Cristalli : BTCP
• Delivery continues according to the plan (~ 1200 xl/month).
• New Contract for 18K Barrel + 4250 EE (on top of the in-kind contribution) in preparation with Russian Electronics
• Key issue is the delivery schedule. We want to be firm on the 1200 EB /month rate, which would correspond to the last EB crystal in October 06 and allow us to complete EE before the run of 2008
• In-kind contribution of 7000 EE crystals (1 Endcap) from Russian federation has been confirmed in a letter from minister Fursenko to DG Aymard
GRI 16-05-05 M. Diemoz - INFN Roma
Cristalli: SIC
• We have completed the 300 EE pre-series• A pre-series of 100 EB crystals (50 type-14 L+R and 50 type-17 L+R)
is being cut and should be sent very soon • Second draft of contract being exchanged• Issues
– Pt import/export authorization (si importa ma non è chiaro se si esporta...)
– Radiation hardness specifications
Non ancora trovata una correlazione utilizzabiletra parametri ottici e radiation hardness.Intensa attività di irraggiamento per capire il comportamento di questi cristalli
GRI 16-05-05 M. Diemoz - INFN Roma
Impianto Calliope-ENEA CasacciaAttività sorgente (01/05): 6.72x1014 Bq (18.1 kCi)
Responsabile: S. Baccaro
Attività irraggiamenti per qualifica SIC:• 100 cristalli trattati• 4100 h di irraggiamento a 3 dose rates
nuovo set-up perirraggiamenti multipli
GRI 16-05-05 M. Diemoz - INFN Roma
Radiation hardness SICRadiation induced damage at 420 nm
after 1h 20min @ 350 Gy/h
specifica BOGO
Come rigettare i cattivi?
SIC può pre-irraggiare i xl in una infrastrutturaindustriale (sterilizzazione alimentare):(????) 30 Gy/h x 24 h
condizioni da verificare con appropriate dosimetrie in loco
GRI 16-05-05 M. Diemoz - INFN Roma
Radiation hardness SIC
SIC EE XtlsBTCP EE Xtls
(HDR_specs_CMS) (LDR_SIC_cond)
Si può stabilire un criterio di reiezione all’origineprovvisto che le condizioni di irraggiamento sianosotto controllo
m=1.19±0.01
saturation (420nm) @ 11.8 Gy/h (m-1)
EE dose rate
Irraggiamenti ENEA:confronto dose rates diverse
GRI 16-05-05 M. Diemoz - INFN Roma
Radiation hardness SIC
(4
20nm
)
(420nm) after 1h 20min @350 Gy/h vs. saturation (420nm) @ 30 Gy/h
ENEA preliminare
GRI 16-05-05 M. Diemoz - INFN Roma
Radiation hardness SIC
Comparison Comparison Rome & SIC after 720 Gy at Rome & SIC after 720 Gy at 30 Gy/h 30 Gy/h
PRELIMINARE
= 15%
Vedere una chiara correlazione è unpasso avanti nontrascurabile!
GRI 16-05-05 M. Diemoz - INFN Roma
Prossima milestone ECAL
Installazione di EB+ in SX5 tra DIC 05- GEN 06
Milestone non soggetta alle incertezze dovute all’arrivo dei cristalli
GRI 16-05-05 M. Diemoz - INFN Roma
Stato costruzione Moduli & S-Moduli-1
SM0
SM1
SM2
SM3
SM4
SM5
SM6
SM7
SM8
SM9
SM10
SM11
SM12
SM13
SM14
SM15
SM16
SM17
M1
CERN
M2
Rome
M3
Rome
M4
CERN
Bare SM
Complete SM
Module Completed in RC
Module In progress
Module Completed & shipped to CERN/lab27
Bare* Super-Module Completed
Super-Module In progress
GRI 16-05-05 M. Diemoz - INFN Roma
Stato costruzione Moduli & S-Moduli-2
SM18
SM19
SM20
SM21
SM22
SM23
SM24
SM25
SM26
SM27
SM28
SM29
SM30
SM31
SM32
SM33
SM34
SM35
SM36
M1
CERN
M2
Rome
M3
Rome
M4
CERN
Bare SM
Completed SM
Module Completed in RC
Module In progress
Module Completed & shipped to CERN/lab27
Bare* Super-Module Completed
Super-Module In progress
GRI 16-05-05 M. Diemoz - INFN Roma
Un traguardo di rilievoThe CERN ECAL team invites you to an aperitif to celebrate the
mechanical completion of the first half Barrel
Building 27 , starting at 18:00, on Wednesday, April 20th .
GRI 16-05-05 M. Diemoz - INFN Roma
Integrazione - 1• Production of SM now in a “routine” mode: since Sept 03 one SM assembled nearly every 3/4 weeks (1 week mechanical assembly, 2 weeks (7 days) monitoring installation)
• 17 bare SM ready to be integrated with front-end electronics & cooling
Installation of rear DCS sensors (1/module), Installation of water “leak detection” cable, Installation of ArmaflexInstallation of 4 Inlet manifolds + He leak testInstallation of 4 return pipes + He leak test Installation HV cablesInstallation of motherboard supportsInstallation Mother boards + test Installation cooling blocks (equipped with the electronic services support) +He leak testInstallation of SM general manifolds + He leak testInstallation DCS sensors in manifoldPressure test @ 20barHelium leak testLast tests on MB Water filling, hydraulics testsInstall back plate
Mi-bare SM integration (HV & Cooling & Motherboard):
GRI 16-05-05 M. Diemoz - INFN Roma
Integrazione - 1 - 2
Bld 867
GRI 16-05-05 M. Diemoz - INFN Roma
Integrazione - 2
Most recent advances: • Staffing of three complete teams
from ~July on • ETHZ (+ Sofia) • Minnesota, IN2P3, IC• INFN
• Three benches ready (for TT test level), full SM test implementation will follow
• Quality insurance policy, with non conformity certificates, proposed by J. Nash
• Controlled access system ordered
The recommendations from the MPR review committee (DEC 04) have been implemented
GRI 16-05-05 M. Diemoz - INFN Roma
Integrazione - 2
Crystal APD
Amplifier*1
Amplifier*6
Amplifier*12
ADCChannel2 (12bit)
ADCChannel1 (12 bit)
ADCChannel0 (12 bit)
CrystalCrystalCrystalCrystalCrystal
Mot
her
boa
rd
Very FrontEnd
(VFE)CARD
(5 Channels)
Very FrontEnd
(VFE)CARD
(5 Channels)
Very FrontEnd
(VFE)CARD
(5 Channels)
Very FrontEnd
(VFE)CARD
(5 Channels)
Very FrontEnd
CARD(VFE)
5 Channels
CrystalCrystalCrystalCrystalCrystal
CrystalCrystalCrystalCrystalCrystal
CrystalCrystalCrystalCrystalCrystal
CrystalCrystalCrystalCrystalCrystal
Front End Card(FE)
25 Channels
14 bitChannel
Data
Trigger Primitives
(Continuous)
Data (on Level 1)
GOH: Optical Digital Data Transmission
GRI 16-05-05 M. Diemoz - INFN Roma
Integrazione - 2
Front End Electronics
LVR
VFE
VFE
VFE
VFE
VFE
Mother BoardHV in
Power in
Digital VoltageDistribution
Analog Voltage Distribution
Trigger Fiber(s) Data Fiber
Flexible Connection to APD’s / VPT’s
Motherboard con kapton
VFE LVR board
FE
Radicale cambio di disegno nel 2002-03
Torre di trigger
GRI 16-05-05 M. Diemoz - INFN Roma
Integrazione - 2
Produzione e test elettronica di serie “on detector” ben avviata
VFE Tests(16000)
FE Tests(3200)
LVRBTests(3200)
DCS TestsMotherboard
Production Tests(3200)
867 Test Centre : Trigger Tower LevelIncludes Test Stand for VFE/FE/LVR/
DCS/GOH/TRB
SuperModule Integration (867)
MotherboardIntegration (Bat 27)Including MB Test
station
Database
Location in SM ofVFE/FE/LVRB
Test Resultsfor VFE/FE/LVRB
(By Barcode)
GOHTests(6400)
Token RingCard Tests
PA(80K)
ADC(80K)
FENIX(25K)
DCU(25K)
Chip
Chip LevelProductionTests
Board
Board LevelProductionTests
TriggerTower
TriggerTowerTesting
SuperModule
SupermoduleIntegrationTesting
CCULVDS
Production Testing
Chip testing for EB nearing completion
GRI 16-05-05 M. Diemoz - INFN Roma
Integrazione - 268 TT per SM
Sequenza operazioni:1. Installazione VFE, LVRB e FE2. Test TT singola (test pulse)
Rumore ~ 1 ADC count (45 MeV )3. Installazione token rings e test4. Installazione GOH e patch panel fibre
ottiche e test5. Distribuzione LV e servizi6. Test con laser verde: cristalli e APD
GRI 16-05-05 M. Diemoz - INFN Roma
Intercalibrazione iniziale
Misure sistematiche laboratorio(qualifica cristalli):misura intercalibrazione al 4%
Test agosto 2004 su M1 ed estrapolazioni
Montecarlo su M2, M3, M4: misura
coefficienti intercalibrazione con precisione
del 3% con 2 settimane/SM di presa datiSM10 all xtals: 4.0% 0.1%
SM10-M1xl con errore
stat. cosm. < 2%
GRI 16-05-05 M. Diemoz - INFN Roma
Intercalibrazione cosmici
Edge taggers
Trigger counters
focal plane
4cm below SM
~20 cm above SM
1. Incline along eta by 10-15 deg. (to increase statistics in M4)
2. Selective quasi-pointing trigger with edge taggers
1. Rate +30% in M4, -20% in M1
2. Spectrum more homogeneus
Guadagno APD x 4
Selezione eventi con tagli di isolamento
SM inclinato di 10°
GRI 16-05-05 M. Diemoz - INFN Roma
Calibrazione cosmici
• Cosmic ray set-up is progressing– Scintillators for telescope have been selected, cut and equipped
by IHEP team – SM support with 10 º inclination being designed (Rome).
• Studio fattibilità e test preliminare: Milano• Set up generale: CERN• DAQ: CERN, Lisbona, Milano• Meccanica per inclinazione: Roma• Monitor on line: Milano e Trieste• Simulazione a analisi dati: Milano
GRI 16-05-05 M. Diemoz - INFN Roma
• DB di condizione contiene le condizioni del detector dal Detector Control System (DCS), dal DAQ/TR, dai run di calibrazione (Piedistalli, Laser Monitoring, Test-Pulse, …)
• Schema del database definito e testato con dati del test-beam di 1 SM del 2004 (Roma, Minnesota)
• Piano di usare questo schema per calibrazione cosmici ad H4 e magnet test 2005
• Effettuate prove di lettura DB da ORCA
Calibrazione cosmici / ECAL Data Base
GRI 16-05-05 M. Diemoz - INFN Roma
Schema DB CMS C
onfig
urat
ion
Con
ditio
nsC
onditions
Calibration
Offline ReconstructionConditions DBONline subset
EquipmentConfiguration
Conditions Create rec conDB data set
Offline ReconstructionConditions DBOFfline subset
Mastercopy
Bat
513
Online Master Data Storage
Schema from Frank Glege
1 PC at the test-beamwith ORACLE
(data from DCS, monitoring,
Token Ring, …) for cosmic ray SM calibration
1 account at the IT ORACLE server
for off-line database
H4(cosmics and test-beam)
ECAL DB schema per cosmici
GRI 16-05-05 M. Diemoz - INFN Roma
Stato impegni INFN
• PRODUZIONE GRIGLIE (RM): TERMINATA 05/03 (36X4=144 PEZZI + spares)
• PRODUZIONE SUPER BASKETS (RM) : TERMINATA 06/04 (36 SB + spares)
• PRODUZIONE PS HV APD (RM):TERMINATA 12/03 (18 CRATE, 144 BOARD + spares) • PRODUZIONE CAVI HV (RM): IN CORSO (80%)
• SISTEMA DI RAFFREDDAMENTO (MI): PRODUZIONE DI SERIE IN CORSO (3 SM/mese)
• MOTHERBOARD (TO): GARE CONCLUSE, PRODUZIONE E VALIDAZIONE PROTOTIPI OK, PRODUZIONE FINALE AVVIATA
GRI 16-05-05 M. Diemoz - INFN Roma
RAFFREDDAMENTO:• Produzione in fonderia delle barre di raffreddamento finita• Lavorazione barre 50%• Assemblaggio cooling blocks 5 SM consegnati, 3SM/mese in corso• Housing 2SM consegnati, segue consegna VFE• Taglio laser Armaflex (INFN Genova) completo < fine maggio
Raffreddamento / Motherboards
MOTHERBOARDS:
•3 Lotti da 1 SM di kapton consegnati da ditta ECS (Vicenza) SM11, SM5, SM16
• Preserie di 80 MB da SEISYSTEM (Massa C.) SM5
• Inizio serie assemblaggio SEISYSTEM SM16 (meta’ maggio 05)
3 SM/mese
GRI 16-05-05 M. Diemoz - INFN Roma
Conclusioni
• La produzione dei cristalli è la spada di Damocle• Forte impegno per la validazione dei cristalli SIC• Mezzo Barrel “bare” fatto (30600 cristalli = L3_ECAL_BGO*3)• Integrazione SM quasi a regime su 3 linee parallele• Impegni costruttivi INFN: in dirittura di arrivo
Forte attività in crescita su:• Gestione dati e ricostruzione• Calibrazioni in situ• Studi di Fisica: