Page 1: Ground Investigation by Horizontal Directional Drilling

Ground Investigationby

Horizontal Directional Drilling

presented byY. C. Lam & Tim Leung

21 May 2005

Page 2: Ground Investigation by Horizontal Directional Drilling

2

Horizontal Directional Drilling (HDD)

• Working Principle• Construction Procedure• Recent Application• Lessons Learnt• Suggested Improvement

Page 3: Ground Investigation by Horizontal Directional Drilling

3

Working Principle

• Define the trajectory and tolerance• Straight section - Conventional Wireline

Drilling• Curve section - Steerable Drilling System• Navigation by toolface angle• Borehole surveying (i.e. to get the azimuth

and inclination)

Page 4: Ground Investigation by Horizontal Directional Drilling

6

Construction Procedure

• Drilling Machine Setup

Drilling Rig Setup

Drilling in Operation

Page 5: Ground Investigation by Horizontal Directional Drilling

7

Construction Procedure

• Steering Adjustment

Adjusting the Toolface

Page 6: Ground Investigation by Horizontal Directional Drilling

8

Construction Procedure

• Changing Bit

DeviDrill BitNQ Bit

Page 7: Ground Investigation by Horizontal Directional Drilling

9

Construction Procedure

• Reading the Toolface

Page 8: Ground Investigation by Horizontal Directional Drilling

10

Construction Procedure

• Surveying

DeviTool Verifying Data

Page 9: Ground Investigation by Horizontal Directional Drilling

11

Construction Procedure

• Sampling

Page 10: Ground Investigation by Horizontal Directional Drilling

12

Recent Application

• Route 8– Eagle’s Nest Tunnel & Associated Works

Page 11: Ground Investigation by Horizontal Directional Drilling

13

Route 8 between Cheung Sha Wan and Sha Tin

Page 12: Ground Investigation by Horizontal Directional Drilling

14

Scope of this Site Investigation by HDD

– Planning of Temporary Support Systems in Tunnels– Excavation Sequencing– Blasting Works– Grouting– Programming

To facilitate:-

Page 13: Ground Investigation by Horizontal Directional Drilling

15

HDD Successfully Drilled

– 1151m long from North Portal

– 516m long from South Portal (excluding the reservation pipe length of 34m)

Page 14: Ground Investigation by Horizontal Directional Drilling

16

HDD Successfully Drilled

South PortalNorth Portal

516m long HDD 1151m long HDD

Page 15: Ground Investigation by Horizontal Directional Drilling

17

Equipment Employed for HDD

– Rotary Drilling Rig– Devico Directional Drilling Equipment

– DeviDrill– DeviTool– Peewee

– Conventional Wireline Drilling– NQU Wireline Drilling System– Mud Pump

Page 16: Ground Investigation by Horizontal Directional Drilling

18

Grouting Unit

– Mixer– Agitator– Grout Pump– Inflatable Packer

Page 17: Ground Investigation by Horizontal Directional Drilling

19

Rotary Drilling Rig For the first 550m drilling while Hydraulic Drilling Rig

Page 18: Ground Investigation by Horizontal Directional Drilling

20

Drill RodsDeviDrill core length in maximum of 3mNQU wireline drilling system coring in length of 6m

Casing Platform

Page 19: Ground Investigation by Horizontal Directional Drilling

21

Devico Directional Drilling Equipment

“DeviDrill” is a wireline operated steerable core barrel

Page 20: Ground Investigation by Horizontal Directional Drilling

22

Devico Directional Drilling EquipmentDiamond Bit and Adjustable Eccentric Housing

Diamond bit

Adjustable eccentric housing

Page 21: Ground Investigation by Horizontal Directional Drilling

23

Devico Directional Drilling EquipmentDeviDrill Bit in N-Size

Page 22: Ground Investigation by Horizontal Directional Drilling

24

Devico Directional Drilling Equipment“DeviTool” is to record information from 3D-magnetometers

and accelerometers to define magnetic and gravity tool face, azimuth and inclination of the borehole

DeviTool

Page 23: Ground Investigation by Horizontal Directional Drilling

25

Devico Directional Drilling Equipment

“Peewee” is a small diameter electronic multi-shot survey device

Page 24: Ground Investigation by Horizontal Directional Drilling

26

Water Outflow Measurement

– Collection Basic– Settlement Tank– Measuring Tank– Flow Meter + Pressure Transducer– Datalogger + Desktop Computer– Wireline Packer

Page 25: Ground Investigation by Horizontal Directional Drilling

27

Water Outflow Measurement

Datalogger

Flow Meter

Page 26: Ground Investigation by Horizontal Directional Drilling

28

Site Constraints

– At North Portal– Site formation works completed in advance under

SHT Contract– Sufficient working spaces, no particular site

constraint

– At South Portal– Not enough working space– Concerns with respect to the existing WSD Tai Po

Road Treatment Works, i.e. underground water tank and filter bed

Page 27: Ground Investigation by Horizontal Directional Drilling

29

Setting Up for HDD at North Portal

Setting up for HDD

Northbound Tunnel

Southbound Tunnel

Page 28: Ground Investigation by Horizontal Directional Drilling

30

HDD & Tunnel Excavation in progress

Page 29: Ground Investigation by Horizontal Directional Drilling

31

Site Formation Works at South Portal

Setting up HDD at the rear of South Portal

Page 30: Ground Investigation by Horizontal Directional Drilling

32

Site Setting Up at South Portal– Setting up Hydraulic Drilling Rig

Hydraulic Drilling Rig

Page 31: Ground Investigation by Horizontal Directional Drilling

33

Site Setting Up at South Portal– Set up Hydraulic Drilling Rig and Drill Rod

Page 32: Ground Investigation by Horizontal Directional Drilling

34

Site Setting Up at South Portal– Setting up Temporary Platform for supporting steel casing

Temporary Platform

Page 33: Ground Investigation by Horizontal Directional Drilling

35

Site Setting Up at South Portal– Drill Rod to be

extended into the terrain

Page 34: Ground Investigation by Horizontal Directional Drilling

36

Site Setting Up at South Portal– Toolface Orientation

Temporary Platform

Page 35: Ground Investigation by Horizontal Directional Drilling

37

Site Setting Up at South Portal– Control Panel for Drilling Operation

Page 36: Ground Investigation by Horizontal Directional Drilling

38

Site Setting Up at South Portal– Drilling in Operation and Safety Fencing

Page 37: Ground Investigation by Horizontal Directional Drilling

39

Lessons Learnt

• Correct use of drill bit affects progress;• Steering rate is obtainable initially upon

literature;• Actual rate is affected by the geology

significantly; therefore, a more precise or site-specific rate should be verified by the available GI information

• High water pressure (i.e. 25 bar) should be kept especially at steering

Page 38: Ground Investigation by Horizontal Directional Drilling

40

Lessons Learnt

• Refurbishing drill bit (without replacing) by lowering the RPM and maintaining a constant penetration rate;

• Optimal bend radius – 1.2o/10m;• Maximum bend radius – 4.8o/10m;• Straight Section – 30m/day (average);• Curve Section – 8m/day (average)

Page 39: Ground Investigation by Horizontal Directional Drilling

41

Further Enhancement

• Modified steering barrel to get toolface angle information (i.e. by acoustic / EM wave) without retracting the inner tube

• Joint orientation mapped with reference to the azimuth reading taken by the accelerometer and magnetometer

Page 40: Ground Investigation by Horizontal Directional Drilling

42

Thank You