guoneng electricals, china
DESCRIPTION
GuoNeng Electricals, China. GNE. Business Sectors. Power Generations – Energy Solutions Project Engineering Machinery Supply Auto Control Solutions Parts & Services Environmental Protections – Total Solutions Thermal power plant by burning urban garbage Ethonol Vinasse treatment. GNE. - PowerPoint PPT PresentationTRANSCRIPT
-
GuoNeng Electricals, China GNE
-
Business SectorsPower Generations Energy SolutionsProject EngineeringMachinery Supply Auto Control SolutionsParts & Services
Environmental Protections Total SolutionsThermal power plant by burning urban garbageEthonol Vinasse treatment GNE
-
Power Generation-ThermalSteam BoilerCFB/PC/Bagasse/BiomassSteam TurbineCondensing/Extraction/Back PressureTurbo GeneratorDirect Coupling/Gearbox, Air/Hytrogen CoolingTotal ControlsDCS/PLC, InstrumentationsGNE
-
Power Generation-HydroHydro TurbineAxial Inflow/Intrusion/Pressure Inflow Hydro GeneratorSingle Shaft/GearboxTotal ControlsDCS/PLC, InstrumentationsGNE
-
Business Associated with: CNIEC, CHEC GXYAChina Science GroupHualan Engineering Top Brands of Manufacturers Power Generation-ThermalGNE
-
Sound TrackThermal Power Plants: CFB/PC boiler 120-300t/h, Steam Turbine 15-50mwmajor boiler, turbine, generator plus auxiliaries, 3 sets
Heat and Power Plants for Sugar Millsbagasse boiler 35-85t/h, turbo generator 3-12mwmajor boiler, turbine, generator plus auxiliaries, 5 sets
Heat and Power Plants for Textile, Chemical MillsCFB/PC boiler 35-120t/h turbo generator 3-15mw major boiler, turbine, generator plus auxiliaries, 2 sets
Thermal Power Plants of Burning Urban GarbageCFB boiler 35-65t/h, turbo generator 6-15mw major boiler, turbine, generator plus auxiliaries, 2 sets
Thermal Boiler Burning Vinasse from Alcohol Plant: 15T/H, vinasse treatment 600t/d
Auto Controls: DCS, PLC, Instrumentations: 60 sets
Hydro Power Plant3-10mw: major boiler, turbine, generator plus auxiliaries, 2 sets
GNE
-
Typical Thermal Power PlantHuaxing Power Plant, Baise, ChinaBoiler1*220t/h CFB, 9.81MPa, 540Turbo Generator: 1*50MW, 9.0MPa, 500Completion: Dec., 2004Notes: Second hand turbo generator, made in 1959Total Plant
Turbo Generator
Control RoomDCS Operator Station
Feed Pumps
GNE
-
Captive Power Plant (1)Deyongjia Garment Plant, Dongguan, ChinaBoiler475t/h, CFB, 3.98MPa, 450Turbine15MW 3.5MPa 435DCSBTG synchronized auto controlsDate of Completion: May, 2001Total Plant
TG Set
Control RoomPower Panels
Coal Conveying
GNE
-
1234 Boiler auto controls, Baiganhua Sugar Mill, Baise, ChinaHoneywell HC-900 DCS systemAll boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves , Wayleber flow metersGNECaptive Power Plant (2)
-
Power Plant Burning GarbageDongguan Garbage Power Plant, 215112mw, 1200t/d garbage handling, Guangdong, ChinaNingbo Garbage Power Plant, 215mw, 800t/d garbage handling, Zhejiang, ChinaBoiler65t/h CFB, 3.98MPa 450 Turbo Generator15mw, 3.5MPa, 435Date of Completion Dongguan-March, 2005, Ningbo-Dec., 2005Dongguan PlantNingbo PlantControl RoomCFB BoilerTurbo Generator
GNE
-
International Projects AA Group, 300t/h, CFBBiomass, Thailand Boiler300t/h, CFB, 9.8MPa, 540 Date of Completionunder construction, to commissioning in Oct. 2008Signing Ceremony Technical Agreement SigningSite SurveySite Survey
China Representatives
GNE
-
International Projects SSYPL, 2*35t/h, CFB2*7.5MW STG, India
2009.04.25 Signing of contract with SSYPL
Signing Ceremony
GNE
-
Lhoknga 216MW Power Plant EP Project, IndonesiaBoiler75t/h,CFBC Boiler, 3.9MPa, 450Steam turbine and generator15MW, 3.5MPa, 435Associated with CHEC, 2006
Used plant package supplied to Indonesia, 2008. Boiler: 275t/h,CFBC Boiler, 3.9MPa, 450 Steam turbine and generator215MW, 3.5MPa, 435
HFO DG Sets, 410MW, 2008, package supplied to Indonesia410MW, HFO DG SetsAssociated with GD Imp/Exp Corp.
GNEInternational Projects
-
International Projects India KPPL 225MW thermal power plant EP ProjectBoiler2130t/h, PC Boiler, 3.9MPa, 450 Steam turbine and generator225MW, 3.5MPa, 435 Contract Signing
GNE
-
SSYPL, Surat, India - Boiler: CFB, 2x35t/h, 3.82MPa, 450 - TG: 2x7.5MW, 3.82MPa, 435
Typical International Projects GNE
-
DCS Applications
Typical DCS installed
XDPS-400, Shanghai XinhuaMACS, Beijing Hollysys WebField ECS-100, Supcon PCS7, Siemens Florence 2000, ABB UMC-800/HC900, Honeywell
GNE
-
PLC Applications
Typical PLC installed
S7-200/S7-300, SiemensSchneiderAllen BradleyFX2N, Mitsubishi
GNE
-
Installed InstrumentationsDrum levelerPressure TransmittersTemprature ProbeGenerator Hydrogen Cooling50MW Turbo GeneratorIndustrial MonitorsSpeed SensorsSony Video CameraGNE
-
Typical ProjectsHoneywell HC-900 DCS systemAll boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves , Wayleber flow meters1234 Boiler auto controls, Baiganhua, Baise, ChinaGNE
-
GuoNeng Electricals Ltd. Addr.: Rm1612, Xincheng Intl Bldg, No.92-1, Nanning, Guangxi, 530028 China Tel: 07715511310 5501300 Fax 07715511852 Email: [email protected]