ground geophysical report for aurelian development ltd. brackin project · 2017-01-17 · ground...

18
42B05SW0037 2.7901 BRACKIN 010 GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT 8 Timmins, Ontario March 5, 1985

Upload: others

Post on 28-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

42B05SW0037 2.7901 BRACKIN010

GROUND GEOPHYSICAL REPORT

FOR

AURELIAN DEVELOPMENT LTD.

BRACKIN PROJECT

8

Timmins, Ontario March 5, 1985

Page 2: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

42B05SWe837 2 .7901 BRACKIN010C

TABLE OY CONTENTS

INTRODUCTION

LOCATION AND ACCESS

PROPERTY

PREVIOUS WORK

GENERAL GEOLOGY

SURVEY EQUIPMENT.AND PROCEDURE

SURVEY RESULTS

RECOMMENDATIONS

Page l

l

1

2

2

2

3

3

MAPS

2 VLF-EM PROFILE

2 MAGNETIC CONTOUR

In back pocket

In back pocket

Page 3: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

(1)

INTRODUCTION

This report summarizes the results of a geophysics program' of

ground magnetometer and VLF-EM surveys run on the property to determine

geological contacts and conductive zones of mineralization, shearing

or faulting.

LOCATION AND ACCESS

The Aurelian property is located approximately 15 miles east

of the town of Missinabie and five miles south of the Renabie Mine in

Brackin Township. Brackin Township is in the District of Sudbury,

Porcupine Mining Division, Ontario.

Access to the property is gained by the Renabie Mine road and

an unmaintained gravel road leading south from Renabie to Crooked Lake.

A boat should be used to get to the south east arm of the lake where

an old overgrown road may be followed on foot or part of an existing

grid may be used to acquire access.

PROPERTY

The Aurelian-Brackin property consists of HO contiguous,

unpatented claims. Sixteen complete claims were covered by the two

surveys.

The claims covered by the surveys are:

P722398 - 408 inclusive 11

P780070 - 072 inclusive 3

P780064 l

P779809 l

See Figure I for property boundary.

Page 4: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

(2)

PREVIOUS WORK

There has been no previous exploration work done on the property.

Government reconnaissance mapping of Rennie, Lesson, Stover

and Brackin townships took place between 1942 and 1944. A government

geological map and report released in 1978 covers Stover and Brackin

townships.

GENERAL GEOLOGY

The rocks of the area are all of Precambrian age. A southeast

to south trending belt of metavolcanics and metasediments had been intruded

by quartz-diorite covering almost two-thirds of Brackin Township. The

property is situated wholly in the quartz-diorite and is cut into thirds

by two northeast trending faults. There are also numerous diabase dikes

trending southeast with one leading northeast being intersected by another

dike. Dips in the formation vary from 50 degrees to 75 degrees southwest

with strikes varying from east-southeast to southeast. Gold may occur

in pyrite-bearing quartz veins.

SURVEY EQUIPMENT AND PROCEDURE

A total of 12.5 miles were surveyed by the geophysical equipment.

The grid was oriented N600E.

The Very Low Frequency Electromagnetic (VLF-EM) survey was

carried using a Geonics EM16 S utilizing the Annapolis, Maryland (NSS)

transmission station, transmitting at 19.0 KHz. Readings of In-phase

and Quadrature were taken every 100 feet with an accuracy of li.

The magnetic survey was conducted with a Geometrics G-816 total

field magnetometer. Readings were taken every 100 feet with the inter

sections of crosslines and baseline used as base stations, so that diurnal

drift could be monitored. This method allows readings to be taken and

corrected with an accuracy of one gamma.

Page 5: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

(3)

SURVEY RESULTS

The VLF-EM detected several conductors, three of which may

delineate the contacts of diabase dikes. The conductors are marJsed A,

B, and C.

The magnetic survey does confirm the VLF conductors. The

magnetic survey results may better show the stratigraphic correlation

upon completion of a geological program.

RECOMMENDATIONS

PHASE I

All the VLF-EM conductors and magnetic anomalies should be

prospected to determine their true nature. A geological mapping and

sampling program should also be completed.

PHASE II

Following successful results from the geological program,

selected targets should be trenched and mapped in detail, accompanied

by stripping to determine litholigies and orientation of mineralization.

Page 6: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario
Page 7: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

42B85SW8837 2,7901 BRACKIN 300

Mining Lands Section

Control Sheet

File No J? ? ft? X

TYPE OF SURVEY GEOPHYSICAL

GEOLOGICAL

GEOCHEMICAL

EXPENDITURE

MINING LANDS COMMENTS:

ijA

f)..

Signature of Assessor

Date

Page 8: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

Mimstryoi Report of WorkNatural ,- , . . ^ , . .Resources (Geophysical, Geological,

Ontario ^ Geochemical and Expenditures)4.

Mining Act

Instructions: Please type or print. If number of mining claims traversed

exceeds space on this form, attach a list. Note: Only days credits calculated in the

"Expenditures" section may be entered in the "Expend. Days Cr." columns.

Do not use shaded areas below.

Ada rets

Survey Company ,um.Date of Survey (from 0V to) Total Miles pf line Cut

Name and Address of Author (of Geo-Technical report).

Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:

Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total (s) here

Airnorne Credits

Note: Special provisions credits do not apply to Airborne Surveys.

Geophysical

' Electromagnetic

- Magnetometer

* Radiometric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Electromagnetic

Magnetometer .~ -" '**

. Radiometrfe--'';;"", ,-

Oays perClaim

^Vo"7O

Days per Claim

-

Days per Claim

"" l

^

Expenditures (excludes power stripping) 'jType o* Work PerforraeCf"

Performed on Claimlsh

Calculation of Expenditure Days Credits

Total ExpendituresTotal

Days Credits

InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected m columns at right.

Date Regarded Holder or Agent (Signature)

Certification Verifying Report'of Work

Mining Claims Traversed (List in numerical sequence)Mining Claim

Prefix Number

G r*, r -.

MAR 2 9

Expend. Days Cr.

3-5-f)

Mining ClaimPrefix Number

M

Expend. Days Cr,

Total number of mining claims covered by this report of work.

For Office Use OnlyTotal Days Cr. Recorded

Date Recordeduate necoroeo . Mining

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Postal Address o i Person Certifying

^ M. K-V

1362 jKio

Page 9: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

9

1985 06 04 Your Filet 108/85 Our File: 2.7901

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins* OntarioP4N 2S7

Dear Sir:

RE: Notice of Intent dated May 7, 1985Geophysical (Electromagnetic ft Magnetometer) Survey on Mining Claims P 722398. et al, In Brackin Township

The assessment work credits, as listed with the above-mentioned Notice of Intent, have been approved as of the above date.

Please Inform the recorded holder of these mining claims and so Indicate on your records.

Yours sincerely*

S.E. YundtDirectorLand Management Branch

Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1M3 Phone:(416)965-4888

D. Isherwood:me

cc: Aural 1an Developers Ltd cc:Toronto, Ontario

cc: Mid-Canada Exploration Services LtdTimmins, OntarioAttention; David Black cc: cc: John StackErin, Ontario

Encl.

Mr. G.H. FergusonMining ft Lands CommissionerToronto, Ontario

Resident Geologist Timmins, Ontario

Page 10: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

/JLJrv Mimsuyo! Technical AssessiIVy] Natural iaf . . ... \V*S l^urces Work CreditsOntario ^P

ment *2.7901

Date Mining Recorder's Report of

1985 05 07 Work O i inft/ftS

Recorded Holder

AURELIAN DEVELOPERS LTDTownship or Area

RRACKIN TOWNSHIP

Type of survey and number of Assessment days credit per claim

Geophysical

Flortrnm.gnBtir 40 days

Radiometric days

Other days

Section 77 (19) S** "Mining Clslmi AiiMied" column

Geological . days

Man days CD Airborne CD

Special provision La Ground Q

CD Credits have been reduced because of partial coverage of claims.

CD Credits have been reduced because of corrections to work dates and figures of applicant.

Mining Claims Assessed

P 722398 to 403 inclusive 722405 to 408 inclusive 780064 780070 780072

799809

Special credits under section 77 (16) for the following mining claims

20 DAYS ELECROMAGNETIC10 DAYS MAGNETOMETER

P 722404 780071

No credits have been allowed for the following mining claims

CD not sufficiently covered by the survey CD Insufficient technical data filed

The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical 80; Geological 40; Geochemical 40; Section 77(19) GO:sea tf-s

Page 11: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

Ministry ofNaturalResources

1985 05 07 Your File: 108/85 Our File: 1.7901

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioPAN 2S7

Dear Sir:

Enclosed are two copies of a Notice of Intent with statements . listing a reduced rate of assessment work credits to be allowed

^

for a technical survey. Please forward one copy to the recorded holder of the claims and retain the other. In approximately fifteen days from the above date, a final letter of approval of these credits will be sent to you. On receipt of the approval letter, you may then change the work entries on the claim record sheets.For further information, if required, please contact Mr. R.J. Pichette at 416/965-4888.

sincerely,

Indt tor

Land Management Branch

Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1W3)D. I sherwood:me

Ends.cc: Aurelian Developers Ltd

2625 Lakeshore Blvd WestToronto, OntarioMSN 1G5

cc: John SlackR.R.11Erin, OntarioNOB 1TO

cc: Mid-Canada Exploration Services Ltd

219 Cherry StreetTimmins, OntarioP4N 6W3 Attn: David Black

cc: Mr. G.H, FergusonMining S Lands CommissionerToronto, Ontario

845

Page 12: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

Ministry ofNaturalResources

Ontario

Notice of Intent

for Technical Reports

1985 05 07

2.7901/108/85

An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.

If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.

If the reduced rate of credits does pot jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.

If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the-opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Land Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.

B46 (82/5)

Page 13: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

till

l l

i

i \

!\

^^K

x\

\\!N

i -.

i i^

sN

' -

J

Page 14: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

REFERENCESAREAS WITHDRAWN FROM D ISPOSITION

M.R.O. -MINING RIGHTS ONLY

S.R.O, - SURFACE RIGHTS ONLY

M.-f S. - MINING AND SURFACE RIGHTS

Description Order No. Det* Dtaporitton FI**

SEC 36/80 W36/79 Nov 2l, '79 MSS. 188509

LEESON TWP.

5 M

e 10 s 0

r K 8*.**18 **" U*Ml4|54943

70QO3O 807^86

^7 Crooked 7

p

Z6137 7666*6

f, .7t,l87O i 7O4O53

P

76'B49 '61866 i '61873 .761640 ^'61643 ;76r.ll'

P 'PU .P l,'T l P

Missinaibi

76-i! 18 l 765119

76IB25 L^J l ' j l76I83K ' '6IB5I 761864 ;76(875 j 76 l 638 ]'61645 i765(36 i 765137 [765138 i7B006

i J x-4-v l i l l _ ^- ^-

P 'P l H

l '6^37^761852 ^619^3 l 76/8

1/p

761647 ;765I45 i 765144 765143 ; 780063

76185^4 1761861 ' '6IB'8 l 76 IBB5 176^164 B i 765 IL7 i 765 158 | 765 159 /j y?."

1B55 ' 761860 761879 '76IH84

76186 l , 76I.B82 76l ; 6!5l^6(83^ 76105' i 761858

74012 l 774013 j 774014 774015 i 774016 i l

L. . 1774021 77402O , 774019

LANG TWR

CD

enCO

48 0 IS 45

S* 45'"8" Appr

LEGEND

HIGHWAY A ND ROUTE No.

OTHER ROADS

TRAILS

SURVEYED L INES:

TOWNSHIPS, BASE LINES, ETC.LOTS, MINING CLAIMS, PARCELS, ETC

UNSURVEYEO LINES:

LOT LINESPARCEL BOUNDARY

MINING CLAIMS ETC!

RAILWAY AND RIGHT OF WAY -*

UTILITY LINES

NON-PERENNIAL STREAM

FLOODING OR FLOODING RIGHTS

SUBDIVISION OR COMPOSITE PLAN

RESERVATIONS

ORIGINAL SHORELINE

MARSH OR MUSKEG

MINES TRAVERSE MONUMENT

DISPOSITION OF CROWN LANDS

TYPE OF DOCUMENT SYMBOL

PATENT, SURFACE A MINING RIGHTS ..........,....6*' 9

.SURFACE RIGHTS ONLY........................ 6

.MINING RIGHTS ONLY n.m.............. .. Q

LEASE,SURFACE Bt M INING RIGHTS.. .. ........ H

" .SURFACE RIGHTS ONLY..............,,.......^ H

" .MINING R IGHTS ONLY...................,........ B

LICENCE OF OCCUPATION ........ _............. . T

ORDER-IN-COUNCIL ....,.., ..................,.....-. OC

RESERVATION .........,.._........................_.

CANCELLED __....................................... *SAND ft GRAVEL ._......__.............^....^......

MOTE: MINING RIGHTS IN FARCE LS PATENTED PMIOA TO MAY t. 1913. VESTED IN ORIGINAL PATENTEE BY THE PUBLIC LANDS ACT, ft.S.O. 1970, CHAP MO, SEC. U, SUSCEC 1.

SCALE: 1 INCH ~ 40 CHAINS

FEET10OO 2OOO 4OOO 6OOO OOO

o 200METRES

10OOd KM)

2000(2KMI

TOWNSHIP

BRACKINM.N.R. ADMINISTRATIVE DISTRICT

CHAPLEAUMINING DIVISION

PORCUPINELAND TITLES/ REGISTRY DIVISION

SUDBURY

Ministryof L andNatural Management

Resources BranchOntario

OiltOCTOBER 1984

Niokir

G-3204

A M

42B85SW0837 2.7901 BRACKIN

200

Page 15: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

50E

40E

30E

20E

LEGEND

G6DLOGICAL

e o z

tDro

CD c\j CM.

o00

50 E

40E

O

VLF SURVEY

In-phot*

Conductor strlk*

Primory fi*ld (NAA)

Quod - phot*

, " v.v'Quod-phoe*

MAGNETIC SURVEY

LESS 59 OOO GAMMAS

Contours

contours

TOPOGRAPHIC

-A- Claim pott located

If OMum*d ton

*4). W it

.Property boundary

Power lin*

s* ss = s Accet* Rood

Swamp

Stream

LakMhor*

Outcrop

Drill taroet (propoeed)

Roil way

IMDEX MAP

MID - CANADAEXPLORATION SERVICES UNITED

AURELIAN DEVELOPMENT LTD.

VLF SURVEY A//!(JS W^

D. ROCHON Pi CAMERON

biter prefev by;

Draw, by. V. SCWPNICK

l600*

BRACKIN TWP.

DISTRIOr OF SUDBURY

PORCUPINE MININC DIVISION

REF CLAIM MAP. M-678

-42B05SW0037 2.7901 BRACKIN

210

Page 16: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

LEGEND

GEOLOGICAL

50E

40E

30E TIE LINE

PROPOSED

PARKLAND

BASE LINE O

VLF SURVEY

Conductor designation

in - phot*

,-'*"v..,'*Ooad-phaie

MAGNETIC SURVEY

LESS 59 OOO GAMMAS

contours

TOPOGRAPHIC

C'aim post located

-Q- Claim poij otsumvdT petition

-Q- w.p WitneM po*t

boundary

Power lint

^. — -^•si Access Rtxid

J/ Swamp

Stream

Lakeehore

Outcrop

Drill target (propoeed)

Railway

IMDEX MAP

60S

SCALE: M4800

42B05SW0037 2.7901 BRACKIN 220

'300 Metres

U1000 Feet

MID-CANADAEXPLORATION SERVICES LIMITED

AURELIAN DEVELOPMENT LTD

VLF SURVEYOR

Operator(e): D. BLACK

Inttrpfetod by

^ D. BLACK

Approved by 1

lSCALE

t^ BRACKIN TWP.

DISTRICT OF SUDBURY

PORCUPINE MININGDIVISION

REF. MAP M-678

Ma

Page 17: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

LEGEND

GEOLOGICAL

/DO

PROPOSED

PARKLAND

BASF L NE O

VLF SURVEY

OO Q -

r .

onductof designation

) 'Assumed

Conductor

\ U4J+fiaitj

plus* Quad ph as*

In phase r - Ouod-phOM

MAGNETIC SURVEY

60S

SCALE' |:

O ' t300 Metres

, 1000 Feet

59000 GAMMAS

100,200,300,400,500,600

TOPOGRAPHIC

post

Joim poel assumed 0o*i t ion

-Q- w.p W'Tnets posf

.Property Boundary1- i

Strtom

Lakethori

Outcrop

D Drill toro*t fpropoMO)

Railway

INDEX MAP

MID-CANADAEXPLORATION SERVICES UNITED

A sftti for fi /i

AURELIAN DEVELOPMENT LTD.

MAGNETIC SURVEYS//^

Op*rotor(O R BENICY

lnt*rprtt*d by

Drawn by- D BLACK

Approved by 1

Rtvtttd by1

SCALE

^ BRACKIN TWP.

DISTRICT OF SUDBURY

PORCUPINE MINING DIVISION

REF. MAP M-678

42Be55W0037 2.7901 BRACKIN 230

Page 18: GROUND GEOPHYSICAL REPORT FOR AURELIAN DEVELOPMENT LTD. BRACKIN PROJECT · 2017-01-17 · ground geophysical report for aurelian development ltd. brackin project 8 timmins, ontario

LEGBJO

GB)t06ICAL

zO CD

(M

Z ^t CM.

Zo(M

Zto C\J

zCO

50E 50 E

40E 40E

JOE

20E

VLF SURVEY

Proboblt

Conductor dMtgnqtjpn

® -i i' .

- Conductor ttrfk*

Primary fMd (NAA)

In-ph

m -' *" X.. 9 ' Quad - phaM

MAGNETIC 3LIRVEY

LESS S90OO GAMMAS

Cootourt

D*pr*Mion contour*

TOPOGRAPHIC

o

42B05SW0037 2.7901 BRACKIN 2-40

Claim pott tocotwJ

-Q- Claim pot) i pavilion

Swamp

Stream

-Q- Witntw po*l

boundary

ssssB Acctss Rood

Outcrop

Drill tOTMt(propo**d)

t * i t Rot l way

INDEX MAP

MID - CANADAEXPLORATION SERVICE* UMtTED

AURELIAN DEVELOPMENT LTD.

MAGNETIC SURVEY0. ROCHON P. CAMERON

V. 3CWPNK*

•CAil

Prepwt' BRACKIN TWP.

DISTRICT OF SUDBURY

PORCUPINE MINI MO DIVISION

RER CLAM MAP. M-*T8