    The Institution of Engineers, Malaysia

    Key Steps, Documents, Timelines and

    Important Information in Position Papers

    10 February 2010

  • 8/3/2019 Guideline IEMPositionStatement

    2/11

    2The Institution of Engineers, Malaysia

    Definition

    An IEM Position Statement is a statement and recommendations

    expressing the views and stand of IEM on issues related to engineering

    that is of importance to our country and to make specific

    recommendations to the government for consideration and

    implementation in addressing the issue.

    AbbreviationsPPCC - Position Paper Coordinating CommitteePSC - Position Statement CommitteePP - Position PaperTD - Technical Division

  • 8/3/2019 Guideline IEMPositionStatement

    3/11

    3The Institution of Engineers, Malaysia

    Role of Position Statement Committee (PSC)

    MembersChairman

    To ensure PSC achieve its objectives and timeline

    To keep track of progress

    To direct PSC along the proposed objectives

    Call regular meetings with the assistance of IEM

    Secretariat

    Members

    To accept assignment needed such as collection of

    data/statistics, research (if required) and regional

    practices

    Compile information and data for meetings and

    discussions

    Assist Secretary/writer to draft the position paper

    Secretary (Writer)

    To prepare meeting minutes with the help of IEM Secretariat

    To compile information and materials (discussed in

    meetings) to draft the position paper

    freelance writer can be appointed

    Chief Editor

    Edit the draft to be tabled to relevant agencies,

    ministries and Cabinet

    Name Position

    Ir. Dr. Gue See Sew Chairman

    Ir. Tan Yean Chin Secretary

    Ir. Neoh Cheng Aik Chief EditorIr. Prof. Dr. Ruslan Hassan Member

    Ir. MC Hee Member

    : :

    Ir. Dr. Lee Jin Member

    Example: Mitigating the Risk of Landslides of Hill-

    Site Development

  • 8/3/2019 Guideline IEMPositionStatement

    4/11

    4The Institution of Engineers, Malaysia

    Distribu-tion

    Approval& Endorse

    -ment

    FinalizeReport

    GatherComments

    DraftReport

    MeetingsIdentify

    Stake-holders

    Approval

    Key Steps, Documents, Timelines and

    Important Information in Position Papers

    TopicProposal

    Engineering-

    related

    And of public

    interest

    Topic

    approval

    Formation

    of PSC

    Identifica-

    tion of

    chairman

    Invitation to

    experts from

    various

    stake-

    holders

    Understand-

    ing

    procedures

    Brainstorm-

    ing sessions

    Carry out

    study

    Begin write-

    up

    From

    PPCC,

    Standing

    Comm. and

    TDs

    From

    members

    and public

    Consolidate

    all

    comments

    Excomm

    approval

    Council

    endorsement

    Cabinet

    Ministry or

    government

    agencies

    *Press

    release

    IEM website

    1 2 3 4 5 6 7 8 9

    Documents to Prepare

    List of

    contacts

    Schedule

    Table of

    contents

    Question-

    naire

    Summary of

    discussion

    PPT and

    Word doc

    template

    Draft report

    Summary of

    comments

    Final report

    < 2 Months *6 to 12 Months ~ 3 Months

  • 8/3/2019 Guideline IEMPositionStatement

    5/11

    The Institution of Engineers, Malaysia 5

    ApprovalTopic

    Proposal

    Criteria for Approval

    The topic must be engineering-related and of public

    interest

    The issue is within the capabilities and expertise of

    IEM members

    The issue is within the objective and scope of IEM

    The issue has or may have an impact on IEM, its

    members and the country

    1 2

    Approval

    PPCC makes recommendation to Excomm for

    approval

    Suggestion

    May originate from IEM officer, member, committee

    and council, or any responsible external entities

    Examples of Topics

    Mitigating the Risk of Landslides of Hill-Site

    Development

    Prevention of Flash Floods and Mitigating of Erosion

    and Siltation

    Mitigation of Floods in Malaysia

    Safety Against Fire in Buildings

    < 2 Months

    PSC Chairman

    PPCC to appoint Chairman for PSC

  • 8/3/2019 Guideline IEMPositionStatement

    6/11

    The Institution of Engineers, Malaysia 6

    Criteria for Selection of PSC Members/Stakeholders

    No. of members is preferably between five and ten

    Balanced organizations and stakeholders

    Members shall be willing to serve until the project is

    completed

    PSC Members/Stakeholders

    PSC Chairman to appoint members

    Identify

    Stake

    -holders

    3

    Experts Authorities

    Consultant

    *ContractorsIEM TDs

    (Representatives)

    Others(i.e. academics)

    Document to Prepare

    List of contacts

    ~ 1-2 MonthsPSC

    membershipshall be

    balanced

    Role of Secretariat

    To advise PSC (i.e. members are from various

    background/stakeholders)

    Name Organization

    Ir. MC Hee (Chairman) IEM

    Ir. Dr. Jeffrey Chiang IEM Civil & Structural Technical Division

    Ir. Liew Shaw Shong IEM Geotechnical Technical Division

    Ar. Andy Gan Khai Fatt Pertubuhan Akitek Malaysia

    Mr. Low Kong Chien Department of SeismologyIr. Teo Ching Wee REHDA

    Ir. Elias Ismail CIDB

    Assoc. Prof. Dr Azlan Adnan UTM

    Prof. Dr. John Kuna Raj Department of Geology, UM

    Example: PSC Earthquake

  • 8/3/2019 Guideline IEMPositionStatement

    7/11

    The Institution of Engineers, Malaysia 7

    Meetings

    4

    Meetings

    Charting of schedule and understanding procedures

    Regular brainstorming sessions for collection of views

    and opinions

    Carry out study

    Documents to Prepare

    Schedule

    Table of contents

    Questionnaire

    Summary of discussions

    ~ 3-6 Months

    Notes

    If PSC wishes to recommend changes in scope,

    recommendations shall be made to PPCC

    Budget

    A budget of RM5,000 could be allocated for research

    or detailed studies, writing and editing

    Role of Secretariat

    To regulate meetings, and compliance of rules and

    methodology

  • 8/3/2019 Guideline IEMPositionStatement

    8/11

    The Institution of Engineers, Malaysia 8

    Finalize

    Report

    Gather

    Comments

    Draft

    Report

    5 6

    Contents of the Draft Report

    Executive Summary

    A statement of the issue, recommendation pertaining

    to public policies, and IEMs commitment

    A listing of PSC members

    Background

    Bases of Consideration Implication

    Conclusion

    Recommendation

    IEMs position, commitment and activities

    Actions to be taken by government (specific ministry of

    relevant)

    Appendix

    See examples at

    http://www.iem.org.my/wapi/mctweb.dll/getObject?MID=IEMWEB-

    MAIN2&objID=1

    Documents to Prepare

    PPT template

    Draft report

    Summary of gathered comments

    Final report

    Gather Comments

    Send draft report to PPCC, Standing Committees and

    Technical Divisions for comments

    Organize forum to hear from members and public

    *Post on website to hear from public or other

    interested parties

    7

    ~ 3-4 Months

    Final Report

    Consolidate all comments and finalize report

    Submit to PPCC along with draft report and summary

    of consolidated comments

  • 8/3/2019 Guideline IEMPositionStatement

    9/11

    The Institution of Engineers, Malaysia 9

    Notes

    Use standard IEM template for report writing

    Step no. 3, 4, 5, 6 and 7 shall be completed in no more

    than 12 months

    Request for extension (if needed) must be submitted to

    PPCC

    Finalize

    Report

    Gather

    Comments

    Draft

    Report

    5 6 7

    ~ 3-4 Months

  • 8/3/2019 Guideline IEMPositionStatement

    10/11

    The Institution of Engineers, Malaysia 10

    Distri

    -bution

    Approval

    & Endorse

    -ment

    8 9

    ~ 3 Months

    Approval and Endorsement

    PPCC will recommend to Excomm for approval

    PP can be presented to the IEM council for

    endorsement or by circulation method

    If circulation method is selected, response of more

    than 50% of Council members would be accepted for

    approval

    Post Distribution

    PPCC to monitor and follow up on the implementation

    of PPs every 6 months

    Every PP shall be evaluated by PPCC for

    recommendation for revision or withdrawal at intervals

    of 3 years

    In the absence of a recommendation for their revisionor continuity, PPs will be automatically dissolved after

    3 years having been issuedDistribution

    Submit to cabinet through a relevant ministry

    Branches are encouraged to bring PP to the attention

    of the state governments Announcement of the availability of PP shall be made

    in IEM Bulletin and website

    Executive summary of PP shall be published in IEM

    Bulletin

    Note

    PPs shall only be used to provide information and to

    give background public policy decisions