griffin trail wind project - innergex.com · the griffin trail wind project is a wind farm located...
TRANSCRIPT
The Griffin Trail Wind Project is a wind farm located in Knox and Baylor Counties, near the community of Vera, in north-west Texas.
Griffin Trail will be sited on approximately 26,000 acres of land and consist of 80 wind turbines for a total installed capacity of 225.6 MW. The project is expected to have an annual power generation of approximately 800,000 MWh, enough to power over 57,000 households in Texas annually with renewable energy. The power generated will be fed into the ERCOT power grid.
GRIFFIN TRAILWIND PROJECT
A - 1
736
COR
D43
65
USHY82E
CORD4381
CO
RD
4351
Farm
To
Mar
ket
CO
RD
185
CORD7004
HW Y82
CO
RD
4171
CO
RD
439
CORD3 182
CORD3 171
Trainham
CO
RD
3171
COR
D43
93
CORD4 170
CORD3170
CO
RD
4371
COR
D70
00
CORD4180
CORD3065
CORD4320
CO
RD
3185
CORD3150
CORD4170
CORD4320
CO
RD
3175
CO
RD
700
1
CO
RD
4395
Private
CORD4180
CO
RD
419
5
CORD4330
Townsend
CO
RD
3181
CORD4320 CORD4320
CORD140
CORD1 60
CO
RD
4181
CO
RD
417
5
Farm To Market
FarmTo
Mar ket
Farm
To
Mar
ket
CORD4361
CO
RD
4361
CO
RD
4331
CO
RD
4331
CO
RD
4390
CORD4390
Farm
To
Mar
ket
Fa r
mTo
Mar
ket
CORD4185
CO
RD
4185
CORD435
£¤82
Town ofVera
B l kB l kAA
B l kB l kAA
T 1T 1
B l kB l kAA
B l kB l kBB
B l kB l kBB
B l kB l kBB
B l kB l k22
B l kB l k22
B l kB l kCC B l kB l k
CC
POI
Griffin Trail Substation
GRIFFIN TRAIL PROJECTKNOX AND BAYLOR COUNTIES
TX
0 1.50.75Miles
Clear Fork GIS, LLC7/23/2020 4:49:17 PM
Base
_̂ City\Town
Project FeaturesGriffin Trail AOI -25,725.63 Acres
")O&M Operating & MaintenaceBuilding
Electric
!" POI\AEP Switch Yard
"S Griffin Trail Substation
Transmission Line
OwnershipParcel
Griffin Trail Wind Leased
´
ShackelfordJones StephensFisherScurryPaloPinto
Parker
Stonewall HaskellKent Throckmorton Young
Clay
WichitaFoard
CottleMotley
WilbargerHardeman
KnoxKingDickens Baylor Archer
ChildressHall
Jack
OklahomaTexas
Kn
ox
Kn
ox
Ba
yl o
rB
ay
l or
COMMUNITY
Being a good neighbor is a priority for Innergex. We have a long and success-ful track record of developing and operating high-quality, environmentally responsible, and socially acceptable renewable energy projects around the world.
Our presence in the Lone Star State is growing. We currently operate three wind farms, Flat Top in Mills County, Shannon in Clay County and Foard City in nearby Foard County, commissioned in 2019. We also operate the Phoebe solar farm in Winkler County, commissioned in 2019, and have an office in Austin.
We expect the Griffin Trail wind project to bring significant and long-term economic benefits on the local community. Knox County and Hospital, as well as the Benjamin and Seymour Independent School Districts, will receive nearly $66 million1 in tax revenues over the project’s initial lifetime. Furthermore, landowners participating in the project will receive direct compensation in the form of long-term lease payments.
In terms of labor, we anticipate creating a peak of 200-250 jobs during the construction period. These jobs are expected to inject millions of dollars in the community in construction and installation labor as well as related services. Upon commissioning, a team of 6-8 employees will maintain the installation over the life of the project.
ENVIRONMENT & PERMITTING
Innergex is proud of its environmental track record. Our facilities are developed and operated with strict adherence to environmental codes and best practices. Following careful study of the wind resource for over a year, a series of environmental studies (including on birds) were conducted that will enable us to make more informed decisions to minimize, mitigate or avoid environmental impacts.
Based on environmental assessments, we will be locating the turbines at a distance from the Brazos River in an effort to eliminate any potential negative impacts and preserve scenic landscapes. Furthermore, as wind farms do not consume water to generate power, there is no impact on availability or quality of local water supplies.
Permits from the Federal Aviation Authority have been obtained regarding airspace usage. While we prepare financing for the project, we are finalizing the interconnection agreement with Electric Transmission Texas, LLC (ETT). Once finalized, we can start the construction of our substation east of the junction of U.S. Route 82 and FM267, adjacent to where ETT’s new 345 kV switchyard will be that will act as point of interconnection with the grid.
ABOUT THE WIND FARM
The site will consist of 80 wind turbines. The GE turbines will have a 2.8 MW rated capacity and are widely used in Texas and elsewhere in the United States because of their reliability. Other equipment on site will include the switchyard, electrical substation, above ground and buried electrical cables, and access roads.
GRIFFIN TRAIL WIND PROJECT IN KNOX COUNTY
1 All dollars mentioned are in US dollars
DETAILED PROJECT VIEW
GRIFFIN TRAIL CONSTRUCTION TIMELINE
2020Mid August Site mobilization: prepare site for office/laydown area – activity localized to one site. Minimal impact.
Early September Start road construction (localized at the start). Start O&M building foundation and construction (localized to one site). Minimal impact.
Late October Start turbine foundation and construction. Construction activities ongoing across the site, expect levels of noise and dust.
Early November Start collection system installa-tion. Construction activities continue across the site. Start substation construction (localized to one area). Expect levels of noise and dust.
2021Mid January Wind turbine delivery begins and installation starts. Cranes on site, more local traffic disruption with delivery of the components (blades, towers, etc).
Late March Wind turbine delivery ends. Most of the traffic and project construction impacts on local community finished.
Late June Project commissioning and completion.
2022
FOR FURTHER INFORMATIONinnergex.com
www.griffintrail.com
1-855-218-7393
WIND POWER FACTSAt the top of the tower sits the rotor, the main components of which are the blades. The blades are attached to a horizontal shaft connected to a generator inside the nacelle. When the wind blows it turns the blades, and the rotation generates electricity: as they turn, the blades activate a gearbox in the nacelle that runs the generator. The electricity produced is transmitted to a step-up station and then delivered to consumers through the grid.
The amount of energy produced depends on three main factors: wind speed, air density and the area swept by the blades. Wind turbines produce no atmospheric emissions, no harmful waste nor any other type of air or water pollution. And the noise produced by a wind turbine, as measured outdoors close to nearby homes, is no more than 40 dB, which is equivalent to the hum in a library. Unlike thermal forms of power generation, wind turbines do not consume water to generate electricity.
More information on wind energy is available at Innergex (innergex.com), the American Wind Energy Association (awea.org) and the International Energy Agency (iea.org).
ABOUT INNERGEXFor 30 years, Innergex has believed in a world where abundant renewable energy promotes healthier communities and creates shared prosperity. As an independent renewable power producer which develops, acquires, owns and operates hydroelectric facilities, wind farms and solar farms, Innergex is convinced that generating power from renewable sources will lead the way to a better world. Innergex conducts operations in Canada, the United States, France and Chile.
WIND ENERGY SYSTEM