APPENDIX C GRIHA Check List
Criterion AppraisalMaximumPoints
Points beingattempted *
Remarks ‐RCC Remarks ‐KNC
Criterion 1 Site SelectionThe site plan must be in conformity with the development plan/masterplan/UDPFI guidelines (mandatory). This should comply with the provisions ofeco‐sensitive zone regulations, coastal zone regulations, heritage areas(identified in the master plan or issued separately as specific guidelines), waterbody zones (in such zones, no construction is permitted in the water‐spreadand buffer belt of 30 meter minimum around the FTL), various hazard pronearea regulations, and others if the site falls under any such area (mandatorywith no point allocation).
0 clients scope clients scope
The site should be located within ½ km radius of an existing bus stop,commuter rail, light rail or metro station and/or the proposed site must be aBrownfield site (to rehabilitate damaged sites where development is hinderedby environmental contamination, thereby reducing pressure on undevelopedland)
1 0 clients scope clients scope
1 0
Criterion 2 Preserve and protect landscape during construction/compensatorydepository forestation.Applicability Check 1There are existing several mature trees on site that can be preserved
yes
Construction has been planned in a way that excavation/basement work, up toplinth level is not coinciding with rainy season and the site disruption isrestricted to pre‐designated areas
1
generalcontractors scopein‐ applicable inconstructionstage
generalcontractors scopein‐ applicable inconstructionstage
*Points will be evaluated by GRIHA consultant appointed by IITH
GRIHA self‐evaluation toolNote: Applicability checks have been provided for various criterions in the table, to check for conditions on site which may make those criterion non‐applicable. If in the Applicability checks, the conditions specified are false for the given project, kindly input 'no' in place of the default 'yes'.
Proper staging, spill prevention plan , sedimentation and erosion controlsystems in place.
1
generalcontractors scopein‐ applicable inconstructionstage
generalcontractors scopein‐ applicable inconstructionstage
Trees are preserved and protected properlyNote: Applicable if answer is yes in Applicability Check 1 above
1
Compensatory forestation is applied on siteNote: Applicable if answer is yes in Applicability Check 1 above
1masterplannersscope
masterplannersscope
4Criterion 3 Soil conservation (post construction)
Applicability Check 2Top soil quality meets the quality standard of top preservation criteria as percriteria 3
yes
Top soil is fertile and properly laid for vegetative growthNote: Applicable if answer is yes in Applicability Check 2 above
1
generalcontractors scopein‐ applicable inconstructionstage
generalcontractors scopein‐ applicable inconstructionstage
Measures taken for proper stabilization so soilNote: Applicable if answer is yes in Applicability Check 2 above
1
generalcontractors scopein‐ applicable inconstructionstage
generalcontractors scopein‐ applicable inconstructionstage
2
Criterion 4 Design to include existing site features
Building and site planning to minimize the disruption of natural ecosystemsand to maximize benefits from prevailing micro‐climate
4
can attempt forthese points asthe micro climateis not disterbed
can attempt forthese points asthe micro climateis not disterbed
4Criterion 5 Reduce hard paving on site
Net Paved area on site under parking, roads etc. to exceed 25% of the site area(minus the building footprint) or the net imperviousness factor of the siteshould not exceed the net imperviousness factors prescribed in the NBC 2005,whichever is more stringent.
1 achieved achieved
Total surface parking not to exceed as permitted by the local building by‐laws 0
More than 50% of the total paved area to havepervious paving oropen grid pavements orgrass pavers orshading through the use of vegetated pergolas orcovered with coating of SRI>0.5ORMore than 50% of the total paved area to have a combination of the above.
1more than 50%pervious coverplanned
more than 50%pervious coverplanned
2Criterion 6 Enhance outdoor lighting system efficiency
Luminous efficacy of 100% of lamps used in outdoor lighting to meet thecorresponding lamp luminous efficacy as mentioned in Table 6.1, as per GRIHA
1planned as perGRIHA guideline
planned as perGRIHA guideline
Automatic controls to be installed for 100% of outdoor lights 01
Criterion 7 Plan utilities efficiently and optimize on‐site circulation efficiency
Various transportation and service corridors shall be minimized andconsolidated and the pedestrian walkways to be shaded.
1 single building single buildng
Aggregate utility corridors shall be used 1
Utility corridors shall be consolidated along the previously disturbed areas oralong new roads in order to minimize unnecessary cutting and trenching andensure easy maintenance
1masterplannersscope
masterplannersscope
3
Criterion 8 Provide minimum level of sanitation/safety facilities for constructionworkers
Ensure compliance with the NBC (2005) safety norms for providing thenecessary safety equipment and measures for construction workers
1
generalcontractors scopein‐ applicable inconstructionstage
generalcontractors scopein‐ applicable inconstructionstage
Provisions for drinking water, healthy and clean living conditions andsanitation facilities shall be provided for the workers
1
generalcontractors scopein‐ applicable inconstructionstage
generalcontractors scopein‐ applicable inconstructionstage
2Criterion 9 Reduce air pollution during construction
Necessary measures to be taken on site to reduce air pollution for exampleproviding site barricading to a height of 3 m on the site perimeter, carry outwheel washing of vehicles entering/exiting the site, sprinkle water on roadswith loose dust etc.
2
generalcontractors scopein‐ applicable inconstructionstage
generalcontractors scopein‐ applicable inconstructionstage
2
Criterion 10 Reduce landscape water demand
If landscape water demand is reduced by up to 30% 1landscapedesigners scope
landscapedesigners scope
If landscape water demand is reduced by up to 40% 2landscapedesigners scope
landscapedesigners scope
If landscape water demand is reduced by up to 50% 3landscapedesigners scope
landscapedesigners scope
3landscapedesigners scope
landscapedesigners scope
Criterion 11 Reduce building water use
Non Applicability condition: All faucets, which are installed in spaces withwater head heights less than 15 feet (4.6 m), in a gravity fed systems, can beexempt for calculations in Criterion 11.
If building water demand is reduced by up to 25% 1
attempted for25% reduction.Domestic &flushing duelplumbing sys forwater supply.Low flow fixtures,Low flow fixturesused
attempted for25% reduction.Domestic &flushing duelplumbing sys forwater supply.Low flow fixtures,Low flow fixturesused
If building water demand is reduced by up to 50% 1 not achieved not achieved2
Criterion 12 Efficient water use during construction
Efforts to be taken to reduce the use of potable water during construction forexample use waste jute bags to cover columns and beams during curing, addadmixtures to concrete which cause a reduction in the water required forcuring etc.
1
generalcontractors scopein‐ applicable inconstructionstage
generalcontractors scopein‐ applicable inconstructionstage
1Criterion 13 Optimize building design to reduce conventional energy demand
The WWR and/or SSR shall be limited to the prescribed levels as per Table13.1(GRIHA Manual Introduction Volume‐I) and all fenestration shall meet eitherthe SHGC requirements of ECBC 2007OR shading requirements as suggested in13.1.4 OR 13.1.5, as per clause 13.2.3 to 13.2.5
2
refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN13
refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN14
Minimum 25% of the living area shall be daylighted and shall meet the level ofdaylight prescribed in NBC 2005 (reference Table 13.2 GRIHA ManualIntroduction Volume‐I)
2
Majority ofspaces being labs, and can beexcluded, otherareas can fulfillthe criterion
Majority ofspaces beingLibrary / bookschelves , andcan be excluded,other areas canfulfill the criterion
If the total daylighted area>50% of the total living area and meets theprescribed level of daylight
1 Not achieved Not achieved
If the total daylighted area>75% of the total living area and meets theprescribed level of daylight
1
Over‐design of artificial lighting system shall be avoided and the lighting levelsin indoor spaces shall be maintained as recommended in NBC 2005.
2designed as perNBC 2005
designed as perNBC 2006
8
Criterion 14 Optimize energy performance of building within specified comfort limits
All mandatory compliance measures (for all applicable buildings) asrecommended in the Energy Conservation Building Code 2007 of BEE shall becomplied with.
6
The thermal comfort conditions and at least 10% reduction from thebenchmark EPI, specified in GRIHA, shall be met.
2
If the reduction in energy consumption is > 20% of the benchmarked figureand the thermal comfort criteria are fully met
2
If the reduction in energy consumption is > 30% of the benchmarked figureand the thermal comfort criteria are fully met
4
If the reduction in energy consumption is > 40% of the benchmarked figureand the thermal comfort criteria are fully met
6
If the reduction in energy consumption is > 50% of the benchmarked figureand the thermal comfort criteria are fully met
8
16
Criterion 15 Utilization of fly‐ash or equivalent industrial/agricultural waste asrecommended by BIS in building structures
Replace 15‐25 % of OPC by weight with fly‐ash or equivalentindustrial/agricultural waste as recommended by BIS in structural concrete
1 can be achieved can be achieved
Replace more than 25% of OPC by weight with fly‐ash or equivalentindustrial/agricultural waste as recommended by BIS in structural concrete
1 can be achieved can be achieved
100% of the building blocks shall have at least 40% fly ash or equivalentindustrial/agricultural waste as recommended by BIS (by volume)
2 can be achieved can be achieved
the HVAC(distribution side)system isdesigned as perECBC 2007 ,however thechilled watergeneration andequipments andefficiancy to becompared alongwith masterplanners for acumulative result.
the HVAC(distribution side)system isdesigned as perECBC 2007 ,however thechilled watergeneration andequipments andefficiancy to becompared alongwith masterplanners for acumulative result.
Replace 15‐25 % of OPC by weight with fly‐ash or equivalentindustrial/agricultural waste as recommended by BIS in masonry and plastermortar
1
Replace more than 25% of OPC by weight with fly‐ash or equivalentindustrial/agricultural waste as recommended by BIS in masonry and plastermortar
1
64‐5 points couldbe attempted.
4‐5 points couldbe attempted.
Criterion 16Reduce embodied energy of construction is reduced by adopting materialefficient technologies and/or low‐energy materials
The embodied energy of the structural systems of the building shall be reducedby at least 2.5% for 100% of the structural system in the building.
1 0
TERI to calcuateas per afterscrutinizing theBOQ
TERI to calcuateas per afterscrutinizing theBOQ
The embodied energy of the structural systems of the building shall be reducedby at least 5% for 100% of the structural system in the building.
2
TERI to calcuateas per afterscrutinizing theBOQ
TERI to calcuateas per afterscrutinizing theBOQ
The embodied energy of the non‐structural systems of the building shall bereduced by at least 5% for 100% of the structural system in the building blockwork.
1
TERI to calcuateas per afterscrutinizing theBOQ
TERI to calcuateas per afterscrutinizing theBOQ
The embodied energy of the non‐structural systems of the building shall bereduced by at least 10% for 100% of the structural system in the building blockwork.
2
TERI to calcuateas per afterscrutinizing theBOQ
TERI to calcuateas per afterscrutinizing theBOQ
4
Criterion 17 Use low‐energy materials in Interiors
Minimum 70% of the total quantity of materials used for sub‐assembly/internal partitions/paneling/false‐ceiling/in‐built furniture shall below‐energy materials
2TERI to calculateas paer BOQ
TERI to calculateas paer BOQ
Minimum 70% of the total quantity of materials used for flooring shall be low‐energy materials
1TERI to calculateas paer BOQ
TERI to calculateas paer BOQ
Minimum 70% of the total quantity of materials used for door, windows andframes shall be low‐energy materials
1TERI to calculateas paer BOQ
TERI to calculateas paer BOQ
4
refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN17
refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN18
Criterion 18 Renewable energy utilizationNon Madatory conditionIf more than 80% of total built‐up area (FSI and non‐FSI) falls underresidential use, then the Appraisal 18.3.1(first appraisal clause ‐ asmentioned below) is non‐mandatory.
The minimum size of the renewable energy system, installed on site, should beequal to 1% of the total connected load for artificial lighting (internal andexternal) and space conditioning loads
2
Solar farmsplanned byMasterplannersfor campus
Solar farmsplanned byMasterplannersfor campus
If the total energy generated by the renewable energy system is equivalent to5% or more of the total annual energy consumption for artificial lighting
1provision forsolar panels onthe roof
If the total energy generated by the renewable energy system is equivalent to10% or more of the total annual energy consumption for artificial lighting
2
If the total energy generated by the renewable energy system is equivalent to20% or more of the total annual energy consumption for artificial lighting
3
If the total energy generated by the renewable energy system is equivalent to30% or more of the total annual energy consumption for artificial lighting
4
If the total energy generated by the On‐site or Off‐site, renewable energysystem is equivalent to 100% or more of the total annual energy consumptionfor artificial lighting
2
8
Criterion 19 Renewable energy based hot water system
Applicability Check 3The total hot water requirement is more than 500 liters per day NO
refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN19
refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN20
If the renewable hot water system saves 20‐50% of the annual energy requiredfor hot waterNote: Applicable if answer is yes in Applicability Check 3 above
0
If the renewable hot water system saves 50‐70% of the annual energy requiredfor hot waterNote: Applicable if answer is yes in Applicability Check 3 above
0
If the renewable hot water system saves more than 70% of the annual energyrequired for hot waterNote: Applicable if answer is yes in Applicability Check 3 above
0
0
Criterion 20 Waste water treatmentApplicability Check 4The total waste water generation on site is more than 10kL per day. Yes
scope ofMasterplanner
scope ofMasterplanner
The treated waste water shall meet the BIS recommended disposal standards,as per table 20.3, GRIHANote: Applicable is answer is yes to Applicability Check 4 above
2
2Criterion 21 Water recycle and reuse (including rainwater)
Applicability Check 5Ground water table is low and ground water recharge is advisable as perCentral Ground Water Board norms.
yesscope ofMasterplanner
scope ofMasterplanner
If the project demonstrates 25% annual water reuseNote: Applicable is answer is yes to Applicability Check 4 above
1
If the project demonstrates 50% annual water reuseNote: Applicable is answer is yes to Applicability Check 4 above
2
If the project demonstrates 75% annual water reuseNote: Applicable is answer is yes to Applicability Check 4 above
3
The surplus rainwater is recharged in to the ground after necessary filtrationNote: Applicable if answer is yes to Applicability Check 5
2
5
Criterion 22 Reduction in waste during construction
Hazardous and inert waste shall be segregated during construction
generalcontractors scopein‐ applicable inconstructionstage
generalcontractors scopein‐ applicable inconstructionstage
The segregated waste shall be recycled and/or safely disposed1
Criterion 23 Efficient Waste segregation
Multi‐coloured bins shall be provided to segregate waste at source 1 0clients/masterplanners scope
clients/masterplanners scope
1 0Criterion 24 Storage and disposal of wastes
Separate space shall be allocated for collection of waste before transfer forrecycling
1 0clients/masterplanners scope
clients/masterplanners scope
1 0Criterion 25 Resource recovery from waste
Applicability Check 6Organic solid waste generation on site is more than 100 kg/day yes
Appropriate measures to be taken for zero‐waste generation from siteNote: Applicable if answer is yes to Applicability Check 6
2 0could beachievable at CDstage
could beachievable at CDstage
2 0
1
Criterion 26 Use of low‐VOC paints/adhesives/sealants
100% of all paints used in building interior shall be low/zero‐VOC, as per Table26.1, GRIHA Manual
1 0could beachievable at CDstage
could beachievable at CDstage
100% of all adhesives and sealants used shall be low/zero‐VOC, as per Table26.1, GRIHA
1 0
100% of all composite wood products shall not use urea‐formaldehyde 1 03 0
Criterion 27 Minimize ozone depleting substancesAll insulation to be used in the building shall be CFC and HCFC free 0 achieved achievedAll HVAC and refrigeration equipment shall be CFC freeThe fire‐suppression systems and fire extinguishers shall be halon free
1 0Criterion 28 Ensure water quality
Water used for various purposes like drinking, irrigation etc. shall conform tothe BIS standards (Table 28.3, GRIHA Manual)
2 0clients/masterplanners scope
clients/masterplanners scope
2 0Criterion 29 Acceptable outdoor and indoor noise levels
The measured outdoor noise levels on site conform to the standard set by theCPCB, Table 29.1, GRIHA
1 0
report can beprepared whenthe buildings areocupied
report can beprepared whenthe buildings areocupied
The measured indoor noise levels inside the building meet the noise levelsrecommended by NBC 2005 (Table 29.2, GRIHA Manual)
1 0 achieved achieved
2 0Criterion 30 Tobacco and smoke control
Smoking is prohibited on siteORNecessary provisions shall be provided in the mechanical ventilation system bythe HVAC consultant
1 0IITH is a no‐smoking campus
IITH is a no‐smoking campus
1 0
1
Criterion 31 Provide at least the minimum level of accessibility for persons withdisabilities
Buildings shall be designed in compliance with the NBC code in order to bedisabled friendly
1 0
provisions maderefer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN31
provisions maderefer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN32
1 0Criterion 32 Energy audit and validation
A mandatory energy audit shall be conducted by a BEE certified energy auditor 0 0
report can beprepared whenthe buildings areocupied
report can beprepared whenthe buildings areocupied
Criterion 33 Operation and Maintenance
Metering and sub‐metering of energy as well as water will be carried out asper GRIHA clause
1 0
report can beprepared whenthe buildings areocupied
report can beprepared whenthe buildings areocupied
An O & M protocol to be specified for operation and maintenance of thevarious systems in the building. Additionally,
1 0
2 097 0
Criterion 34 Innovation Points None NonePoint for innovation 0Point for innovation 0Point for innovation 0Point for innovation 0
Total 0
ScorePercentile
0
APPENDIX D
IMPOSED LOAD DIAGRAM
F-1
APPENDIX D : Imposed Load Diagram
a) KNC
i. GROUND FLOOR LEVEL
F-2
ii. 1ST FLOOR LEVEL
iii) 2nd FLOOR LEVEL
F-3
iv) 3rd FLOOR LEVEL
v) ROOF LEVEL
F-4
ii) RCC
i) GROUND FLOOR LEVEL
F-5
ii) 1st FLOOR LEVEL
iii) 2nd FLOOR LEVEL
F-6
iv) 3rd FLOOR LEVEL
v) 4th FLOOR LEVEL
APPENDIX E KNC & RCC Drawings
KNOWLEDGE CENTREAT INDIAN INSTITUTE OF TECHNOLOGY HYDERABAD
ISSUED FOR DESIGN DEVELOPMENT 100%OCTOBER 31ST, 2014ARCHITECTURE
UP
SITE BOUNDARY
DRIVEWAY
BOHENTRANCE
LOADING
MAINENTRANCE
EASTENTRANCE
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
As indicated
A-051--NSI
SITE PLAN
DESIGN DEVELOPMENT
SITE PLAN1
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
2 3 4 5 6 7 8 9 10 11 12 13
1
A-261
1
A-256
1
A-259
1
A-276
1
A-280
1
A-277
1
A-252
1
A-262
1
A-2531
A-263
1
A-286
1
A-279
FIN. FLOOREL.+528.10M
1
A-278
1
A-257
EPS
1
A-282
1
A-251
1
A-254
1
A-281
1
A-285
1
1
A-255
1
A-258
1
A-260
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
1
A-274
EV PIT 3
PUMPROOM
FIN. FLOOREL.+528.80M
FIN. FLOOREL.+528.80M
FIN. FLOOREL.+528.10M
FF WATERTANK 1(50cbm)
FF WATERTANK 2(50cbm)
STAIR 2 A-3021
FIN. FLOOR
EL.+528.90M
FIN. FLOOR
EL.+527.55M
FIN. FLOOR
+527.75M
FIN. FLOOR
EL.+529.20M
1
A-283
FIN. FLOOR
EL.+528.90M
FIN. FLOOR
EL.+528.90M
FIN. FLOOR
EL.+527.25M
SUMP PIT600X600X450
SUMP PIT600X600X450
SUMP PIT600X600X450
SUMP PIT600X600X450
SUMP PIT600X600X450
SUMP PIT600X600X450
MH
MH
MH
MH
MH900X450
MH900X450
MH900X450
MH900X450
600 dia
600 dia
600 dia
600 dia
2.2
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 150
A-100--NSI
PIT LEVEL PLAN
DESIGN DEVELOPMENT
PIT LEVEL PLAN1
UP
UP
UPUP
UP
A-201
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
2 3 4 5 6 7 8 9 10 11 12 13
1
A-261
1
A-2031
A-202
A-204 1
1
ELV/TELECOMRM
COUNSELLINGROOM 2
STORAGE 5
MINIKITCHEN
MEN'S WC(STAFF) ELECTRICAL
ROOM
STAIR 2
MECH RM 3
STAIR 4VESTIBULE MECH RM 4
STAIR 3VESTIBULE
1
A-2561
A-259
1
A-276
1
A-280
1
A-277
1
A-252
1
A-262
1
A-2531
A-263
1
A-286
1
A-279
A-3011
A-3022
A-3041
A-3031
A-3051
A-204 2
A-202
2
A-2032
A-3111
A-603
1
EASTENTRANCE
ENTRANCEHALL
CAFETERIA
KITCHEN
MEETINGROOM 1
MEETINGROOM 2
ADMINISTRATIONOFFICE
MECH RM 1
WOMEN'SWC (STAFF)
PS 1
WOMEN`SWC
PUBLICATIONSUPPORT
ROOM
ARCHIVERM
MECH RM 2
CORRIDOREAST
AUDIOVISUALROOM 2
AUDIOVISUALROOM 1
STORAGE 6
JANITOR'SROOM/FIRECONTROL
DIRECTOR'SROOM
SE 1
EPS 1
DS
STAIR 1VESTIBULEFHC 1
BOHCORRIDOR
1
STAIR 3
PE1 PE2STAIR 4
FHC 4
EV HALL EPS 2
STORAGE 2
COUNSELLINGROOM 1
JC 1
MEN'S WCJC 31
A-278
1
A-257
STORAGE 3
PS 2
JC 2
JC 4
WAITINGAREA
MICROREADING
ROOM
CORRIDORWEST
LOCKER RM
1
A-282
1
A-251
NORTHENTRANCE
HALL
FHC 3
STORAGE 1
STORAGE 4
1
A-254
1
A-281
1
A-285
1
A-2551
A-258
1
A-260
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
FIN. FLOOREL.+530.90M
FIN. FLOOREL.+530.90M
FIN. FLOOREL.+530.40M
FIN. FLOOREL.+530.90M
FIN. FLOOREL.+529.90M
FIN. FLOOREL.+529.90M
FIN. FLOOREL.+529.70M
FIN. FLOOREL.+530.90M
FIN. FLOOREL.+529.20M
FIN. FLOOREL.+530.40M
FIN. FLOOREL.+530.90M
FIN. FLOOREL.+530.40M
DRAINPIPE
FIN. FLOOREL.+530.40M
FIN. FLOOREL.+530.40M
FIN. FLOOR
+529.20M
FIN. FLOOR
+529.20M
FIN. FLOOR
+530.40M
FIN. FLOOR
+530.40MFIN. FLOOR
+529.20M
FIN. FLOOR
+529.20M
FIN. FLOOR
+529.50MFIN. FLOOR
+529.50M
FIN. FLOOR
+529.50M
FIN. FLOOR
+529.50M
FIN. FLOOR
+529.50M
FIN. FLOOR
+529.60MFIN. FLOOR
+529.60M
FIN. FLOOR
+529.60M
FIN. FLOOR
+529.60M
FIN. FLOOR
+529.90MFIN. FLOOR
+529.90M
FIN. FLOOR
+529.90M
FIN. FLOOR
+529.90MFIN. FLOOR
+529.90M
FIN. FLOOR
+529.90M
FIN. FLOOR
+530.40M
FIN. FLOOR
+528.95M
BOH PARKING
A-205
2
A-2053
FHC 2unassigned
FIN. FLOOREL.+531.05M
HVAC SPACE
A-205 1
1
A-274
A-205
4
A-205
5
A-205 6
A-205
7
A-614
3
1
24
A-614
7
5
68
A-603
4
A-603 2
A-6042
A-604
3
A-604 1
A-609
3
A-615
1
3
READINGSPACE
STAIR 1
A-6033
MH
MH
MH
1
A-283
A-203
3
A-2023
SLOPE 1=40
FIN. FLOOR
+530.74 FIN. FLOOR
+530.90
FIN. FLOOR
+530.40
SLOPE 1=12
SLOPE 1=12
SLOPE 1=18SLOPE 1=18
SLOPE 1=18
FIN. FLOOR
+529.60
SLOPE 1=24
SLOPE 1=14
SLOPE 1=28
WATERMIST MECH
ROOM
BOHCORRIDOR
2
STAIR 5
FIN. FLOOR
+530.90FIN. FLOOR
+530.76
SLOPE 1= 15
SLOPE 1= 18
MH
MH900X450
MH900X450
MH900X450
MH900X450
600 dia
600 dia
600 dia
600 dia
2.2
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 150
A-101CheckerNSI
GROUND FLOOR PLAN
DESIGN DEVELOPMENT
GROUND FLOOR PLAN1
UP
UP
UP
UP
UP
UP
UP
A-201
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
2 3 4 5 6 7 8 9 10 11 12 13
1
A-261
1
A-2031
A-202
A-204 1
1
STAIR 4VESTIBULE
GROUPSTUDY
ROOM 102
WOMEN`SWC
STAIR 2
A-3013
A-3023
A-30403
A-3033
A-3063
A-3053
MANIFOLDERROOM
PRINTINGROOM
READINGRM 101
CORRIDORNORTH
1
A-2561
A-259
1
A-276
1
A-280
STAIR 5
1
A-277
1
A-2521
A-262
1
A-2531
A-263
1
A-286
1
A-279
STAIR 6
DUCTSPACE1
EPS 1
FHC 2
unassigned
MEN`S WC
STAIR 4
FHC 3
PE2PE1
EPS 3DS 3
STAIR 1VESTIBULEDS 1
FHC 1
GROUPSTUDY
ROOM 101
DS 5
FHC 4
STAIR 3
MEDIALITERACYROOM 1
EPS 2
JC 1
JC 2
MECHROOM 3
FIN. FLOOREL.+535.90M
FIN. FLOOR
EL.+535.90M
FIN. FLOOR
EL.+535.90M
PS
1
A-278
1
A-257
1
A-282
1
A-251
FIN. FLOOREL.+535.90M
FIN. FLOOREL.+537.10M
STORAGE 2
MEDIALITERACYROOM 2
STORAGE 1
1
A-254
CORRIDORWEST
NORTHHALL
1
A-281
1
A-285
SE 1
1
A-2551
A-258
1
A-260
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
HALL
FIN. FLOOREL.+536.05M
FIN. FLOOREL.+536.50M
CORRIDOREAST
1
A-274
STAIR 1
EV HALL
SOUTHHALL
SEE A-103FOR THISAREA
1
A-283
DS 4
DS 6
DS 2
SLOPE 1=15
SLOPE 1=14
2.2
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 150
A-102--NSI
FIRST FLOOR PLAN
DESIGN DEVELOPMENT
FIRST FLOOR PLAN1
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UPUP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UPUP
UP
A-201
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
2 3 4 5 6 7 8 9 10 11 12 13
1
A-261
1
A-2031
A-202
A-204 1
1
EPS 1
DS 3
WOMEN`SWC
STAIR 2
STEPPEDOPENSHELF
STAIR 3VESTIBULE
FHC 1
STAIR 3DS 7
1
A-256
1
A-259
1
A-276
1
A-280
1
A-277
1
A-252
1
A-262
1
A-253
1
A-263
1
A-286
1
A-279
A-3014
A-3024
A-3043
A-3034
A-3064
STAIR 1 MEN`S WC
DS 4
PS 2
OPENSHELF
GROUPSTUDY
ROOM 201
GROUPSTUDY
ROOM 202
GROUPSTUDY
ROOM 203
GROUPSTUDY
ROOM 204
GROUPSTUDY
ROOM 205
GROUPSTUDY
ROOM 207
GROUPSTUDY
ROOM 208
GROUPSTUDY
ROOM 209
STAIR 2VESTIBULE FHC 4
EPS 2
FHC 2DS 2
DS 8PE1 PE2STAIR 4VESTIBULE
FHC 3
STAIR 4
FIN. FLOOR
EL.+536.50MFIN. FLOOREL.+535.90M
FIN. FLOOR
EL.+537.10M
FIN. FLOOREL.+537.70M
FIN. FLOOREL.+537.70M
FIN. FLOOREL.+538.90M
FIN. FLOOREL.+540.10M
FIN. FLOOR
EL.+538.30M
FIN. FLOOR
EL.+539.50M
FIN. FLOOR
EL.+540.70M
FIN. FLOOR
EL.+541.30M
1
A-278
1
A-257
JC 2
1
A-282
1
A-251
EPS 3
1
A-254
FIN. FLOOR
EL.+541.30M
1
A-281
1
A-285
SE 1
1
A-255
1
A-258
1
A-260
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
FIN. FLOOREL.+538.90M
FIN. FLOOREL.+540.10M
FIN. FLOOREL.+541.30M
FIN. FLOOREL.+541.30M
FIN. FLOOREL.+538.90M
FIN. FLOOREL.+540.10M
FIN. FLOOREL.+541.30M
FIN. FLOOREL.+541.30M
FIN. FLOOREL.+541.30M
FIN. FLOOREL.+541.30M
FIN. FLOOREL.+541.30M
1
A-274
STAIR 1VESTIBULE
BOOKCORRIDOR
NORTH
OPEN TOBELOW
STAIR 5
JC 1
GROUPSTUDY
ROOM 210
OPEN TOBELOW
WESTTERRACE
FIN. FLOOR
+541.10M
FIN. FLOOR
+541.10M
FIN. FLOOR+541.10M
DS 5
DS 6
DS 1
1
A-283
PS 1
SLOPE 1=20
SLOPE 1=20
SLOPE 1=20
SLOPE 1=20
SLOPE 1=20
SLOPE 1=20
SLOPE 1=20
FIN. FLOOR
+536.50
FIN. FLOOR
+536.05
SLOPE 1=15
SLOPE 1=14
SLOPE 1=16
EV HALL
2.2
NORTH TERRACE
NORTH EASTTERRACE
EAST TERRACE
SOUTH TERRACE
FIN. FLOOREL.+541.30M
A-50110
A-501.23
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 150
A-103CheckerNSI
SECOND FLOOR PLAN
DESIGN DEVELOPMENT
SECOND FLOOR PLAN1
A-201
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
2 3 4 5 6 7 8 9 10 11 12 13
1
A-261
1
A-2031
A-202
A-204 1
1
1
A-256
1
A-259
1
A-276
1
A-280
1
A-277
1
A-252
1
A-262
1
A-253
1
A-263
1
A-286
1
A-279
A-3015
A-3025
A-3044
A-3035
A-3065
STAIR 4 STAIR 3STORAGE 3
STAIR 2
STAIR 6
GROUPSTUDY
ROOM 301
GROUPSTUDY
ROOM 302
GROUPSTUDY
ROOM 304
GROUPSTUDY
ROOM 305
GROUPSTUDY
ROOM 306
GROUPSTUDY
ROOM 307
GROUPSTUDY
ROOM 308
GROUPSTUDY
ROOM 309
READINGROOM 301
STAIR 2VESTIBULE
WOMEN`SWC
STAIR 3VESTIBULE
FHC 2
EPS 1STORAGE 4
STAIR 4VESTIBULE
FHC 4
GROUPSTUDY
ROOM 303
MEN`S WC
EPS 3
PS 1
PE2PE1 READINGROOM 302
DS 1
EPS 2
STAIR 1STAIR 1
VESTIBULESTORAGE 1FHC 1
STORAGE 5
STORAGE 2
JC 1
JC 2
1
A-278
1
A-257
1
A-282
1
A-251
FHC 3
1
A-254
1
A-281
1
A-285
PS 3
PS 2
SE 1
1
A-255
1
A-258
1
A-260
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
FIN. FLOOREL.+545.00M
FIN. FLOOREL.+545.00M
FIN. FLOOREL.+545.00M
FIN. FLOOREL.+545.00M
1
A-274
READINGLOUNGESOUTH
BRIDGE
READINGLOUNGENORTH
OPEN TO BELOWOPEN TO BELOW
CORRIDORNORTH
1
A-283
EV HALL
2.2
NORTH TERRACE
NORTH EASTTERRACE
EAST TERRACE
SOUTH TERRACE
DN
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 150
A-104CheckerNSI
THIRD FLOOR PLAN
DESIGN DEVELOPMENT
THIRD FLOOR PLAN1
UP
A-201
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
2 3 4 5 6 7 8 9 10 11 12 13
1
A-261
1
A-202
A-204 1
1
1
A-256
1
A-259
1
A-276
1
A-280
1
A-277
1
A-252
1
A-262
1
A-253
1
A-263
1
A-286
1
A-279
1
A-278
1
A-257
1
A-282
1
A-251
1
A-254
1
A-281
1
A-285
EPS
STAIR 2
MECHPENTHOUSE
FIN. FLOOREL.+549.50M
FIN. FLOOREL.+549.50M
1
1
A-255
1
A-258
1
A-260
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
1
A-274
SOLAR PANEL
A-3026
1
A-283
DR04 DR04
DR03
DR34
DR
25
DR25DR25
DR
25
DR
25
2.2
A
B
C
D
E
F
G
H
11 12 13
1
A-261
1
A-280
1
A-262
1
A-263
1
A-286
1
A-279
1
A-282
1
A-281
1
A-285
15 CBM
7.5 CBM
1
A-284
FLUSHINGWATER 1
FLUSHINGWATER 2
CITYWATER 2
FF WATER 4
15 CBM
7 CBM
CITYWATER 1
7 CBM
FF WATER 1
FF WATER 2
FF WATER 3
7.5 CBM
7.5 CBM
7.5 CBM
1
A-283
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 150
A-105CheckerNSI
MAINTENANCE ROOF LEVEL PLAN
DESIGN DEVELOPMENT
ROOF LEVEL PLAN - ACCESSIBLE AREA1 WATER TANK2
UP
A-201
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
2 3 4 5 6 7 8 9 10 11 12 13
1
A-261
1
A-2031
A-202
A-204 1
1
1
A-256
1
A-259
1
A-276
1
A-280
1
A-277
1
A-252
1
A-262
1
A-253
1
A-263
1
A-286
1
A-279
1
A-278
1
A-257
1
A-282
1
A-251
1
A-254
1
A-281
1
A-285
1
1
A-255
1
A-258
1
A-260
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
1
A-274
SKY LIGHT
SKY LIGHT
SKY LIGHT
SKY LIGHT
600
600
FIN. FLOOR
+550.00M
FIN. FLOOR
+550.00M
FIN. FLOOR
+549.50M
FIN. FLOOR
+549.50M
FIN. FLOOR
+549.50M
MECHANICALPENTHOUSEFOR FHCMECHANICAL
PENTHOUSEFOR PRESSURISED FAN
MECHANICALPENTHOUSEFOR FHC
MECHANICALPENTHOUSEFOR FHC
MECHANICALPENTHOUSEFOR FHC
MECHANICALPENTHOUSE
1
A-283
H.P
L.P.
2.2
F
G
H
J
K
6 7 8
1
A-256
1
A-280
1
A-277
1
A-279
1
A-278
1
A-257
1
A-254
1
A-281
1
A-255
1
A-258
E
F
G
H
J
K
6 7 8 9
1
A-256
1
A-280
1
A-277
1
A-279
1
A-278
1
A-257
1
A-254
1
A-281
1
A-255
1
A-258
A-5214
ABOVE SOFFIT
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 150
A-106CheckerNSI
ROOF PLAN
DESIGN DEVELOPMENT
ROOF PLAN - OVERALL1 MAINTENANCE CATWALK2
ABOVE SOFFIT3
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
THIRD FLOOR LEVEL+545.00 m
2 3 4 5 6 7 8 9 10 11 12 13
1
A-261
GROUND LEVEL+530.40 m
1
A-256
1
A-259
1
A-252
1
A-262
1
A-253
1
A-263
1
A-257
1
A-251
1
A-254
T.O ROOF+549.40 m
1
1
A-255
1
A-258
1
A-260
PEAK+558.80 m
ST 01ST 01ST 01 ST 01 ST 01ST 01
RAIN WATERDRAIN PIPE
RAIN WATERDRAIN PIPE
RAIN WATERDRAIN PIPE
RAIN WATERDRAIN PIPE RAIN WATER
DRAIN PIPE
CONC 01
? ??
MTL 01
MTL 01MTL 01
MTL 01MTL 01
A-5033
A-5011
A-5021
GL 01GL 02
GL 03GL 05
GL 06
GL 12
SL 01
MTL 01
?
?
?
?
LVR01
GRL 03
----
GL 04
A-5027
?
A-5231
GRL12
GRL11
GRL13 GRL13 GRL13
SMOKEEXHAUST FAN
OPENING FORMAINTENANCE DECK
CONC 01
CONC 01
CONC 01
CONC 01
CONC 01 CONC 01
CONC 01 CONC 01 CONC 01
CONC 01
2.2
A-501.22
A-5213
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 100
A-201--NSI
BUILDING ELEVATION SOUTH
DESIGN DEVELOPMENT
ELEVATION SOUTH1
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
THIRD FLOOR LEVEL+545.00 m
2345678910111213
1
A-261
GROUND LEVEL+530.40 m
1
A-256
1
A-259
1
A-252
1
A-262
1
A-253
1
A-263
1
A-257
1
A-2511
A-254
T.O ROOF+549.40 m
1
1
A-255
1
A-258
1
A-260
PEAK+558.80 m
ST 01 ST 01 ST 01 ST 01 ST 01 ST 01
?
AAC 01
AAC 01
RAIN WATERDRAIN PIPE
RAIN WATERDRAIN PIPE
RAIN WATERDRAIN PIPE
RAIN WATERDRAIN PIPERAIN WATER
DRAIN PIPE
AAC 01
AAC 01
MTL 01 MTL 01 MTL 01 MTL 01 MTL 01MTL 01
A-5026
A-50107
GL 08
GL 11
GL 01
GL 09
GL 10
SL 02
?
RAIN WATERDRAIN PIPE
SMOKEEXHAUST FAN
OPENING FORMAINTENANCE DECK
2.2
A-501.21
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
678910111213
1
A-261
GROUND LEVEL+530.40 m
1
A-256
1
A-259
1
A-262
1
A-2631
A-257
1
A-2581
A-260
CONC 01
CONC 01
AAC 01
AAC 01
MTL 01
AAC 01AAC 01
CONC 01CONC 01CONC 01CONC 01 CONC 01
GL 31
A-5048
A-5046
GL 26
GL 25
GRL20GRL05 GRL06GRL20GRL20GRL20
GRL04
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
R
1
A-271
AAC 01
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 100
A-202--NSI
BUILDING ELEVATION NORTH
DESIGN DEVELOPMENT
ELEVATION NORTH 11
ELEVATION NORTH 22 ELEVATION WEST 2 - BOH ENTRANCE3
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
THIRD FLOOR LEVEL+545.00 m
A B C D E F G H J K L M N P Q R
GROUND LEVEL+530.40 m
1
A-276
1
A-2801
A-277
1
A-286
1
A-2791
A-2781
A-282
1
A-281
1
A-285
T.O ROOF+549.40 m
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
PEAK+558.80 m
1
A-274
ST 01
AAC 01
?
CONC 01
CONC 01
CONC 01
AAC 01CONC 01
CONC 01
AAC 01
AAC 01
CONC 01
RAIN WATERDRAIN PIPE
RAIN WATERDRAIN PIPE
RAIN WATERDRAIN PIPE
RAIN WATERDRAIN PIPE
ST 01ST 01ST 01ST 01
ST 01
ST 01 ST 01
MTL 01MTL 01
MTL 01MTL 01 MTL 01
MTL 01MTL 01
GL 31
GL 31
GL 06
GL 07
GL 08
GL 09
SL 03
GL 24
GRL15
GRL16 GRL16
? GRL17
A-50106
A-50103A-502
8
?
?
A-5044
GRL18
GRL19 GRL19
1
A-283
SMOKEEXHAUST FAN
OPENING FORMAINTENANCE DECK
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
A B C D E F G
1
A-280
1
A-286
1
A-282
1
A-281
1
A-285
1
A-284
CONC 01
ST 01
ABOVE SOFFIT ABOVE SOFFIT ABOVE SOFFIT
AAC 01
ST 01
GL 15
GL 16 GL 17
A-5038
1
A-283
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
12
1
A-261
1
A-262
1
A-263
GL 27
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 100
A-203--NSI
BUILDING ELEVATION EAST
DESIGN DEVELOPMENT
ELEVATION EAST 1 - BACK ENTRANCE1
ELEVATION EAST 2 - EAST ENTRANCE2 ELEVATION NORTH - EAST ENTRANCE3
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
THIRD FLOOR LEVEL+545.00 m
ABCDEFGHJKLMNPQR
GROUND LEVEL+530.40 m
1
A-276
1
A-280
1
A-277
1
A-286
1
A-279
1
A-278
1
A-282
1
A-281
1
A-285
T.O ROOF+549.40 m
1
A-272
1
A-2711
A-275
1
A-284
1
A-273
PEAK+558.80 m
1
A-274
ST 01 ST 01 ST 01 ST 01 ST 01
MTL 01MTL 01 MTL 01
MTL 01
MTL 01
SL 04
GL 01
A-501.24A-501
11
1
A-283SMOKEEXHAUST FAN
OPENING FORMAINTENANCE DECK
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
ABCDEFGHJKLMNPQR
GROUND LEVEL+530.40 m
1
A-276
1
A-280
1
A-277
1
A-286
1
A-279
1
A-278
1
A-282
1
A-281
1
A-285
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
1
A-274
CONC 01
CONC 01MTL 01
CONC 01GL 18
GL 19GL 20 GL 21 GL 13
GL 14
GL 23
GL 22
GRL02
GRL20
A-5035
A-50414
A-50411
GRL20 GRL20
GRL07 GRL08
1
A-283
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 100
A-204--NSI
BUILDING ELEVATION WEST
DESIGN DEVELOPMENT
ELEVATION WEST 11
ELEVATION WEST 22
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
THIRD FLOOR LEVEL+545.00 m
ABCDEFGHJKLMNPQR
GROUND LEVEL+530.40 m
FOOTING (TBD)+526.40 m
1
A-276
1
A-280
1
A-277
1
A-286
1
A-279
1
A-278
1
A-282
1
A-281
1
A-285
T.O ROOF+549.40 m
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
WESTENTRANCE
PEAK+558.80 m
1
A-274
MECH PIT LEVEL+527.55 m
CONC 01
AAC 01
MTL 01
RAIN WATERDRAIN PIPE RAIN WATER
DRAIN PIPE
READINGZONE
READINGZONE
GRL20
GRL02
WESTTERRACE
1
A-283
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 100
A-251CheckerNSI
BUILDING SECTION - NORTH ANDSOUTH 01
DESIGN DEVELOPMENT
SECTION NORTH AND SOUTH 011
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
THIRD FLOOR LEVEL+545.00 m
ABCDEFGHJKLMNPQR
GROUND LEVEL+530.40 m
FOOTING (TBD)+526.40 m
1
A-276
1
A-280
1
A-277
1
A-286
1
A-279
CAFETERIA
MECH RM 4
READINGROOM 302GROUP
STUDYROOM 301
GROUPSTUDY
ROOM 201
CORRIDORNORTH
DUCTSPACE1
ARCHIVERM
1
A-278
1
A-282
1
A-281
1
A-285
T.O ROOF+549.40 m
1
A-272
1
A-271
1
A-275
1
A-284
1
A-273
READINGSPACE
CORRIDORNORTH
GROUPSTUDY
ROOM 101
STORAGE 2NORTH
ENTRANCEHALL STORAGE 3
BOHCORRIDOR
1 MEN'S WCWOMEN`S
WC
STEPPEDOPENSHELF
PEAK+558.80 m
1
A-274
BOOKCORRIDOR
NORTH
MECHANICALPIT
MECH PIT LEVEL+527.55 m
CONC 01
CONC 01CONC 01
ABOVE SOFFIT
CONC 01
CORRIDORSOUTH
BOOKCORRIDOR
SOUTH
READINGSPACE
MECHANICALPIT
A-5022
1
A-283
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 100
A-256CheckerNSI
BUILDING SECTION - NORTH ANDSOUTH 06
DESIGN DEVELOPMENT
SECTION NORTH AND SOUTH 061
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
THIRD FLOOR LEVEL+545.00 m
A B C D E F G H J K L M N P Q R
GROUND LEVEL+530.40 m
FOOTING (TBD)+526.40 m
1
A-2761
A-280
1
A-277
1
A-286
WOMEN`SWC MEN`S WC
MEN`S WCWOMEN`SWC
STAIR 2
GROUPSTUDY
ROOM 206
GROUPSTUDY
ROOM 306
ELECTRICALROOM
EASTENTRANCE
READINGROOM 301
GROUPSTUDY
ROOM 309
GROUPSTUDY
ROOM 308
GROUPSTUDY
ROOM 307
GROUPSTUDY
ROOM 207
GROUPSTUDY
ROOM 208
GROUPSTUDY
ROOM 209
MECH RM 2
1
A-278
1
A-282
1
A-281
1
A-285
T.O ROOF+549.40 m
1
A-272
1
A-2711
A-275
1
A-284
1
A-273
DS 4
STORAGE 2 PS 2
FHC 3
FHC 4
FHC 2
STAIR 2EPS
EPS 3
EPS 2
EPS 1MEDIALITERACYROOM 2
MECHANICALPITEPS
PEAK+558.80 m
FHC 2
STAIR 2
STAIR 2
STAIR 2
MECHPENTHOUSE
1
A-274
WOMEN`SWC
PS
PS 2
MECH PIT LEVEL+527.55 m
ABOVE SOFFIT
PUMPROOM
PS 1
ABOVE SOFFIT
1
A-283
DS 6 DS 5
DS 6 DS 5
NORTHENTRANCE
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 100
A-263CheckerNSI
BUILDING SECTION - NORTH ANDSOUTH 13
DESIGN DEVELOPMENT
SECTION NORTH AND SOUTH 131
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
THIRD FLOOR LEVEL+545.00 m
2345678910111213
1
A-261
GROUND LEVEL+530.40 m
FOOTING (TBD)+526.40 m
1
A-256
1
A-259
1
A-252
1
A-262
1
A-253
1
A-263
1
A-257
1
A-251
1
A-254
T.O ROOF+549.40 m
1
1
A-255
1
A-258
1
A-260
MEN`S WC
MEN`S WC
STORAGE 1STAIR 1FHC 1STAIR 1
VESTIBULESE 1DS 1
DS 3 SE 1STAIR 1
VESTIBULE FHC 2 DS 2
FHC 1STAIR 1VESTIBULEDS 3 SE 1
DS SE 1STAIR 1
VESTIBULE FHC 1MECH RM 1
WESTENTRANCE
PEAK+558.80 m
EV PIT 3
MECH PIT LEVEL+527.55 m
CONC 01 CONC 01 CONC 01 CONC 01 CONC 01 CONC 01
AAC 01
AAC 01
AAC 01
AAC 01AAC 01
ST 01
MECHANICALPIT
A-50108
DS 2 DS 1
DS 1 WESTTERRACE
STAIR 1
STAIR 1
STAIR 1
EV PIT 3
2.2
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 100
A-271CheckerNSI
BUILDING SECTION - EAST ANDWEST 01
DESIGN DEVELOPMENT
SECTION EAST AND WEST 011
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
THIRD FLOOR LEVEL+545.00 m
2345678910111213
1
A-261
GROUND LEVEL+530.40 m
FOOTING (TBD)+526.40 m
1
A-256
1
A-259
1
A-252
1
A-262
1
A-253
1
A-263
1
A-257
1
A-251
1
A-254
T.O ROOF+549.40 m
1
1
A-255
1
A-258
1
A-260
STEPPEDOPENSHELF
GROUPSTUDY
ROOM 306
GROUPSTUDY
ROOM 206
MEDIALITERACYROOM 2
ELECTRICALROOM
CORRIDOREAST
AUDIOVISUALROOM 2
WOMEN'SWC (STAFF)
MEN'S WC(STAFF) MEN'S WC JC 3
CORRIDORWEST
ADMINISTRATIONOFFICE
MECHANICALPIT
NORTHHALL READING
RM 101DUCT
SPACE1
WESTENTRANCE
PEAK+558.80 m
MECH PIT LEVEL+527.55 m
MTL 01
MECHANICALPIT
JC 2
BRIDGE
READINGZONE
CORRIDOREAST
BOOKCORRIDOR
EAST
STAIR 5HALL
2.2
2.2
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 100
A-278CheckerNSI
BUILDING SECTION - EAST ANDWEST 08
DESIGN DEVELOPMENT
SECTION EAST AND WEST 081
FIRST FLOOR LEVEL+535.90 m
GROUND FLOOR LEVEL+530.90 m
SECOND FLOOR LEVEL+541.30 m
THIRD FLOOR LEVEL+545.00 m
2 3 4 5 6 7 8 9 10 11 12 13
1
A-261
GROUND LEVEL+530.40 m
FOOTING (TBD)+526.40 m
1
A-256
1
A-259
1
A-262
1
A-253
1
A-263
1
A-257
1
A-2511
A-254
T.O ROOF+549.40 m
1
1
A-255
1
A-258
1
A-260
STEPPEDOPENSHELF
GROUPSTUDY
ROOM 309
GROUPSTUDY
ROOM 209
ENTRANCEHALL
STAIR 5
HALL
EASTENTRANCEWEST
ENTRANCE
PEAK+558.80 m
MECH PIT LEVEL+527.55 m
CONC 01
CONC 01 CONC 01 CONC 01 CONC 01
ABOVE SOFFIT
MTL 01
MTL 01
MECHANICALPIT
FF WATER 3
BRIDGE
BOOKCORRIDOR
EAST
CORRIDOREAST
READINGSPACE
ENTRANCEHALL
READINGZONE
ABOVE SOFFIT ABOVE SOFFIT
UPTURN BEAM
2.2
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
KNOWLEDGE CENTER
01 31 MAR 2014 ISSUED FOR SD
KNC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
2014/10/31
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 04 JUL 2014 ISSUED FOR DD 50%
05 03 AUG 2014 ISSUED FOR DD 70%
06 08 SEP 2014 ISSUED FOR DD 90%
07 31 OCT 2014 ISSUED FOR DD 100%
1 : 100
A-282CheckerNSI
BUILDING SECTION - EAST ANDWEST 12
DESIGN DEVELOPMENT
SECTION EAST AND WEST 121
RESEARCH CENTRE COMPLEXAT INDIAN INSTITUTE OF TECHNOLOGY HYDERABAD
ARCHITECTURE
A
B
C
D
E
F
H
J
K
L
M
N
P
1 2 3 4 5 6 7 8 9
G
10
MAIN ENTRANCE
BOH ENTRANCE
North
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 As indicated
A-052Checker--
SITE PLAN
DESIGN DEVELOPMENTDRAWING
SITE PLAN1
1
A-252
1
A-256
A
B
C
D
E
F
H
J
K
L
M
N
P
1 2 3 4 5 6 7 8 9
G
1
A-258
1
A-251
1
A-253
1
A-254
1
A-259
1
A-255
STAIR6
10
FIN. FLOOR
+524.80
FIN. FLOOR
+525.80
FIN. FLOOR
+525.80 FIN. FLOOR
+526.10
FIN. FLOOR
+526.10
FIN. FLOOR
+526.10FIN. FLOOR
+526.10
FIN. FLOOR
+526.10
A-3061
SUMP PIT
SUMP PIT600x600x450H
SUMP PIT600x600x450H
A-3031
1
A-260
SUMP PIT1200x1200xH1500
SUMP PIT1200x1200xH1500
SPOUT OPENINGSPOUT OPENING
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 150
A-100----
PIT PLAN
DESIGN DEVELOPMENTDRAWING
PIT LEVEL PLAN1
A-202
A-201 1
1
A-252
1
A-256
1
A
B
C
D
E
F
H
J
K
L
M
N
P
1 2 3 4 5 6 7 8 9
G
1
A-257
1
A-258
1
A-251
1
A-253
1
A-254
1
A-259
1
A-255
A-3011
FIN. FLOOREL.+528.70M
A-3021
A-3032
A-3041
A-3051
A-305.23
FIN. FLOOR
+528.40
FIN. FLOOR
+527.50
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+529.00FIN. FLOOR
+528.40
FIN. FLOOR
+529.00FIN. FLOOR
+528.70FIN. FLOOR
+528.70
10
FIN. FLOOR
+528.70
FIN. FLOOR
+528.70
FIN. FLOOR
+528.70
FIN. FLOOR
+528.40
FIN. FLOOR
+528.70
FIN. FLOOR
+528.70
OPENTO
BELOW
FIN. FLOOR
+529.00
A-613
A-75726
A-3063
MAIN ENTRANCE
BOH ENTRANCE
T.O.SLAB
+527.70T.O.SLAB
+527.70
T.O.SLAB
+527.70
T.O.SLAB
+527.70
FIN. FLOOR
+528.40
T.O.SLAB
+527.70
T.O.SLAB
+527.70
T.O.SLAB
+527.70
T.O.SLAB
+527.70
T.O.SLAB
+527.70
T.O.SLAB
+527.70
T.O.SLAB
+527.70
T.O.SLAB
+527.70
T.O.SLAB
+527.70
FIN. FLOOR
+528.70
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
FIN. FLOOR
+528.40
1
A-260
FENCE H=1100
MH MH
MH
MH
1
3
4
FIN. FLOOR
+528.15
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 150
A-101----
GROUND FLOOR PLAN
DESIGN DEVELOPMENTDRAWING
GROUND FLOOR PLAN1
A-202
A-202
A-201 1
1
A-252
1
A-256
1
2
A
B
C
D
E
F
H
J
K
L
M
N
P
1 2 3 4 5 6 7 8 9
G
1
A-257
1
A-258
1
A-251
1
A-253
1
A-254
1
A-259
1
A-255
A-3012
FIN. FLOOR
+532.40
FIN. FLOOR
+532.40
FIN. FLOOR
+532.40
A-3022
A-3033
A-3042
A-3052
OPENTO
BELOWFIN. FLOOR+532.35
FIN. FLOOR
+532.40
FIN. FLOOR
+532.40
OPENTO
BELOW
OPENTO
BELOWOPEN
TOBELOW
OPENTO
BELOW
FIN. FLOOR
+532.40FIN. FLOOR
+532.40
FIN. FLOOR
+532.40
FIN. FLOOR+532.40
FIN. FLOOR
+532.40
FIN. FLOOR
+532.40
OPENTO
BELOW
OPENTO
BELOW
OPENTO
BELOW
OPENTO
BELOW
OPENTO
BELOW
OPENTO
BELOW
OPENTO
BELOW
OPENTO
BELOW
GASSTORAGE
A-61111
OPENTO
BELOW
OPENTO
BELOW
OPENTO
BELOW
FIN. FLOOR
+532.40
FIN. FLOOR
+532.40
FIN. FLOOR
+532.40
FIN. FLOOR
+532.40
1
A-260
ROOF
HANDRAIL
A
5 6 7
A-75826
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 150
A-102----
FIRST FLOOR PLAN
DESIGN DEVELOPMENTDRAWING
FRIST FLOOR PLAN1 ENTRANCE CANOPY2
A-202
A-201 1
1
A-252
1
A-256
1
A
B
C
D
E
F
H
J
K
L
M
N
P
1 2 3 4 5 6 7 8 9
G
1
A-257
1
A-258
1
A-251
1
A-253
1
A-254
1
A-259
1
A-255
A-3013
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
A-3023
A-3034
A-3043
A-3053
FIN. FLOOR
+536.05
FIN. FLOOR
+536.05
FIN. FLOOR
+536.40
FIN. FLOOR
+536.05
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
OPEN TOBELOW
MAINTENANCEDECK FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
INTERIOR FINISHESWILL BE INSTALLED
INITIALLY
INTERIOR FINISHESWILL BE INSTALLED
INITIALLY
OPEN TOBELOW
FIN. FLOOR
+536.40
A-614
9
RAINWATER DOWNPIPE
RAINWATER DOWNPIPE
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPTSPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT SPT
SPT
SPT
SPT
SPT
SPT
FIN. FLOOR
+536.05
FIN. FLOOR
+536.05
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
FIN. FLOOR
+536.40
1
A-260
EMERGENCYSHOWER UNIT
EMERGENCYSHOWER UNIT
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 150
A-103----
SECOND FLOOR PLAN
DESIGN DEVELOPMENTDRAWING
SECOND FLOOR PLAN1
A-202
A-201 1
1
A-252
1
A-256
1
A
B
C
D
E
F
H
J
K
L
M
N
P
1 2 3 4 5 6 7 8 9
G
1
A-257
1
A-258
1
A-251
1
A-253
1
A-254
1
A-259
1
A-255
FIN. FLOOR
+540.90
FIN. FLOOR
+540.90
FIN. FLOOR
+540.55
A-3024
A-303.23
A-3044
A-3054
FIN. FLOOR
+540.90
FIN. FLOOR
+540.90
FIN. FLOOR
+540.90FIN. FLOOR
+540.90
FIN. FLOOR
+540.55
FIN. FLOOR
+540.90
FIN. FLOOR
+540.90
FIN. FLOOR
+540.90
FIN. FLOOR
+540.90
FIN. FLOOR
+540.90
FIN. FLOOR
+540.55
FIN. FLOOR
+540.90
FIN. FLOOR
+540.55
A-6022
SPT
SPTSPT
SPT
SPT
SPT
SPT
SPT
SPT
SPTSPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
FIN. FLOOR
+540.55
FIN. FLOOR
+540.55FIN. FLOOR
+540.90
FIN. FLOOR
+540.90
FIN. FLOOR
+540.55 FIN. FLOOR
+540.90
FIN. FLOOR
+540.55
FIN. FLOOR
+540.90
FIN. FLOOR
+540.90
FIN. FLOOR
+540.90
FIN. FLOOR
+542.00
FIN. FLOOR
+542.00
FIN. FLOOR
+540.55FIN. FLOOR
+540.90
1
A-260
EMERGENCYSHOWER UNIT
EMERGENCYSHOWER UNIT
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 150
A-104----
THIRD FLOOR PLAN
DESIGN DEVELOPMENTDRAWING
THIRD FLOOR PLAN1
A-202
A-201 1
1
A-252
1
A-256
1
A
B
C
D
E
F
H
J
K
L
M
N
P
1 2 3 4 5 6 7 8 9
G
1
A-257
1
A-258
1
A-251
1
A-253
1
A-254
1
A-259
1
A-255
FIN. FLOOR
+545.40
FIN. FLOOR
+545.40
FIN. FLOOR
+545.05
A-302.21
A-303.21
A-304.21
A-305.21
FIN. FLOOR
+545.40
FIN. FLOOR
+545.40
FIN. FLOOR
+545.40
FIN. FLOOR
+545.40
FIN. FLOOR
+545.40
FIN. FLOOR
+545.05
FIN. FLOOR
+545.05
FIN. FLOOR
+545.40FIN. FLOOR
+545.40
FIN. FLOOR
+545.40
FIN. FLOOR
+545.40
FIN. FLOOR
+545.40
OPENTO
BELOW
FIN. FLOOR
+545.40
A-6022
A-615
10
MAINTENANCE
BALCONY
SPT
SPTSPT
SPT
SPT
SPT
SPT
SPT
SPT
SPTSPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
MOVABLE PARTITION
FIN. FLOOR
+545.05
FIN. FLOOR
+545.40
FIN. FLOOR
+545.40
FIN. FLOOR
+545.40
FIN. FLOOR
+545.05
FIN. FLOOR
+545.05
FIN. FLOOR
+545.05
FIN. FLOOR
+545.05
1
A-260
EMERGENCYSHOWER UNIT
EMERGENCYSHOWER UNIT
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 150
A-105----
FOURTH FLOOR PLAN
DESIGN DEVELOPMENTDRAWING
FOURTH FLOOR PLAN1
A-202
A-201 1
1
A-252
1
A-256
1
A
B
C
D
E
F
H
J
K
L
M
N
P
1 2 3 4 5 6 7 8 9
G
1
A-257
1
A-258
1
A-251
1
A-253
1
A-254
1
A-259
1
A-255
FIN. FLOOR
+549.90
FIN. FLOOR
+549.90
FIN. FLOOR
+549.90
FIN. FLOOR
+549.90
FIN. FLOOR
+547.65
MECHANICALPENTHOUSEFOR FHC
MECHANICALPENTHOUSEFOR FHC
MECHANICAL PENTHOUSE FOR FHC
MECHANICALPENTHOUSE
FOR PRESSURISEFAN
MECHANICAL PENTHOUSEFOR FHC
MECHANICALPENTHOUSE
FOR FHC
MECHANICALPENTHOUSE
1
A-260 GUTTER
GUTTER
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 150
A-106Checker--
ROOF PLAN
DESIGN DEVELOPMENTDRAWING
ROOF PLAN1
A-201 1
1
A-252
1
A-256
A
B
C
D
E
F
H
J
K
L
M
N
P
1 2 3 4 5 6 7 8 9
G
1
A-257
1
A-258
1
A-251
1
A-253
1
A-254
1
A-259
1
A-255
A-3014
FIN. FLOOR
+549.90
FIN. FLOOR
+549.90
FIN. FLOOR
+549.90
FIN. FLOOR
+551.05
FIN. FLOOR
+551.05
FIN. FLOOR
+551.05
FIN. FLOOR
+550.50
FIN. FLOOR
+551.05
FIN. FLOOR
+551.90
FIN. FLOOR
+547.65
FIN. FLOOR
+551.05
FIN. FLOOR
+551.05
FIN. FLOOR
+551.05
FIN. FLOOR
+551.05FIN. FLOOR
+551.05
FIN. FLOOR
+551.80
FIN. FLOOR
+549.90
MECHANICALPENTHOUSE
FOR PRESSURISEFAN
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
1
A-260
SPT SPT
SPT SPT
A-1072
B
C
D
E
F
H
J
K
L
M
N
3 4 5 6 7 8
G
FIN. FLOOR
+553.95
FIN. FLOOR
+552.55
FIN. FLOOR
+554.95
FIN. FLOOR
+551.80
FIN. FLOOR
+551.05
FIN. FLOOR
+551.05
FIN. FLOOR
+550.11
A-7566
FIN. FLOOR
+551.05
FIN. FLOOR
+551.05
MECHANICALPENTHOUSEFOR PRESSURISE FAN
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
MECHANICALPENTHOUSE
SPT SPT
SPT SPT
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 150
A-107----
ROOF PLAN - RL+2500 & +4000
DESIGN DEVELOPMENTDRAWING
ROOF PLAN - RL+25001 ROOF PLAN - RL+ 40002
GROUND FLOOR LEVEL+528.40 m
FIRST FLOOR LEVEL+532.40 m
GROUND LEVEL+528.00 m
SECOND FLOOR LEVEL+536.40 m
THIRD FLOOR LEVEL+540.90 m
FOURTH FLOOR LEVEL+545.40 m
ROOF LEVEL+549.90 m
ROOF LEVEL +2500+552.40 m
PIT LEVEL+526.10 m
1
A-252
1 2 3 4 5 6 7 8 9
1
A-251
1
A-253
1
A-254
10
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC WALL
GRANITE STONE PANEL(300MM X 300 MM)
CONCRETE
CONCRETEBUILDING SINAGE
AAC WALL
AAC WALL
AAC WALL
AAC WALL
AAC WALL
CONCRETE
CONCRETE
GRANITE STONE PANEL(300MM X 300 MM)
GRANITESTONEPANEL(300MM X300 MM)
BLOCK SCREEN
BLOCK SCREEN
BLOCK SCREEN
GROUND FLOOR LEVEL+528.40 m
FIRST FLOOR LEVEL+532.40 m
GROUND LEVEL+528.00 m
SECOND FLOOR LEVEL+536.40 m
THIRD FLOOR LEVEL+540.90 m
FOURTH FLOOR LEVEL+545.40 m
ROOF LEVEL+549.90 m
ROOF LEVEL +2500+552.40 m
PIT LEVEL+526.10 m
1
A-256
ABCDEFHJKLMNP G
1
A-257
1
A-258
1
A-259
1
A-255
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC WALL AAC WALL
CONCRETE
SIGNAGE
AAC WALL
AAC WALL
AAC WALL
AAC WALL
AAC WALL
AAC WALL
GRANITESTONEPANEL
GRANITE STONE PANEL(300MM X 300 MM)
GRANITE STONE PANEL(300MM X 300 MM)
GRANITE STONE PANEL(300MM X 300 MM)
1
A-260
BLOCKSCREEN
BLOCKSCREEN
BLOCKSCREEN
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 150
A-201----
ELEVATION
DESIGN DEVELOPMENTDRAWING
ELEVATION SOUTH2
ELEVATION WEST1
GROUND FLOOR LEVEL+528.40 m
FIRST FLOOR LEVEL+532.40 m
GROUND LEVEL+528.00 m
SECOND FLOOR LEVEL+536.40 m
THIRD FLOOR LEVEL+540.90 m
FOURTH FLOOR LEVEL+545.40 m
ROOF LEVEL+549.90 m
ROOF LEVEL +2500+552.40 m
PIT LEVEL+526.10 m
1
A-252
12345678
1
A-251
1
A-253
1
A-254
10
CONCRETE
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
GATE TYPE 1
GATE TYPE 2
GATE TYPE 2
GATE TYPE 2
AAC WALL AAC WALL
AAC WALL
AAC WALL
AAC WALL
CONCRETE
CONCRETE
GRANITE STONE PANEL(300MM X 300MM)
RWP
RWP
GRANITE STONE PANEL(300MM X 300MM)
GROUND FLOOR LEVEL+528.40 m
FIRST FLOOR LEVEL+532.40 m
GROUND LEVEL+528.00 m
SECOND FLOOR LEVEL+536.40 m
THIRD FLOOR LEVEL+540.90 m
FOURTH FLOOR LEVEL+545.40 m
ROOF LEVEL+549.90 m
ROOF LEVEL +2500+552.40 m
PIT LEVEL+526.10 m
1
A-256
A B C D E F H J K L M N PG
1
A-257
1
A-258
1
A-259
1
A-255
BUILDING SIGNAGE
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC RAILING
RC RAILING
AAC WALL
CONCRETE
GATE TYPE 2
GATE TYPE 2
GATE TYPE 2
GRANITE STONE PANEL(300MM X 300MM)
AAC WALL AAC WALL
GRANITE STONE PANEL(300MM X 300MM)
1
A-260
BLOCK SCREEN
BLOCK SCREEN
BLOCK SCREEN
RWPRWP
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 150
A-202----
ELEVATION
DESIGN DEVELOPMENTDRAWING
ELEVATION NORTH2
ELEVATION EAST1
GROUND FLOOR LEVEL+528.40 m
FIRST FLOOR LEVEL+532.40 m
GROUND LEVEL+528.00 m
SECOND FLOOR LEVEL+536.40 m
THIRD FLOOR LEVEL+540.90 m
FOURTH FLOOR LEVEL+545.40 m
ROOF LEVEL+549.90 m
ROOF LEVEL +2500+552.40 m
PIT LEVEL+526.10 m
1
A-256
ABCDEFHJKLMNP G
1
A-257
1
A-258
1
A-259
1
A-255
FOOTING LEVEL+524.00 m
1
A-260
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 100
A-251----
BUILDING SECTION NORTH-SOUTH
DESIGN DEVELOPMENTDRAWING
BUILDING SECTION1
GROUND FLOOR LEVEL+528.40 m
FIRST FLOOR LEVEL+532.40 m
GROUND LEVEL+528.00 m
SECOND FLOOR LEVEL+536.40 m
THIRD FLOOR LEVEL+540.90 m
FOURTH FLOOR LEVEL+545.40 m
ROOF LEVEL+549.90 m
ROOF LEVEL +2500+552.40 m
PIT LEVEL+526.10 m
1
A-256
ACDEFHJKLMNP G1
A-257
1
A-258
1
A-259
1
A-255
2
A-303.2
FOOTING LEVEL+524.00 m
1
A-260
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 100
A-252----
BUILDING SECTION NORTH-SOUTH
DESIGN DEVELOPMENTDRAWING
BUILDING SECTION1
GROUND FLOOR LEVEL+528.40 m
FIRST FLOOR LEVEL+532.40 m
GROUND LEVEL+528.00 m
SECOND FLOOR LEVEL+536.40 m
THIRD FLOOR LEVEL+540.90 m
FOURTH FLOOR LEVEL+545.40 m
ROOF LEVEL+549.90 m
ROOF LEVEL +2500+552.40 m
PIT LEVEL+526.10 m
1
A-256
ABCDEFHJKLMNP G
1
A-257
1
A-258
1
A-259
1
A-255
2
A-305.2
FOOTING LEVEL+524.00 m
1
A-260
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 100
A-254----
BUILDING SECTION NORTH-SOUTH
DESIGN DEVELOPMENTDRAWING
BUILDING SECTION1
GROUND FLOOR LEVEL+528.40 m
FIRST FLOOR LEVEL+532.40 m
GROUND LEVEL+528.00 m
SECOND FLOOR LEVEL+536.40 m
THIRD FLOOR LEVEL+540.90 m
FOURTH FLOOR LEVEL+545.40 m
ROOF LEVEL+549.90 m
ROOF LEVEL +2500+552.40 m
PIT LEVEL+526.10 m
1
A-252
1 2 3 4 5 6 7 8 9
1
A-251
1
A-253
1
A-254
FOOTING LEVEL+524.00 m
A-7541
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 100
A-255----
BUILDING SECTION EAST-WEST
DESIGN DEVELOPMENTDRAWING
BUILDING SECTION1
GROUND FLOOR LEVEL+528.40 m
FIRST FLOOR LEVEL+532.40 m
GROUND LEVEL+528.00 m
SECOND FLOOR LEVEL+536.40 m
THIRD FLOOR LEVEL+540.90 m
FOURTH FLOOR LEVEL+545.40 m
ROOF LEVEL+549.90 m
ROOF LEVEL +2500+552.40 m
PIT LEVEL+526.10 m
1
A-252
1 2 3 4 5 6 7 8 9
1
A-251
1
A-253
1
A-254
FOOTING LEVEL+524.00 m
10
A-7531
A-7511
A-7521
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 100
A-256----
BUILDING SECTION EAST-WEST
DESIGN DEVELOPMENTDRAWING
BUILDING SECTION1
GROUND FLOOR LEVEL+528.40 m
FIRST FLOOR LEVEL+532.40 m
GROUND LEVEL+528.00 m
SECOND FLOOR LEVEL+536.40 m
THIRD FLOOR LEVEL+540.90 m
FOURTH FLOOR LEVEL+545.40 m
ROOF LEVEL+549.90 m
ROOF LEVEL +2500+552.40 m
PIT LEVEL+526.10 m
1
A-252
1 2 3 4 5 6 7 8 9
1
A-251
1
A-253
1
A-254
FOOTING LEVEL+524.00 m
Date Scale Drawn Checked
Sheet Number
No. Date Issue
GENERAL NOTES
SIGN. SEAL.
1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.
Sheet Title
Project Name
IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331
7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN
NIHON SEKKEIINTERNATIONAL INC.
NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku
Tokyo 163-1329 JAPAN
APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN
THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY
RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD
Architect/Engineer
Architect Of Record
INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD
RESEARCH CENTER COMPLEX
01 31 MAR 2014 ISSUED FOR SD
RCC-
NOT FOR CONSTRUCTION
9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)
02 31 MAY 2014 ISSUED FOR DD 30%
03 17 JUN 2014 ISSUED FOR COST ESTIMATION
04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%
05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%
06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%
07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%
2014/10/31 1 : 100
A-259----
BUILDING SECTION EAST-WEST
DESIGN DEVELOPMENTDRAWING
BUILDING SECTION1