greater orlando aviation authority board meetingjan 18, 2017  · o west park place opened for first...

41
Greater Orlando Aviation Authority Board Meeting Wednesday, January 17, 2017

Upload: others

Post on 10-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Greater Orlando Aviation AuthorityBoard Meeting

    Wednesday, January 17, 2017

  • Award

  • 2016 HOLIDAY REVIEW&

    2017 OUTLOOK

  • 2016 HOLIDAY REVIEW

    • HOLIDAY NUMBERS

    • ENTERTAINMENT

    • CUSTOMER COMMUNICATION

    • 2017 FORECAST

    • CONSTRUCTION ACTIVITY

  • BY THE NUMBERS• 3 million travelers over a 22-day period (Dec. 16-Jan 6)

    • 8% increase over previous year

    • Busiest day: Jan. 2, 2017o 150,000 total passengerso 4th busiest day in airport history

    • 652 International flights arrived with 126,329 passengers3.7% increase in flights over 20157.0% increase in passenger activity over 2015

    2016 HOLIDAY REVIEW

  • BY THE NUMBERS• Checkpoint lines

    o 62.8% of guests waited 15 minutes or less at the West Checkpointo 80.6% of guests waited 15 minutes or less at the East Checkpointo 71.7% of guests waited 15 minutes or less at checkpoints combined

    • More than 780,000 bags moved through baggage systemo 65,466 bags moved on Jan. 2 (biggest day in airport history)

    • Increased Ambassador staffing

    2016 HOLIDAY REVIEW

  • BY THE NUMBERS

    • Parking activity increased 14%o Garages at capacity multiple times during holiday periodo West Park Place opened for first time since 2006

    • December Concessions (Food, Beverage, Retail & Services) gross sales: $27,328,528

    • December on-site rental car gross sales: $49,827,092

    2016 HOLIDAY REVIEW

  • Over 28 performances

    ENTERTAINMENT

    2016 HOLIDAY REVIEW

  • ENTERTAINMENT

    2016 HOLIDAY REVIEW

  • CUSTOMER COMMUNICATION

    • News Releases/Press Avail• Direct Engagement

    o Orlando International Airport Websiteo FlyMCO 105.1HD2 Radio

    • Traditional media coverageo Local & National televisiono Print outletso Online trade publications & Blogs

    • Positive feedback through social media platformso Twittero Facebooko Instagram

    2016 HOLIDAY REVIEW

  • TRADITIONAL MEDIA

    2016 HOLIDAY REVIEW

  • SOCIAL MEDIA

    2016 HOLIDAY REVIEW

  • SOCIAL MEDIA

    2016 HOLIDAY REVIEW

  • • A robust convention and event season is expectedo Shows ranging from 30,000 to 60,000 attendees

    Home Builders Pro Bowl Wrestlemania PGA Merchandise Show NCAA Basketball Tournament

    • Spring Break — Mid-February through Mid-April

    • 2017 passenger traffic projectiono 43 million annual passengers

    2017 FORECAST

  • HAPPY NEW YEAR 2017

  • CONSTRUCTION ACTIVITY

    Starbucks Level 2 A Side

    New Airside 3 APM

    New South Airport APM

    New Ticket Lobby Video Wall

  • Board PresentationConstruction Update

    January 18, 2017

    Davin RuohomakiSenior Director, Planning, Engineering and Construction

    Greater Orlando Aviation Authority

  • North Terminal Main Ticket Lobby Modifications

    Project Scope:Public area improvements with expanded areas for check-in with new and expanded systems and replacement of finishes and check-in counters.

    Status:In Construction

    Substantial Completion:Winter 2017

  • Ticket Lobby Bump-out and Counter Phasing

    A1: Aer Lingus, Aeromexico, Alaska, Azul, Caribbean, Frontier, Swiftair

    A2: Air Transat, Avianca, Copa, Norwegian, Sunwing, Virgin America, Westjet

    A3: Emirates, JetBlue, Virgin Atlantic

    A4: Southwest

    B4: Delta, Sun Country, Bahamasair

    B3: Lan Peru, Lufthansa, Tam, Thomas Cook, Air Canada, VolarisB2: American, British AirwaysB1: Silver, Spirit, United,

    Icelandair

  • Ticket Lobby Bump-Out ProgressA-Side

  • Ticket Counter Progress

    B-Side B-Side

    A-Side

  • Airside 4 Improvements

    Project Scope:FIS/CBP improvement and expansion, aircraft gate conversion to international swing gates, and aircraft apron and systems improvements.

    Status:In Construction

    Substantial Completion:Winter 2017

  • Airside 4 Aerials

    90’s Gate Work

    BHS Carousel DemoBetween

    Wings 70 & 80

    80s 90s

    70s

  • Airside 4 FIS/CBP Renovation & Wing Expansion

    90s Wing Work 60s Wing WorkTSA Work

  • Baggage Handling System Improvements Project Scope:Replace multiple conveyor systems, Explosive Detection System (EDS) devices, and baggage claim carousels; Upgrade BHS control systems, lighting, and the emergency power generation and distribution system to increase capacity.

    Status:In Construction

    Substantial Completion:Summer/Fall 2017

  • BHS Modifications & Replacements of POD B West End

    New Line & Canopy Video

  • BHS Optimization of Pod C

    Optimization of Pod C Video

  • Airside 1 & 3 Automated People Mover RenovationContractor: Mitsubishi

    Project Scope: Dual lane train which will replace existing trains, one lane at a time.

    Substantial Completion: Spring 2018

    OPERATIONAL IMPACTS: Airside 3:

    2100 Lane Removed Oct 2016 2100 Lane Opened Feb 2017

    2200 Lane Removed Feb 2017 2200 Lane Opened Jun 2017

    Airside 1: 2300 Lane Removed Jun 2017 2300 Lane Opened Oct 2017

    2400 Lane Removed Oct 2017 2400 Lane Opened Mar 2018

  • Airside 1 & 3 Automated People Mover

  • South Terminal Aerial

  • South Airport APM Complex & Intermodal Terminal Facility

    Construction Management at Risk (CMAR): Hensel Phelps Construction Company Turner-Kiewit Joint Venture

    Scope: APM Station ITF Station Parking Garage APM Guideway Central Energy Plant Roads and Bridges

    Substantial Completion: Summer 2017

  • South Airport APM Complex & Intermodal Terminal Facility

    Dirt Moved (C.Y.) – 1,216,147

    Dirt Imported (C.Y.) – 95,668

    Concrete Placed (C.Y.) – 64,174

    Reinforcing Steel in Place (tons) – 5,737

    Structural Steel in Place (tons) – 2,817

    Storm Piping Installed (L.F.) – 35,731

    Sanitary Piping Installed (L.F.) – 5,432

    Water Main Piping (L.F.) – 6,560

  • South Airport Automated People Mover (APM)

  • South Terminal APM/ITF Time Lapse

  • South Terminal Phase 1 Site Work

    D-1 HP/TK Parking Lot Relocation

    GMP 1S Construction Start:

    1/16/2017

    72” Dual RCP Culvert

    C-1 North Rd. Lane Expansion

    A-1

    C-1

  • Other ProjectsTenant Projects:

    • 7 New Initiated• 42 in Design• 12 in Construction• 10 in Closeout

    Maintenance and Other Small Projects:• 13 New Initiated• 3 in Design• 12 in Construction• 19 in Closeout

    *As of 1/4/17

    Hyatt Guestroom & Corridor Renovation:• 445 Rooms• 20 Corridors• 10 Elevator Lobbies

    Other Projects:• New Information Booths• Companion Restroom

    Modifications• Nursing Rooms at Airside• Level 2 Business Messaging• Airside 4 Seating• Employee Screening Lanes• Timeless Travel (picture below)

    Hotel Elevator Lobby-6th Floor

    Hyatt Ballroom New Carpet

  • South Terminal