Growing the Grid The Wind Farm to Market Highway Nebraska Wind Power Conference November 16, 2011 Paul Malone

Upload: chance

Post on 25-Feb-2016

41 views

Category:

Documents


1 download

DESCRIPTION

Growing the Grid The Wind Farm to Market Highway. Nebraska Wind Power Conference November 16, 2011 Paul Malone. Topics. Transmission Planning on an Interregional or Interconnection -wide basis FERC Order 1000 directives. 150,000 MW. 55,000 MW. 750,000 MW. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Growing the Grid The Wind Farm to Market Highway

Growing the GridThe Wind Farm to Market Highway

Nebraska Wind Power ConferenceNovember 16, 2011

Paul Malone

Page 2: Growing the Grid The Wind Farm to Market Highway

Topics

• Transmission Planning on an Interregional or Interconnection -wide basis

• FERC Order 1000 directives

Page 3: Growing the Grid The Wind Farm to Market Highway

3

150,000 MW

55,000 MW 750,000 MW 3

Page 4: Growing the Grid The Wind Farm to Market Highway

4

Page 5: Growing the Grid The Wind Farm to Market Highway

Interconnection-wide Transmission Studies

• Joint Coordinated System Plan (JCSP)– Sponsored by the Regional Transmission Organizations– Completed 2008

• Eastern Wind Integration and Transmission Study (EWITS) – Sponsored by the National Renewable Energy Lab– Report published 2010

• Eastern Interconnection Planning Collaborative (EIPC) – Sponsored by the Department of Energy– To be completed in 2012

Page 6: Growing the Grid The Wind Farm to Market Highway

6

Eastern Wind Integration and

Transmission Study

Page 7: Growing the Grid The Wind Farm to Market Highway
Page 8: Growing the Grid The Wind Farm to Market Highway
Page 9: Growing the Grid The Wind Farm to Market Highway
Page 10: Growing the Grid The Wind Farm to Market Highway
Page 11: Growing the Grid The Wind Farm to Market Highway

Seams Steering Committee• FERC Order 1000 pertaining to seams

– Interregional Planning– Interregional Cost Allocation

• SPP staff will review current seams agreements and JOAs

11

Page 12: Growing the Grid The Wind Farm to Market Highway

Questions?