group v ict infrastructure requirements

9
Group V Group V ICT Infrastructure ICT Infrastructure Requirements Requirements Saleem Khan Saleem Khan Additional SIO, NIC J&K Additional SIO, NIC J&K

Upload: ross

Post on 11-Jan-2016

22 views

Category:

Documents


1 download

DESCRIPTION

Group V ICT Infrastructure Requirements. Saleem Khan Additional SIO, NIC J&K. ERO Level. Hardware Desktop Computers, Laser Printers, Scanners UPS, DG Set (for problematic areas) Digital Camera, Android Phone Connectivity Leased Line (NICNET/ SWAN) / VPNoBB - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Group V ICT Infrastructure Requirements

Group VGroup V

ICT Infrastructure ICT Infrastructure RequirementsRequirements

Saleem KhanSaleem Khan

Additional SIO, NIC J&KAdditional SIO, NIC J&K

Page 2: Group V ICT Infrastructure Requirements

ERO LevelERO Level

HardwareHardwareDesktop Computers, Laser Printers, ScannersDesktop Computers, Laser Printers, ScannersUPS, DG Set (for problematic areas)UPS, DG Set (for problematic areas)Digital Camera, Android PhoneDigital Camera, Android Phone

ConnectivityConnectivityLeased Line (NICNET/ SWAN) / VPNoBBLeased Line (NICNET/ SWAN) / VPNoBBRouter / Switch/ Cables/ IO BoxesRouter / Switch/ Cables/ IO Boxes

ManpowerManpowerOffice Asstt./ Data Entry Operators (data entry/ reports/ Office Asstt./ Data Entry Operators (data entry/ reports/ EPIC/ Complaint handling)EPIC/ Complaint handling)

SoftwareSoftwareOffice Automation Suite (MS Office 2010 pro)Office Automation Suite (MS Office 2010 pro)AVSAVS

Page 3: Group V ICT Infrastructure Requirements

DEO LevelDEO Level

HardwareHardwareDesktop Computers, Laser Printers, ScannersDesktop Computers, Laser Printers, ScannersUPS, DG Set (for problematic areas)UPS, DG Set (for problematic areas)Android based PhoneAndroid based Phone

ConnectivityConnectivityLeased Line (NICNET/ SWAN)/ VSATLeased Line (NICNET/ SWAN)/ VSATRouter / Switch/ Cables/ IO BoxesRouter / Switch/ Cables/ IO BoxesVideo-Conferencing setupVideo-Conferencing setup

ManpowerManpowerAssistant ProgrammersAssistant ProgrammersData Entry Operators (data entry/ reports/ EPIC)Data Entry Operators (data entry/ reports/ EPIC)

SoftwareSoftwareOffice Automation Suite (MS Office 2010 pro)Office Automation Suite (MS Office 2010 pro)AVSAVS

Page 4: Group V ICT Infrastructure Requirements

CEO LevelCEO LevelHardwareHardware

Desktop Computers, Desktop Computers, Multifunctional DevicesMultifunctional DevicesUPS, DG Set (for problematic areas)UPS, DG Set (for problematic areas)Android based PhoneAndroid based Phone

ConnectivityConnectivityLeased Line (NICNET/ SWAN)/ VSATLeased Line (NICNET/ SWAN)/ VSATRouter / Switch/ Cables/ IO BoxesRouter / Switch/ Cables/ IO BoxesVideo-Conferencing setupVideo-Conferencing setup

ManpowerManpowerIT Manager IT Manager Systems AnalystSystems AnalystProgrammersProgrammersData Entry Operators (data entry/ reports/ EPIC)Data Entry Operators (data entry/ reports/ EPIC)

SoftwareSoftwareOffice Automation Suite (MS Office 2010 pro)Office Automation Suite (MS Office 2010 pro)AVSAVS

Page 5: Group V ICT Infrastructure Requirements

State LevelState LevelSetting up of Computer / IT centreSetting up of Computer / IT centre

Design and Development TeamDesign and Development TeamReporting TeamReporting TeamTesting/ debugging/ Staging / Deployment TeamTesting/ debugging/ Staging / Deployment TeamHardware and Networking TeamHardware and Networking TeamDocumentation TeamDocumentation Team

Benchmarking and Standardization of all activitiesBenchmarking and Standardization of all activitiesApplications Development ActivitiesApplications Development ActivitiesHardware and Networking Infrastructure Hardware and Networking Infrastructure Software Maintenance ActivitiesSoftware Maintenance Activities

HardwareHardwareHigh-end Blade Servers with Blade enclosure and FC-FC pass-High-end Blade Servers with Blade enclosure and FC-FC pass-through (Application /DB/ Replication/ Web/ Staging/ FTP)through (Application /DB/ Replication/ Web/ Staging/ FTP)Multifunctional DeviceMultifunctional DeviceHigh rating online UPSHigh rating online UPSDG Set (for problematic areas)DG Set (for problematic areas)SAN Storage (depending upon size of database)SAN Storage (depending upon size of database)

Page 6: Group V ICT Infrastructure Requirements

State levelState levelDisaster Recovery Site (in a different city/state)Disaster Recovery Site (in a different city/state)ConnectivityConnectivity

Leased Line (NICNET/ SWAN)/ VSATLeased Line (NICNET/ SWAN)/ VSAT

ManpowerManpowerDBADBANetwork AdminNetwork AdminHW expertHW expertDocumentation in charge/ technical writerDocumentation in charge/ technical writerAnalysts/ programmersAnalysts/ programmers

SoftwareSoftwareLicensed OS (say Windows 2008)Licensed OS (say Windows 2008)Licensed RDBMS (say SQL Server 2008 or above)Licensed RDBMS (say SQL Server 2008 or above)Office Automation Suite (MS Office 2010 pro)Office Automation Suite (MS Office 2010 pro)AVSAVS

Page 7: Group V ICT Infrastructure Requirements

Capacity BuildingCapacity Building

E-Governance Lifecycle trainingE-Governance Lifecycle training

Training on BPRTraining on BPR

Training on OB and Change ManagementTraining on OB and Change Management

Training on Contract ManagementTraining on Contract Management

NISG may be roped inNISG may be roped in

At least 2-3 training programs/ seminars/ At least 2-3 training programs/ seminars/ workshop every year at various levelsworkshop every year at various levels

Page 8: Group V ICT Infrastructure Requirements

Some more SuggestionsSome more Suggestions

Strengthening of Election Machinery at all levels Strengthening of Election Machinery at all levels with dedicated officers/ officials:with dedicated officers/ officials:

Addl./ Jt. /Dy. CEOAddl./ Jt. /Dy. CEOSection OfficerSection OfficerAssistants (UDC/ LDC)Assistants (UDC/ LDC)PeonsPeons

Dedicated BLOs (other than teachers)Dedicated BLOs (other than teachers)Mobile Phone SIM to be provided to BLOs Mobile Phone SIM to be provided to BLOs GPS hand-held devices for PSL mappingGPS hand-held devices for PSL mappingCUG network for CEO/DEO/ERO/AEROCUG network for CEO/DEO/ERO/AEROOnline Discussion Forum (using Collaboration Online Discussion Forum (using Collaboration Tools)Tools)

Page 9: Group V ICT Infrastructure Requirements

ThanksThanks