gulf coast lng, llc. brownsville, texas -...

11
September 12, 2012 GULF COAST LNG, LLC. BROWNSVILLE, TEXAS

Upload: others

Post on 03-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

September 12, 2012

GULF COAS T LNG, LLC.BROWNSVILLE, TEXAS

Page 2: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

Location

Brownsville

Panama Canal

G U L F C O A S T L N G , L L C .B R O W N S V I L L E , T E X A S

Page 3: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

Eagle Ford

Brownsville

PipelinesTETTranscoKinder MorganEnterpriseETCTennesseeFGTGulf SouthNGPLTrunklineGC LNG

King Ranch

G U L F C O A S T L N G , L L C .B R O W N S V I L L E , T E X A S

HoustonKaty

Page 4: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

Gulf Coast Terminal Description

The Gulf Coast Liquefaction terminal is proposed to includes the following facilities:  Two to three full‐containment 160,000 m3

LNG storage tanks 42” Downstream pipeline system 2 State‐of‐the‐art marine dock facilities capable of handling up to Pan‐max sized LNG ships each

Up to 3 API Liquefaction Units, ±700MMCF/d each

G U L F C O A S T L N G , L L C .B R O W N S V I L L E , T E X A S

Page 5: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

559 Acre Site

Spoil Area

PORTBROWNSV I L L E

OF

W O R L D C L A S S

Brownsville

G U L F C O A S T L N G , L L C .B R O W N S V I L L E , T E X A S

Brownsville Ship Channel

Page 6: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

Storage

Dock Area

Turning Basin

Possible Configuration

Storage

500 Acre SitePORTBROWNSV I L L E

OF

W O R L D C L A S SG U L F C O A S T L N G , L L C .B R O W N S V I L L E , T E X A S

Storage

Page 7: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

LNG Ships& Canal

Standard LNG Vessels• 138,000m3

• 151,296m3

• 171,045m3

• Existing Panama Canal

• New Panama Canal

Length915947951

956

1200

Beam139144150

106

161

Draft37.6337.8039.27

39.50

49.90

Page 8: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

Global LNG PricesSpot DES ($/MMBtu)

North AmericaHH $2.66 Asia

JKM $12.50

EuropeDES $9.50

September 11, 2012

0.00

5.00

10.00

15.00

20.00

25.00

Jan‐00

Dec‐01

Nov‐03

Oct‐05

Sep‐07

Aug‐09

Jul‐1

1

Jun‐13

May‐15

Apr‐17

Mar‐19

HH

WTI  Equivalent

NYMEX FUTURES

WTI FUTURESEquivalent

August 21, 2012

AsiaContract 

11‐15% of Crude

Page 9: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

Value of Panama Canal Shipping Cost 

With an LNG Vessel moving at 18.5 Knots, the extended route would take an additional 30 days and cost an additional $5,700,000 at an $80,000/day charter rate on a round trip basis.  More ships would be required with each additional ship costing ±$220,000,000 each.

Page 10: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

Investment• Scope of a Three Train Liquefaction Project:

o Capital Investment of $5-$6 Billiono Estimated Jobs

• Construction – 3,000• Permanent – 250• Indirect Job Creation – 30,000-40,000 New American jobs by drilling for

and production of natural gas required to support the export volumes. o Significant Economic Stimulus: Estimated to be $5.4-$7.8 billion per year

from 2018-2040 or $135-$195 billion over 25 years.o Balance of Trade: Assuming $7.00/MMBtu value, exporting 2 BCF/d will

improve the US balance of payments by ±$5.8 billion/year, or $146 billion over 25 years.

o Environmental Benefits: gas is clean burning and will be a substitute for Coal

Page 11: GULF COAST LNG, LLC. BROWNSVILLE, TEXAS - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/panama/minutes/091412_sumral.pdf · Gulf Coast Terminal Description The Gulf Coast

G U L F C O A S T L N G , L L C .B R O W N S V I L L E , T E X A S

Thank You