guide for migrating simatic s5 projects to simatic s7- 1500 and

Download Guide for Migrating SIMATIC S5 Projects to SIMATIC S7- 1500 and

Post on 01-Jan-2017

236 views

Category:

Documents

7 download

Embed Size (px)

TRANSCRIPT

  • https://support.industry.siemens.com/cs/ww/en/view/105106251

    Background and System Description 04/2015

    Guide for Migrating SIMATICS5 Projects to SIMATIC S7-1500 and TIA PortalBoundary Conditions and Procedure for Migrating Hardware andSoftware

    https://support.industry.siemens.com/cs/ww/en/view/105106251

  • Warranty and Liability

    Migration from S5 to S7-1500Entry ID: 105106251, V1.0, 04/2015

    2

    Siem

    ens

    AG20

    15Al

    lrig

    hts

    rese

    rved

    Warranty and Liability

    Note The Application Examples are not binding and do not claim to be completeregarding the circuits shown, equipping and any eventuality. The ApplicationExamples do not represent customer-specific solutions. They are only intendedto provide support for typical applications. You are responsible for ensuring thatthe described products are used correctly. These Application Examples do notrelieve you of the responsibility to use safe practices in application, installation,operation and maintenance. When using these Application Examples, yourecognize that we cannot be made liable for any damage/claims beyond theliability clause described. We reserve the right to make changes to theseApplication Examples at any time without prior notice. If there are any deviationsbetween the recommendations provided in these Application Examples andother Siemens publications e.g. Catalogs the contents of the otherdocuments have priority.

    We do not accept any liability for the information contained in this document.Any claims against us based on whatever legal reason resulting from the use ofthe examples, information, programs, engineering and performance data etc.,described in this Application Example shall be excluded. Such an exclusion shallnot apply in the case of mandatory liability, e.g. under the German Product LiabilityAct ("Produkthaftungsgesetz"), in case of intent, gross negligence, or injury of life,body or health, guarantee for the quality of a product, fraudulent concealment of adeficiency or breach of a condition which goes to the root of the contract("wesentliche Vertragspflichten"). The damages for a breach of a substantialcontractual obligation are, however, limited to the foreseeable damage, typical forthe type of contract, except in the event of intent or gross negligence or injury tolife, body or health. The above provisions do not imply a change of the burden ofproof to your detriment.Any form of duplication or distribution of these Application Examples or excerptshereof is prohibited without the expressed consent of Siemens Industry Sector.

    Securityinforma-

    tion

    Siemens provides products and solutions with industrial security functions thatsupport the secure operation of plants, solutions, machines, equipment and/ornetworks. They are important components in a holistic industrial securityconcept. With this in mind, Siemens' products and solutions undergo continuousdevelopment. Siemens recommends strongly that you regularly check forproduct updates.

    For the secure operation of Siemens products and solutions, it is necessary totake suitable preventive action (e.g. cell protection concept) and integrate eachcomponent into a holistic, state-of-the-art industrial security concept. Third-partyproducts that may be in use should also be considered. For more informationabout industrial security, visit http://www.siemens.com/industrialsecurity.

    To stay informed about product updates as they occur, sign up for a product-specific newsletter. For more information, visithttp://support.industry.siemens.com.

    http://www.industry.siemens.com/topics/global/en/industrial-securityhttps://support.industry.siemens.com/cs/?lc=en-DE

  • Table of Contents

    Migration from S5 to S7-1500Entry ID: 105106251, V1.0, 04/2015

    3

    Siem

    ens

    AG20

    15Al

    lrig

    hts

    rese

    rved

    Table of ContentsWarranty and Liability ................................................................................................. 2

    1 Introduction ........................................................................................................ 5

    1.1 Purpose of this document..................................................................... 5

    2 Planning Plant Migration................................................................................... 6

    2.1 General procedure ............................................................................... 62.2 Partial or complete migration................................................................ 72.3 Planning the migration phases ............................................................. 82.4 Advantages of modernization ............................................................... 9

    3 SIMATIC S5 and SIMATIC S7-1500 System Architecture ............................ 10

    3.1 SIMATIC S5-115U, S5-135U, S5-155U ............................................. 103.1.1 Information on the SIMATIC S5-115U automation system ................ 103.1.2 Information on the SIMATIC S5-135U/155U automation system ...... 113.2 SIMATIC S7-1500 .............................................................................. 133.2.1 CPU .................................................................................................... 133.2.2 Information on the SIMATIC S7-1500 automation system ................. 13

    4 Hardware Migration ......................................................................................... 15

    4.1 General information on migrating the hardware ................................. 154.1.1 Support, aids, adapters ...................................................................... 154.2 Selecting the CPU .............................................................................. 164.3 Centralized and distributed I/O ........................................................... 164.3.1 Centralized I/O ................................................................................... 164.3.2 I/O adapters ........................................................................................ 174.3.3 Expansion units in S5 (EU) ................................................................ 184.3.4 Distributed I/O .................................................................................... 194.3.5 SIMATIC ET 100 ................................................................................ 194.3.6 SIMATIC ET 200U and ET 200B ....................................................... 194.4 Communication and networks ............................................................ 214.4.1 SINEC H1 ........................................................................................... 214.4.2 SINEC L1 ........................................................................................... 244.4.3 SINEC L2 ........................................................................................... 244.4.4 Serial communication ......................................................................... 254.5 Operator control and monitoring ........................................................ 25

    5 Software Conversion ....................................................................................... 26

    5.1 General information on software conversion...................................... 265.1.1 Programming languages .................................................................... 265.1.2 Requirements, programming environment ......................................... 275.1.3 Procedure and tool support ................................................................ 285.1.4 Conversion to STEP 7 V5.x and S5/S7 converter ............................. 285.1.5 Migration to STEP 7 1x to TIA Portal ................................................. 295.2 Program structure and standard functions ......................................... 295.2.1 Organization blocks (OBs) ................................................................. 295.2.2 Program blocks, function blocks and functions .................................. 325.3 Data structures and data blocks ......................................................... 335.3.1 Data handling in S5 and S7 ............................................................... 335.3.2 The S5 system data blocks DB 0, DB1 and DX0 ............................... 345.4 OBs for special functions.................................................................... 355.5 Assignment list symbol table symbols.......................................... 355.6 Programming sequential controls GRAPH 5 and GRAPH in

    TIA Portal ........................................................................................... 35

    6 The most important Recommendations ........................................................ 36

  • Table of Contents

    Migration from S5 to S7-1500Entry ID: 105106251, V1.0, 04/2015

    4

    Siem

    ens

    AG20

    15Al

    lrig

    hts

    rese

    rved

    6.1 Contacts in the region ........................................................................ 366.2 Services offered by Siemens ............................................................. 366.3 Solution Partners ................................................................................ 366.4 References and online documents ..................................................... 366.4.1 Important information ......................................................................... 36

    7 Appendix .......................................................................................................... 38

    7.1 Comparison of SIMATIC S5 and S7 components .............................. 387.1.1 CPU modules ..................................................................................... 39

Recommended

View more >