The Cinderella of sustainable building projects
Operational Carbon
Whole Life Carbon
75% High Energy Building
Low Energy Building
25%
50% 50%
Embodied Carbon+
?25% 75%
Finishes Building Services
Windows
Internals
Other
Foundation
Floor Structure
Roof
External WallsHeating
Electricity
Cooling
Other
Whole Life Cycle
Source: Sturgis Associates LLP Indicative Whole Life Carbon Emissions
Building = 50% Embodied Carbon
Structure = 25% Whole Life Carbon
Operational Carbon Embodied Carbon
Common problems and or obstacles associated with re-use
• Lack of information about the building
• Inflexible design vision
• Load capacity
• Incorporating modern services
• Levels
Common problems and or obstacles associated with re-use
• Lack of information about the building
County Hall, Trowbridge
Bartholomew Row, Birmingham cloud data
Bartholomew Row, Birmingham cloud data
Bartholomew Row, Birmingham cloud data
Opening up works
Common problems and or obstacles associated with re-use
• Inflexible design vision
Bartholomew Row
Common problems and or obstacles associated with re-use
• Load capacity
Office load per m2
Middleport Pottery Feilden Clegg Bradley Studios
Middleport Pottery Feilden Clegg Bradley Studios
Grand Parade Balustrades
Hotel du Vin Feilden Clegg Bradley Studios
Carbon fibre strengthening
Common problems and or obstacles associated with re-use
• Incorporating modern services
Carbon fibre strengthening
Common problems and or obstacles associated with re-use
• Levels
Manvers Street Stride Treglown
Manvers Street Stride Treglown
Manvers Street Stride Treglown
Obstacles overcome
Examples
College of Law, Temple Circus
Eastleigh House Stride Treglown
County Hall, Trowbridge Stride Treglown
County Hall, Trowbridge Stride Treglown
County Hall, Trowbridge Stride Treglown
County Hall, Trowbridge Stride Treglown