MUST BE CUT AND HANDLED IN THE FIELD TO ACCOMPLISH THE WORK,
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR AND SHALL TAKE ALL APPROPRIATE PRECAUTIONS
FOR PROTECTING AGAINST THREATS TO HEALTH AND SAFETY OF THE WORK FORCE AND GENERAL
PUBLIC ARISING OUT OF CONSTRUCTION INVOLVING ASBESTOS. THE CONTRACTOR SHALL COMPLY
WITH ALL APPLICABLE REGULATIONS FOR THE HANDLING, CUTTING, SHAPING, INSTALLATION AND
DISPOSAL OF ASBESTOS. ASBESTOS CEMENT PIPE TO BE DISPOSED SHALL BE PROPERLY
MANIFESTED, PREPARED FOR TRANSPORT FOLLOWING CRITERIA OF COUNTY OF SAN DIEGO
DEPARTMENT OF PUBLIC WORKS, SOLID WASTE DIVISION, AND DELIVERED TO A LANDFILL
PERMITTED FOR DISPOSAL OF NON-FRIABLE ASBESTOS CONTAINING MATERIALS. THE COMPLETED
GENERATOR COPY (YELLOW) MANIFEST SHALL BE RETURNED TO THE DISTRICT'S REPRESENTATIVE.
ALL COSTS FOR HANDLING AND DISPOSAL OF THE AC PIPE SHALL BE INCLUDED IN THE
CONTRACTOR'S BID.
14. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE DISTRICT AND HOCH CONSULTING,
ITS EMPLOYEES, OFFICERS, OR AGENTS HARMLESS AGAINST ANY AND ALL CLAIMS BY ANY PARTIES
ARISING FROM, OR RELATED TO, ANY AND ALL DAMAGES, INCLUDING LEGAL COSTS AND
ATTORNEY'S FEES, RESULTING FROM INTERFERENCE WITH, INTERRUPTION OF, DAMAGE TO, OR ANY
AND ALL INJURIES WHICH RESULT FROM DAMAGE CAUSED TO SUBSURFACE INSTALLATION, WHICH
IS UNFORESEEN AND DESPITE ENGINEER'S EFFORT DURING THE DESIGN PROCESS WAS NOT
LOCATED, EXCEPTING ONLY THE GROSS NEGLIGENCE OR WILLFUL MISCONDUCT OF THE ENGINEER
IN PROVIDING ITS SERVICES.
15. THE CONTRACTOR SHALL RESTORE TRAFFIC DETECTION LOOPS TO PRECONSTRUCTION
FUNCTIONALITY. TRAFFIC DETECTION LOOPS SHALL BE DESIGNED IN ACCORDANCE WITH THE
FEDERAL HIGHWAY ADMINISTRATION'S TRAFFIC DETECTOR HANDBOOK: THIRD EDITION-VOLUME 1,
CHAPTER 4 (PUBLICATION NUMBER FHWA-HRT-06-108).
16. MANUFACTURER WILL DELIVER PRESSURE REDUCING STATION TO THE SITE. CONTRACTOR IS
RESPONSIBLE FOR UNLOADING PRESSURE REDUCING STATION OFF DELIVERY TRUCK AND
PROVIDING STORAGE ON SITE.
17. PRESSURE REDUCING STATION MANUFACTURER WILL PERFORM ALL EQUIPMENT TESTING.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION TESTING WITH MANUFACTURER.
H CH
AI
LIV
EN
O 1966
Oliv
enha
in R
oad
Mun
icip
al W
ater
Dis
tric
t
Enc
inita
s,C
A 9
2024
(76
0)75
3-64
66
S
S
S
S
S
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
S
S
D
S
D
S
D
G
A
S
G
A
S
G
A
S
G
A
S
E
E
E
E
E
E
E
E
E
E
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
E
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
P
W
20
SITE M
AP/D
EM
O PLAN
3 G-3
MAJOR ITEMS OF WORK
21
22
23
24
N
SCALE: 1" = 20'
20'10'0
SITE MAP
21
INSTALL NEW PRESSURE REDUCING STATION
CONSTRUCT 10" PVC PIPE
TIE-IN TO EXISTING 12" POTABLE WATER LINE
25
TIE-IN TO EXISTING 8" POTABLE WATER LINE
22
22
23
25
BASIS OF BEARINGS:
THE BASIS OF BEARING FOR THIS SURVEY IS THE CALIFORNIA COORDINATE SYSTEM, NAD 83 (CCS83)
[EPOCH 1991.35], ZONE 6, AS DETERMINED LOCALLY BY A LINE BETWEEN FIRST ORDER CONTROL
STATIONS 20 AND 10 BEING A GRID BEARING OF N68°24'24"W AS DERIVED FROM GEODETIC VALUES
SHOWN ON RECORD OF SURVEY 17271 (CITY OF CARLSBAD SURVEY CONTROL), FILED ON FEBRUARY 08,
2002 AS FILE NUMBER 2002-0112862 IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY.
BENCHMARK:
THE BENCHMARK FOR THIS SURVEY IS THE CITY OF CARLSBAD SURVEY CONTROL POINT #20, AS SHOWN
ON RECORD OF SURVEY 17271. AN ALUMINUM CAP STAMPED "CLSB-020 L.S. 6215", 200-FEET WEST OF
ROMERIA STREET AND 40-FEET SOUTHERLY FROM THE CENTERLINE OF LA COSTA AVENUE.
ELEVATION = 104.25' NGVD 29
DEMOLISH (E) PRESSURE REDUCING STATION
24
NOTES
1. AFTER DEMOLITION OF EXISTING VAULT THE CONTRACTOR SHALL BACKFILL AND PAVE TO MATCH EXISTING. BACKFILL WITH CLSM TO 1' ABOVE TOP OF
EXISTING 10" AC PIPE, REMAINING BACKFILL PER SPECIFICATION SECTION 02223 AND PAVEMENT PER CITY OF CARLSBAD STD DWG GS-26.
2. THE CONTRACTOR SHALL CONSTRUCT THRUST BLOCKS AND INSTALL END CAPS TO EXISTING AC PIPE PER DETAIL 3 ON SHEET C-2.
DEMO PLAN
1 8" STL PIPE REMOVE/DISPOSE
2 10" X 8" STL REDUCER REMOVE/DISPOSE
3 10" CAST IRON FLG X AC ADAPTER REMOVE/DISPOSE
4 4" RADIUS ELBOW REMOVE/DISPOSE
5 4" GATE VALVE REMOVE/DISPOSE
6 8" GATE VALVE REMOVE/DISPOSE
7 4" GATE VALVE REMOVE/DISPOSE
8 8" GATE VALVE REMOVE/DISPOSE
9 4" PRESSURE REGULATING VALVE SALVAGE/RETURN TO OMWD
10 8" PRESSURE REGULATING VALVE SALVAGE/RETURN TO OMWD
11 4" ORIFICE PLATE REMOVE/DISPOSE
12 FLOW INDICATOR REMOVE/DISPOSE
13 MANHOLE FRAME AND COVER REMOVE/DISPOSE
14 PIPE SUPPORT REMOVE/DISPOSE
15 6" PIPE AND HOOD REMOVE/DISPOSE
16 6" PIPE REMOVE/DISPOSE
17 PRECAST VAULT ABANDON IN PLACE
18 LADDER REMOVE/DISPOSE
19 COUPLING AND HARNESS REMOVE/DISPOSE
20 10" AC PIPE PROTECT IN PLACE
DEMOLITION NOTES
3
20
17
12
5
4
9
19
11
7
4
3
20
2
1
8
1
10
18
6
1
2
16
15
13
13
20
3
14
3
3
C-2
180
190
200
180
190
200
1+00 1+50 2+00 2+50 3+00
STA =
1+
34.66
45° H
OR
IZ
B
EN
D
IN
V E
L =
184.49
STA =
1+
30.23
45° H
OR
IZ
B
EN
D
IN
V E
L =
184.49
STA =
1+
02.50
45° V
ER
T B
EN
D
IN
V E
L =
190.22
STA =
2+
18.14
GRAD
E BREAK
IN
V EL =
185.06
STA =
1+
08.22
45° V
ER
T B
EN
D
90° H
OR
IZ
B
EN
D
IN
V E
L =
184.49
ST
A 2+
91±
187.25'± E
L
BO
P
EX
6'' A
C W
ST
A 2+
18±
186.71'± E
L
BO
P
EX
E
LE
C
ST
A 2+
25±
187.73'± E
L
BO
P
EX
C
OM
M
ST
A 2+
53±
187.58'± E
L
BO
P
EX
12'' A
C W
EX
F
O
EX 8'' S
STA 2+82±
182.84'± EL TOP
ST
A 2+
57±
187.83'± E
L
BO
P
EX
F
O
ST
A 2+
42±
187.47'± E
L
BO
P
EX
4'' G
ST
A 1+
00
190.33'± E
L
BO
P
EX
8'' A
C W
ST
A 2+
76±
188.36'± E
L
BO
P
S
=
1
.
0
8
9
2
S = 0.0068
S
=
0
.
0
3
4
3
10" RSG
V M
J x M
J
STA =
2+
50.00
IN
V EL =
186.14
S
=
0
.
0
3
2
7
W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8''
S
S
S
S
S
S
S
S
S
S
S
S
S
GG
GG
GG
GG
G
COMM
COMM
COMM
E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
CO
MM
CO
MM
CO
MM
CO
MM
FO
FO
FO
FO
FO
FO
FO
G
G
G
G
G
G
G
G
G
G G G G G G G G G G G G G G G G
E
E
E
E
E
E
E
EE
EE
E
E
FO
FO
FO
FO
FO
FO
FO
SD
42''
SD
42''
SD
42''
SD
42''
SD
42''
SD
42''
SD
42''
W10''
W10''
W12''
W12''
W12''
W12''
W12''
W
1
0
'
'
W8''
W8''
W8''
W
E
E
LA
C
OS
TA
A
VE
.
CADENCIA ST.
2+00
L2
L1
L
4
L3
L5
NOTES
1. TRENCH PIPE ZONE AND BACKFILL PER OMWD STD DWG NO. E-2.1.
2. TRENCH RESURFACING PER CITY OF CARLSBAD STANDARD DRAWING GS-25
FOR TRENCHES LESS THAN 25" WIDE OR CITY OF CARLSBAD STANDARD
DRAWING GS-26 FORT TRENCHES WIDER THAN 25".
3. SAWCUT EXISTING CURB & GUTTER. REMOVE & REPLACE PORTION
DISTURBED BY CONSTRUCTION.
4. REMOVE SIDEWALK TO NEAREST JOINT SDRSD G-11. REPLACE WITH 4" PCC
SIDEWALK PER SDRSD G-3, G-7, G-9, G-10.
5. PROTECT IN PLACE EXIST SIGNS & LIGHTS.
6. PROTECT ALL UTILITIES TO REMAIN IN PLACE, AND SHALL SUPPORT ALL
UTILITIES ACROSS TRENCHES.
7. THE CONTRACTOR SHALL NOTIFY SDG&E; CROWN CASTLE; AND AT&T PRIOR
TO STARTING WORK NEAR COMPANY FACILITIES AND SHALL COORDINATE
WORK WITH COMPANY REPRESENTATIVES. FOR LOCATION OF ELECTRIC
CABLE, GAS PIPING AND TELEPHONE CABLES AND APPURTENANCES, CONTACT
UNDERGROUND SERVICE ALERT: 1 800-422-4133, 48 HOURS PRIOR TO START
OF CONSTRUCTION.
8. ELEVATIONS SHOWN ON THE PROFILE FOR THE EXISTING UTILITIES ARE
BASED ON RESEARCH OF THE AVAILABLE RECORDED INFORMATION ONLY AND
ARE SOLELY FOR THE CONTRACTOR'S CONVENIENCE. THE DISTRICT DOES
NOT GUARANTEE THAT IT HAS REVIEWED ALL AVAILABLE DATA. PRIOR TO
EXCAVATION, CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES EITHER
SHOWN ON THE PLANS OR MARKED IN THE FIELD.
9. CONTRACTOR SHALL POTHOLE ALL UTILITY CROSSINGS PRIOR TO ANY
EXCAVATION. POTHOLING RESULTS TO BE SUBMITTED TO ENGINEER FOR
REVIEW. ANY DISCREPANCIES WITH DESIGN DRAWINGS SHALL BE
SUBMITTED TO THE ENGINEER A MINIMUM OF ONE WEEK PRIOR TO
CONSTRUCTION.
10. THE CONTRACTOR IS REQUIRED TO TAKE PRECAUTIONARY MEASURES TO
PROTECT THE UTILITY LINES SHOWN HEREON AND ANY OTHER EXISTING
LINES NOT OF RECORD OR NOT SHOWN ON THESE PLANS.
11. THE CONTRACTOR SHALL RESTORE TRAFFIC DETECTION LOOPS TO
PRECONSTRUCTION FUNCTIONALITY. TRAFFIC DETECTION LOOPS SHALL BE
DESIGNED IN ACCORDANCE WITH THE FEDERAL HIGHWAY
ADMINISTRATION'S TRAFFIC DETECTOR HANDBOOK: THIRD EDITION-VOLUME
1 CHAPTER 4 (PUBLIC NUMBER FHWA-HRT-06-108) AND CITY OF CARLSBAD
STANDARDS.
12. CONTRACTOR SHALL REMOVE INTERFERING CROSS GUTTER TO NEAREST
JOINT AND REPLACE IN-KIND.
No.
O
Exp.
O
D
E
A
T
S
T
IG
RE
E
R
S
T
E
R
P
O
FI
C
FA
L
V
I
C
L
I
R
I
A
N
06-30-17
C77635
EE
R
N
G
I
N
E
A
SS
F
E
N
OI
L
H
N.
O
H
C
D
A
A
M
H CH
AI
LIV
EN
O 1966
Oliv
enha
in R
oad
Mun
icip
al W
ater
Dis
tric
t
Enc
inita
s,C
A 9
2024
(76
0)75
3-64
66
CONSTRUCT 166.03 LF OF 10" PVC, C-900, DR-14 PIPE, HGL = 582'
CONSTRUCT 13.22 LF
OF 10" PVC C-900,
DR-18 PIPE,
HGL=437'
CAD
EN
CIA ST. 10" PVC PIPELIN
E
PLAN
AN
D PRO
FILE
4 C-1
1' CLEAR
2
C-2
1
C-2
SCALE
1" = 10' HORIZ.
1" = 2' VERT.
EX PAVEMENT
PRESSURE REDUCING STATION - SEE
SPECIFICATIONS APPENDIX 1
2° DEFLECTION
FROM MJ JOINT
10" MJ X MJ RSGV
8" RSGV
N
0' 10' 20'
CONSTRUCT4' x 4' CONCRETE PAD
PER OMWD STD. DWG. C-1.1
CENTERED AROUND HYDRANT
CONSTRUCT TYPE A
GRAVITY RETAINING
WALL PER SDRSD C-09
4
C-3
EX CROSS
GUTTER
SEE NOTE 11 SEE NOTE 12
2° DEFLECTION
FROM MJ JOINT
(BOTH SIDES)
PIPE TABLE
LINE # BEARING DISTANCE DIAMETER MATERIAL
L1 S39°50'11"E 8.22' 10" PVC
L2 N50°09'21"E 5.00' 10" PVC
L3 N50°09'51"E 5.00' 10" PVC
L4 N05°08'54"E 4.43' 10" PVC
L5 N50°09'49"E 156.66' 10" PVC
10" DI MJ X MJ 90°
FITTING
ROTATE VERT 45°
PI STA = 1+08.22
N = 1976294.66
E = 6258538.56
10" DI MJ X MJ
45° FITTING
PI STA = 1+30.22
N = 1976308.75
E = 6258555.45
BEGIN ALIGNMENT
CONNECT TO EX 8" ACP
STA = 1+00.00
N = 1976300.97
E = 6258533.29
10" DI MJ X MJ 45°
FITTING
PI STA = 1+34.65
N = 1976313.17
E = 6258555.85
10" PVC C-900, DR-14 PIPE
10" PVC C-900,
DR-18 PIPE
EX 8" AC W
EX 6" AC W
EX ELEC
EX 4" G
EX 6" AC W
EX FO
EX FO
EX 8" S
EX 12" AC W
END ALIGNMENT
CONNECT TO EX 12" ACP
STA 2+91.31
N =1976413.52
E = 6258676.14
CONSTRUCT TYPE A
GRAVITY RETAINING
WALL PER SDRSD C-09
EX TRAFFIC DETECTION
LOOPS
EX R/W
5
No.
O
Exp.
O
D
E
A
T
S
T
IG
RE
E
R
S
T
E
R
P
O
FI
C
FA
L
V
I
C
L
I
R
I
A
N
06-30-17
C77635
EE
R
N
G
I
N
E
A
SS
F
E
N
OI
L
H
N.
O
H
C
D
A
A
M
H CH
AI
LIV
EN
O 1966
Oliv
enha
in R
oad
Mun
icip
al W
ater
Dis
tric
t
Enc
inita
s,C
A 9
2024
(76
0)75
3-64
66CIVIL D
ETAILS
C-2
SCALE: 1/2" = 1'
CONNECTION DETAIL1
C-1
SCALE: 1/2" = 1'
12" PIPELINE CONNECTION DETAIL2
C-1
SCALE: 3/8" = 1'
END CAP DETAIL3
G-3
EX 10" AC PIPE
EX 10" AC PIPE
PER NOTE 1 ON G-3
NO
RTH
BO
UN
D
TRAVEL LAN
E
LA COSTA AVE
EX 12" ACP PIPE
EX 12" ACP PIPE
EX 8" AC PIPE
8" AC PIPE
REMOVE EX 8" ACP
AS REQUIRED
RESTRAIN
ED
EX R/W
CADENCIA STREET
EX SID
EW
ALK
EX CURB AND GUTTER
MATCH TOP OF MANHOLE HATCH TO GRADE
OF EXISTING SIDEWALK
NOTE
THE INTENT OF THE MATERIALS LIST PROVIDED HEREIN IS TO SHOW THE
MAIN ITEMS FOR CONSTRUCTION. THE CONTRACTOR SHALL BE
REQUIRED TO FURNISH ALL MATERIAL ITEMS REQUIRED FOR THE
COMPLETE CONSTRUCTION OF THIS PROJECT IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
N
N
1 8" X 8" FLG DI TEE
2 8" FLG X FLG RESILIENT SEATED GATE VALVE W/ VALVE BOX PER OMWD STD DWG. E-1.2
3 CONCRETE THRUST BLOCK PER OMWD STD DWG D-3.4
4 CONCRETE THRUST BLOCK PER OMWD STD DWG D-3.6
5 8" PVC C-900, DR 18 PIPE
6 10" PVC C-900, DR 18 PIPE
7 10" PVC C-900, DR 14 PIPE
8 8" FLEXIBLE TRANSITION COUPLING W/ TYPE 1300 UNI-FLANGE BY FORD, OR EQUAL, ON
PVC SIDE OF COUPLING
9 8" FLG X MJ ADAPTER
10 10" X 8" FLG DI ECCENTRIC REDUCER (FLAT TOP)
11 10" FLG X MJ (RESTRAINED) 45° FITTING
12 10" MJ X MJ (RESTRAINED) 90° FITTING (ROTATE 45°)
13 10" FLG X MJ ADAPTER
14 10" MJ X MJ 45° FITTING
15 PRESSURE REDUCING STATION - SEE CONTRACT SPECIFICATIONS APPENDIX 1
16 VENT CAP AND 4" SCH 40 PIPE - SEE CONTRACT SPECIFICATIONS APPENDIX 1
17 BLOW OFF ASSEMBLY PER OWMD STD DWG A-1.1
18 12" x 12" X 10" MJ DI TEE
19 12" FLEXIBLE TRANSITION COUPLING W/ TYPE 1300 UNI-FLANGE BY FORD, OR EQUAL, ON
PVC SIDE OF COUPLING
20 10" END CAP COUPLING
21 CONCRETE THRUST BLOCK PER OMWD STD DWG D-2.3
22 12" PVC C-900, DR-14 PIPE
23 SUMP PUMP DISCHARGE LINE, 1
1
4
" PVC SCH 80 PIPE
LIST OF MATERIALS
CONSTRUCT 14" THICK 13' X 13' CONCRETE PAD W/ #4
REBAR @ 12" OC EACH WAY TOP AND BOTTOM PER DETAIL 4
ON SHEET C-3
N
N = 1976299.79
E = 6258548.60
THRUST BLOCK SIZES (SQ. FT)
45° 90° TEE
8" PVC 10 18 13
10" PVC 14 26 19
REMOVE EX 12" ACP
AS REQUIRED
18
19
3
19
15
9
9
20
13
8
7
14
7
4
7
7
22
22
22
4
2
21
5
16
17
13
4
6
12
11
10
1
5
8
14
6
3
20
3
22
3
4
23
6
No.
O
Exp.
O
D
E
A
T
S
T
IG
RE
E
R
S
T
E
R
P
O
FI
C
FA
L
V
I
C
L
I
R
I
A
N
06-30-17
C77635
EE
R
N
G
I
N
E
A
SS
F
E
N
OI
L
H
N.
O
H
C
D
A
A
M
H CH
AI
LIV
EN
O 1966
Oliv
enha
in R
oad
Mun
icip
al W
ater
Dis
tric
t
Enc
inita
s,C
A 9
2024
(76
0)75
3-64
66CIVIL D
ETAILS
C-3
SCALE: 1 1/2" = 1'
FOUNDATION DETAIL4
C-1
13' X 13' REINFORCED
CONCRETE SLAB, 3000 PSI
3
4
" CRUSHED ROCK PER
GREENBOOK SPEC 200-1
TENSAR TX-7 GEOGRID, OR EQUAL, OVER
NON-WOVEN 4 OZ FILTER FABRIC
UNDISTURBED NATIVE SOIL
MIN. 6"
EMBEDMENT
1" 316SS ANCHOR BOLT SET IN HILTI HIT RE
500-SD EPOXY, SIMPSON STRONG-TIE SET-XP
EPOXY, OR EQUAL.
14"
12"
8"
3
8
" GALVANIZED STEEL WASHER
4"
PRS ANCHOR PLATE
1
1
8
" Ø HOLE
#4 REBAR 12" O.C.
EACH WAY TOP AND
BOTTOM
NUT