it is a final project presentation .

TRANSCRIPT

GSM Monitoring Of Tap Changing TransformerDedication

Dedicated To Our Beloved Country PAKISTAN And Our Nation Final Project ProposalSupervisor: Sir Arif Group Members: Hafiz Naseer Afzal(EE-100) Syed Saqib Ali(EE-!) Mu"ammad #smail (EE-10$) %a&ood '"a( (EE-!!) E"sa( )lla" '"a((EE-!*) Contents Introduction Project DescriptionFlow ChartEpected ComponentsProject scope Planing Chart!uestion "nswer SessionIntroductionInourcountryPakistan,wearefacingElectricityandPower Problems.Oftenthereisfluctuationofmainsupplythatcan damageourhomeappliancesandotherelectricalequipments. Alsotheoverloadingoftransformersisnormalproblemand duetoimpropermonitoring,theycangetdamaged. hisresult in loss of supply of electricity and also loss of money spent on these transformers. !eaimedtocoverbothoftheseproblemsandsomehowwehave presented a solution. Our pro"ect entitled +GSM mo(i,ori(- of .ap/"a(-i(-.ra(sformer+/a(mo(i,orremo,e ,ra(sformers i(/ludi(- ,"eir 0ol,a-e1 2urre(, a(d 3o&er4 #, /a(alsoa/,asas,abilizer for ,"eloada(d/"a(-es,apsof ,ra(sformer a//ordi(- ,o mai( supply a(d load dema(d4 Project Description #onitoring of transformer is done through $%# and is displayed on &'( and we have used )IA' for switching of aps of transformer. Although this project can bring revolution in power transmission and generation system of Pakistan but still there is a room of improvement like installment of infrared sensor with transformers for security, cooling and heating of transformers, better monitoring transformers with a technology better than GSM, as sometimes GSM signals can cause problem in hilly areas, Monitoring of each individual load and much more. e have just presented a concept and taken a step towards improvement of monitoring of transformers and fulfilling load re!uirements. And afterwards we have practically implemented this concept to present a model. "here can be much improvement in this as improvement is nature. Project Description here are two 'ategories of ap 'hanging as underMa/"a(i/al .ap 2"a(-i(-: ap changing of transformers can be done mechanically but this is very uncommon as their switching speed is very slow because they have to move their contacts physically proportional to voltage correction per second. %o if voltage correction is high, they will take more time to correct voltage. Moder( .ap 2"a(-i(-: As we have know that #echanical tap changer has many disadvantages like slow speed, heavy si*e etc. therefore modern technique is to use electronic or solid state device for tap changing of transformer. Project Description .ap /"a(-i(- i( ,"is pro5e/,: +or the tap changing of transformer, we have used )IA' as a switching device. )IA' as a fast and robust switching device as compared to )E&A, or other switching devices. Flow Chart -. /--. //-. /0-.ransformer

TRIACLOAD Instrument TranformerOpt-Couplers Micro ControlerLCDMain SupplyGSMComponents #Epected$ #icrocontroller )IA' ransformers Opto 'oupler&'( #obile$%# #odule 'apacitors )esistors etcProject scope 6e(efi,s of .ap 2"a(-i(- 3ar, )educe &osses )eduction of #anual 'ontrol Increase efficiency 1etter O2 load technique &ow cost3 Economical 6e(efi,s of GSM 3ar, #onitoring from mobile station 'ontrolling +ault Alert %etting of .oltage )educe manpower &ow costProject Planing Chart Than% &ou