Governor and AGC Controlof System Frequency
TRE Technical WorkshopMarch 31, 2009
Bob GreenGarland Power and Light
![Page 2: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/2.jpg)
Two generators equipped withgovernors having output feedback
![Page 3: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/3.jpg)
Schematic of a governor with output feedback
![Page 4: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/4.jpg)
Response of governor with output feedback
![Page 5: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/5.jpg)
Steady-state speed characteristic (droop) curve
![Page 6: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/6.jpg)
R(per unit), the slope of the “droop” curve, is defined as f(p.u.)/ P(p.u.), where f(p.u.)= f(HZ) / 60.0,and P(p.u.)= P(MW) / Unit Capacity.For a 600 MW unit that has a governor response of 20 MW for a frequency excursion that settles out at 59.9 HZ, R=f(p.u.) / P(p.u.) = (0.1/60)/(20/600)=0.05 or 5% droop.
Once the droop is known, the MW response to frequency deviation can be determined by (P/f)=(1/R), or P=(1/R) X f.For the 600 MW unit with 5% droop, (P/600)=(1/0.05) X (f/60), or P=200MW/HZ
Calculation of steady-state speed characteristic
![Page 7: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/7.jpg)
So, how do governors with the steady-state speed characteristic interact when there are multiple generators in a power system?
What determines the steady state system frequency after a load is
added to the system?
![Page 8: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/8.jpg)
Multiple Generator Governor ResponseConsider an isolated power system with three generators on-line and operating at 60HZ. The load is 360 MW and the generator outputs for units #1, #2 and #3 are 80MW, 120MW and 160MW, respectively.A load of 21MW (P) is added. What frequency does the system settle at? How much does each unit pick-up (MW)?Since R(p.u.)=( f(HZ)/60)/( P(MW)/Capacity), then (P/f)=(1/R) X Capacity/60).
UNIT CAPACITY R (DROOP) P/f#1 300MW 0.100 (10%) 50MW/HZ#2 450MW 0.075 (7.5%) 100MW/HZ#3 600MW 0.050 (5%) 200MW/HZSolution:Unit #1: P1=50 X fUnit #2: P2=100 X fUnit #3: P3=200 X fPi=350f=21MW,and f=21/350=0.06HZFrequency=60-0.06=59.94HZ
P1=50 X 0.06=3MWP2=100 X 0.06=6MWP3=200 X 0.06=12MW check: Pi=21MW
![Page 9: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/9.jpg)
Three generators serving 360MW
![Page 10: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/10.jpg)
Three generators serving 367MW
![Page 11: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/11.jpg)
Three generators serving 374MW
![Page 12: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/12.jpg)
Three generators serving 381MW
![Page 13: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/13.jpg)
The system frequency reaches steady-state at a value that causes the sum of the on-line generator output MW to be
equal to the system load MW.With this type of governor, when the
system load increases, the system frequency decreases and visa versa.
How do we control frequency to 60HZ, no matter what the load is?
![Page 14: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/14.jpg)
Power system equipped for supplemental control
![Page 15: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/15.jpg)
Addition of a speed changer
![Page 16: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/16.jpg)
Steady-state speed characteristic with speed changer
![Page 17: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/17.jpg)
Power output as a function of frequency
![Page 18: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/18.jpg)
How does the addition of the speed changer to the governor
facilitate the control of frequency?
Hint: The system frequency reaches steady-state at a value
that causes the sum of the on-line generator output MW to be equal
to the system load MW.
![Page 19: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/19.jpg)
From a central site, you increase or decrease the 60HZ set-points until the sum of the 60HZ set-points is
equal to the system load. Then the frequency will stabilize at 60HZ.
This form of supplemental control is called Automatic Generation Control
(AGC) and more specifically, Load Frequency Control (LFC).
![Page 20: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/20.jpg)
Load of 367MW and 60HZ SPs increased by 7 MW
![Page 21: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/21.jpg)
Load as a function of frequency (load damping)
![Page 22: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/22.jpg)
Governor and load characteristic curve intersection
![Page 23: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/23.jpg)
![Page 24: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/24.jpg)
Illustration of typical governor dead band
![Page 25: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/25.jpg)
Generation oscillations at the dead band frequency
![Page 26: Governor and AGC Control](https://reader035.vdocuments.mx/reader035/viewer/2022062413/587e20431a28ab34298ba1fb/html5/thumbnails/26.jpg)
Primary Control Secondary or Supplementary ControlCommon Name Governor Control/Response AGC Control/ResponseFunction-Generic Holds the system together as load changes
occur and also as un-commanded generation excursions occur
Shifts generation between units to achieve security and economic objectives plus restores frequency to the rated value.
Function-Technical Provides the correct amount of mechanical input to turbines to match the electrical output of the corresponding generators
Changes the 60HZ governor set-points of the units to achieve scheduled values established by the market.
Control Input Frequency/rotational speed of the turbine In ERCOT, the SCE for the portfolio of unitsControl Time Constant Fast - Seconds Slower - Tens of seconds and minutesStyle of Control Local within the Units/PGCs—A QSE has no
direct control over governor response.Centralized from ERCOT to Units via QSEs
Performance Optimization
Having more governors on-line (with a given droop characteristic) will minimize the magnitude of frequency deviations
Having more units being controlled by AGC will minimize the duration of frequency deviations
Key Parameters Steady state speed characteristic (droop), governor dead-band, first stage boiler pressure (steam units) and head (hydro units)
Base power schedule plus deployments of balancing energy, regulation energy, responsive and non-spinning reserve. AGC dead-band, gains and frequency bias term.
Market Characteristics If there ever is a governor response market, there will probably be bids, awards and settlement, but the market will never deploy the governor response.
Bids, awards, deployments and settlement through the Ancillary Service Market. Performance monitoring of individual Services is approximate and complicated.
Disturbance Timeline Initial governor response (to point B) is over completely by the time units start receiving secondary control signals in response to the disturbance.
There needs to be recognition of governor response and coordination between RRS and RegUp deployments to insure smooth , rapid and sustained frequency recovery.