Great Lakes Navigation SystemBuffalo District
Josh FeldmannU S Army Corps of EngineersU.S. Army Corps of EngineersChief , Operations Branch
Feb 12, 2013
US Army Corps of EngineersBUILDING STRONG®
Key FY13 Buffalo District O&M A i i iActivities
D d i Dredging
Structure repair with government plant at Structure repair with government plant at Ashtabula, Cleveland, and Buffalo
Cleveland Dredged Material Management
P j t diti Project condition surveys
BUILDING STRONG®
FY13 President’s Budget Dredging FY13 President’s Budget Dredging ProjectsProjects
Lake SuperiorLac La Belle
Eagle Harbor
Chippewa Harbor
Grand Marais
Beaver Bay
Two Harbors
MI Channels in Straits of Mackinac
G f
ManistiqueDetour
Les Cheneaux Island
Soo Locks
St. Marys River
Whitefish Point HarborLittle Lake
Grand MaraisPresque Isle
Marquette
Big Bay
Grand Traverse Bay
Lac La Belle
Keweenaw Waterway
Knife River
Duluth-Superior Bayfield
La PointeCornucopia
Port Wing
OgdensburgWI CANADAMorristown
Cape Vincent
Harrisville
Black River Harbor
Alpena
Hammond Bay
Cheboygan
Inland Route
Mackinac CityMackinac Island
St. James
Cross VillagePetoskey
Charlevoix
Grays Reef
Leland
GreilickvilleFrankfort
Arcadia
Washington Island
Green Bay
Big Suamico
Kewaunee
Algoma
Sturgeon BayPensaukee
Oconto
MenomineeCedar River
Little Bay de nocGladstone
MI
Sackets Harbor
Port Ontario
Oswego
Black River
Lexington
Port Austin
Harbor Beach
Port Sanilac
Saginaw
Point Lookout
Tawas Bay
Au Sable HarborPortage Lake
Manistee
Ludington
Pentwater
White Lake
Muskegon
Grand River
Port Washington
Sheboygan
Manitowoc
Two Rivers
NY
PA
ILBolles Harbor
Monroe
Rouge RiverDetroit River
Clinton RiverBelle River
Pine River
Lake St. Clair
St. Clair River
Saugatuck
Holland
Grand Haven
South Haven
St. JosephSt. Joseph River
New Buffalo
Michigan CityChicago River
Chicago Harbor
Waukegan
Kenosha
Milwaukee
Commercial
BUILDING STRONG®3
INOH
CalumetRecreational
President’s Budget
FY13 Dredging RequirementsFY13 Dredging Requirements
Lake SuperiorLac La Belle
Eagle Harbor
Chippewa Harbor
Grand Marais
Beaver Bay
Two Harbors
MI Channels in Straits of Mackinac
G f
ManistiqueDetour
Les Cheneaux Island
Soo Locks
St. Marys River
Whitefish Point HarborLittle Lake
Grand MaraisPresque Isle
Marquette
Big Bay
Grand Traverse Bay
Lac La Belle
Keweenaw Waterway
Knife River
Duluth-Superior Bayfield
La PointeCornucopia
Port Wing
OgdensburgWI CANADAMorristown
Cape Vincent
Harrisville
Black River Harbor
Alpena
Hammond Bay
Cheboygan
Inland Route
Mackinac CityMackinac Island
St. James
Cross VillagePetoskey
Charlevoix
Grays Reef
Leland
GreilickvilleFrankfort
Arcadia
Washington Island
Green Bay
Big Suamico
Kewaunee
Algoma
Sturgeon BayPensaukee
Oconto
MenomineeCedar River
Little Bay de nocGladstone
MI
Sackets Harbor
Port Ontario
Oswego
Black River
Lexington
Port Austin
Harbor Beach
Port Sanilac
Saginaw
Point Lookout
Tawas Bay
Au Sable HarborPortage Lake
Manistee
Ludington
Pentwater
White Lake
Muskegon
Grand River
Port Washington
Sheboygan
Manitowoc
Two Rivers
NY
PA
ILBolles Harbor
Monroe
Rouge RiverDetroit River
Clinton RiverBelle River
Pine River
Lake St. Clair
St. Clair River
Saugatuck
Holland
Grand Haven
South Haven
St. JosephSt. Joseph River
New Buffalo
Michigan CityChicago River
Chicago Harbor
Waukegan
Kenosha
Milwaukee
Commercial
Recreational
FY13 Funded Dredging
BUILDING STRONG®4
INOH
Calumet
FY13 Unbudgeted Dredging Need
Harbors Affected by Hurricane SandyHarbors Affected by Hurricane Sandy
• Supplemental bill signed Jan 29th providing Corps with
y yy y
Supplemental bill signed Jan 29 providing Corps with funds to address damages/impacts associated with Hurricane Sandy – will compete with many needs in the northeast
• Sandy related needs identified for Buffalo DistrictSandy related needs identified for Buffalo District projects:
• Cleveland (structure repair)• Lorain (structure and CDF repair)
BUILDING STRONG®5
LRB FY14 Dredging Priorities (Top 7)LRB FY14 Dredging Priorities (Top 7)
1 Cleveland Harbor
g g ( )g g ( )
1. Cleveland Harbor2. Toledo Harbor3 F i t H b3. Fairport Harbor4. Sandusky Harbor5. Lorain Harbor6 Buffalo Harbor6. Buffalo Harbor7. Huron Harbor
BUILDING STRONG®6
Cleveland Dredged Material Management
August 1, 2012 Non-Federal Sponsor’sAugust 1, 2012
October 2012
Non Federal Sponsor s concurrence with Tentatively Selected Plan
Completed AgencyOctober 2012 Completed Agency Technical Review of Draft and Started Division Review
Dec. 3, 2012 Received Letter from Port Authority requesting redirection
TBD Complete USACE Review and Start Public Review of Draft IDMMP/EA
BUILDING STRONG®
CDF Improvements for T t ti l S l t d PlTentatively Selected Plan
BUILDING STRONG®
Evaluation of Open Lake Placement Suitability
Biological testing was g gcompleted in late NovemberL l l f Low levels of contaminants in sediment
Complex Tiered Evaluation is now underwayunderway
Engaging Ohio EPA on USACE process
BUILDING STRONG®
p
Cleveland Harbor Green Cleveland Harbor Green Breakwaters/Engineering WithBreakwaters/Engineering WithBreakwaters/Engineering With Breakwaters/Engineering With Nature Demonstration Project Nature Demonstration Project
Repair Area
BUILDING STRONG®
BUILDING STRONG®
Repair Section
BUILDING STRONG®
Horizontal Groove Textured Toe Block
BUILDING STRONG®
Fish Habitat Shelf Textured Toe Block
BUILDING STRONG®
Dimple Textured and Non-textured Toe Blocks
BUILDING STRONG®
Beginning of Repair Section
BUILDING STRONG®
Placing Aggregate Base Material
BUILDING STRONG®
Moving Toe Block into Place
BUILDING STRONG®
Positioning Toe Block
BUILDING STRONG®
Placing Fish Shelf Toe Block
BUILDING STRONG®
Placing Slope Block
BUILDING STRONG®
Installed Toe Blocks
BUILDING STRONG®
Completed Repair Section