Building our community - A Photo Chronology(Stay tuned for updates!)As of April 29, 2014

PhotologGrowing the Community Park Education Center

Updated July 1, 2014!

Page 2: Gtc construction 07 01-2014

Sign marks the SpotOf the Future

Park Education Center

Page 3: Gtc construction 07 01-2014

December 6, 2013Groundbreaking Celebration

Left – Right: Joanne Lytton, Carroll County Extension Educator, Josh Ayres, Flora Town Council PresidentMiriam Robeson, Flora Community Club TreasurerLaurie Brower, Flora Community Club President

Page 4: Gtc construction 07 01-2014

Carroll County Agriculture AssociationDonated the first and last $5,000 of the campaign

(total contribution = $10,000)

Left – Right: Laurie Brower, Flora Community Club PresidentMaurice Robeson, CCAA TreasurerDean Scott, CCAA President

Page 5: Gtc construction 07 01-2014

March 14, 2014REAL Groundbreaking!

Page 6: Gtc construction 07 01-2014
Page 7: Gtc construction 07 01-2014

March 17, 2014Setting the Block

Page 8: Gtc construction 07 01-2014
Page 9: Gtc construction 07 01-2014
Page 10: Gtc construction 07 01-2014
Page 11: Gtc construction 07 01-2014

March 31, 2014Concrete has been poured

And smoothed

Page 12: Gtc construction 07 01-2014
Page 13: Gtc construction 07 01-2014
Page 14: Gtc construction 07 01-2014

April 24, 2014Framing Begins

Page 15: Gtc construction 07 01-2014

April 24, 2014Framing Begins

Page 16: Gtc construction 07 01-2014

April 24, 2014Framing Begins

Page 17: Gtc construction 07 01-2014

April 25, 2014Framing

Page 18: Gtc construction 07 01-2014

April 25, 2014Interior Painting

Page 19: Gtc construction 07 01-2014

April 25, 2014Moving Dirt

Page 20: Gtc construction 07 01-2014

April 29, 2014Framing

Page 21: Gtc construction 07 01-2014
Page 22: Gtc construction 07 01-2014

June 6, 2014Running the wiring

Page 23: Gtc construction 07 01-2014

June 6, 2014HVAC

Page 24: Gtc construction 07 01-2014
Page 25: Gtc construction 07 01-2014
Page 26: Gtc construction 07 01-2014

June 20, 2014Overhead door moved from east

To north side of building

Page 27: Gtc construction 07 01-2014

June 20, 2014Installing insulation

Page 28: Gtc construction 07 01-2014
Page 29: Gtc construction 07 01-2014
Page 30: Gtc construction 07 01-2014
Page 31: Gtc construction 07 01-2014

June 23, 2014New accessible ramp

Page 32: Gtc construction 07 01-2014

June 26, 2014Drywall

Page 33: Gtc construction 07 01-2014