GOVERNMENT OF ARUNACHAL PRADESH OFFICE OF THE DEPUTY COMMISSIONER: TAWANG DISTRICT TAWANG MINUTES OF DISTRICT LEVEL MONITORING COMMITTEE MEETING HELD ON 29TH DECEMBER 2009 AT 1000 HOURS UNDER THE CHAIRMANSHIP OF DEPUTY COMMISSIONER TAWANG TO REVIEW THE PROGRESS OF PROJECTS UNDER ONE TIME ACA, SPA, NEC, NLCPR, RDIf, Pi--1 PACKAGE, ETC IMPLEMENTED AT TAWANG DISTRICT. Shri Gamli Padu, Deputy Commissioner, Tawang took a meeting on 29th December 2009 at 1000 hours in his office chamber with concerned administrative officer and implementing agencies to review the progress· of projects under One Time ACA, SPA, NEC, NLCPR, RDIF, PM Package, etc implemented at Tawang District. 2. 3. The list of participates are appended. After threadbare discussion following points were emerged for follow-up action. a. Schemes shculd be completed within the stipulated time frame. b. The completed building projects are to be handed over to the concerned beneficiary department immediately and a copy 0f the handing and taking over note should be submitted to the Deputy Commissioner. c. The provision for Transmission & Distribution line / transformer for supply of power are absent in new projects like Ropeway from Tawang Monastery to Ani Gonpa, Residential accommodation for General pool at Tawang, Office Building of Deputy Commissioner, DUDA colony, etc. which will affect proper utilization of the project. These are to be identified by the electrical department and necessary action should be taken for smootn supply or power to these new buildings. Ad. The electrical department is also to identify the surplus 4 ower generation by the hydels and make provision for drawing such surplus power to needy locations. .~ . Duplicacy of projects to be avoided/at any costs~ y~~ (7\. Q/ "f\\\rf" ~ I (2 ~ ~~ . ..., n , \)--

Upload: others

Post on 20-Jul-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GOVERNMENT OF ARUNACHAL PRADESH OFFICE OF THE … · Ropeway from Tawang Monastery to Ani Gonpa WIP (SPA) 35 Construction of approach road to ekalabya Model Residential School at

GOVERNMENT OF ARUNACHAL PRADESHOFFICE OF THE DEPUTY COMMISSIONER: TAWANG DISTRICT

TAWANG

MINUTES OF DISTRICT LEVEL MONITORING COMMITTEE MEETING HELD ON29TH DECEMBER 2009 AT 1000 HOURS UNDER THE CHAIRMANSHIP OFDEPUTY COMMISSIONER TAWANG TO REVIEW THE PROGRESS OF PROJECTSUNDER ONE TIME ACA, SPA, NEC, NLCPR, RDIf, Pi--1 PACKAGE, ETCIMPLEMENTED AT TAWANG DISTRICT.

Shri Gamli Padu, Deputy Commissioner,Tawang took a meeting on29th December 2009 at 1000 hours in his office chamber with concernedadministrative officer and implementing agencies to review the progress· ofprojects under One Time ACA, SPA, NEC, NLCPR, RDIF, PM Package, etcimplemented at Tawang District.

2.

3.

The list of participates are appended.

After threadbare discussion following points were emerged forfollow-up action.

a. Schemes shculd be completed within the stipulated timeframe.

b. The completed building projects are to be handed overto the concerned beneficiary department immediatelyand a copy 0f the handing and taking over note shouldbe submitted to the Deputy Commissioner.

c. The provision for Transmission & Distribution line /transformer for supply of power are absent in newprojects like Ropeway from Tawang Monastery to AniGonpa, Residential accommodation for General pool atTawang, Office Building of Deputy Commissioner, DUDAcolony, etc. which will affect proper utilization of theproject. These are to be identified by the electricaldepartment and necessary action should be taken forsmootn supply or power to these new buildings.

Ad.The electrical department is also to identify the surplus4 ower generation by the hydels and make provision for

drawing such surplus power to needy locations.

. ~ . Duplicacy of projects to be avoided/at any costs~y~~ (7\. Q/ "f\\\rf" ~ I (2 ~ ~~ . ...,n , \)--

Page 2: GOVERNMENT OF ARUNACHAL PRADESH OFFICE OF THE … · Ropeway from Tawang Monastery to Ani Gonpa WIP (SPA) 35 Construction of approach road to ekalabya Model Residential School at

f. Detail list of bridges maintained under the projectProcurement of wire rope for emergency bridges inremote area in Arunachal Pradesh under SPA is to be

submitted by EE PWD Jang Division.g. Proper maintenance of Assets Register.h. To maintain the quality of work, the civil works

(especially concrete works) for some of the projectslocated in higher altitude are stopped from Novemberonwards because of extreme cold climatic conditions.

-i. The balance fund for some of the schemes beingimplemented are not released which are affecting theprogress of works.

4. The current status of schemes implementing by variousdepartments are placed at annexure "A".

5. The meeting ended with vote of thanks to the chair.

Sdj-[Gamli Padu]

Deputy Commissioner,Tawang District: Tawang.

MEMO _NO. TDP~ljCAj2008-09 ~ -Dated~-Tawang the 29th December, 2009Copy to:-

~~he Secretary (Planning, Govt. of Arunachal Pradesh./ 2. The All HMLA of Tawang District.

3. The ADC, JangjLumla.4. The Zilla Parishad Members, TawangjKitpijThingbujMuktojLumlaj

Zemithang.5. The EE, PWD Tawang & JangjPHEDjPOWERjDHPDjE&MjRWDjWRD, DD

(DUDA), PO (APEDA), Tawang6. The DDSEjADTHjDTOj ADAC, Tawang.7. The P.A. to Deputy Commissioner, Tawang.8. Office copy

~~-4RIBA]District Planning Officer,

Tawang District: Tawang.

Page 3: GOVERNMENT OF ARUNACHAL PRADESH OFFICE OF THE … · Ropeway from Tawang Monastery to Ani Gonpa WIP (SPA) 35 Construction of approach road to ekalabya Model Residential School at

ANNEXURE-ADEPARTMENT WISE LIST OF SCHEMES AND THEIR STATUS

SI.No

Name of Project Status

5 Infrastructure Develo ment of ADC's Office at Jan leted within Feb,10

6 C/o Road from BRTF to New Circuit House at Jan leted on March, 20107

8

PWD, JANG DIVISION1 I C/o Indoor Stadium at Lhou in Tawang District (ACA)

2 I Infrastructure.development of School ,building at Muktomiddle School in Tawang District (ACA)

3 D/o Infrastructures/amenities around Sela ACA4 C/o outdoor Stadium at Jang in Tawang District (SPA)

leted on Jan,2010

WIP

Completed

WIP

Tower works in progress.13

19

20

1415

1617

18

9

101112

Page 4: GOVERNMENT OF ARUNACHAL PRADESH OFFICE OF THE … · Ropeway from Tawang Monastery to Ani Gonpa WIP (SPA) 35 Construction of approach road to ekalabya Model Residential School at

28 Approach road to new Aunqhar (PM Package) Completed29

Bridge over Road from BRTF road point to Tawang WIPMonastery and Ani Gonpa (PM Packaqe) 30

C/o Suspension bridge over river Nyamjangchu at Completedzemithanq (PM Package) 31

C/o 3 nos suspension bridges on Dungshengmang to CompletedKangteng Mule track at Ebabling nallah, mangnam nallah & Thonqlenq Nallah (PM Packaqe)32

C/o Suspension bridge on Porter track/Mule track to WIPBumla (PM Package) 33

C/o Porter track & Mule track from Tawang-Zemithang CompletedBRTF road to 8umla (40 Kms) (PM Package) 34

C/o Ropeway from Tawang Monastery to Ani Gonpa WIP(SPA) 35

Construction of approach road to ekalabya Model CompletedResidential School at Lumia (SPA) 36

C/o Residential accommodation for General pool at WIP

Tawang (Type-III-2 blocks 4 units each and Type-II 3 blocks 4 units each) (SPA)37C/o ADC's Office buildinq at Lumia (Phase-I) (SPA) WIP

38C/o Cultural cum Meditation Hall at Dolma Park at LumiaCompleted

(Phase-I) 39C/o RCCqallery at General Parade qround, tawanq (SPA)Completed

40C/o Office Building of Deputy Commissioner, Tawang Completed

(SPA) 41C/o waiting room, ticket counter, VIP lounge, security WIP

room, refilling station and residential accommodations at Tawang helipad (SPAL-:42

. C/o Heiipad at Zemithanq-(SPA) WIP~'"'"~:;,,;:, --;:"''C'--.~, .

.

43C/o helipad at Blettinq (SPA) WIP

44C/o Community hall cum Cultural centre at Temilo, Completed

Tawanq (SPA) 45C/o community Hall cum cultural Centre at Jamyang Completed

Choekorlinq at Changpronq Tawanq (SPA) 46C/o sports Complex at Lumia (SPA) WIP

47Renovation and interior works of Convention Hall at Completed

tawanq (SPA).48

C/o Multipurpose Community Hall at Tawanq (NEA) completed49

C/o Ropeway from Tawang Monastery to Ani Gonpa WIP(NLCPR) 50

Vivekananda Kendra Vidyalaya, Kitpi (NLCPR) WIP51

Rinq road at Zemithanq (RIDF) WIP52

C/o Govt. HS school at Lumia (RIDF) Not started53

C/o Govt HS school at Tawanq (RIDF) Work in initial stage.,WR!)! TAWANG DIVISION

---,-,,- --------54 C/o Office cum -store room for Textile & handicrafts completedDepartment at Tawanq (SPA) 55

C/o Residential building Type II two storied quadruple completedunit for WRD Tawanq (SPA)

-

56C/o Teachers quarter for Govt. Secondary School Lhoucompleted

(SPA) 57

C/o Teachers Quarter for Govt school at Janq (SPA) completed

Page 5: GOVERNMENT OF ARUNACHAL PRADESH OFFICE OF THE … · Ropeway from Tawang Monastery to Ani Gonpa WIP (SPA) 35 Construction of approach road to ekalabya Model Residential School at

58 C/o building at Govt. Secondary School, Lhou. (SPA) completed59

C/o transit camp at Gyamdonq (SPA) WIP60

C/o Tourist Hut at Maqo (SPA) completed61

C/o Office Buildinq of Circle Officer, Thinqbu (SPA) completed62

C/o Office Buildinq of Circle Officer, Mukto (SPA) completed63

C/o Community hall at Gyamdong (SPA) WIPELECTRICAL TAWANG DIVISION 64

Providing of Sub T&D network connectivity to under Completedconstruction SHP by DHPD in Tawang District (SH: Chellengkhang Ph II, Shakti, Bongleng, Thingbu & .-JBramdonqchunq Hydels1 (ACA1 .. 65

C/o 33 KV Tie line from Kitpi Ph II to Nurar~ang-TawangCompletedexisting line. (ACA) 66

C/o Additional 33KV Line from Kitpi Ph II (3MW) HydelWIP

Project Switchyard to Lhou Nallah (Phongda) at under Construction project site (SPA)67C/o additional 33KV bays at Kitpi Ph-II switchyard with WIP (civil works)

synchronization arrangement of synchronize Nuranang Hydel (6MW) power supply with Kitpi Ph-II(3MW) powersupply at Kitpi Ph-II switchyard. (SPA)68C/o LT Line in New GA Complex at Tawanq (PM Packaqe)Completed

69E/improvement of LT Distribution System at Lumia (PMCompleted

Package) 70Strengthening of 33 KV line from Jaswant Ghar to BaisakiCompleted

cross Sela to avoid frequent line fault due to snow deposit (PM Packaqe)71C/o 33 KV Express Line from Tawang to Lumia with 33/11Erection of Control panel

KV, 2x1.6 MVA Sub station at Lumia (NLCPR) DHFD, LHOU DIVISION72R&M of Kitpi MHS Ph-I Commissioned

73C/o Kitpi MHS ph-II Commissioned

74C/o Shakti MHS (2x50 Kw) Commissioned

75C/o Bramdungchung MHS (2x50 Kw) Commissioned

76C/o Bongleng MHS (2x50 Kw) 40%

77C/o Khet MHS (2x50 Kw) WIP

78C/o Mukto MHS over Shakanqchu (3x2 MW) WIP

79C/o Nurananq SHP (3x2MW) Commissioned

80C/o Thinqbu MHS (2x50 Kw) EM works under Progress

81C/o Mago MHS (2x50 Kw) WIP

82C/o Chellengkhang MHS (lx30 Kw) Commissioned

83C/o BramadungchunC] MHS Ph-II(2x50 Kw) WIP

84C/o Nurananq SHP PH-II (2x500 Kw) WIP

85C/o Tsechu MHS (2x50 Kw) WIP

86Restoration of Nurananq Hydel Station Completed

87R~storation of Mukto SHP ov~r Shaik9ngst1l:!-, ___ ~__ -,-completed---"88 Restoration of Approach road to Lhou Division (DHPD) completed

89Restoration of Kitpi SHP Ph-I completed

URBAN DEVELOPMENT AND HOUSING

-

90C/o approach road and parking place for proposed Completion within January 2010.

shopping complex for unemployed and poor women at Tawang Township (SPA)91

Extension of taxi Parking Place at Tawanq (SPA) completed

Page 6: GOVERNMENT OF ARUNACHAL PRADESH OFFICE OF THE … · Ropeway from Tawang Monastery to Ani Gonpa WIP (SPA) 35 Construction of approach road to ekalabya Model Residential School at

ressressress

Completed

Completed

Completed

WIPFinancial liabilities to be cleared.

Completed

38 sets distributed to electrify four villagesviz. Thongleng ani Gonpa, Khinmey,Tsarmang Ani Gonpa and Phomqhar.Tender works completedTender works completedTender works completed.~..9ik in progressWork in progressWork in progressNot startedWork inWork inWork in

Completed

2na andyd installment not received.

completed

Completed

First floor works in progress

• I Completed,..Compleie-a-------- "•..Completed

Water Supply to Lhou village and its adjoining newsettlement

C/o Random Rubble Masonry for protection of variouswater supply structure at TawanC/o CC drain at 8 KM Water Treatment Plant site,Tawan

Improvement and Extension of Water supply at Lumiatownship (NLCPRRURAL DEVELOPMENT

C/o security Compound wall and approc;lch Road withlocal type entrance and exit gate at District Hospital

RWD, TAWANG DIVISION

C/o RCCtype Office building for EE RWD, Tawang (SPAC/o Raod fron Dongshengmang to Bongkhar CircleHeadquarter (Formation Cutting and SOiling) (SPAC/o Road from Jang Mukto Road to Kharsa (SPAConstruction/ Restoration of damaged infrastructure byflood and natural calamities during 2005 (ACARLR from BRTF Road t9 $!·lerbang (PM Pa.ckag~RLR from BRTF Road to Hoongla (PM PackageRLR from Kitpi Power House Road point to Weikharvillage (PM Package)RLR from BRTF Road to Singsur Ani Gonpa (Lhou Bazaar)Via Sec School at Lhou (PM PackageRLR from Jang-Mukto Road to Nimsa Gonpa (PMPackage)RLR from Jang-Mukto Road to Granghar via Hot Springt PM PackageAPEDA

Distribution of Solar Home Lighting system under PMPackage.

116

110

104

105

109

102

103

111

101

117

118

119

112

113

114

112

113

114

115

106

107

108

95

99

100

96

97

98

93

94

92

Page 7: GOVERNMENT OF ARUNACHAL PRADESH OFFICE OF THE … · Ropeway from Tawang Monastery to Ani Gonpa WIP (SPA) 35 Construction of approach road to ekalabya Model Residential School at

LIST OF PARTICIPATES WHO ATTENDED THE DLMC MEETING HELD ON29/12/2009 AT DEPUTY COMMISSIONER'S OFFICE CHAMBER,

TAWANG

SI I Name of MembersIDesignationNo. 01

Gamli Padu02

Lobsan Dor'ee.03

P K Thun on04

Md. Yamin Khan05

K Vishwanathan06

R.P Sin h07

L Chudru08

M. Somdanaranjan

! 09

(\ . I\btkI JE_f. Representative of EE {2HED)I -~ ••. ,.-'- ••

.-10 T. Pertin DIPRO

11N. Nyodu EE; RWD

12

T. Dirkhipa EE, DHPD Lhou13

D. Riba DPO,Tawan14

T. N