gtpe 04/06/15 l. scibile 04/06/2015 1 edms: 1515929

20
GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

Upload: hilary-lyons

Post on 19-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 1

GTPE 04/06/15

L. Scibile

04/06/2015

Page 2: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 2

Items

• IPP Status• Parking 4-5• NEWS – Ex BP station• NEWS - Mobility Centre• NEWS – On-going projects

04/06/2015

Page 3: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929

IPP Process status

04/06/2015 3

Page 4: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 4

IPP Status: Approved for study

• The two projects clearly identified as having safety implications:– IPP-2015-01: Relocation of the coating laboratory to a more adequate working area on the first floor

of Bldg 101. (X)– IPP-2015-05: Replacement of Bldg 195 and refurbishment work on associated buildings (196 and 232)

and infrastructure

• Two projects with consolidation implications:– IPP-2015-04: RAMSES Office, storage and laboratory space– IPP-2015-07: Refurbishment of Bldg 156

• And seven new projects: – IPP-2015-02: Second network hub (X)– IPP-2015-03: Extension of radioactive equipment storage building capacity (X)– IPP-2015-06: Modification of Bldg 238 and tank for gensets (X)– IPP-2015-08: New building for metallurgy laboratory.– IPP-2015-11: Conversion and refurbishment of chemical laboratories in Bldg 3 for the safe handling of

nano-materials.– IPP-2015-13: ALICE R&D O2 lab. (X)– IPP-2015-15: ALICE visitor space in Point 2.

04/06/2015

Page 5: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 5

IPP Status: Not approved

• Projects not considered for this round of IPP:– IPP-2015-09 Storage building for rewinding line, cables and connectors– IPP-2015-10 Construction of a New Assembly Hall in Prévessin near Building 867– IPP-2015-12 New Training Centre Prevessin– IPP-2015-14 CMS 3585 Annexe (Workshops and Tooling storage)– IPP-2015-16 Building 287 Extension – IPP-2015-17 866 Building Annex

04/06/2015

Page 6: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 6

Parking 4-5

04/06/2015

Page 7: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 7

PARKING (Consolidation program) Safety

For Pedestrians and cyclists For kids from the kindergarten For car traffic on and around the parking (entrance, exit, junction)

Continuous sidewalk from Entrance A & Building 33 to main building No reduction of number of parking spots Dedicated parking spots for kindergarten drop-off (3m wide instead of 2.5) Dedicated car sharing parking spots Disabled parking spots Emergency services road marking Energy saving and high performing led lighting

ENTRANCE A (security & mobility program) Access control for cars, pedestrians and cyclists Car plate reader for in- and out-going cars Fully automated gates (car, bike, pedestrians)

Program

04/06/2015

Page 8: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 8

Existing parking layout

04/06/2015

Page 9: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 9

New parking layout

04/06/2015

Page 10: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 10

PARKING 234 parking spots 6.000+ m2 of parking surface 500+ ml of sidewalk 9 high-rise lighting masts on car park 10 low-rise lighting masts along sidewalk

ENTRANCE A 2 automated turnstiles for bikes and pedestrians 2 automated gates and barriers for cars 2 car plate readers Surveillance cameras 1 high-rise lighting masts

Technical specification

04/06/2015

Page 11: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 11

Phased execution

Phase 1

Phase 2

Phase 1’or 2’

04/06/2015

Page 12: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 12

Planning

Option 1 – Requiring early supply of automated equipment Start of work Phase 1 & 1’: 6-07 End of work Phase 1: 28-08 Start of work Phase 2: 31-08 End of work Phase 1’: 15-09 End of work Phase 2: 30-10

Option 2 – If early supply of automated equipment not possible Start of work Phase 1: 6-07 End of work Phase 1: 28-08 Start of work Phase 2 & 2’: 31-08 End of work Phase 2’: 16-10 End of work Phase 2: 30-10

04/06/2015

Page 13: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 13

Ex BP station

04/06/2015

Page 14: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 14

Ex BP station

• Agreement to use the space as is (not blacktop)

04/06/2015

Page 15: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 15

Mobility Centre

04/06/2015

Page 16: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 16

CERN Mobility Centre

• Pole échange multimodale• Trams, navettes, voitures, vélos

• Réception voiture location

• Stations à vélo

04/06/2015

Page 17: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 17

Overview

04/06/2015

Page 18: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 18

On-going projects

04/06/2015

Page 19: GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929

EDMS: 1515929 19

On-going projects

• PolimerLab– CE tenders out, HVAC and EL should be published this week.

• Bat 311– CE detailed studies on-going for call for tender as planned.

• Extension ENH1 - CENF extension– Works on-going as planned.

• Globe renovation– Globe closed and preparatory works started.

• Bat 107– Building closed, final resolutions with previous contractor to be presented at next FC. Being passed new contracts for

engineering support.

• Bat 245 - LIU Injectors– CE construction contract passed and works starting next week.

• Bat. 3852– CE tenders out.