GreetingsSANIBONANI
Warm
Thami Manyathi
Ethekwini Transport Authority
3Go!Durban Integrated Public Transport Network
1. Overview of the Go!Durban Project
2. Fleet Procurement Strategy
3. Go!Durban Empowerment Charter
3
Transformation of Public Transportin the City
Feeder routes &
services
Project Description
Network of dedicated Public
Transport trunk corridors
(Road & Rail), linking key
Commercial, Industrial and
Residential nodes in the
City; supported by:
Transfer and terminal
stations, anchoring
transit orientated
developments.
Intelligent transport and
fare management
systems to facilitate
seamless travel for
passengers, monitoring
and management of the
system performance .
Extended hours of
services (16-18hrs) with
universal accessible
vehicles.
Non-motorized transport
1
7
Transformation of existing operators
Existing operators to
be incorporated into
new system
Economic Empowerment Charter
Promotion of
investment into the
City and communities
Part of City’s Climate
Change Adaptation
and Resilience
Strategies
Sustainable Urban
Form
Transformation of the City2 3
5
Equity of Access
to Opportunity
Reduce
Environmental
Impact
Promotion of
a Liveable
City
Rectify &
Enhance Spatial
Structure
Have a Positive
Impact on the
City's Economy
Goals
6
C7
C9
C8
C6a
C6bC6c
C5
Hillcrest
Bridge City
Mpumalanga
Chatsworth
Pinetown
Umhlanga
King Shaka
International
Tongaat
CBD
Rossburgh
Merebank
ProspectonUmlazi
Isipingo
C4
C2
C3 C1
Overall Project Corridors and Timeline
Phasing
% Trunk
– Feeder
Trips
Planned
Operational
Year
Phase 1
ICDS*
25%
2020
C3 2018
C9 2020
C1 2022
C2 (Rail) 40% 2022
Phase 2 C5 20% 2025
C7 20% 2025
Phase 3 C4 9% 2028
C8 9% 2028
Phase 4 C6a,b,c 6% 2030
Note 1: * ICDS : Inner City Distribution System
Note 2: Phase 1 – Being Implemented to 2022
7
20172016 2018 2019 2020 20222021
Today
C3! Go Live
June 2018
C9! Go Live
June 2020
C1! Go Live
June 2022
Operations Go
Live
17/18 18/19 19/20 20/21 21/22
R1,1bn R2,0bn R1,9bn R1,1bn R1,1bn
Financial
Year
Capital
Budget
Project Budget Estimated Capital Costs for the
Entire Project (2030) – R24 billion
1 US $ = R 12,92 *estimated
8
Public Sector Investment
R 14 billion – Transport
Private Sector Investment
R 35 billion – Residential &
Commercial
Right of Way (ROW) – 77km
Transfer Stations – 22
BNG Units – 80 000
Integration Zones
PRIME INVESTMENT CORRIDORSC3,C9,C2
9
“If you want to go
fast, go alone; if you
want to go far, go
together” African Proverb
Employment
Construction FTE’s – 448 000
Permanent Jobs – 44 200
Skills Development
Entrepreneurship
Professional Drivers
ICT
Construction
Manufacturing
Cycling
Enterprise Development
Travel Time and Cost Savings
Time available to spend with
family
Investment in Communities
7Project in relation to
resilience goals01
02
03
04
05
Strengthening local communities and
building greater social cohesion
Improve of effectiveness of
education and skills development
Promote economic growth
inline with 21st century
trends and opportunities
Manage environmental
assets more effectively
Create a more inclusive
and integrated spatial
plan06
Improve municipal
effectiveness
The Go!Durban Integrated Public
Transport Network Project
contributes directly to all Resilience
levers of change identified in the
City’s Resilience Strategy
City Resilience StrategyLevers of Change
113
Go!DurbanFleet Procurement Strategy
12
12
% O
wn
ers
hip
by
PT
Op
erat
ors
Current Contracts & Incentives Program
Contract with Academic Institutes & Feeder service
contracts
DOT Contracts &Go! Durban contracts
New Contracts
Individual Ownership VOC Ownership
Operational Model
13
• Articulated / Double Decker (Trunk)– 18 – 22m
– low entry
– LH & RH doors
• Rigid (Trunk)
– min 12 m
– low entry
– LH Door
– 2 doors on the RHS
• Midi (Feeder)
– min 9 m
– low entry
– LH door
– 1 door on the RHS
High level bus specifications
7
Fleet Numbers (2017 -2021)
Vehicle Type Number
Rigids 200
High Capacity (Articulated /
Double Deckers)
180
Midibuses 765
Commuter Buses 250
7
Focus of Fleet Procurement
Encouraging investment to
strengthen manufacturing
sector, in line with
economic transformation.
Go!Durban Empowerment Charter
Enterprise
Development
# Link component
suppliers to the fleet
production process
# Expand capacity to
maintain the fleet
Skills Development –
expand the pool of
artisans in the City
Corporate Social
Investment
C3 Crossing the Umgeni River - Before C3 Crossing the Umgeni River - After
C3 Crossing the Umgeni River
Go!Durban Pilot Station in New Germany, Pinetown, C3
C3 Wyebank, Pinetown
Pedestrian Bridge across C3, Pinetown CBD
St John’s Underpass, Pinetown, C3
C9 Bridge Across N2 (Umhlanga to Cornubia)