GPP in practice: Vienna EcoBuy programme
Eva Persy, City of Vienna, Environmental Department
Tallinn GPP Seminar, May 2013
![Page 2: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/2.jpg)
Overview
• Background
• Organisation „OekoKauf Wien“
• Development of criteria
• Examples
• Communication
• Benefits
• Conclusion
![Page 3: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/3.jpg)
City Profile
1.8 million inhabitants
special position: (capital) city as well as federal province
volume of purchasing budget: 5 billion Euro
![Page 4: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/4.jpg)
GPP and Climate Protection
1 of 3 spearheads of the Vienna Climate Protection Programme (KliP)
adopted by the Vienna City Council in November 1999
![Page 5: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/5.jpg)
![Page 6: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/6.jpg)
Structure
No extra personell!!Steering team>20 working groups (e.g. building
construction, food, cleaning, paper, electrical appliances, vehicle fleet, events, textiles …)
3 consultative commitees
Altogether some 180 internal and external staff
![Page 7: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/7.jpg)
Development of criteria
Within working groupsAbout 4 – 6 meetings/yearAbout 10 experts/group
staff from relevant departments co-operate with experts from affiliated bodies and external organisations
Budget for research, pilot projects,..
![Page 8: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/8.jpg)
Win-Win (Study by PwC, 2009)
CO2 Reduction Long term savings
![Page 9: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/9.jpg)
data for 2004 - 2007organic foodenergy saving deviceswater saving devices
In total 103,000 tonnes CO2 reduction (selected product groups, 04-07)
CO2 Reduction (EcoBuy)
![Page 10: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/10.jpg)
International Awards 2011
274 applications from 32 European countries
European Public Sector Award (EPSA) 2011
Best Practice Transfer Award
3 Awards; winner: “going green”
![Page 11: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/11.jpg)
![Page 12: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/12.jpg)
Air = most important substance for living: 6 – 10 l/min
Europeans nearly 90 % of time indoors
• Health and Safety at Work (workers)
• Healthy air for residents
• Environment protection (as a side-effect)
building sector: good indoor airquality
![Page 13: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/13.jpg)
VOC (organic chemicals): Eye, nose, throat irritation; headaches; damage to liver, kidney, and central nervous system
CMR-chemicals (carcinogenic, mutagenic, repro-toxic)heavy metalsformaldehydebiocides
Hazardous substances
![Page 14: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/14.jpg)
1000
2000
3000
0
300
Guidance values for TVOCs in indoor airGerman Federal Environment Agency
in new buildings common
critical limit
target value
TVOC
[µg/m³]
TVOC:(Total Volatile Organic Compounds)
measure
![Page 15: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/15.jpg)
![Page 16: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/16.jpg)
Vienna North HospitalVienna North Hospital
![Page 17: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/17.jpg)
SiteSite
Protecting/restoring areas of unspoiled Protecting/restoring areas of unspoiled nature; Building structures as part of nature; Building structures as part of the landscape; Use of potable water the landscape; Use of potable water and rainwater; Transportation and rainwater; Transportation connectionsconnections
![Page 18: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/18.jpg)
InteriorInterior
Thermal comfort; Indoor air Thermal comfort; Indoor air quality; Flexibility of use; quality; Flexibility of use; Accessibility; User control Accessibility; User control (ventilation, shading, lighting)(ventilation, shading, lighting)
![Page 19: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/19.jpg)
ConstructionConstruction
Environment protection on site; Environment protection on site; Reducing waste, dust, noise and Reducing waste, dust, noise and vibrations; Complying with the vibrations; Complying with the ÖÖkoKauf koKauf Wien standards; Materials that are easy Wien standards; Materials that are easy to clean and maintainto clean and maintain
![Page 20: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/20.jpg)
ResultsResults
• considering sustainability criteria early on in the considering sustainability criteria early on in the processprocess
• applying life-cycle costingapplying life-cycle costingpossible to build considerations into the possible to build considerations into the
economic aspect of the project from the outseteconomic aspect of the project from the outsetEstimated reductions include: energy demand Estimated reductions include: energy demand
for heating by 25% and energy for cooling by for heating by 25% and energy for cooling by 20%, below current minimum legal requirements20%, below current minimum legal requirements
![Page 21: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/21.jpg)
Communication
Production of posters, folders, brochures, videos, “hands on-material”: – Examples: Posters/folders explaining the advantages of “fair trade”, brochures regarding energy saving light bulbs, video and game collection explaining background
information of organic farming to children
![Page 22: GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013](https://reader037.vdocuments.mx/reader037/viewer/2022110209/56649e4c5503460f94b420e5/html5/thumbnails/22.jpg)
GPP allows public authorities to achieve environmental targets: CO2 Reduction
Role model for publicInduced innovation Cost reductions for private buyers
e.g. organic food
Positive effects on healthLong term savings
Benefits