habitat for humanity. hfh members â architectural team ã bill cox ã brian vosberg ã rosann...
TRANSCRIPT
HFH Members Architectural Team
Bill Cox Brian Vosberg Rosann Magnifico John Peugeot
Web Information Team Asli Kumcu Mike Monahan
Energy Efficiency Brent Phillips Adam Stanczak Jeff Bryles Drew Susott
Architectural Team
Objectives To create a floor plan selection guide to be used
for future home owners To create a 3-D video tour of a habitat house
for prospective buyers To create building materials lists for each home
with price estimates To create a standard construction timeline
Selection Guide
Blueprints for 2, 3, & 4 bedroom homes Floor plans Elevations 3-D views Electrical plans Wall sections
Architectural Team
Future plans Finish floor plan selection guide Deliver interior 3-D video tour Create building materials lists Create construction timeline
Objectives
To calculate energy profiles of home designs
To find cost effective ways to improve the energy efficiency of habitat homes
Approach
Create models of multiple habitat houses within the Energy 10 software
Perform on-site energy testing and evaluation
Make modifications to the base model and compare to current design
Compare energy savings to cost of design changes
Energy 10 Inputs
Key Parameters Floor plan House orientation Lighting profiles Local utility costs Insulation Weather Windows Air infiltration model
Other Inputs Wall construction Ceiling area Floor construction Duct location Thermostat settings Daylight properties Occupants
Energy 10 Numerical OutputsPlan1278_4A1 Sep 29, 1999 Energy-10 Summary Page Weather file: Indy.et1 Variant: AutoBuild Shoebox Saved as T:\1278_4A1, Var. 1 Comments: Description: Reference Case Low-Energy Case Floor Area, ft² 1278.0 1278.0 Surface Area, ft² 3892.0 3892.0 Volume, ft³ 10224.0 10224.0 Surface Area Ratio 1.38 1.38 Total Conduction UA, Btu/h-F 300.3 229.0 Average U-value, Btu/hr-ft²-F 0.077 0.059 Wall Construction 2 x 4 frame, R=14.8 steelstud 6 poly, R=19.2 Roof Construction attic, r-30, R=29.4 flat r-38, R=38.0 Floor type, insulation Crawl Space, Reff=23.7 Slab on Grade, Reff=38.3 Window Construction 4060 double, wood, U=0.47 4060 low-e al/b, U=0.31 Window Shading None 40 deg latitude Wall total gross area, ft² 1336 1336 Roof total gross area, ft² 1278 1278 Ground total gross area, ft² 1278 1278 Window total gross area, ft² 240 336 Windows (N/E/S/W:Roof) 5/2/1/2:0 3/1/8/1:1 Glazing name double, U=0.49 double low-e, U=0.26 Operating parameters for zone 1 HVAC system Heat with Gas Furn Heat with Gas Furn Rated Output (Heat/SCool/TCool),kBtuh 48/0/0 65/0/0 Rated Air Flow/MOOA,cfm 593/0 988/0 Heating thermostat 72.0 °F, no setback 72.0 °F, setback to 67.0 °F Cooling thermostat 72.0 °F, no setup 72.0 °F, setup to 77.0 °F Heat/cool performance eff=80,EER=1.0 eff=90,EER=13.0 Economizer?/type no/NA yes/fixed dry bulb, 60.0 °F Duct leaks/conduction losses, total % 11/10 3/0 Peak Gains; IL,EL,HW,OT; W/ft² 0.20/0.04/0.66/0.36 0.15/0.03/0.66/0.36 Added mass? none 639 ft², 8in cmu Daylighting? no yes, continuous dimming Infiltration, in² ELA=177.7 ELA=48.1
Energy 10 Graphical Output
0
20
40
60
80
100
kBtu / ft²
Heating Cooling Lights Other Total
ANNUAL ENERGY USEReference Case
55.9
7.64.7
20.3
88.5
HFH 3 bedroom / Base Model
Future Tasks
Tests
Blower door
Thermal imaging
Analyses Reevaluate central vs.
window air conditioning House wrap Automatic thermostat Air infiltration
Window type
Shingle color
Objectives
Web interface for: Floor Plans, Elevations, and Energy Analysis
Web-based construction guide and tutorial: for use by construction managers and volunteers
Interesting and easy to navigate, understand, and follow: for people with all levels of computer literacy
Approach
Modify the data created by the other two teams to make them Web compatible
Take pictures during different stages in the construction of a house - tutorial
Gather information on techniques used to build a house for tutorial
Create dynamic construction timeline Create bill of materials for each house
Complete Floor Plans, Elevation, and Energy Analysis for:
1 - 2 Bedroom house
4 - 3 Bedroom houses
1 - 4 Bedroom house
Enter Guide
Progress: Home Selection Guide
Construction timeline for a 10-week build
Construction Tips Brochures, Fall 1998 team
Progress: Construction Guide
Home Selection Guide Make the interface more enjoyable and easier to
navigate Add more designs as the other teams complete
them
Construction Timeline Building materials list Building construction timeline Volunteer on-line tutorial
Future Tasks