Greater Orlando Aviation AuthorityBoard Meeting
Wednesday, January 17, 2017
-
Award
-
2016 HOLIDAY REVIEW&
2017 OUTLOOK
-
2016 HOLIDAY REVIEW
• HOLIDAY NUMBERS
• ENTERTAINMENT
• CUSTOMER COMMUNICATION
• 2017 FORECAST
• CONSTRUCTION ACTIVITY
-
BY THE NUMBERS• 3 million travelers over a 22-day period (Dec. 16-Jan 6)
• 8% increase over previous year
• Busiest day: Jan. 2, 2017o 150,000 total passengerso 4th busiest day in airport history
• 652 International flights arrived with 126,329 passengers3.7% increase in flights over 20157.0% increase in passenger activity over 2015
2016 HOLIDAY REVIEW
-
BY THE NUMBERS• Checkpoint lines
o 62.8% of guests waited 15 minutes or less at the West Checkpointo 80.6% of guests waited 15 minutes or less at the East Checkpointo 71.7% of guests waited 15 minutes or less at checkpoints combined
• More than 780,000 bags moved through baggage systemo 65,466 bags moved on Jan. 2 (biggest day in airport history)
• Increased Ambassador staffing
2016 HOLIDAY REVIEW
-
BY THE NUMBERS
• Parking activity increased 14%o Garages at capacity multiple times during holiday periodo West Park Place opened for first time since 2006
• December Concessions (Food, Beverage, Retail & Services) gross sales: $27,328,528
• December on-site rental car gross sales: $49,827,092
2016 HOLIDAY REVIEW
-
Over 28 performances
ENTERTAINMENT
2016 HOLIDAY REVIEW
-
ENTERTAINMENT
2016 HOLIDAY REVIEW
-
CUSTOMER COMMUNICATION
• News Releases/Press Avail• Direct Engagement
o Orlando International Airport Websiteo FlyMCO 105.1HD2 Radio
• Traditional media coverageo Local & National televisiono Print outletso Online trade publications & Blogs
• Positive feedback through social media platformso Twittero Facebooko Instagram
2016 HOLIDAY REVIEW
-
TRADITIONAL MEDIA
2016 HOLIDAY REVIEW
-
SOCIAL MEDIA
2016 HOLIDAY REVIEW
-
SOCIAL MEDIA
2016 HOLIDAY REVIEW
-
• A robust convention and event season is expectedo Shows ranging from 30,000 to 60,000 attendees
Home Builders Pro Bowl Wrestlemania PGA Merchandise Show NCAA Basketball Tournament
• Spring Break — Mid-February through Mid-April
• 2017 passenger traffic projectiono 43 million annual passengers
2017 FORECAST
-
HAPPY NEW YEAR 2017
-
CONSTRUCTION ACTIVITY
Starbucks Level 2 A Side
New Airside 3 APM
New South Airport APM
New Ticket Lobby Video Wall
-
Board PresentationConstruction Update
January 18, 2017
Davin RuohomakiSenior Director, Planning, Engineering and Construction
Greater Orlando Aviation Authority
-
North Terminal Main Ticket Lobby Modifications
Project Scope:Public area improvements with expanded areas for check-in with new and expanded systems and replacement of finishes and check-in counters.
Status:In Construction
Substantial Completion:Winter 2017
-
Ticket Lobby Bump-out and Counter Phasing
A1: Aer Lingus, Aeromexico, Alaska, Azul, Caribbean, Frontier, Swiftair
A2: Air Transat, Avianca, Copa, Norwegian, Sunwing, Virgin America, Westjet
A3: Emirates, JetBlue, Virgin Atlantic
A4: Southwest
B4: Delta, Sun Country, Bahamasair
B3: Lan Peru, Lufthansa, Tam, Thomas Cook, Air Canada, VolarisB2: American, British AirwaysB1: Silver, Spirit, United,
Icelandair
-
Ticket Lobby Bump-Out ProgressA-Side
-
Ticket Counter Progress
B-Side B-Side
A-Side
-
Airside 4 Improvements
Project Scope:FIS/CBP improvement and expansion, aircraft gate conversion to international swing gates, and aircraft apron and systems improvements.
Status:In Construction
Substantial Completion:Winter 2017
-
Airside 4 Aerials
90’s Gate Work
BHS Carousel DemoBetween
Wings 70 & 80
80s 90s
70s
-
Airside 4 FIS/CBP Renovation & Wing Expansion
90s Wing Work 60s Wing WorkTSA Work
-
Baggage Handling System Improvements Project Scope:Replace multiple conveyor systems, Explosive Detection System (EDS) devices, and baggage claim carousels; Upgrade BHS control systems, lighting, and the emergency power generation and distribution system to increase capacity.
Status:In Construction
Substantial Completion:Summer/Fall 2017
-
BHS Modifications & Replacements of POD B West End
New Line & Canopy Video
-
BHS Optimization of Pod C
Optimization of Pod C Video
-
Airside 1 & 3 Automated People Mover RenovationContractor: Mitsubishi
Project Scope: Dual lane train which will replace existing trains, one lane at a time.
Substantial Completion: Spring 2018
OPERATIONAL IMPACTS: Airside 3:
2100 Lane Removed Oct 2016 2100 Lane Opened Feb 2017
2200 Lane Removed Feb 2017 2200 Lane Opened Jun 2017
Airside 1: 2300 Lane Removed Jun 2017 2300 Lane Opened Oct 2017
2400 Lane Removed Oct 2017 2400 Lane Opened Mar 2018
-
Airside 1 & 3 Automated People Mover
-
South Terminal Aerial
-
South Airport APM Complex & Intermodal Terminal Facility
Construction Management at Risk (CMAR): Hensel Phelps Construction Company Turner-Kiewit Joint Venture
Scope: APM Station ITF Station Parking Garage APM Guideway Central Energy Plant Roads and Bridges
Substantial Completion: Summer 2017
-
South Airport APM Complex & Intermodal Terminal Facility
Dirt Moved (C.Y.) – 1,216,147
Dirt Imported (C.Y.) – 95,668
Concrete Placed (C.Y.) – 64,174
Reinforcing Steel in Place (tons) – 5,737
Structural Steel in Place (tons) – 2,817
Storm Piping Installed (L.F.) – 35,731
Sanitary Piping Installed (L.F.) – 5,432
Water Main Piping (L.F.) – 6,560
-
South Airport Automated People Mover (APM)
-
South Terminal APM/ITF Time Lapse
-
South Terminal Phase 1 Site Work
D-1 HP/TK Parking Lot Relocation
GMP 1S Construction Start:
1/16/2017
72” Dual RCP Culvert
C-1 North Rd. Lane Expansion
A-1
C-1
-
Other ProjectsTenant Projects:
• 7 New Initiated• 42 in Design• 12 in Construction• 10 in Closeout
Maintenance and Other Small Projects:• 13 New Initiated• 3 in Design• 12 in Construction• 19 in Closeout
*As of 1/4/17
Hyatt Guestroom & Corridor Renovation:• 445 Rooms• 20 Corridors• 10 Elevator Lobbies
Other Projects:• New Information Booths• Companion Restroom
Modifications• Nursing Rooms at Airside• Level 2 Business Messaging• Airside 4 Seating• Employee Screening Lanes• Timeless Travel (picture below)
Hotel Elevator Lobby-6th Floor
Hyatt Ballroom New Carpet
-
South Terminal
Thank You.
-
Greater Orlando Aviation AuthorityBoard Meeting
Wednesday, January 17, 2017