Green technology used Green technology used for for ATLAS processing ATLAS processing Dr. Ing. F Dr. Ing. F ă ă rca rca ş ş Felix Felix [email protected] [email protected] NATIONAL INSTITUTE FOR RESEARCH AND DEVELOPMENT OF ISOTOPIC NATIONAL INSTITUTE FOR RESEARCH AND DEVELOPMENT OF ISOTOPIC AND MOLECULAR TECHNOLOGIES AND MOLECULAR TECHNOLOGIES Donath St. 65-103, 400293, Cluj-Napoca, ROMANIA Donath St. 65-103, 400293, Cluj-Napoca, ROMANIA Tel.: +40-264-584037; Fax: Tel.: +40-264-584037; Fax: +40-264-420042; GSM: +40-731- +40-264-420042; GSM: +40-731- 030060 030060 e-mail: e-mail: [email protected] , web: , web: http://www.itim-cj.ro

Upload: bailey

Post on 08-Jan-2016

37 views

Category:

Documents


1 download

DESCRIPTION

Green  technology  used  for  ATLAS  processing. Dr. Ing. F ă rca ş Felix [email protected]. INCDTIM. Why may we use “Green” Technology in a datacenter especially for Grid?. INCDTIM. Green IT. Green use . Reduce the energy consumption of computers and other information systems. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Green  technology  used  for   ATLAS  processing

Green  technology  used  for  Green  technology  used  for  ATLAS  processing ATLAS  processing

Dr. Ing. FDr. Ing. Făărcarcaşş Felix [email protected]@itim-cj.ro

NATIONAL INSTITUTE FOR RESEARCH AND DEVELOPMENT OF ISOTOPICNATIONAL INSTITUTE FOR RESEARCH AND DEVELOPMENT OF ISOTOPIC AND MOLECULAR TECHNOLOGIESAND MOLECULAR TECHNOLOGIES

Donath St. 65-103, 400293, Cluj-Napoca, ROMANIADonath St. 65-103, 400293, Cluj-Napoca, ROMANIA Tel.: +40-264-584037; Fax:Tel.: +40-264-584037; Fax: +40-264-420042; GSM: +40-731-030060+40-264-420042; GSM: +40-731-030060

e-mail: e-mail: [email protected], web: , web: http://www.itim-cj.ro

Page 2: Green  technology  used  for   ATLAS  processing

22

Why may we use “Green” Why may we use “Green” Technology in a datacenter Technology in a datacenter

especially for Grid?especially for Grid?

INCDTIM

Page 3: Green  technology  used  for   ATLAS  processing

33

Green IT

Green use. Reduce the energy consumption of computers and other information systems.

Green disposal. Refurbish and reuse old computersGreen manufacturing. Manufacture of electronic components and other subsystems with minimal or no impact on the environment

Green design. Design energy efficient and environmentally sound computers, servers, and cooling equipment.

INCDTIM

Page 4: Green  technology  used  for   ATLAS  processing

44

ITIM Datacenter dedicated to Grid

Place for max 5 rack’s, total of 200 1U rack mountable computers

To small for our expectation 5 years ago, but good for a start.

No backup solution, no redundancy

INCDTIM

Page 5: Green  technology  used  for   ATLAS  processing

55

We used some of the green IT concepts

Green disposal– less space more computers– good management program, less

people, – redundant system

Green use– power economy– using virtual environment on 5

Years old rack mountable computers

INCDTIM

Page 6: Green  technology  used  for   ATLAS  processing

66

Technology and ImplementationTechnology and Implementation INCDTIM

Page 7: Green  technology  used  for   ATLAS  processing

77

Blade technologyBlade technology

IBM and HP Blade system, total of IBM and HP Blade system, total of 46 46 Blades in only Blades in only 29 U29 UProcessing power: Processing power: 368 368 corecoreLess space for 46 PC => Less space for 46 PC => core increase by core increase by 56%56%Less Less powerpower consume consume reduced reduced by by 34%34%Management -> through web based Management -> through web based interfacesinterfacesMSA Storage capacity: 50 TB, MSA Storage capacity: 50 TB,

INCDTIM

Blade system and MSA storage

Page 8: Green  technology  used  for   ATLAS  processing

88

Network Layer 3 Switch Cisco Network Layer 3 Switch Cisco 6509E6509E

A Layer 3 switch with A Layer 3 switch with routing capabilities routing capabilities -> -> decrease power consumedecrease power consume

Full redundant system -> Full redundant system -> increase reliabilityincrease reliability

ITIM – RoEduNet 10 GB 2011ITIM – RoEduNet 10 GB 2011

INCDTIM

Page 9: Green  technology  used  for   ATLAS  processing

99

Backup and monitoringBackup and monitoring

Power generator 275kW

APC Netbotz Monitoring System

Temperature

Humidity

Fluid detector

Smoke detector

Uninterruptible Power Source ~ APC Symetra of

max 160 KVA full redundant

INCDTIM

U

P

S

Page 10: Green  technology  used  for   ATLAS  processing

1010

Logical Schema of the DatacenterLogical Schema of the Datacenter Network Configuration Network Configuration

INCDTIM

Page 11: Green  technology  used  for   ATLAS  processing

RO-14-RO-14-ITIM ITIM

ResultsResultsfor Atlas for Atlas

in in RomaniaRomania

1111

INCDTIM

Page 12: Green  technology  used  for   ATLAS  processing

1212

17% of CPU time in Romania17% of CPU time in RomaniaINCDTIM

Page 13: Green  technology  used  for   ATLAS  processing

1313

What are the Green IT implementations results?

Did we increase the number of Cores in the Datacenter? - Yes

Did we Improve the management condition – Yes

Do we have good redundancy? – Yes

Did we Reduce the power consumption? … Maybe

INCDTIM

Page 14: Green  technology  used  for   ATLAS  processing

1414

Financial supportFinancial support

1.1. Fund through National Authority for Science Fund through National Authority for Science Research (ANCS)Research (ANCS)

2.2. SINDEGRIDSINDEGRID, closed project , closed project 3.3. 12 EU12 EU – ConDeGrid / 2009 – present – ConDeGrid / 2009 – present4.4. 15 EU15 EU / 2008 – present / 2008 – present5.5. POS-CCEPOS-CCE 192/2719 192/2719, , Sectorial Operational Sectorial Operational

Program, “Increase of Economic Program, “Increase of Economic Competitiveness”, Competitiveness”, contract 42/11.05.2009 contract 42/11.05.2009 Axis 2, Operation 2.2.3~ Axis 2, Operation 2.2.3~ Improving the Improving the capacity and reliability of INCDTIM GRID capacity and reliability of INCDTIM GRID center for integration in international center for integration in international networks (INGRID)networks (INGRID), , ValueValue: 2.345.800 lei: 2.345.800 lei ~ ~ 500.000 Euro500.000 Euro

6.6. POS-CCE 536, Axis 2, operation 2.1.2, POS-CCE 536, Axis 2, operation 2.1.2, software acquisition. software acquisition.

7.7. Cooperation programCooperation program "Hulubei- "Hulubei-Meshcheryakov“ together with the Laboratory Meshcheryakov“ together with the Laboratory of Information Technologies at JINR –Dubnaof Information Technologies at JINR –Dubna

INCDTIM

Page 15: Green  technology  used  for   ATLAS  processing

Conference InvitationConference InvitationINCDTIM is organizing between the INCDTIM is organizing between the 25-27 25-27 OctoberOctober 2012 2012 the the Fifth Romania Tier 2 Fifth Romania Tier 2 Federation "Grid, Cloud & High Performance Federation "Grid, Cloud & High Performance Computing Science" - RO-LCG ConferenceComputing Science" - RO-LCG Conference

http://www.itim-cj.ro/rolcg2012

Under the Regis of: Under the Regis of: IEEE Romania IEEE Romania SectionSection– Full paper submission: 2Full paper submission: 25.07.20125.07.2012– Notification of acceptance: Notification of acceptance: 1.09.20121.09.2012– Camera ready papers: Camera ready papers: 15.09.201215.09.2012 1515

INCDTIM

Page 16: Green  technology  used  for   ATLAS  processing

1616

?Future idea?

We are We are improving the storage improving the storage capacity for capacity for analyzing ATLAS data in the near futureanalyzing ATLAS data in the near future

Virtual implementation

We are looking to improve the middleware. We are looking to improve the middleware. and changing and changing gLite to EMgLite to EMII

Improving the IPv6 link

Working for obtaining new collaboration for the Grid site

INCDTIM

Page 17: Green  technology  used  for   ATLAS  processing

1717

Thank you for your time

Your question please…