Int. Symposium on Recent Advances in High-Rise Buildings & Geotechnical Analysis 7-Dec-15, Knowledge City, Dubai
3D Numerical Analysis of Piled-raft FoundationsConcepts & Case studies
Ahmed Elkadi, PhD, M.ASCE
![Page 2: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/2.jpg)
Contents
• Piled-raft systems
• Pile modeling & embedded piles
• Single pile calibration
• Parametric analysis
• Case studies
2
![Page 3: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/3.jpg)
Piled Rafts (PR)
Advantages of a piled raft foundation
• Limitation of absolute and differential settlements
• Reduction in foundation tilting either due to load eccentricity or due to
irregularities in the subsoil
• Reduction in raft internal stresses
• Economical foundation option for
circumstances where the performance of
the raft alone does not satisfy the design
requirements.
• The addition of a limited number of piles
may improve the ultimate load capacity,
the settlement and differential settlement
performance, and the required thickness
of the raft. (H.G. Poulos, 2001)
Piled-rafts
3
www.geomarc.it
![Page 4: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/4.jpg)
Piled Rafts
SSI of piled-rafts
Interaction influences:
• Pile-Soil interaction
• Pile-Pile interaction
• Raft-Soil interaction
• Pile-Raft interaction
Piled-raft system
4
![Page 5: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/5.jpg)
Piled Rafts
• Ensure that the foundation does not undergo excessive displacementsServiceability limit state (SLS) => rmax < r allowable & qmax < q allowable
• Overall stability should be insuredUltimate limit state (ULS) => Rg* ≥ S* (geotechnical)
Design issues
Key questions:• The relative proportion of load carried by the raft and piles
• Which pile configuration reduces total and differential settlements
3D Nonlinear FE Analysis
5
![Page 6: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/6.jpg)
Piled Rafts
Desirable characteristics for the analysis of piled rafts
• Pile groups subjected to vertical load and
moments in both horizontal directions
• Realistic (nonlinear) soil behavior
• Non-linear soil-pile interface behavior
• Different pile types within group
• Raft/cap stiffness incorporated
• Structure stiffness incorporated
Analysis characteristics
TC18 report, 2001
6
![Page 7: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/7.jpg)
Model Simulation
Geotechnical reportSoil profiles
Lab (e.g. Triaxial tests)
Field (e.g. CPT, SPT,..)
Calibration
Foundation Design
• Serviceability Limit State
• Ultimate Limit State
Determine the required structural parameters
Structural Design
Pile TestsSLT, DLT, RLT, PDA
Numerical Model
• Parametric Study
• Load Combinations
7
![Page 8: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/8.jpg)
Three pile modeling approaches are available:
• Solid Element Model
• Beam-Solid Connectivity Model
• Line-to-Solid Interface Model (embedded pile)
Pile modeling in DIANAPile modeling concepts
8
![Page 9: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/9.jpg)
Model = Soil (solid) + Pile (solid) + Interface (surface)
Nodal connectivity is required on pile outer surface
Solid element modelSolid element model
9
![Page 10: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/10.jpg)
Points of attention for solid element models:
• Model definition and mesh-generation could be elaborative for large number of piles
• Many elements in model large computation times
• Pile forces and moments are not directly available in post-processing
• Interface behavior: elastic, nonlinear elastic, coulomb friction, and user-supplied material
Surface interface elements for solid-to-solid connection:
Solid element modelSolid element model
10
![Page 11: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/11.jpg)
Model = Soil (solid) + Pile (beam) + Interface (line)
Nodal connectivity is required along pile length
Beam solid connectivity modelBeam-solid model
11
![Page 12: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/12.jpg)
Points of attention for beam-solid element models:
• The nodal compatibility requirement makes geometry modeling and
meshing of the soil elaborative.
• For piled rafts with large number of piles, this technique produces
large models large computation times
Line interface elements for beam-to-solid connection:
Beam solid connectivity modelBeam-solid model
12
![Page 13: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/13.jpg)
Model = Soil (solid) + Pile (beam) + Interface (line-to-solid)
No nodal connectivity required => well-suited for PRs
Line-to-soild interface model
Sadek & Shahrour (2004):
A three dimensional embedded beam element for reinforced geomaterials
Shear interaction between beam element and surrounding soil.
Line-to-solid (Embedded pile) model
13
![Page 14: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/14.jpg)
Elementary Coordinate
y
z
x
Line-to-solid interface elements for beam-to-solid connection:
Characteristics of line-to-solid interface modeling in DIANA:
• Pile and soil geometries and meshes can be specified independently
• Intersections of line and solid elements are calculated automatically
• Nonlinear friction-slip properties for line-solid interface elements
• Mesh refinement requirements for the soil are minimum
reduced computation time
Line-to-soild interface modelLine-to-solid (Embedded pile) model
14
![Page 15: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/15.jpg)
Model = Soil (solid) + Pile (beam) + Interface (point-to-solid)
Axis of pile tip bearing
y
z
x
Pile tip sping
Point-to-soild interface model
Characteristics of point-to-solid interface modeling in DIANA:
• The pile tip can be arbitrarily placed in the solid element
• Nonlinear properties for point-solid interface elements
Point-to-solid (Embedded pile) model
15
![Page 16: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/16.jpg)
Relative Slipdisplacement
Shaft friction forceper unit length of pile
1
Ks
Ultimate shear force, qu
Input parameters:
• Ultimate shear force, qu [kN/m]
per unit length of the pile, at reference depth
• Shear Stiffness Modulus, Ks [kPa]
Linear elastic penalty stiffness of the interface
in the longitudinal direction of the pile.
• Normal Stiffness Modulus, Kn,Kt [kPa]
Linear elastic penalty stiffness of the
interface in the transversal direction.
These input parameters are best extracted from
SLT results after separating shaft friction and
base bearing behavior from the total response
Pile element parameters
Pile bearing capacity is input in pile elements and not a result of the calculation!
=> Deformation behavior
Line-to-solid interface model
16
![Page 17: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/17.jpg)
Pile element parametersPile element parameters
Skin tractions
ts = qs/length = ks * (Du) ≤ qult
tn = qn/length = kn * (Du)
tt = qt/length = kt * (Du)
Displacement
Specified bearing capacity
Force
Relative
displacement
Tau
Base (tip) bearing capacity
qb = kb * (Du) ≤ qbult
Relative
displacement
Tip
capacity
17
![Page 18: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/18.jpg)
VerificationSingle pile analysis of the Alzey Bridge pile loading test
The pile load test was conducted by Sommer & Hammabach in 1974 to optimize the foundation
design of Alzey Highway Bridge in Germany (El-Mossallamy 1999)
Calibration analysis
18
![Page 19: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/19.jpg)
VerificationSingle pile analysis of the Alzey Bridge pile loading test
Calibration analysis
19
O. Elkadi (2011):
M.Sc. Thesis “Performance of Piled Raft Systems”
![Page 20: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/20.jpg)
Parametric study
D = 1.3m
S/D = 2, 3 & 4
L/D = 5 & 20
20
![Page 21: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/21.jpg)
Parametric study
29MM 15MM
D = 1.3m S/D = 2 L/D = 5
21
30MM
![Page 22: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/22.jpg)
D = 1.3m
S/D = 2, 3 & 4
Pile Group L/D=20 Pile Group L/D=5
Parametric study
22
![Page 23: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/23.jpg)
Piled-raft L/D=20 Piled-raft L/D=5
D = 1.3m
S/D = 2, 3 & 4
Parametric study
23
![Page 24: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/24.jpg)
Parametric study
% load carried by raft for different pile layouts in piled-raft
24
![Page 25: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/25.jpg)
Single pile vs pile group vs piled raft
Group behavior and pile-raft interaction reduce on the one hand the stiffness
of the piles and increase on the other hand their bearing capacity
Pile behavior
25
![Page 26: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/26.jpg)
Single pile vs pile group vs piled raftPile behavior
26
![Page 27: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/27.jpg)
Piled raft foundation
27
Case study: Pentominium Tower
Hyder Consulting, 2008
Worlds Tallest residential building
• > 100 stories tall (>500m)
• Preliminary design 233 piles
• 1.5m Diameter
• 46-51m long
![Page 28: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/28.jpg)
Piled raft foundation
28
Case study: Pentominium Tower
Kamiran et. al., Proceedings ICE, Civil Engineering, 162, Nov. 2009
Site Investigation
Field
• 8 boreholes 80-125 deep boreholes
• standard penetration testing
• packer permeability testing
• pressuremeter testing at 3 m intervals in
three of the boreholes
• geophysics (cross-hole, cross-hole
tomography and down-hole testing)
Lab
• cyclic undrained triaxial
• cyclic simple shear
• stress path triaxial testing
• resonant column
• constant normal stiffness testing
![Page 29: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/29.jpg)
Piled raft foundation
29
Case study: Pentominium Tower
Model statistics
• 102355 nodes
• 6260 beam elements
• 22200 plate elements
• 3520 interface elements
• 6250 pile interface elements
• 162184 solid wedge elements
• 10 Load cases
MIDAS GTS software
![Page 30: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/30.jpg)
Piled raft foundation
30
Case study: Pentominium Tower
User defined Nonlinear elastic &
Nonlinear Elasto-plastic soil models
MIDAS GTS software
Kamiran et. al., Proceedings ICE, Civil Engineering, 162, Nov. 2009
![Page 31: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/31.jpg)
Piled raft foundation
31
Case study: Pentominium Tower
Final design from 36MN => 32MN
Pile length of 42m
Hyder: “complex geotechnical finite element analysis has been carried
out, which has been validated using standard geotechnical calculation
techniques. The application of such testing and analysis approach has
resulted in a cost-effective and optimised foundation design solution.”
![Page 32: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/32.jpg)
Piled raft foundation>250 Piles of 1.5m diameter
Varying length: 35m edge, 65m center
Marine sediments underlayed by Sandstone
32
Case study: Kingdom Tower
Langan International
https://commons.wikimedia.org/wiki/File:Jeddah_tower.jpg#/media/File:Jeddah_tower.jpg
![Page 33: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/33.jpg)
Piled raft foundation
33
Case study: Kingdom Tower
![Page 34: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/34.jpg)
Piled raft foundation
Deformed shape of vertical displacement
34
Case study: Kingdom Tower
DIANA SOFTWARE
![Page 35: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/35.jpg)
Piled raft foundation
Axial forces in the piles
35
Case study: Kingdom Tower
![Page 36: GTS Seminar Dubai 7DEC2015](https://reader037.vdocuments.mx/reader037/viewer/2022100301/577c7cbf1a28abe0549bde49/html5/thumbnails/36.jpg)
Introduction to Pile Analysis
Q & AShams Tower, 2006
Palazzo Versace & D1 Tower, 2007
FAD Towers, 2007