Overview
Phoenix is building a multi-use trail along the Grand Canal from Glendale to Tempe
Phase I between
15th Avenue and 16th Street and
Garfield and Van Buren Streets is under design now and will be built in
Fall 2016
Phase II between I-17 and Tempe has been approved and under development
now
![Page 3: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/3.jpg)
Grand Canalscape Goals
Goal: Provide multiuse trail Re-integrate canal into neighborhoods
Project focus: Street crossings Contiguous commuter trail Neighborhood street connections
Limits: Phoenix Grand Canal Segment
Glendale (75th Ave at Camelback Rd) to Tempe (Priest Drive and Van Buren)
![Page 4: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/4.jpg)
Grand Canalscape Master Plan
Central Segment Bridging Grand Ave
and I-17(Final Phase)
East Segment I-
17 to Tempe (Fully Funded)
West Segment Glendale to Grand
Avenue(Under development)
![Page 5: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/5.jpg)
Canal Bank Trail
Multi-use trail 10-12 feet wide
Pedestrian lighting
![Page 6: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/6.jpg)
Signalized Crossings
Traffic Signal
HAWK pedestrian signal
![Page 7: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/7.jpg)
Neighborhood Connections
![Page 8: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/8.jpg)
Other Features
Integrated public art Minimal landscaping Maintained by Street Transportation Dept. Patrolled by Phoenix Police Canal serviced by SRP
![Page 9: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/9.jpg)
Grand CanalscapePhase I Project Areas
Funding: $4,900,000 (SRP/City Funds)
Timeline: Fall 2016 Completion
Uptown Project Area15th Ave to 16th St
2.8 miles/6 crossings
Gateway North Area
Garfield to Van Buren
0.7 miles/ 0 crossing
Green Gables
Extension
![Page 10: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/10.jpg)
Concept DesignUptown Trail
Commuter trail – north bank Neighborhood trail – south bankTrail lighting, pedestrian bridges and local street connections
![Page 11: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/11.jpg)
Concept DesignGateway North Trail
Neighborhood trail - south bankTrail lighting and local street connections
![Page 12: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/12.jpg)
Grand Canalscape Phase I – Where are we today?Phase I approved and funded Design underwayConstruction completion:
Fall 2016
![Page 13: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/13.jpg)
Phase I Design Team
Michael Singer Studio
![Page 14: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/14.jpg)
Rio Salado Pathway – 24th St to Tempe Drain (City
Phoenix)1-mile long
Part of Rio Salado Pathway Revitalization Effort
12’-wide asphalt pathway
Pedestrian bridge
Rest stops/benches
Ramadas (shade)
![Page 15: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/15.jpg)
Western Canal Multi-Use Pathway (City Tempe)
5.5-mile longUrban trail connecting community destinations10’-wide concrete pathwayPathway lightingBenches/walls
![Page 16: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/16.jpg)
Rio Salado Pathway Segment 3 (City Mesa)
1-mile long
Part of Rio Salado Pathway Revitalization Effort
10’-12’-wide asphalt pathway
Safety railing/lighting
Gathering nodes
![Page 17: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/17.jpg)
Crosscut Canal Multi-Use Pathway (City Tempe)
2-mile long
10’-wide concrete pathway
Public Art incorporated
Landscaping
Pathway lighting
Crosscut Canal
![Page 18: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/18.jpg)
Arizona Canal Pathway – 60th St to Goldwater Blvd (City
Scottsdale))1.5-mile long
10’-wide concrete pathway
Neighborhood connections
Public Art
Wayfinding system
Pathway lighting
Street crossings
![Page 19: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/19.jpg)
Michael Singer Studio
Grand Rapids Riverwalk Sculpted Flood Wall Grand Rapids, MI
![Page 20: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/20.jpg)
Michael Singer Studio
Select Water Garden DetailsGermany, Greece, and New Jersey
![Page 21: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/21.jpg)
Michael Singer Studio
Seminole Sculptural Biofiltration Wall Coconut Creek, Florida
![Page 22: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/22.jpg)
Michael Singer Studio
Queens PlazaIntegrated sculpted paving, runnels, and benches throughout the entire site Long Island City, Queens, New York City
![Page 23: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/23.jpg)
Michael Singer Studio
Sculpted shade structure, pathway and landscape
Contemplative ShelterLa Jolla, California
![Page 24: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/24.jpg)
Michael Singer Studio
West Palm Beach Waterfront and Living DockIntegrated sculpted shade structures, benches, water features and dock South Florida
![Page 25: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/25.jpg)
Grand Canalscape Phase II – Where are we today?Approved for federal (TIGER II)
funding Concept planning underwaySegment: I-17 to TempeConstruction completion (tentative):
2018
![Page 26: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/26.jpg)
Grand Canalscape Phase II – Federal – I-17 to Tempe
Funding: $16 million (Fed/Local)
Construction: 2018 (est.)
8 miles of new trail10 new street crossings
Phase II Project Area
![Page 27: Grand Canalscape Phase I and II General Update October 30, 2015](https://reader035.vdocuments.mx/reader035/viewer/2022062518/5697bf901a28abf838c8dc76/html5/thumbnails/27.jpg)
For more information
Project Website:
http://grandcanalscape.com
Project Hotline:
623-825-3444
Kerry Wilcoxon – City of Phoenix
Street Transportation Department
602-262-4613 or