Graphic Package Checklist:
� Graphic Kit
� Copy of Drawings
� Installation Instructions
� Emergency Contact Numbers
� Safety Tips Information Sheet
� Hotel Etiquette Information Sheet
� Caution Construction Zone Signage
� Please Use other Entrance Signage
� Instructional DVD for Graphic Installation
Please take into consideration of the Hotel Property’s Guests,
installations should be scheduled between 10am and 4pm.
3M Warranty only applies if installed when temperatures are
between 40° and 100°F. Property Managers are aware of this.
Very Important: Property Manager must sign the Completion Form
upon installation! Payment is generated by this form!
Any questions please contact the Graphics Project Manager
Carole Korner Coastal Installations, Inc. 9 Hunter Road Suite F Hilton Head Island, SC 29926 Toll Free (800) 952-2725 Local (843) 341-6789 Fax (866) 341-7535 [email protected]
Holiday Inn/Holiday Inn Express Installation Instructions
These instructions are to be used with the drawings supplied in the graphics kit.
Only individuals experienced with the installation of 3M Fasara films particularly
when used as a graphic should install the Holiday Inn or Holiday Inn Express
graphic kits.
Please review the Graphic Installation Video included with this kit, prior to
installation.
Caution: Decals and other miscellaneous placards and decals appearing on top portion of
glass doors should be removed prior to installation of Door Graphics, depending on local code
requirements.
Each graphic kit contains an arc element that is either 8’ or 16’ in width. The 16’ kit also
includes at least 4 sets of blocks/logo squares that have been masked for ease of installation.
The 8’ kit has at least 2 sets of logo squares. The blocks are of two designs. One set includes
a logo for the left and right center doors the other set (if a 16’ kit) are just blocks (see
drawings) for the outer right and left doors.
All graphics are to be installed on the INTERIOR of glass only unless otherwise instructed!
Please follow these guidelines for installation of the arc element:
1. Arc element is to be installed first and before logo squares
2. The arc is to be centered in the doorway and trimmed on right and left sides.
3. There are two possible installations of the arc (see drawings).
4. If, while positioning arc for installation, arc element comes down to cross bar on the
far left side it should stop at cross bar. Arc element should never extend below or
across cross bar at center of door.
5. Arc element should not have any less than 2.5” depth at far right edge.
6. If you can position arc by butting top edge and the installation will meet the above
criteria then only the left and right side of the graphic will be trimmed. Otherwise the
graphic will need to be raised and trimmed across the top as well.
Continued:
Please follow these guidelines for installation of the logo squares/blocks:
1. Logo squares/blocks are to be installed after the arc element.
2. Blocks without the logos are to be used to fill in the far left door/side light as long as at
least three blocks can be used (see drawings).
3. There should never be any less than three squares used on any section of entry glass.
4. The blocks that contain the logo are to be used on the center doors only on the 16’
graphic. Please note that there are specific left and right logo blocks (see drawings).
The 8’ doors only include the logo blocks.
5. The height of the blocks may vary per site due to various door types. The blocks
should be at least 1-2 inches above the center cross bar. Be sure to install blocks level
and proportionate to arc (see drawings).
Please be sure to review drawings in detail before installation. Refer to
drawings and sample pictures of actual installations to insure proper
installation of graphics. If you have any concerns before or during application
please call:
Carole Korner Coastal Installations, Inc. 9 Hunter Road Suite F Hilton Head Island, SC 29926 Toll Free (800) 952-2725 Local (843) 341-6789 Fax (866) 341-7535 [email protected]
Emergency Contact Numbers
Graphic Package Installation
If you should encounter any difficulties
during the Graphic Installation, please feel
free to contact the Project Manager.
Carole Korner Coastal Installations, Inc. 9 Hunter Road Suite F Hilton Head Island, SC 29926 Toll Free (800) 952-2725 Local (843) 341-6789 Fax (866) 341-7535 [email protected]
Safety Tips
� Think! – Be Smart!
� Install all safety signs, caution tape, etc.
� Put down Safety Cone in front of entrance doors
� Block off Entrance Doors so guests cannot sneak
through
� Do not run power cords in front of doors, guests
might trip and fall
� Install Towels & Tarp so guests don’t trip
� Pick up excess film and liner, guests might slip and
fall
� Do not leave tools and ladders laying around, guests
might slip and fall
� Keep a clean and neat working area
� If Hotel has electric slider or swing door, make sure
you turn off during film installation and turn back
on when installation is complete
� Never leave the job unattended, not for one minute!
Make sure you take your breaks before or after film
installation.
� Make sure at least one person is at the installers site
at all times during the installation
� Be Alert!
Hotel Etiquette
Remember, you are representing 3M
� Acknowledgement: Please inform Hotel Managers
and Staff of your arrival and inform them of your
installation schedule and which doors you are going
to be installing the graphics on
� Parking: Park in designated space. Do not block the
Entrance for Guests
� Politeness: Please be polite and courteous
� Dress: To Impress. No tank tops, no cut off sleeves,
or torn or untidy clothing
� Language: No Profanity or vulgar language. No
insulting or demoralizing conduct
� Noise: Be professional, no loud noise as not to
disturb the guests. No Radios, no Cell Phones during
film installation
� Smoking: No Smoking on Hotel Property. If you
must Smoke, please smoke in your vehicle and
please do not discard your cigarettes butts on Hotel
Property
� Clean Up: Cleaning is a must. Wipe everything
down and pick up. Remove all trash from
installation area.
� Leave your Job Site better than you found it!
Caution: Caution: Caution: Caution:
Entrance Closed for Graphic Installation
Please Use Other Entrance. Thank you.