government of rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 ·...

120
G o v e r n m e n t o f R a j a s t h a n Deptt. Watershed Development & Soil Conservation District Watershed Development Unit, Bikaner IWMP (2010-11) - XXII (Jaitpur,Sabaniya) Block :-Lunkaransar District bikaner Project Area 7000 ha. Project Cost :- Rs1050 Lacs Convergence Cost :- Rs. 0 Lacs Total Cost :- Rs1050 Lacs Shivlal Verma Y. S. Poonia Assistant Engineer Executive Engineer (L.R.) Panchayat Samiti, lunkaransar cum Project Manager, WCDC,Bikaner

Upload: others

Post on 10-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Government of Rajasthan Deptt. Watershed Development & Soil Conservation District Watershed Development Unit, Bikaner

IWMP (2010-11) - XXII (Jaitpur,Sabaniya) Block :-Lunkaransar District bikaner Project Area 7000 ha.

Project Cost :- Rs1050 Lacs Convergence Cost :- Rs. 0 Lacs Total Cost :- Rs1050 Lacs

Shivlal Verma Y. S. Poonia Assistant Engineer Executive Engineer (L.R.) Panchayat Samiti, lunkaransar cum Project Manager, WCDC,Bikaner

Page 2: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

DPR TEMPLATE

Index

S.No Topics Page no.

1 Chapter

Location

General Features of watershed (Cost and Area details)

Climatic and Hydrological information

Other Development Schemes in the project area

Details of infrastructure in the project areas

Institutional arrangements (,DWDU,PIA,WDT,WC)

2 Chapter Basic Data ,Analysis and Scope

2.1 Demography Details 2.2 Development Indicators 2.3 Land use 2.4 Agriculture status and Productivity Gap Analysis 2.5 Horticulture/Vegetable/Floriculture status 2.6 Land holding pattern 2.7 Livestock status 2.8 Fodder status 2.9 Farm Implements 2.10 NREGS Status 2.11 Migration details 2.12 Livelihood Details. 2.13 Existing SHG 2.14 Ground Water details 2.15 Drinking Water Status 2.16 Water use efficiency 2.17 Slope details 2.18 Water Budgeting 2.19 Soil Details 2.20 Soil erosion status

3 Chapter Proposed Development Plan

4 Chapter Activity wise Total Abstract of cost

5 Chapter Annual Action Plan

5.1 Project fund 5.2 Convergence Plan

6 Chapter Project outcomes

7 Technical designs and estimates for proposed activities

8 Enclosures

Maps a. Location –District, block, village, watershed location map b. Map of Project with Watershed Boundary demarcation in cadastral map c. Land Use Land Cover map d. Existing water bodies, DLT e. PRA Map (along with photos & paper drawing) f. GIS based intervention map g. Treatment map ie proposed works on revenue map

Page 3: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER- I

Page 4: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER – I INTRODUCTION

Location.

BKN XXII (IWMP)Project is located in Loonkaransar Block, of Bikaner district. The project area

is between the latitudes 29º49’36” -30º36’18”& longitudes. 73º26’13”- 73º57’27” It is at a

distance of 75 km from its Block head quarters and 150 Kms from the district head quarters. There

are 1525 no. of habitations in the Project area and other details are given below.

General features of watershed

S.No. Name of Project(as per GOI) BKN – XXII,(IWMP)

(a) Name of Catchment Jaitpur, Sabniya

(b) Name of watershed area(local name) BKN -XXII

© Project Area 7169 Hac

(d) Net treatable Area 7000 Hac

e) Cost of Project 1050 Lacs

f) Cost/hectare 15000 Rs.

g) Year of Sanction 2010-2011

h) Watershed Code Cluster

i) No. of Gram Panchayats in project area 1

j) No. of villages in project area 2

k) Type of Project Desert

l) Elevation (metres) ------

m) Major streams Nil

n) Slope range (%) 0-3%

Page 5: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Macro/micro

Name of Gram

Panchayat

Name of Villages

Covered

Census code of

villages

Project

Area

Cluster

Jaitpur Jaitpur 00511100 4500

Hac

Sabniya 00510900 2500

Hac

The watershed falls in Agroclimatic Zone 1C(RF-VLR-SD). The soil texture is Sandy Soil The

average rainfall last 10 year is 35.73 cm . The temperatures in the area are in the range between

28.01-49.00 centigrade during summer and 8.6-23.60 centigrade during winter. The major crops in

the area are Guar, Bajra.Moth. 72.48% land is under cultivation 24.68% land fallow, 5.24% land

is wasteland. 0.21% land is irrigated through Tubewell.

485 No of households are BPL(31.80% households) 281 are landless households(18.42%

households) and 348 household are small and marginal farmers(22.81 %household) .Average

land holding in the area is 4.70 ha. 72.48 % area is single cropped area and 0.21 % is double

cropped. There is no major source of iriigation. The average annual rainfall (5 years) in the area is

514.8 mm. The Major streams in the Watershed does not exist. The major festivals in the village

are Deepawali, Holi, Gangour, Deshra, Eid & Teej. At present this village is having 6995

population with Communities like Jat, Brahmin, Baniya, Swami, Raigor, Meghwal, Nayak,

Sansi, Teli, Rangare, Joiya, Bisayati, Neelgar And damami etc.

Page 6: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Other Development Schemes in the project area

Climatic and Hydrological information

1 Average Annual Rainfall(mm)

Year Average Annual Rainfall(mm)

1 2002 64

2 2003 283

3 2004 103

4 2005 342

5 2006 207

6 2007 348

7 2008 491

8 2009 403

9 2010 783

10 2011 549

2 Average Monthly rainfall (last ten years)

Month Rainfall(mm)

i) June 46.10

ii) July 108.40

iii) August 85.80

iv) September 48.90

3 Maximum rainfall intensity (mm)

Duration rainfall intensity(mm)

i) 15 minute duration 6.30 MM

ii) 30 minute duration 12.60 MM

iii) 60 minute duration 25.0 MM

4 Temperature (Degree C)

Season Max Min

i) Summer Season 49.0 28.1

ii) Winter Season 23.6 8.6

iii) Rainy Season 38.5 28.3

5 Potential Evaporation Transpiration (PET) (mm/day)

Season PET

i) Summer 26.60

ii) Winter 14.20

iii) Rainy 24.70

S.No Scheme Name of the department

Key interventions under the Scheme

Targeted Beneficiaries

Provisions under the Scheme

1 MNREGA P.S. L.K.S. Employ ment 53 Private Tanka

2 SGSY P.S. L.K.S. SHG Deal 30 Micro Enterprises through SHG

3 IAY P.S. L.K.S. House for BPL 33 House

4 NRHM Health dpt. Health 38 Health for rural people

Page 7: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Details of infrastructure in the project areas

Parameters Status

(i) No. of villages connected to the main road by an all-weather road

2

(ii) No. of villages provided with electricity 2

(iii) No. of households without access to drinking water 154

(iv) No. of educational institutions : (P)8

(S) 1

(HS) -----

(VI) --- Primary(P)/ Secondary(S)/ Higher Secondary(HS)/

vocational institution(VI)

(v) No. of villages with access to Primary Health Centre 2

(vi) No. of villages with access to Veterinary Dispensary 2

(vii) No. of villages with access to Post Office 2

(viii) No. of villages with access to Banks 2

(ix) No. of villages with access to Markets/ mandis 2

(x) No. of villages with access to Agro-industries 2

(xi) Total quantity of surplus milk 2690275

(xii) No. of milk collection centres (U) ---

(S) ----

(PA) 7

(O) --- (e.g. Union(U)/ Society(S)/ Private agency(PA)/

others (O))

(xiii) No. of villages with access to Anganwadi Centre 2

(xiv) Any other facilities with no. of villages (please specify)

Nil

(xv) Nearest KVK Bikaner

(xvi) cooperative society Jaitpur

(xvii) NGOs Maru Bhumi Seva Sansthan, Bikaner

Urmul Seva Sansthan , Loonkarnsar

(xviii) Credit institutions

(i) Bank SBBJ Jaitpur

(ii) Cooperative Society Cop. Soc. Jaitpur

(xix) Agro Service Centre's KVK Bikaner

Institutional arrangements (SLNA,WCDC,PIA,WDT,WC, Secretary)

DWDU Details

1 2 3

S.No Particulars Details of WCDC

1. PM ,WCDC Y.S. Punia

2. Address with contact no.,

website

Executive Engineer,(L.R.) Z.P. Bikaner

3. Telephone 0151-2200695 M- 9414397237

4. Fax 0151-2520326 Z.P. Bikaner

5. E-mail

Page 8: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

PIA particulars

WDT Particulars:

1 2 3

S.No Particulars Details of PIA

6. Name of PIA Shiv Lal Verma

7. Designation Assistant Engineer

8. Address with contact no., website P.S. Lunkaransar

9. Telephone 01528-272026 M- 9460236039

10. Fax 01528-272026

11. E-mail [email protected]

1 2 3 4 5 6

7

S.No Subject specialist

Name of WDT

member M/F Age Qualification

Experience in

watershed(Yrs)

1 Engineering Mukesh Das M 20 Engg. Dip. 1 yr.

2 Agriculture Pramod Paiwal M 32 B.Sc. Ag. (H) 1 Yr.

3 Animal

husbandry Ranveer Godara M 23 A.H. (Dip.) 1 Yr.

4 Social sci. Aarti Dubey F 27 B.A.(Soc) 1 yr.

Page 9: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Details of Watershed Committees (WC)

S.N.

Name of WCs

Date of Gram

Sabha for WC

Date of Registratio

n as a Society

(dd/mm/yyyy

Designation

Name M/F SC/ST/OBC/General

Landless/MF/SF/ BF

Name of UG/SHG

Educational qualification

1. Jaitpur 16-03-11

321/2010-11 28-03-11

President Samaun Khan M OBC BF Pasture

Develop. Educate

Secretary Hanuman Prasad M Gen LL Producation Educate

Member Kishor Chand Regar M SC BF Live Stock Educate

Sona Devi F Gen BF Brahamani

SHG Literate

Vidhya Devi F OBC LL Ganga SHG Literate

Mahaveer Brahaman M Gen BF Pasture

Develop. Educate

Sarwan Kumar M OBC SF Producation Literate

Guddi Devi F OBC BF Disha SHG Literate

Bagtavari Devi F SC BF Vasundra

SHG Literate

Jagdish Jatt M OBC BF Agri Farming Educate

Puran Singh M Gen BF Agri Farming Educate

Dungar Ram M Gen BF Live Stock Educate

Maina devi F SC LL Deepak

SHG Uneducate

Meera Sharma F Gen BF Producation Literate

Purusotam M Gen BF Agri Farming Educate

Govind M Gen

BF Pasture Develop. Literate

Bharti Devi F SC LL Live Stock Uneducate

Abhay Dubey M Gen LL ----- BE(Ag.)

Page 10: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

SHG DETAIL

Page 11: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

SHG Detail

S.R. Name Of

Water Shed

Committee

Name of

SHG

s.no. Name of member Designation

1. Jaitpur Jai Mata Di 1

2

3

4

5

6

7

8

9

10

Rukhmani Sharma W/o Kishan Lal Madan Kanwar W/o Khet Singh

Kalawati W/o Bhup Chand

Kamla W/o Pawan Kumar

Rukhmani W/o Subash Das

Prem W/o Bhanwar Sing

Jayana W/o Shiv das

Gaytri W/o Sankar Sharma

Puja W/o Rajendra

Kiran W/o kishan singh

President

Secretary

Member

Member

Member

Member

Member

Member

Member

Member

2 Jaitpur Sonu 1

2

3

4

5

6

7

8

9

10

11

12

Rukmani w/o Subash Das

Tara W/o Jagdish Sharma

Rukhmani W/o Subsh Chandra

Hira W/o Bajrang

Krishna W/o Gori Sankar

Dropati W/o Sitaram

Susia W/o Gulab Singh

Nima W/o Nand Ram

Santosh W/o Kojuram

Bhanwari W/o hanuman Singh

Lichma W/o Bhanwar Singh

Suman W/o Mohanram

President

Secretary

Member

Member

Member

Member

Member

Member

Member

Member

Member

Member

3 Jaitpur Jai Bhawani 1

2

3

4

5

6

7

8

9

10

Gayri W/o Sankar Lal

Anju W/o Kishan Lal

Santosh W/o Bhanwar Lal

Chandar Kala W/o Ram Sawroop

Urmila W/o Ghanshyam

Ganga W/o Ruparam

Prema W/o Amruram

Puja W/o Parhlad

Tara W/o Jagdish

Vimala W/o Mohan Ram

President

Secretary

Member

Member

Member

Member

Member

Member

Member

Member

Page 12: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

4 Jaitpur Sangita 1

2

3

4

5

6

7

8

9

10

Deepa W/o Kahaniya Lal

Rukhmani W/o Kishan Lal

Santi W/o Magaram

Bhalal devi W/o Hetram

Susila W/o Gulab singh

Bhanwari W/o Hanuman Singh

Hira Wo Bajrang lal

Dropti W/o Mangilal

Siman W/o Mahiveer Sarma

Sarda W/o Rajendra Prasad

President

Secretary

Member

Member

Member

Member

Member

Member

Member

Member

5 Jaitpur Disha 1

2

3

4

5

6

7

8

9

10

Disha D/o Gulab Singh

Vinod W/o Gulab singh

Saroj W/o Lal chand

Tija W/o Kishan Dash

Santosh W/o Sankar Lal

Jarina Banop W/o Nakhbooj

Sunita w/o Revant Ram

Guddi W/o Hansraj

Premashvari W/o Sankar Das

Mohani W/o manaram

President

Secretary

Member

Member

Member

Member

Member

Member

Member

Member

6 Jaitpur Brahmani 1

2

3

4

5

6

7

8

9

10

Chandar Kala W/o Gulab Singh

Dropati W/o Jodha Ram

Punam Devi W/o Phusa Singh

Suman Kanwar W/o Bhanwar singh

Kamla Kanwar W/o Keshar Singh

Tija Devi W/o Kishan Das

Chawdi W/o Bajrang Das

Sona dEvi W/o Rupdas

Lichma W/o Tara Chand

Ram Pyari W/o Mal singh

President

Secretary

Member

Member

Member

Member

Member

Member

Member

Member

Page 13: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

7 Jaitpur Laxmi 1

2

3

4

5

6

7

8

9

10

Chandra W/o Gopal Ram

Manju W/o

Urmioa W/o Dilip

Lila W/o Giovind

Rukhmani W/o Babu Singh

Kamla W/o Keshar Singh

Jora W/o Apsar

Jaitun W/o Noor Mohmad

Hajrav W/o Kri Bakhs

Prem Kanwar W/o Laxmi Sing

President

Secretary

Member

Member

Member

Member

Member

Member

Member

Member

8 Sabniya Vasundra 1

2

3

4

5

6

7

8

9

10

Chanrawali W/o Mahiveer Singh

Roshni W/o Chanan Ram

Kalawati W/o

Chandra W/o Sabhram

Kamla W/o ram Sawroop

Bakhtwari W/o Jagdish

Vimla W/o Goruram

Ruprani W/o Udharram

Chukhi W/o Phusa ram

Rukhma W/o madanlal

President

Secretary

Member

Member

Member

Member

Member

Member

Member

Member

9 Sabniya Sabniya 1

2

3

4

5

6

7

8

9

10

11

Lali w/o Ram Kumar

Chama W/o Rewant ram

Chuni W/o Mukhram

Meera W/o Bajaram

Kalawati W/o Jaisaram

Guddi W/o Omprakesh

Kasi W/o Nathuram

Kamla W/o Rameshwer

Savitri D/o Sukhram

Vidhya W/o Pusharam

Vimal W/o Satruram

President

Secretary

Member

Member

Member

Member

Member

Member

Member

Member

Member

Page 14: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Problems and scope of improvement in the project area

The socio economic conditions of the area can be improved through increased production which

can be achieved through expansion in cultivated area and productivity enhancement. 125 ha land

is arable wasteland and 444 ha is fallow can be brought under cultivation.

15 ha is only irrigated and with efforts this can be increased to 45. The productivity gap of major

crops in the area as compared with district and with areas in the same agro climatic zones indicate

potential to increase the productivity. The demonstration of improved package of practices,

improved varieties, increased irrigation facilities and soil conservation measures under the project

can bridge this gap. Due to small land holdings in the area focus of the project would be on

diversification in agriculture (horticulture, vegetables, green houses, Agro forestry, fodder

crops)and diversification in Livelihoods(Agriculture, Animal husbandry, self employment)

1048 Quintal fodder scarcity can be met out through Pasture development .Improved animal

Husbandry practices can increase the productivity of livestock. 356 no of persons migrate due to

Unemployment this migration can be checked through creation of employment opportunities in

the project area through increase in production and diversification in agriculture and Livelihoods as

mentioned above.

Page 15: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER- II

Page 16: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER – II Socio economic Features, Problems and Scope

Table 2.1 Population & Household Details:

Total Population

Male Female Total SC ST

3635 3360 6995 2083 ---

Household Details

BPL

household

L.

Less

Marginal

Farmer

Small

Farmer

Middle

Farmer

Big

Farmer

Total

household

SC

household

485 485 117 231 241 451 1525 326

Table 2.2 Development indicators

S. No. Development Indicators State Project

Area

1 Per capita income (Rs.) 16260 15800

2 Poverty ratio 0.22 0.24

3 Literacy (%) 0.604 0.47

4 Sex Ratio 921 924

5 infant mortality rate 4 4-5

6 maternal mortality ratio 2 2

The table indicates poor socio economic conditions.

Page 17: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Table 2.3 Land Use

Land Use Total area in Ha.

Private Panchayat Government Community Total

Agriculture Land 6646 -------

206

------- 6852

Temporary fallow 1198 -------

32

-------

1230

Permanent

Fallow

155 -------

11

-------

166

Cultivated

Rainfed

4923 -------

151

-------

5074

Cultivated

irrigated

15 -------

-------

-------

15

Net Sown Area 4938 -------

151

-------

5089

Net Area sown

more than once

15 -------

-------

-------

15

Forest Land ---- ------- ------- ------- -------

Waste Land 355 ------- 12 ------- 367

Pastures ----- 177 ------- ------- 177

Others --- 140 ------- ------- 140

Total 6963 317 206 ------- 7169

Page 18: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

The project area has 367 ha of cultivable wasteland . 1385 ha of fallow land (total 1752 ha) can be

brought under cultivation if some irrigation source can be provided through Construction of WHS

like Khadin, Tanka, Farm ponds etc. and also through demonstration of rainfed varieties of crops.

Construction of WHS can also increase in area under irrigation which is only 0.21%

367 ha. (5.24 % of the project area)is under wastelands and can be brought under vegetative

cover, with reasonable effort .Activities like Earthen check dams, Vegetative filter strip, V-ditches,

staggered trenches ,WHS (Johad) Afforestation of wastelands and Pasture development will be

taken up on these lands

Pasture development the land use table shows that there is 177 hectare pasture land

(2.54%)This emphasizes the need for taking up pastureland development works through sowing of

promising species of grasses and plantation

Table 2.4 .a Agriculture and Horticulture status and fuel availability.

Croping Status

SNo Season Crop sown

Rain Fed Irrigated

Varieties Area (ha)

Production (Ton) Productivity (Kg/ha)

Varieties Area (ha)

Production (Ton)

Productivity (Kg/ha)

Area (ha)

Production (Ton)

1 Karif Guar Desi 4178 1169.84 280 4178 1169.84

Moth Desi 497 178.92 360 497 178.92

Bajra Desi 314 100.48 320 314 100.48

2 Rabi Gram Desi 85 32.30 380 Desi 12 33.60 2800 97 65.90

Mustard Desi 3 3.24 1080 3 3.24

Total 5074 1481.5 1340 15 36.84 3880 5089 1518.38

.

The table 2.4 B shows that only 15 ha is (0.21%) is double cropped area.

Soil and Water conservation measures besides putting fallow lands under cultivation can

change the area under single cropping to double and multiple cropping.

Table 2.4.b Abstract of cropped Area(ha)

Area under Single crop 5074

Area under Double crop 15

Page 19: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)

Analysis of the above table indicate that besides national gap there is wide gap in productivity

within state and even within same agro climatic zones.

The reasons for this variation are

The farmers are using Local varieties of Bajra whereas the recommended varieties like

HHB-67 provide 480 Kg. per hac. yield

The farmers are using Local varieties of Guar whereas the recommended varieties like

RGC-102, 103 provide 360 Kg. per hac. Yield.

The farmers are using Local varieties of Moth whereas the recommended varieties like

RMO-235 provide 480 Kg. per hac. Yield.

Lack of Availability of good quality seeds of desired crop and variety in adequate quantities

and time to the farmers.

Availability of water for cultivation(0.21% is irrigated table 2.3)

The productivity gap and reasons of it indicate potential to increase the productivity through crop

demonstration .Crop demonstrations would be carried out on improved crops/ varieties, improved

agronomic practices. INM, IPM, Mixed cropping, distribution of fodder seed mini kit.

Name of the crop

Productivity kg/ha

India

Highest Average in Rajasthan

Highest Average of Agro climatic zone District

Project Area

Guar 300-350 230

250

200

280

Moth 270-300 225

350

180

360

Bajra 450-500 450

300

240

320

Page 20: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)

Activity Area Species Varieties Recommended varieties Production

Horticulture 0.5 Ber Desi Gola Ber 80-100Kg/plant

Lamon ----- Kagji nimbu 40-50Kg/plant

Anwala ------ banarasi 50-100Kg/plant

Vegetables Tomato ------ Pusha gourav 200-500Q./Ha

brinjal Pusha round 200-400Q./Ha

Floriculture Nil

Medicinal Plants Nil

Sona mukhi

10 Q./Ha

Hohoba 1000-1200 Kg/Ha (leaf after 4 yrs)

Table 2.6 Land holding Pattern in project area

Type of Farmer

Total House holds

Land holding (ha) irrigation source wise

Land holding (ha)Social group wise

Total Irrigated (source)

Rainfed Total

Gen. SC ST OBC BPL

(i)Large farmer 451 15 5228 5243 1860

357 --- 3026 81 5243

(ii) middle farmer 241 ----- 664 664

168 264 ----

232 102 664

(iii) Small farmer 231 ----- 324 324

85 185 -----

54 91 324

(iv)Marginal farmer 117 ----- 92 92

22 47 -----

23 49 92

(v) Landless person 485 ----- ----- ---------

------- ----- -----

------- ------- -----

(vi)No.of BPL households 485 ----- 323 323

59 159 -----

105 ----- 323

Total 1525 15 6631 6646 2194 1012 ---- 3440 323 6646

Page 21: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

416 hact. land holdings belong to small and marginal farmers who own 6.25% of total cultivated

area. Horticulture/vegetables could be more economical to Small and marginal farmers with

irrigation source. For large farmers with no irrigation facility Horticulture/vegetables will be

promoted in a part of land with farm pond/Tanka construction.

The following activities will be more beneficial for small land holdings and for diversification and

income for large farmers

Horticulture plantation And Medicinal Crops: As discussed earlier . Horticulture/vegetables

could be more economical to Small and marginal farmers with irrigation source. Also the project

area has good potential for medicinal crops like Sonamukhi, Ashwagandha, aloevera, hohoba etc.

Agro forestry plantation: To increase the income of farmers and also for shelter belt plantation

as wind velocity is high in the project area.

Setting of Vermi Compost Units - Keeping in view the side effect of residues of chemicals and

fertilizers on human health the emphasis would be on cultivation of organic produce through

motivating farmers and providing assistance for production of organic input, vermi compost.

Production and distribution of quality seed – There is need to ensure that good quality seed is

available for cultivators for which adequate seed production would be initiated in watershed areas

with the assistance of private sector and agriculture department technologies

Sprinklers and pipelines for efficient water management practices emphasis on demonstration

of sprinklers with adequate financial support and convergence/private partnership.

Establishment of Green House - For growing off season vegetables seedlings and other

horticultural crops under controlled atmospheric conditions of green house.

Innovative hi-tech/ export oriented activities: innovative hi-tech/ export oriented projects like

mushroom cultivation, etc which are in negligible existence at present, can be implemented by

individual farmers / private companies.

Drip irrigation Drip irrigation will be promoted in all horticulture plantations, vegetables and green

houses for rational use of irrigation higher yields and quality produce.

Page 22: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Table 2.7 Livestock Status - animals/milk production / average yield.

S.No

.

Description

of animals

Population

in No.

Yield(milk/mutton/

Wool)/yr

Equ. cow

units

Dry matter

requirement

per year

(7Kg per

animal.)

Total

requirement

in M.T.

1 Cows 3691 3745130 Ltr. 3691 9430505 9430

Indigenous -----

Crossbrid -----

2 Buffaloes 652 684600 ltr 652 1665860 1665

3 Goat 3637 723400 ltr. 1818 4644990 4644

4 Sheep 8506 11669 Kg 4253 10866415 10866

5 Camel 402 402 1027110 1027

6 Donkey 83 NA

Total 16971 5153130 ltr milk

& 11669 Kg Wool 10816 27634880 27634

In spite of the large number of livestock, production is less hence increase in productivity

across all species, is a major challenge. To reduce production of unproductive cattle and

improve the productivity by improving the breeds by breeding management following activities

will be taken up

Castration

Artificial insemination

Distribution of superior Breeding bulls for use in Cattle and Buffalo

Breeding distribution crossbred rams

Besides breed improvement other animal husbandry practices like better health, hygiene and

feeding practices can increase productivity of livestock. Hence Activities like Animal health camps

,Urea-Molasses treatment demonstration ,demonstration of improved methods of conservation

and utilization of Forage crops are proposed.

Page 23: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Table 2.8 Existing area under fodder (ha)

S.No Item Unit Area/Quantity

1 Existing Cultivable area under Fodder

Ha Nil

2 Production of Green

fodder

Tonns/year -------

3 Production of Dry fodder Tonns/ Year 3084

4 Area under Pastures Ha 150

5 Production of fodder Tonns/year 3084

6 Existing area under Fuel

wood

Ha 215

7 Supplementary feed Kgs/ day 260

8 Silage Pits No -------

9 Availability of fodder quintals 30840

10 Deficiency of fodder

quintals 245863 Qt.

The above table shows there is fodder deficiency 245863 Qt. (Requirement is 276348 Qt. and

availability 30840 Qt.) to minimize the large and expanding gap between feed and fodder

resource availability and demand there is need for

Increase in area under fodder crops

Increase in productivity of fodder crops

Development of pastures

And reduction in large number of livestock production through replacement by few but

productive animals

Table 2.9 Agriculture implements

1 2 3

S. No Implements Nos.

1 Tractor 147

2 Sprayers-manual/ power 546

3 Cultivators/Harrows 116

4 Seed drill 96

5 Any Other 53

Page 24: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Farm mechanization and seed banks: As discussed earlier 416 Hac. land holdings belong to

small and marginal farmers who own only 6.25% of total cultivated area so owning of big farm

implements by individual farmers is not economical so SHG would be promoted to buy farm

implements and rent to farmer

Table 2.10 NREGA Status - No. of Card Holder, activities taken so far, employment

status.

Sr. no.

Name of village

Total No .of job cards

Employment Status

Activity taken up so far

1 Jaitpur 1273

1064

Gravel Road, WHS,

Plantation

2 Sabniya 418 379 Gravel Road, WHS

Table 2.11 Migration Details

The migration can be check by creation of employment opportunities, enhancing farm level

economy, increases the income of the people engaged in animal husbandry by dairy, poultry

and marketing and value addition and by increasing pasture development (as discussed

earlier) and diversification in livelihoods .

Name of

village

No. of persons migrating

No. of days per year of migration

Major reason(s) for

migrating

Distance of destination of migration

from the village (km)

Occupation during

migration

Income from such

occupation (Rs. in lakh)

Jaitpur 218 150 Unemployment & cattle feeding

70 Labour 54.5

Sabniya 138 150 Unemployment 80 Labour 34.5

Page 25: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

The existing livelihoods Village are given below

Table 2.12 (a)Major activities (On Farm)

Name of activity No of House holds Average annual income from

the

Cultivators 1320 6.10 Cr.

Dairying 954 1.90 Cr.

Poultry ----- ------

Piggery ------ ------

Landless Agri. Labourers

354 2.86 Cr.

The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals.

Table 2.12(b)Major activities (Off Farm)

Name of activity Households/individuals Average annual income from

the

Artisans ------ ---------

Carpenter 10 3.62 Lacs

Blacksmith 2 0.52 Lacs

Leather Craft 15 3.79 Lacs

Porter 4 1.13 Lacs

Mason 14 6.72 Lacs

Others specify (Cycle Repair ,STD,Craft etc)

------ --------

Page 26: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Table 2.13 Status of Existing SHG

S.No Name of

SHG Members

Activity involved

Monthly income

Fund available

Assistance available

Source of assistance

Training received

1 Jai Mata di 10 Silai 1000 45500 Yes SBBJ Jetpur

2 Sonu 10 Farming 500 16400 No N.A.

3 Jai

Bhawani 10

Farming, Aachar

2000 7000 No N.A.

4 Sangita 10 Posahar 500 16500 No N.A.

5 disha 10 Dal Badi, Posahar

100 6600 No N.A.

6 Brahmani 10 Klewa yojna

100 3700 No N.A.

7 Laxmi 10 Dari 100 7000 No N.A.

8 Vashundra 10 Klewa 100 4900 No N.A.

9 Mahila I 10 Posahar 500 3400 No N.A.

The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance II. Technical Features Table 2.14 Ground Water

S.No Source No. Functional depth

Dry Area irrigated

Hact.

Water availability(days)

i) Dug wells Nil Nil

ii) Shallow tube wells Nil Nil

iii) Pumping sets Nil Nil

iv) Deep Tube Wells 8 450 Ft. 3 15 365

Total 8 3 15 365

Table 2.15 Availability of drinking water

S.No

Name of the

village

Drinking water requirement Ltrs/day

Present availability of drinking water Ltrs/day

No. of drinking water sources available

No. functional

No. requires repairs

No. defunct

1 Jaitpur 387775 348998 4 2 ----- 2

2 Sabniya 21375 190238 3 2 ------ 1

Page 27: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Table 2.16 Soil details

Soil Profile

S.No. Major Soil Classes Area in hectares

Sandy 7000

Soil Depth :

B Depth (Cms.) Area in hectares

1 0.00 to 7.50

2 7.50 to 45.00

3 > 45.00 7000

C Soil fertility Status Kg/ha Recommended

N Low 10 25-30 Kg./Hac.

P Sufficient 36 35-40 Kg./Hac

K Low 84 150-200 Kg./ Ha.

Micronutrients PPM PPM

Zn 16 50

Fe 16 50

Cu 3 50

Mn 4 50

The analysis of table shows need to improve and maintain soil fertility. Soil health card to every

farmer in every crop season will be provided, which will include the recommendation for

Application micro nutrient and fertilizers

Table 2.17 Erosion details

Erosion status in project Area

Cause

Type of

erosion

Area affected

(ha)

Run off(mm/

year) Average soil loss

(Tonnes/ ha/ year)

Water Erosion Nil

Wind erosion 7000 150-180

Total for project 7000 150-180

The need is:

To Stablize the sand dunes.

To develop the shelter belts.

To check Faulty agriculture techniques

To check Uncontrolled grazing and developed cattle tracks

Page 28: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER- III

Page 29: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER - III

Proposed Development Plan: The Activities are indicative addition /deletion in activities

will be as per local conditions

A) Preparatory phase activities Capacity Building Trainings and EPA

The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and

wall paintings etc. were carried out in all the habitations of Watershed. A series of

meetings were conducted with GP members, community and discussed about the

implementation of IWMP programme. User groups were also formed.

Grama Sabhas were conducted for approval of EPA (Village), for selecting the

watershed committee and approval of DPR.

S.no Name of the Gram Panchayat Date on which Grama

Sabha approved EPA

1 Jaitpur 16.03.2011

1 2 3 4 5 6 7 8 9

S. No.

Names of village

Amount earmarked for

EPA

Entry Point Activities planned

Estimated cost

Expenditure incurred

Balance Expected outcome

Actual outcome

1 Jaitpur 27 Lacs 1 Public Jal Kund

1.90 Lacs 1.86 Lacs 0.04 lacs

Ful Fill Potable water

requirment

Ful Fill Potable water

requirement

Pipe Line 25.10 Lacs

----- 25.10 Lacs

Ful Fill Potable water

requirment

-

2 Sabniya 15 Lacs 1 Public Jal kund

1.90 Lacs 1.86 Lacs 0.04 lacs

Ful Fill Potable water

requirment

Ful Fill Potable water

requirement

Repair of WHS

13.10 Lacs

------ 13.10 lacs

Ful Fill Potable water

requirment

-

Page 30: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

The PRA exercise was carried out in all the villages on the dates shown below:

S.no Name of the

village/Habitation

Date on which PRA

conducted

1 Jaitpur 12.10.2011

2 Sabniya 14.10.2011

Transact walk were carried out involving the community for Social mapping, Resource

mapping. Detailed discussions and deliberations with all the primary stakeholders were carried

out. Socio-economic survey was carried out during 22-09-2011 to 16.11.2011 period covering

all the households and primary data on demography, Land holdings, Employment status,

Community activities etc. was collected as mentioned in chapter 2.

State remote sensing department was assigned the work of preparing various

thematic layers for Creation, development and management of geo-spatial database depicting

present conditions of land (terrain), water and vegetation with respect to watershed under

different ownerships at village level

Various thematic layers provided by SRSAC are :

Digitised Khasara maps of the villages falling in project area.

Existing water bodies, falling in the project area.

Land Use / Land cover map.

Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as

discussed in chapter 2) final Treatment plan on revenue map for implementation has been

framed. Thus each intervention identified has been marked on revenue map (map enclosed

in DPR as annexure------).The GIS based intervention map, PRA based intervention map are

annexed as ------.

Page 31: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER- IV

Page 32: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER -I V Activity wise Total Abstract of cost

Activity Unit Quantity Unit cost

(Lacs) Total cost

(Lacs) Cost from Project Fund Convergence

Fund Beneficiary Contribution*

Jalkund No. 670 0.63 422.10 422.10 ---- 33.76 lacs

Public jal kund No.

7 1.90 13.30 13.30 ----- -------

Diggy No.

7 8.00 56.00 56.00 ------ ------

Pasture Development

Hact. 100

.966

96.60

96.60 ------- ------

Kitchen gardening No.

100 0.004 0.40 0.40 0.12

Compost pit No.

668 0.10 66.80 66.80 20.04

Soil testing No.

2000 0.0001 0.20 0.20

Plantation in non arable

No. 10000 0.00035 3.50 3.50

Crop demonstration No.

2000 0.005 10.00 10.00 3.00

Vat. treat. camp No.

10 1.2 12 12

Bull distribution No.

3 0.5 1.50 1.50

SHG Training No.

8 0.84 3.84 3.84

Micro enterprises 101.26 101.26

*Tentative and will vary during execution according to beneficiary

Page 33: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Name of watershed committee : Jaitpura Name of watershed:- Bikaner xxii

Gram Panchyat : Jaitpura

Panchayat samiti :lunkaransar (Bikaner) Scheme : I.W.M.P

Area- 7000 hac. 0.15 lac per hac. Total Cost 1050 Lac.

% Fin. % Fin. % Fin. % Fin. % Fin. % Fin. % Fin.

Admn. 1.00 10.50 2.00 21.00 2.00 21.00 2.00 21.00 2.00 21.00 1.00 10.50 10.00 105.00

Monitoring 0.10 1.05 0.20 2.10 0.20 2.10 0.20 2.10 0.20 2.10 0.10 1.05 1.00 10.50

Evaluation 0.00 0.00 0.30 3.15 0.00 0.00 0.35 3.68 0.00 0.00 0.35 3.68 1.00 10.50

EPA 4.00 42.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 42.00

I & CB 1.50 15.75 1.50 15.75 0.50 5.25 1.00 10.50 0.00 0.00 0.50 5.25 5.00 52.50

DPR 1.00 10.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 10.50

Watershed Works 0.00 0.00 7.00 73.50 14.00 147.00 19.00 199.50 9.00 94.50 7.00 73.50 56.00 588.00

Livelihoods, production system

and micro enterprises0.00 0.00 2.00 21.00 5.00 52.50 5.00 52.50 5.00 52.50 2.00 21.00 19.00 199.50

Consolidation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 31.50 3.00 31.50

Total 7.60 79.80 13.00 136.50 21.70 227.85 27.55 289.28 16.20 170.10 13.95 146.48 100.00 1050.00

This year wise breakup of watershed activities has been compiled with reference of letter no. F18 (1 - 49) IWMP/WDSC/2010-11 Dates &F18(I-13)

6867-6951, 15.12.2011 Dated of directorate of Watershed Dev. & Soil Conservation Department Jaipur.

ljaip W. D. T

xzke ipk;r (Agri.)

tSriqj

W.D.T. J.EN. A.EN.

(Vet.)

IWMP-XXII

Total

W.D.T. W.D.T. v/;{k

mi lfefr ¼tyxzg.k½

tSriqj

(Engg.) (Social Science.)

IWMP-XXII

Component Wise & Year wise Breakup of watershed Activities

Cost-

Activity

Year wise

2011-12 2012-13 2013-14 2014-15 2015-16 2016-17

P.S. Lunkaransar P.S. Lunkaransar ftyk ifj"kn] chdkusjA

IWMP-XXII

ifj;kstuk izcU/kd

(I W M P) (I W M P) ftyk tyxzg.k fodkl bdkbZ

IWMP-XXII

Page 34: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Name of watershed committee : Jaitpur Name of watershed:- Bikaner XXII

Gram Panchyat : Jaitpur

Panchayat samiti :lunkaransar (Bikaner) Scheme : I.W.M.P

Area- 1000 hac. Cost- 0.15 lac per hac. Total Cost 150 Lacs

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1Construction of Jalkund / Tanka

670 0.63 422.10 24 15 158 99.54 266 167.58 113 71.19 109 68.67

2Construction of Public Jalkund / Tanka 50000 Lit.

Capacity7 1.90 13.30 3 5.70 2 3.80 1 1.90 1 1.90

3 Diggy 7 8.00 56.00 3 24.00 2 16.00 1 8.00 1 8.00

4 Repair of existing W.H.S.

Total 491.40 24 44.82 158 119.34 266 177.48 113 81.09 109 68.67

Conservation and production measures for non-

arable land(Activity)

1 Pasture development 2 50 96.60 28.68 27.66 22.02 13.41 4.83

Total 96.60 28.68 27.66 22.02 13.41 4.83

Grant total 588.00 73.50 147.00 199.50 94.50 73.50

ljaip

xzke ipk;r

tSriqj

W.D.T. W.D.T. J.EN. A.EN.

(Vet.) (Agri.)

IWMP-XXII IWMP-XXII

UNIT

COST

TOTAL

AMT.

(lacs)

Year wise

2016-2017

W.D.T. W.D.T. v/;{k

Component Wise & Year wise Breakup of watershed Activities

Natural resources management 56 %

Conservation measures for arable & non-arable land

Conservation measures for arable land (Activity) NO.

2012-2013 2013-2014 2014-2015 2015-2016

(Engg.) (Social Science.)

tSriqj IWMPXXII IWMPXXII

mi lfefr ¼tyxzg.k½

ifj;kstuk izcU/kd

(I W M P) (I W M P) ftyk tyxzg.k fodkl bdkbZ

P.S. Lunkaransar P.S. Lunkaransar ftyk ifj"kn] chdkusjA

Page 35: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Name of watershed committee : Jaitpura Name of watershed:- Bikaner XXII

Gram Panchyat : Jaitpura

Panchayat samiti :lunkaransar (Bikaner) Scheme : I.W.M.P

Area- 7000 hac. Cost- 0.15 lac per hac. Total Cost 1050 Lacs

No. Unit

cost

Total

cost

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Kitchen Garden(Seed Packet) 100 0.004 0.40 0 0 0.00 100 0.40 0.00 0.00 0.002 Compost Pit 668 0.1 66.80 0 170 17.00 198 19.80 200 20.00 100 10.00 0.003 Soil testing 2000 0.0001 0.20 0 500 0.05 500 0.05 500 0.05 500 0.05 0.004 Plantation along the road 10000 0.00035 3.50 0 1000 0.35 5000 1.75 4000 1.40 0.00 0.00

5 Crop Demonstration 2000 0.005 10.00 0 0 700 3.5 700 3.50 600 3.00 0.00

6 Fodder demonstration 0 0 0.00 0 0 0.00 0 0.00 0.00 0.00 0.00

80.90 0 2910 17.40 417 25.50 24.95 13.05 0.00

1 Veterinary Treatment camp 10 1.2 12.00 0 2 2.40 2 2.40 2 2.40 2 2.40 2 2.40

2 Breed Improvement 0 0 0.00 0 0 0.00 0.00 0 0.00 0.00 0.003 Bull distribution 3 0.5 1.50 0 0 0.00 2 1.00 1 0.50 0.00 0.00

4 Artificial Insemination 0 0 0.00 0 0 0.00 0.00 0 0.00 0.00 0.005 SHG's Training 8 0.48 3.84 0 0 0.00 4 1.92 0.00 4 1.92 0 0.006 Micro Enterprises 0 0 101.26 0 1.20 21.68 0 24.65 35.13 18.60

118.60 0 4 3.60 27.00 1 27.55 39.45 21.00

199.50 4 21.00 52.50 52.50 52.50 21.00

ljaip W. D. T

xzke ipk;r (Agri.)

tSriqj

W.D.T. J.EN. A.EN.

(Vet.)

IWMP-XXII P.S. Lunkaransar P.S. Lunkaransar ftyk ifj"kn] chdkusjA

(B) Production System and micro enterprise 19 % measure for arable land

Production measures for non arable land (activity)

W.D.T.

(Social Science.)

tSriqj IWMP-XXII IWMP-XXII

Production measures for arable

land (activity)2011-12 2012-13 2013-14 2014-15 2016-20172015-16

Component Wise & Year wise Breakup of watershed Activities

ifj;kstuk izcU/kd

W.D.T.

(I W M P) (I W M P) ftyk tyxzg.k fodkl bdkbZ

v/;{k

(Engg.) mi lfefr ¼tyxzg.k½

IWMP-XXII

Page 36: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER- VI

Page 37: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER – VI EXPECTED OUT COMES

1 2 3 4 5 6

S. No. Item Unit of

measurement

Pre-project

Status

Expected Post-

project Status Remarks

1 Status of water table (Depth to Ground

water level)

Meters 100-105 mtr. Not applicable Area in desert

2 Ground water structures repaired/

rejuvenated

No. --------- 2

3 Quality of drinking waters Description Salty &

potable

Potable water

4 Availability of drinking water Description 90 % 98 %

5 Change in irrigated Area Ha 15 45

6 Change in cropping/ land use pattern Description 0 15

7 Area under agricultural crop Ha

I Area under single crop Ha 5074 5700

Ii Area under double crop Ha 15 45

Iii Area under multiple crop Ha --- -----

8 Change in cultivated Area Ha 5089 5745

9 yield of

major

crops of

area

Yield of Bajra Q/Ha 320 480

Yield of moth Q/Ha 360 480

Yield of Gram Q/Ha 380 520

Yield of Guar Q/Ha 280 360

10 Production of Bajra Ton 100.48 150.72

Page 38: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

production

of major

crops of

area

Production of Guar Ton 1169 1504

Production of Gram Ton 132.3 44.2

Production of Moth Ton 179 238.56

11 Area under vegetation Ha 25 100

12 Area under horticulture Ha ---- 10

13 Area under fuel Ha 15 45

14 Area under Fodder Ha 280 440

15 Fodder production Q 30480 40490

16 Milk production Litres/day 5153130 5865580

17 SHGs Active No. 9 15

18 No. of livelihoods No. -------- 5

19 Income Rs.in la 2098.5 2550

20 Migration No. 356 200

21 SHG Federations formed No. ------- 2

Page 39: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Critical Assumption

No severe droughts/ unexpected floods/ natural disasters

Adequate funds are allocated for the same and released on time.

There is no significant pest/ disease attack, and if so, then it will have been contained before

irreversible damage is done.

Adverse market conditions do not persist long.

Sound macro-economic and growth conditions continue and the benefits are widely distributed

particularly in the rural areas.

Facilitating agencies and resource providers have the required competent staff so that timely

and appropriate technical advice and services are provided to farmers whenever required.

The Capacity Building Plan is implemented, monitored and modified to address evolving needs

and feedback from participants.

The execution of the Women’s Empowerment Pedagogy is regularly monitored by the District

and State level Implementing Agencies

Means of Verification of indicators

Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning,

mid-term and end of the project period

Annual participatory assessment by communities during project period.

Regular project monitoring reports prepared by project monitoring teams/ agencies.

Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/

Individual beneficiaries/project-related village and local bodies/PRIs.

External review missions

Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation,

Animal Husbandry

Page 40: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER- VII

Page 41: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER VII TECHNICAL DESIGNS AND ESTIMATES

Technical designs and estimates for proposed activities.

For Estimates GKN of the districts should be used. For Production System activities, rates of

Agriculture/Horticulture/Animal Husbandry should be used.

Page 42: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER- VIII

Page 43: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

CHAPTER - VIII Enclosures -

a. Location –District, block, village, watershed location map

b. Map of BKN XXII IWMP Project (Watershed Boundary demarcation in cadastral &

Topo Sheet)

c. PRA Map (along with photos & paper drawing)

d. Treatment map (Indicate proposed works)

e. Cadastral Map on watershed boundary

f. Information on Soils, Soil fertility, Land capability, Soil chemical problems like

salinity, alkalinity

g. Land Use Land Cover map

h. Information on existing water harvesting structures & well inventory along with GPS

co-ordinates.

i. High resolution, latest Remote Sensing Satellite data

Page 44: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

dk;Z dk uke% fuft tydq.M fuekZ.k dk;Z

tyxzg.k {ks+= % chdkusj xxii ;kstuk % vkbZ-MCY;w-,e-ih-

dzl dk;Z dk fooj.k la[;k yEckbZ pkSMkbZ xgjkbZ ekrzk bZdkbZ nj Je jkf'k dqy jkf'k

1 uho][kkbZ]ijukyk esa 1-5eh xgjkbZ dq.M 0.79 3.15 3.15 3.45 26.87 91.00 2657.57 2657.57

rd feVVh dh [kqnkbZ djuk]ry dks ik;rku nhokj 3.14 11.00 0.45 0.15 2.33 91.00

dwVuk]ikuh Mkyuk]cxy dks lokjuk

rFkk cph feVVh dkss 50eh nwjh rd

fuLrkj.k djukA 29.20 ?k-eh-

l[r feV~Vh esa

2 lhesaV dadhV 1 lhesaV 4 ctjh rFkk dq.M 0.79 3.15 3.15 0.15 1.17 1894.00 388.54 2212.90

8 fxVVh bZV dh 40 feeh ukHkh; 332.55

eki dh uho esa Mkyuk]dqVkbZ o rjkbZ

djukA 1.17 ?k-eh-

3 uhao rFkk dqlhZ esa izFke Js.kh bZaVksa dh dq.M 3.14 2.93 0.23 3.80 8.04 2772.00 4331.67 27794.91

fpukbZ lhesaV&ctjh 1%6 elkys esa] ik;rku nhokj 3.14 11.00 0.23 0.25 1.99 432.00

10.03 ?k-eh-

4 50fe-eh- eksVkbZ esa lhesaV dadzhV 1%2%4 dq.M 0.79 2.70 2.70 5.72 249.00 566.54 1424.94

ftlesa 1lhesaV 2ctjh 4 iRFkj dh 12 99.00

fe-eh- ukHkh; fxVVh ds lkFk feykdj

Mkyuk] dwVuk] rjkbZ vkfn lesr A 5.72 o-eh-

5 iRFkj ds fljny ¼fyVay 7-5 ls-eh dq.M 2.00 3.15 0.30 1.89 636.00 368.55 1202.04

eksVkbZ½ dh vkiwfrZ dj] fpukbZ es 195.00

mi;ksx dh xbZ elkys es mls yxkukA 1.89 o-eh-

6 vOoy ntsZ dh iRFkj dh ifê;ksa dh dq.M 0.79 3.15 3.15 7.79 1097.00 2435.32 8322.57

Nr Mkyuk] Åij rFkk uhps ls tksMksa es <Ddu 0.45 0.45 0.20 321.00

iRFkj dh phi ds lkFk 1%4 vuqikr esa

lhesaV elkys ls HkjukA ¼2 eh rd½ 7.59 o-eh-

7 iDds bZaV ds VqdMs ;k iRFkj ds NksVs 206.00 318.64 1562.85

dkrys es lhesaV elkyk 1%4 es Hkaofj;k 7.59 o-eh- 42.00

Mkyuk] iêh Nr ds Åij rFkk vkiwfÙkZ

djukA

8 lhesaV IykLVj nhokj ij 1%4 vuqikr es dq.M iSank 0.79 2.70 2.70 5.72 97.00 2500.97 4991.65

lhesaV&ctjh feykdj dj tksMksa dks dq.M nhokj 3.14 2.70 3.80 32.22 48.60

dqjsnus rFkk rjkbZ lfgr 12 fe-eh- dq.M ckgj 3.14 3.15 0.60 5.93

dq.M Nr 7.59

51.46 o-eh-

9 lhesaV IykLVj nhokj ij 1%6 vuqikr es ik- nhokj 3.14 11.00 0.35 12.09 108.00 587.53 1305.61

lhesaV&ctjh feykdj tksMksa dks dqjsnus 48.60

rFkk rjkbZ lfgr 20 fe-eh-A 12.09 o-eh-

dk;Z dk foLrr fooj.k

dk;Z dk rdehuk

Page 45: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

10 Dosjh jfol ftles 40 izfr'kr iRFkj ds ik;rku 0.79 10.70 10.70 0.15 13.48 376.00 1191.27 4629.62

Liky gks ;k dØaj ;k ?kkaM+yk dks dq.M 0.79 3.15 3.15 0.15 1.17 96.75

fcNkuk rFkk vkiwfÙkZ djuk] ikuh

fNM+duk rFkk nqjeqV ls dwVukA 12.31 ?k-eh-

11 <Ddu 1 la[;k 0.00 800.00

12 yhM pktZ o-eh-

ctjh 76.00 5.49 ?k-eh- 3.00 921.93

105 fxzV 76.00 0.26 ?k-eh- 4.00 57.68

bZV 0.00 4.74 gtkj 0.00

Dosjh jfol 92.00 14.78 ?k-eh- 3.00 3191.48

13 fjgSMfyax pktZ 800.00 1500.00

16146.60 62575.77

vkdfLed O;;A 53.40 424.23

egk;ksx 16200.00 63000.00

Note %& mDr njsa iapk;r lfefr ywudj.klj chdkusj dh ch,lvkj (01-04-12 ls ykxw½ ls yh xbZ gSaA

J.EN.

(I W M P) (I W M P)

P.S. Lunkaransar

W.D.T.

Engg.

IWMP-XXII

ifj;kstuk izcU/kd

ftyk tyxzg.k fodkl bdkbZ

P.S. Lunkaransar ftyk ifj"kn] chdkusjA

A.EN.

Page 46: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

dk;Z dk uke% fuft tydq.M fuekZ.k dk;Z

tyxzg.k {ks+= % chdkusj xxii ;kstuk % vkbZ-MCY;w-,e-ih-

dz l vk-la[;k vkbVe ekrzk bZdkbZ lhesaV ctjh 20feeh bZV ifV~V;k xzsoy fljny bZV fxV~Vh

1 2 lh-lh-1%4%8 1.17 ?k-eh- 3.74 0.53 1.05

2 3 bZaVksa dh fpukb 10.03 ?k-eh- 10.93 2.33 4742.8

3 4 lh-lh-1%2%4 5.72 fdyks 1.79 0.13 0.26

4 5 fljny 1.89 o-eh- 0.50 0.10 1.89

5 6 ifê;kW 7.59 o-eh- 0.52 0.68 8.35

6 7 bZaV ds Hkofj;k 7.59 o-eh- 2.73 0.19 0.38

7 8 IykLVj 1%4 51.46 o-eh- 8.73 1.24

8 9 IykLVj 1%6 12.09 o-eh- 1.40 0.30

9 10 Dosjh jfol 12.31 ?k-eh- 14.78

10 11 <Ddu 1

dqy 30.34 5.49 0.26 4743 8.35 14.78 1.89 1.43

cSx ?k-eh- ?k-eh- la[;k o-eh- ?k-eh- o-eh- ?k-eh-

lkexzh dh vko';drk

Page 47: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

dk;Z dk uke% lkoZtfud tydq.M fuekZ.k dk;Z ykxr 1-90 yk[k

tyxzg.k {ks+= % chdkusj xxii ;kstuk % vkbZ-MCY;w-,e-ih-

dzl dk;Z dk fooj.k la[;k yEckbZ pkSMkbZ xgjkbZ ekrzk bZdkbZ nj Je jkf'k dqy jkf'k

1 uho][kkbZ]ijukyk esa 1-5eh xgjkbZ dq.M 0.79 5.10 5.10 4.70 95.96 75.00 7531.11 7531.11

rd feVVh dh [kqnkbZ djuk]ry dks ik;rku nhokj 3.14 21.00 0.45 0.15 4.45 75.00

dwVuk]ikuh Mkyuk]cxy dks lokjuk

rFkk cph feVVh dkss 50eh nwjh rd

fuLrkj.k djukA 100.41 ?k-eh-

lk/kkj.k feV~Vh esa

2 lhesaV dadhV 1 lhesaV 4 ctjh rFkk dq.M 0.79 5.10 5.10 0.15 3.06 1894.00 1018.49 5800.71

8 fxVVh bZV dh 40 feeh ukHkh; 332.55

eki dh uho esa Mkyuk]dqVkbZ o rjkbZ

djukA 3.06 ?k-eh-

3 uhao rFkk dqlhZ esa izFke Js.kh bZaVksa dh dq.M 3.14 4.75 0.35 5.05 26.36 2772.00 13008.51 83471.26

fpukbZ lhesaV&ctjh 1%6 elkys esa] ik;rku nhokj 3.14 20.77 0.23 0.25 3.75 432.00

30.11 ?k-eh-

4 50fe-eh- eksVkbZ esa lhesaV dadzhV 1%2%4 dq.M 0.79 4.40 4.40 15.20 249.00 1504.56 3784.20

ftlesa 1lhesaV 2ctjh 4 iRFkj dh 12 99.00

fe-eh- ukHkh; fxVVh ds lkFk feykdj

Mkyuk] dwVuk] rjkbZ vkfn lesr A 15.20 o-eh-

5 yksgs ds xMZj dks dkVdj p<kuk rFkk 225.00 62.43 1665.00 14046.75

LFkku ij yxkuka A 7.40

(275*140 I S L B ) 225.00 fdyks

6 vOoy ntsZ dh iRFkj dh ifê;ksa dh dq.M 0.79 5.10 5.10 20.42 1097.00 6489.13 22176.24

Nr Mkyuk] Åij rFkk uhps ls tksMksa es <Ddu 0.45 0.45 0.20 321.00

iRFkj dh phi ds lkFk 1%4 vuqikr esa

lhesaV elkys ls HkjukA ¼2 eh rd½ 20.22 o-eh-

7 iDds bZaV ds VqdMs ;k iRFkj ds NksVs 206.00 849.04 4164.36

dkrys es lhesaV elkyk 1%4 es Hkaofj;k 20.22 o-eh- 42.00

Mkyuk] iêh Nr ds Åij rFkk vkiwfÙkZ

djukA

8 lhesaV IykLVj nhokj ij 1%4 vuqikr es dq.M iSank 0.79 4.40 4.40 15.20 97.00 5578.90 11134.84

lhesaV&ctjh feykdj dj tksMksa dks dq.M nhokj 3.14 4.40 5.05 69.77 48.60

dqjsnus rFkk rjkbZ lfgr 12 fe-eh- dq.M ckgj 3.14 5.10 0.60 9.61

dq.M Nr 20.22

114.79 o-eh-

9 lhesaV IykLVj nhokj ij 1%6 vuqikr es ik- nhokj 3.14 20.77 0.35 22.83 108.00 1109.35 2465.23

lhesaV&ctjh feykdj tksMksa dks dqjsnus 48.60

rFkk rjkbZ lfgr 20 fe-eh-A 22.83 o-eh-

10 Dosjh jfol ftles 40 izfr'kr iRFkj ds ik;rku 0.79 20.75 20.75 0.15 50.70 376.00 4608.79 17911.16

Liky gks ;k dØaj ;k ?kkaM+yk dks dq.M 0.79 5.10 5.10 0.15 3.06 96.75

dk;Z dk rdehuk

dk;Z dk foLrr fooj.k

Page 48: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

fcNkuk rFkk vkiwfÙkZ djuk] ikuh

fNM+duk rFkk nqjeqV ls dwVukA 47.64 ?k-eh-

11 <Ddu 1 la[;k 0.00 800.00

12 yhM pktZ o-eh-

ctjh 76 fdeh 13.20 ?k-eh- 3.00 2217.79

105 fxzV 76 fdeh 0.68 ?k-eh- 4.00 153.19

bZV fdeh 14.24 gtkj 0.00

Dosjh jfol 92 fdeh 57.16 ?k-eh- 3.00 12347.27

43362.89 188004.11

vkdfLed O;;A 637.11 1995.89

egk;ksx 44000.00 190000.00

Note %& mDr njsa iapk;r lfefr ywudj.klj chdkusj dh ch,lvkj (01-04-12 ls ykxw½ ls yh xbZ gSaA

J.EN.

(I W M P) (I W M P)

P.S. Lunkaransar

A.EN. ifj;kstuk izcU/kd

ftyk tyxzg.k fodkl bdkbZ

P.S. Lunkaransar ftyk ifj"kn] chdkusjA

W.D.T.

Engg.

IWMP-XXII

Page 49: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

dk;Z dk uke% lkoZtfud tydq.M fuekZ.k dk;Z

tyxzg.k {ks+= % chdkusj xxii ;kstuk % vkbZ-MCY;w-,e-ih-

dz l vk-la[;k vkbVe ekrzk bZdkbZ lhesaV ctjh 20feeh bZV ifV~V;k xzsoy bZV fxV~Vh

1 2 lh-lh-1%4%8 3.06 ?k-eh- 9.80 1.38 2.76

2 3 bZaVksa dh fpukb 30.11 ?k-eh- 32.82 6.99 14243

3 4 lh-lh-1%2%4 15.20 fdyks 4.74 0.33 0.68

4 5 yksgs dk xMZj 225.00 fdyks

5 6 ifê;kW 20.22 o-eh- 1.38 1.82 22.237

6 7 bZaV ds Hkofj;k 20.22 o-eh- 7.28 0.51 1.01

7 8 IykLVj 1%4 114.79 o-eh- 11.71 1.61

8 9 IykLVj 1%6 22.83 o-eh- 2.65 0.57

9 10 Dosjh jfol 47.64 ?k-eh- 57.163

10 11 <Ddu 1

dqy 70.39 13.20 0.68 14243 22.24 57.16 3.77

cSx ?k-eh- ?k-eh- la[;k o-eh- ?k-eh- ?k-eh-

lkexzh dh vko';drk

Page 50: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

dk;Z dk uke% lkoZtfud fMXxh fuekZ.k dk;Z ykxr 8-00 yk[k

tyxzg.k {ks+= % chdkusj xxii ;kstuk % vkbZ-MCY;w-,e-ih-

vk/kkj dh pkSMkbZ %& 14.5 eh- mij dh pkSMkbZ %& 26.50 eh-

vk/kkj dh yEckbZ %& 18 eh- mij dh yEckbZ %& 30.00 eh-

vk/kkj ij {ks=Qy %& 261 o-eh- mij dk {ks=Qy %& 795.00 o-eh-

dqy xgjkbZ %& 3 eh- e/;e pkSMkbZ %& 20.50 eh-

e/;e yEckbZ %& 24.00 eh-

e/;e ij {ks=Qy %& 492.00 o-eh-

fMXxh [kqnkbZ vk;ru %& 1512 ?k-eh-

dzl dk;Z dk fooj.k la[;k yEckbZ pkSMkbZ xgjkbZ ekrzk bZdkbZ nj Je jkf'k dqy jkf'k

1(1) uho][kkbZ]ijukyk esa 1-5eh xgjkbZ fMXxh 1512.00 124.75 195338.85 195338.85

rd feVVh dh [kqnkbZ djuk]ry dks ry nhokj 2 18.00 0.45 0.45 7.29 124.75

dwVuk]ikuh Mkyuk]cxy dks lokjuk ry nhokj 2 14.50 0.45 0.45 5.87

rFkk cph feVVh dkss 50eh nwjh rd mij dh nhokj 2 30.00 0.60 0.60 21.60

fuLrkj.k djukA mij dh nhokj 2 26.50 0.60 0.60 19.08

l[r feV~Vh esa ,d yhM lfgr 1565.84 ?k-eh-

1(2) ,d fyQ~V vfrfjDr dqy vk;ru dk 40 izfr'kr 626.34 11.00 6889.71 6889.71

626.34 ?k-eh- 11.00

2 lhesaV dadhV 1 lhesaV 4 ctjh rFkk dq.M 1 14.50 18.00 0.10 26.10 2353.00 9652.26 68295.83

8 fxVVh iRFkj dh 40 feeh ukHkh; ry nhokj 2 18.00 0.45 0.10 1.62 332.55

eki dh uho esa Mkyuk]dqVkbZ o rjkbZ ry nhokj 2 14.50 0.45 0.10 1.31

djukA 29.03 ?k-eh-

3 uhao rFkk dqlhZ esa izFke Js.kh bZaVksa dh ry nhokj 2 18.00 0.35 0.35 4.41 2772.00 26871.48 172425.33

fpukbZ lhesaV&ctjh 1%6 elkys esa] ry nhokj 2 14.50 0.35 0.35 3.55 432.00

mij dh nhokj 2 30.00 0.45 0.60 16.20

mij dh nhokj 2 26.50 0.45 0.60 14.31

mij dh nhokj 2 30.00 0.35 0.60 12.60

mij dh nhokj 2 26.50 0.35 0.60 11.13

62.20 ?k-eh-

4 izFke Js.kh dh lw[kh iV~V bZaV d.kZdkj fMXxh ryk 1 18.00 14.50 261262.00

69441.3 224612.6

esa Q'kZ 12 eh-eh- eksVs eM elkys ds <yku 2 24.00 6.70 321.6 81.00

Åij yxkuk rFkk tksM+ksa esa Hkjdj 2 20.50 6.70 274.7

Åij ls likV Vhi lhesaV elkys 1%3

esa Hkjuk A 857.30 o-eh-

5 lhesaV IykLVj nhokj ij 1%6 vuqikr es 857.30 108.00 49902.48 110894.40

lhesaV&ctjh feykdj tksMksa dks dqjsnus mij dh nhokj 2 30.00 1.50 90.00 48.60

rFkk rjkbZ lfgr 20 fe-eh-A mij dh nhokj 2 26.50 1.50 79.50

1026.80 o-eh-

6 yhM pktZ ctjh 76 68.42 ?k-eh- 3.00 11494.92

fxzV 76 26.12 ?k-eh- 4.00 5851.44

dk;Z dk rdehuk

dk;Z dk foLrr fooj.k

Page 51: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

bZV 0 63.71 gtkj 0.00

;ksx 358096.08 795803.08

7 vkdfLed O;;A 1903.92 4196.92

say 360000 800000

Note %& mDr njsa iapk;r lfefr ywudj.klj chdkusj dh ch,lvkj (01-04-12 ls ykxw½ ls yh xbZ gSaA

J.EN.

(I W M P) (I W M P)

P.S. Lunkaransar

W.D.T.

P.S. Lunkaransar ftyk ifj"kn] chdkusjA

A.EN. ifj;kstuk izcU/kd

ftyk tyxzg.k fodkl bdkbZ

Engg.

IWMP-XXII

Page 52: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

dk;Z dk uke% lkoZtfud fMXxh fuekZ.k dk;Z

tyxzg.k {ks+= % chdkusj XXii ;kstuk % vkbZ-MCY;w-,e-ih-

dz l vk-la[;k vkbVe ekrzk bZdkbZ lhesaV ctjh bZV iRFkj fxV~Vh

1 2 lh-lh-1%4%8 29.03 ?k-eh- 92.88 13.06 26.12

2 3 bZaVksa dh fpukb 62.20 ?k-eh- 67.80 14.43 29422

3 4 bZV [kajtk 857.30 o-eh- 22.46 15.26 34292

4 5 IykLVj 1%6 1026.80 o-eh- 119.31 25.67

dqy 302.46 68.42 63714 26.12

cSx ?k-eh- la[;k ?k-eh-

lkexzh dh vko';drk

Page 53: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

2- dk;Z LFky %& [kljk u- 1001@2 6- dk;Zdkjh laLFkk%&tyxzg.k lfefr tSriqj

3- tyxzg.k {ks+= % chdkusj xxii 7- {kS=Qy gS- esa %& 50

4- xzke iapk;r % tSriqj 8- Qsaflx dh dqy y- eh+- esa %& 4100

5- ;kstuk dk uke%&vkbZ-MCy;w-,e-ih- 9- izfr gS- ikS/kkjksi.k la[;k %& 400

Je dqy Je dqy

1 {ks= dk losZ ,oa lhekadu djuk gSDVj 50 44.55 71.55 2227.50 3577.50

2 vkj-lh-lh- Qsaflx iksLV 1-5 eh dh vkiwfrZ djuk ua- 820 0.00 227.46 0.00 186517.20

3 vkj-lh-lh- Qsaflx iksLV dh fjgSMfyax (1.37+6.57) ua- 820 1.37 7.94 1123.40 6510.80

4CykWDl dks ekSds ij vykbZUesaV esa [kMMk [kksndj

xkM+uk e; LFkkuh; <qykbZ e; fu'kkunsghua- 820 8.87 8.87 7273.40 7273.40

5

dkaVsnkj rkj [kksyuk] Qsykuk] f[kapuk rFkk ckbZfMax

ok;j@ uV cksYV }kjk dl dj fu/kkZfjr Nsn ij

cka/kuk@ dluk

eh- 16400 0.78 0.78 12792.00 12792.00

6ckbZfMax ok;j@ uV cksYV dz; e; ifjogu nj 11

xzk-@ iksy fd-xzk 45 0.00 60.00 0.00 2706.00

7ckjoMZ ok;j dz; nj ¼ 7 eh- izfr fdyksxzke½ 12 ls

14 xst 10 lS-eh- ij ckjoMZfd-xzk 2343 0.00 54.00 0.00 126514.29

8

iqjkus rkj ls ;k LFkkuh; :i ls miyC/k >kfM+;ksa

¼dkaVsnkj ½ls baVjysaflx djuk nj ¼5$4-10½@2

=4.6/RMT

eh- 6150 3.59 3.59 22078.50 22078.50

9ikS/ks [kjhnuk ¼ 12 ekgh½ 10 izfr'kr vfrjfDr e;

ifjoguua- 22000 0.00 10.00 0.00 220000.00

1020 izfr'kr xSi fQfyax gsrq ikS/ks [kjhnuk ¼ 12 ekgh½

10 izfr'kr vfrjfDr e; ifjoguua- 4400 0.00 10.00 0.00 44000.00

11 ikS/kk jksi.k gsrq [kMMk [kksnus gsrq fu'kkunsgh ua- 20000 0.55 0.55 11000.00 11000.00

12 lk/kkj.k feVVh es [kM~Ms [kksnuk¼45x45x45 cm½ ua- 20000 6.10 6.10 122000.00 122000.00

13xSi fQfyx gsrq lk/kkj.k feVVh es [kM~Ms

[kksnuk¼45x45x45 cm½ 20 izfr'krua- 4000 3.05 3.05 12200.00 12200.00

14ikS/kks dh LFkkuh; <qykbZ o leLr mipkj dj ikS/kk

yxkukua- 20000 3.00 3.00 60000.00 60000.00

15xSi fQfyx gsrq ikS/kks dh LFkkuh; <qykbZ o leLr

mipkj dj ikS/kk yxkukua- 4000 3.00 3.00 12000.00 12000.00

foLr`r rdehuk

1- dk;Z dk uke%&ikS/kkjksi.k dk;Z xkspj Hkwfe

dk;Z dk foLr`r fooj.k

dz-l- dk;Z fooj.k bZdkbZ ek=knj jkf'k

Page 54: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

16 ikS/kksa dk (3+3+3+2+1) ckj Fkkoyk l 240000 1.80 1.80 432000.00 432000.00

17ikS/kksa dks 15 yhVj izfr ikS/kks ikuh nsuk 3 fdeh nwjh

rdA dqy 26 ckj (6+6+6+4+4)l 520000 1.80 2.07 936000.00 1076400.00

18ikS/kksa dh 15 ls-eh xgjkbZ o 45 ls-eh- v)ZO;kl esa

la;qDr fujkbZ xqM+kbZ djuk 8 ckj ua- 160000 1.20 1.20 192000.00 192000.00

19 ikuh ,df=dj.k gsrq Vkdka fuekZ.k ua- 8 56000.00 190000.00 448000.00 1520000.00

20 dsVy xkMZ gV fuekZ.k dk;Z ua- 1 10000.00 20000.00 10000.00 20000.00

21 o`{kkjksi.k xsV o lkbZu cksMZ fuekZ.k ua- 1 2000.00 5000.00 2000.00 5000.00

22 dhVuk'kd o [kkn dz; e; ifjogu ua- 1 0.00 15000.00 0.00 15000.00

23 lqj{kk ,oa ns[kHkky dk;Z 2 pkSdhnkj ekg 48 9100.00 9100.00 436800.00 436800.00

24

ikS/kksa dks ikys] yw ,oa i'kqvksa ls lqj{kk gsrq 60 ls-eh

O;kl esa o ,d ehVj mapkbZ ds >ksaiksa LFkkuh; >kfM+;ksa

ls cukuk

ua- 20000 2.66 4.44 53200.00 88800.00

25 ikS/kksa dh 1@3 Hkkx rd iwzqfuax djukA 3 ckj l 60000 1.11 1.11 66600.00 66600.00

26 Qsflax ejEer 3 ckj l 3 3000.00 10000.00 9000.00 30000.00

27/kke.k@lsou cht dher 6 fdyks izfr gSDVj izfr

Kg 300 0.00 38.00 0.00 11400.00

28/kke.k@lsou cht ifjogu izfr

Kg 300 0.00 0.60 0.00 180.00

29

?kkl@lsou cht dh xksfy;ka cht] [kkn] ckyw ,oa

fpduh] nqeV feV~Vh esa 1% 2% 2% 2 ds vuqikr esa

feykdj cukuk¼QksjsLV ch,lvkj½

izfr

Kg 300 0.00 24.06 0.00 7218.00

30/kke.k@lsou ds cht dh xksfy;ka fMcfyax }kjk cksuk gSDVj

50 0.00 276.75 0.00 13837.50

2848294.80 4764405.19

vkdfLed O;; 151705.20 71594.81

3000000.00 4836000.00

Say 3000000 4836000

Note : mDr njsa ftyk ifj’kn ¼xkzeh.k fodkl izdks’B½ chdkusj dh ¼ch,lvkj 01-04-11½ Note %& mDr njsa iapk;r lfefr ywudj.klj chdkusj dh ch,lvkj (01-04-12 ls ykxw) ls

,oa eq[; ou laj{k.k vkbZth,uih] chdkusj dh ch,lvkj ls yh xbZ gSA

W.D.T.

J.EN. A.EN.

(I W M P) (I W M P)

P.S. Lunkaransar

ftyk tyxzg.k fodkl bdkbZ

P.S. Lunkaransar ftyk ifj"kn] chdkusjA

(Agri.)

IWMP-XXII

ifj;kstuk izcU/kd

Page 55: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

MODEL ESTIMATE

Agro forestry Plantation

S.

N.

ITEM NO. QTY RATE AMOUNT

1. Digging of pits in ordinary soil of size

0.45 x 0.45 x 0.45m

150 150 5.00 750.00

2. Planting of Plant including local

transportation of plant up to pit

150 150 3.00 450.00

3. Weading & Hoeing up to 15 cum depth

in thawala of 0.45 cum radius

150 X

2

300 1.30 390.00

4. Watering to plants (15 lit. per plant) on

availability of water in planting area or

providing water

150 x

6

900 1.30 1170.00

5. Cost of Plant (As per Forest

Department)

150 150 5.00 750.00

TOTAL 3705.00

çfr ikS/kk Hkqxrku #i, 24-70

35% Rate increase as forest B.S.R. 8.65 _____ 33.35 Say Rs. 33.00 Per plant - _____

W.D.T.

(Agri.)

IWMP-XXII

J.EN.

A.EN.

ifj;kstuk izcU/kd

ftyk tyxzg.k fodkl bdkbZ

P.S. Lunkaransar P.S. Lunkaransar ftyk ifj"kn] chdkusjA

Page 56: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Model Estimate

ARID HORTICULTURE

S.N. Item Qty RATE AMOUNT

1. Digging of pits in ordinary soil (0.6 x 0.6 x 0.6 mtr.)

10.216 Cum

56 12.09

2. Planting of plants including filling of earth & remming of soil

1 5 5.00

3. Hoeing work for breaking of capillary actionafter watering

2 1.30 2.60

4. Treatment of pit with insecticide including cost of insecticide

1 5.00 5.00

5. Watering of plant including transportation 25 Lit.

12 1.50 18.00

6. Cost of plant (av.cost of horticuliture plants) including transportation

1 15 15.00

7. Transportation of Plant with Avg. lead 40 km,

1 2 2.00

8. Watch and ward of plant 1 3 3.00

9. Preparation of Basin 1 1.30 1.30

TOTAL 63.99

SAY RS. 64.00 35% Rate increase as forest B.S.R. 22.40

_________

86.40

Say Rs. 86.00 per plant

W.D.T.

(Agri.)

IWMP-XXII

J.EN.

A.EN.

ifj;kstuk izcU/kd

ftyk tyxzg.k fodkl bdkbZ

P.S. Lunkaransar P.S. Lunkaransar ftyk ifj"kn] chdkusjA

Page 57: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

dkcZfud [ksrh ¼usMsi dEiksLV fiV½

Ø-

la-

fooj.k ek=k bdkbZ nj jkf'k

1- xkao esa 1-50 ehVj xgjkbZ rd l[r

feVVh dh [qknkbZ] ry dks dwnuk] cxy

cxy dks lgh djuk] uhao dh [kkyh

dks okil feVVh ls Hkjuk ,oa cph gqbZ

feVVh dks 50 ehVj dh nwjh rd gVkus

dk dk;Z

1.780 çfr ?ku

ehVj

75/- 133.5

2- fiV ds iSans ,oa uhao esa 1%4%8 ¼lhesUV]

ctjh] fxV~Vh½ dk dadjhV Mkyuk]

ftlesa 40 feeh vkdkj ds iRFkj dh

fxV~Vh gks rFkk rjkbZ ,oa dqVkbZ dk;Z

1.780 çfr ?ku

ehVj

1970/- 3506.6

3- vf/kjpuk esa bZaV dh pqukbZ dk dk;Z 75

oxZ uki ls 1%6 ¼lhesUV%ctjh½ esa

2.09 çfr ?ku

ehVj

2164/- 4522.76

4- lhesUV dadjhV 1%2%4

¼lhesUV%ctjh%feV~Vh½ dh nhokjksa dh

dksfiax] fdukjksa dks xksyjuk bR;kfn dk

dk;Z 50 feeh eksVkbZ esa] 20 feeh

fxV~Vh dk uki lfgr

2.60 çfr ?ku

ehVj

187.65 487.89

5- lkexzh dk ifjogu ¼vuqekfur½ 1350/-

;ksx 10000.75

çfr usMsi dEiksLV fiV #i;s 10,000.00

W.D.T.

(Engg.)

IWMP-XXII

J.EN.

A.EN.

ifj;kstuk izcU/kd

ftyk tyxzg.k fodkl bdkbZ

P.S. Lunkaransar P.S. Lunkaransar ftyk ifj"kn] chdkusjA

Page 58: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

cktjk izfr bdkbZ ykxr ¼0-25½

vknku ek=k nj ¼vuqekfur½ vuqekfur jkf'k

cht 0.94 40 30

moZjd 0 0 0 Mh-,-ih- 16.25 690 per Bag 169.75 ;wfj;k 10 349 per Bag. 55.50

dYpj iSdsV 25 10 per beg 20.63 iks-l- jlk;u 156.25

egk;ksx 432.43

Xokj izfr izn'kZu bdkbZ ykxr ¼0-25 gS½

vknku ek=k nj ¼vuqekfur½ vuqekfur jkf'k

cht 5 23.75 95 moZjd 0 0 0 Mh-,-ih- 225 12.5 234.90

dYpj iSdsV 2.5 12.5 20 iks-l- jlk;u 187.5

;ksx 537.40

eksB izfr izn'kZu bdkbZ ykxr ¼0-25 gS½

vknku ek=k nj ¼vuqekfur½ vuqekfur jkf'k

cht 3.75 Kg. 37.5 112.50 moZjd - - - Mh-,-ih- 22.5 Kg 12.5 225

dYpj iSdsV 2.5 20.5 20.62 iks-l- jlk;u 162.50

;ksx 520.62

W.D.T.

(Agri.)

IWMP-XXII

J.EN.

A.EN.

ifj;kstuk izcU/kd

ftyk tyxzg.k fodkl bdkbZ

P.S. Lunkaransar P.S. Lunkaransar ftyk ifj"kn] chdkusjA

Page 59: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

J.EN.

A.EN.

ifj;kstuk izcU/kd

ftyk tyxzg.k fodkl bdkbZ

usMsi dEiksLV fiV Iyku ,oa vuqizLr dkV

A'A' ij vuqizLr dkV

Page 60: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

P.S. Lunkaransar P.S. Lunkaransar ftyk ifj"kn] chdkusjA

Sockage-Well Plan

Page 61: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

dz-l- [krkSuh uEcj [kkrsnkj e; firk dk uke [kljk ua-{ks=Qy

¼ch?kk½

ty dq.M

dh la[;k

dEiksLV

fiV~l

95 16.08

114 107.06

117 7.17

127 4.05

147 10.05

149 5.15

152 0.01

153/2 2.18

164 18.08

166 7.19

168 17.05

175 36.18

180 10.09

193 8.04

200 22.15

207 0.10

212 6.00

260/2688 13.02

262 7.00

263 0.14

270 6.15

283 3.02

286 4.08

305/1872 10.00

419 19.16

424 5.15

425/1985 50.00

427 5.07

429 16.12

444 0.02

448 1.05

453 7.12

464 5.06

466 0.10

468 0.07

505 3.00

522 5.16

560 2.08

564/2056 2.19

568 42.12

592 4.12

597 21.00

614 37.17

616 4.10

621 7.09

632 10.06

634 0.10

640 16.00

647 7.17

652 0.08

654 0.02

663 6.15

vjkthjkt dz-l-

vjkthjkt

11

ykHkkfFkZ;ksa dh lwph e; izLrkfor dk;Z tyxzg.k lfefr

& tSriqjtyxzg.k {ks= & chdkusj XXII xzzke & tSriqj

Page 62: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

664 1.15

668 6.00

677 1.00

680 1.00

684 2.02

692 12.10

698 18.04

702 1.05

705 7.05

731 3.09

737 18.18

753 7.10

582 3.16

3 xkspj ¼fg- 1@2 tyxzg.k ds fy, ½ 1001/2 384.00

161 1.06

162 17.00

175/1686 2.10

269 19.14

565 1.05

566 43.18

569 45.00

579 69.10

613 16.12

711 5.01

710 1.00

dz-l-[krkSuh

uEcj[kkrsnkj e; firk dk uke [kljk ua-

{ks=Qy

¼ch?kk½

ty dq.M

dh la[;k

dEiksLV

fiV~l

124 2.00

411/1968 35.00

625 7.04

6 3 v.krqjke oYn th;kjke dkSe uk;d 108 20.14 1 1

7 4 vejflag oYn jsMkjke dkSe yqgkj 724 49.00 1 1

8 5 vejkjke oYn iUukjke czkgEe.k 501 33.10 1 1

9 6 ve:jke oYn Qwlkjke dkSe Mkdksr 677/2727 26.00 1 1

181 11.16

184 26.04

275 18.02

11 8vyh eksgEen oYn futkeqnhu dkSe

eqlyeku713/2120 15.00 1 1

722 14.18

723 14.09

84 18.10

86/1 23.14

469 20.00

500 5.00

143 0.04

144/1 30.00

645 7.07

647/1 2.13

647/2098 30.00

17 17vk;'kk iRuh Lo- xQwjnhu dkSe

eqlyeku200/1 40.00 1 1

18 18vkjhQ oYn lyke~nhu fclk;rh dqjS'kh

dkSe eqlyeku183/1 20.00

260/1848/

225.00

260/1849/

22.10

1 1

1 1

1 1

1 1

1 1

1 1

vkjhQ oYn lyke~nhu dkSe dqjS'kh

vkRekjke oYn gtkjhjke dkSe tkV

vjkthjkt

11

1516

1114

v'kksd dqekj oYn cnzhukjk;.k dkSe

fcgk.kh

flok; pd ukdkfcy dk'r 'ke'kku2

1315

25

vyh'ksj oYn ltokj [kka dkSe

eqlyeku

vyh eksgEen oYn lqyseku dkSe

eqlyeku

vyh eksgEen] djhe cDl fi-futkeqnhu

dkSe eqlyeku

1919

vdh nsoh iRuh Lo- nhipan] Nxuyky]

ekaxhjke] ?ku';ke] tsBeky] fyPNkek]

izsek nsoh] Hkaojh] firk nhipan dkSe ekSnh

ve:jkjke] lksguyky] nsohyky]

xkSjh'kadj] T;k.kh] lR;ukjk;.k]

ckykjke fi- Qwlkjke dkSe Mkdksr

710

12 9

1013

flok; pd ukdk fcy dk'r vkxksj4

Page 63: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

469/1 9.06

500/1 14.14

21 21vk'kk ekSgEen oYn ltokj [kka dkSe

eqlyeku444/1995 20.00 1 1

22 22 vk'kkjke iq= Hkkstkjkr tkfr dqEgkj 608 12.18

23 23 vk'khjke oYn [kqcpan dkSe ;kno 448/2005 40.00 1 1

24 25 vk'kkjke oYn /kwMkjke dkSe tkV 583/2849 42.00 1 1

25 26 vk'kkjke oYn Hkknjjke dkSe fNEik 650 11.07

26 27 vk'kkjke oYn yk/kwjke dkSe es?koa'kh 438 13.02 1 1

519 59.17

523 3.00

536/1990 12.00

28 29 bUnzpan oYn eksgujke dkSe czkgEe.k 506 12.14 1 1

29 30

bUnzkt oYn Jo.kjke] xqM~Mh] xkSjk]

lkfo=h] foeyk] pkoyh] iqf=;ka Jo.kjke

dkSe uk;d

564/2050 10.00 1 1

30 32

bejrh iRuh Lo- th;kjke 1@4 fg-

Hkkstkjke] ekejkt] dkywjke firk

vejkjke 1@4 fg- Nxukjke] v.krqjke

firk th;kjke 2@4 fg- dkSe uk;d

538/2032 15.00 1 1

207/1 20.00

263/1 15.00

283/1 15.00

32 35bYewnhu oYn uwj eksgEen vkfjQ oYn

lykewnhu tkfr fclk;rh260/1845 25.00

33 36 b'kjjke oYn pkS[kkjke dkSe ckojh 640/2726 75.00 1 1

34 37bZ'ojpan] xksfoUnjke] eqdukjke fi-

lkxjey tkfr czkgEe.k589 22.12

35 38 bZ'ojjke oYn yk?kwjke dkSe tkV 614/7 25.13 1 1

36 39bZ'kekby [kka oYn gkdevyh oYn

Mkj[kk tkfr eqlyeku411/1971 15.00 1 1

37 40

mdkjjke] 'kkarkjke] irjke fi-

eqjyhjke 3@4 fg- cychjks iRuh Lo-

lqYrku] d".kdqekj] galjkt] bUnzknsoh]

jk.kh nsoh] lquhrk nsoh] d".kk nsoh firk

lqYrku 1@4 fg- dkSe ;kno

659 28.01 1 1

38 42 mn;iky oYn th;kjke dkSe tkV 96 20.00

39 43 mnkjke oYn nqykjke dkSe tkV 616/2720 36.18 1 1

138/1798 30.00

614/5 7.10

41 45 vkSadkj oYn jkeukjk;.k dkSe ekgs'ojh 136 19.07 1 1

651 10.16

662 20.12

43 47

vkseizdk'k] dklhjke fi- Qwlkjke]

guqeku iq= ctyky 1@2 fg-

vkseizdk'k] osnizdk'k] cuokjh]

pku.kjke] Mkywjke] n;kjke fi- euhjke

1@2 fg- tkfr tkV

650/1 25.00

44 48vkseizdk'k] t;izdk'k] lR;izdk'k fi-

lqjtkjke dkSe vghj539/1 48.04

45 50vkseizdk'k oYn jkepanz lqFkkj 1@3 fg-

';ksiky jkepanz fi- uhdwjke dkSe lqFkkj141 29.11

46 52 vkseizdk'k oYn ys[kjke dkSe tkV 411/1975 25.00 1 1

47 53 vkseizdk'k oYn gsrjke dkSe czkgEe.k 568/2062 40.00 1 1

1 1

1 1

1 1

1 12020

2827

behpan oYn galjkt dkSe es?koky

vkf'kd vyh oYn ltokj [kka dkSe

eqlyeku

bUnzpan oYn ewypan dkSe egktu

mnkjke oYn Hkk:jke dkSe es?koa'kh

3331

4440

vkSadkjjke] fgEerkjke firk [ksepan

1@2 fg-] lkaorjke] lqYrkujke fi-

eqjyhjke 1@2 fg- dkSe ;kno

4642

Page 64: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

48 54 vkseizdk'k oYn ukuwjke tkfr tkV754/2167/

210.00

49 55vkseizdk'k] ykypan] iFohjkt] Hkknjkjke

fi- [ksrkjke dkSe czkgEe.k526/2027 23.16 1 1

50 56

deyk iRuh Lo- xtkuUn] Hkaojyky]

dsljhpan] nzksinh] ykypan alaryky fi-

xtkuUn dkSe czkgEe.k

757/2135 50.00 1 1

51 58djhe cDl oYn futkenhu dkSe

eqlyeku

713/2120/

115.00 1 1

52 59dykorh iRuh Lo- iqj[kkjke] larks"k]

dkukjke] xksihjke] dsljkjke] :[ke.kh

fi- iqj[kkjke dkSe tkV

138/2675 25.00

53 60 dykorh iRuh Lo- guqeku tkfr tkV 583/2074 15.00

54 61

dfork daoj iRuh Lo- nqysflag]

Hkxokuflag] mesnflag] fo'kkyflag]

xkssfoUnflag fi- nqysflag 1@4 fg-

lqxudaoj iRu Hkqjflag 1@4 fg- eaxst

daoh iRuh Hkwjflag 1@2 fg- dkSe

jktiqr

409/1 4.17 1 1

488 10.06

493 5.02

504 14.09

56 63 dkukjke oYn uRFkkjke dkSe es?koa'kh 538/2038 30.00 1 1

57 64 dkukjke oYn uRFkqjke dkSe es?koa'kh 467/2 19.14 1 1

735 21.15

737/1 5.00

59 66 dkukjke oYn lksguyky dkSe dqEgkj 652/5 28.12

426 10.10

427/1986 1.10

431 23.12

432 8.00

494/2019 20.00

525 2.13

702/1 26.00

705/2 25.00

62 69 dkuhjke oYn ekukjke dkSe tkV 287 4.04 1 1

661 3.15

742 11.02

64 76fdluh iRuh Lo- jkorey dkSe

czkgEe.k698/2729 25.00 1 1

65 77 fd'kksjpan iq= Nksxkjke tkfr jsxj 702/2114 30.00 1 1

478/2717 4.07

482 7.02

67 79 dqaHkkjke oYn rstkjke dkSe tkV 614/2723 25.00 1 1

189/1820 20.00

264 16.16

264/1661 14.08

641 2.00

642 32.02

643 40.13

70 82d".kyky rkjkpan fi- jkepanz dkSe

czkgEe.k697 24.09

629 23.06

633 6.04

72 86 dsljke oYn tSlkjke dkSe tkV 114/2670 12.17 1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

dkukjke oYn x.kirjke 1@2 fg-

nqykjke oYn pkankjke 1@2 fg- dkSe

czkgEe.k

dkuhjke oYn t;ukjk;.k dkSe lqukj

dq'kkykjke iq= [ksekjke dkSe xqjMk

6255

dkukjke oYn csxkjke6558

dkuhjke oYn x.kirjke dkSe czkgEe.k6760

6861

fdlukjke] dkukjke fi- vkSadkjjke dkSe

vfgj7563

fdLrqjh iRuh Lo- lghjke] iFohjke]

eksguyky] x.kir] jkeflag] ykypan fi-

lghjke fo|k] xqMMh] pkoyh] lhek

iqf=;ka lghjke dkSe es?koa'kh

7866

80

d".kpanz oYn isekjke] HkkxhjFk oYn

Mwaxjjke] j/kqohj oYn jkejj[k dkSe

tkV

81

d".kyky y{ehukjk;.k fi- izselq[k

tkfr czkgEe.k83

68

69

71

Page 65: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

122/1796 24.05

130 30.15

74 88dksMkey fxj/kkjhyky fi- ykypan dkSe

egs'ojh137 11.19 1 1

75 89dkS'kY;k nsoh iRuh bUnzkt jke dkSe

tkV705/3 20.00

76 90dkS'kY;k nsoh iRuh jkedj.k dkSe

czkgEe.k568/2060 20.00 1 1

434 10.00

435/1989 6.00

476 0.16

78 92 f[k;kjke oYn eksVkjke dkSe es?koky 556/3 25.00 1 1

671 10.07

732 16.01

733 1.11

80 94[kqek.kkjke fxj/kkjhjke jkepanz eq[kjke

fi- f'kodj.k dkSe xqlkabZ411/1972 20.00

81 95 [ksekjke oYn eksVkjke dkSe es?koky 106 23.08

82 96

[;kyhjke jkepanz fi- lqjtey 2@3 fg-

yyhrdqekj nyhidqekj fi-

y{ehukjk;.k 1@3 fg- dkSe egs'ojh

606 26.02 1 1

83 97 [;kyhjke oYn chjcyjke dkSe tkV 706 32.04 1 1

84 98 [;kyhjke oYn euQwyjke dkSe dqEgkj 512 7.19

85 99 [;kyhjke oYn jkepanz dkSe es?koa'kh 555 29.02

86 100 x.kirjke oYn [;kyhjke dkSe tkV 718 11.07

87 101

x.kh bdcky guhQk jks'kuh lbZnk

gfyek fi- egj[kk ';kek iRuh Lo-

gj[kkjke dkSe eqlyeku

599 62.15 1 1

444/1991/

314.00

452/3 26.06

89 103 xgkMw oYn x.ks'kkjke dkSe es?koky 153/4 26.08 1 1

507/2023 11.12

508 23.08

713 64.13

731/1 3.10

673 4.00

674 4.10

713/2122 20.00

716 32.07

93 107

xhrk nsoh iRuh Lo- nqyhpan] txnh'k

izlkn] jkedqekj] egkohj izlkn fi-

nqyhpan iq"ik] foeyk] jkek iqf=;ka

nqyhpan czkgEe.k

529/2 11.06 1 1

94 108

xqM~Mh iRuh Lo- 'kadj] xqykch] lksek]

>.Mwkjke]uhdwjke] xksfoUnjke] iq=

iqf=;k 'kadj dkSe esgrj

564/2048 40.00

95 109 xqekuflag oYn esgrkcflag dkSe jktiqr 753/2132 20.00 1 1

96 110 xqekukjke fi- gj[kkjke dkSe tkV 702/2112 20.00 1 1

97 111xqjpj.k flag xqjeSyflag fi- djrkjflag

iq= eyflag tkfr dqEgkj fl[k160/2 20.00

260/1846 50.00

1 1

1 1

1 1

1 1

[kkupan oYn jkepanz tkfr dEckst

xhrk iRuh Lo- guqeku 17@50 fg

}kjdk izlkn] cztyky] :de.kh]

Hkxorh firk guqeku 4@25 fg- foeyk

iRuh Lo- ekaxhyky 1@3 fg- HkkxhjFk]

jkds'k] :dek] lqeu] fdluh fi-

ekaxhyky 1@6 fg- dkSe czkgEe.k

91

92

98

90

dsljke oYn cLrhjke dkSe uk;d87

91

[kqek.kpan oYn gjdpan dkSe y[kksfV;k93

xQqj [kka oYn eksgEen [kka dkSe

eqlyeku102

fxjnkojh iRuh f'k'kiky] lqykspuk iRuh

txnh'k tkfr tkV104

105

xhrk iRuh Lo- /kUukjke HkkxhjFk]

lR;ukjk;.k] lq'khy dqekj] cqykdh]

egkohj] fo|k] fi- /kUukjke dkse

czkgEe.k

106

xqjtVflag lq[ktV flag fi- bUnzflag

dkSe tVfl[k112

73

77

79

88

Page 66: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

268 17.00

99 113xq:n;kyflag djrkjflag fi- bUnz flag

dkSe fl[k409 70.12

495 3.06

496/2020 50.00

101 115 xqykc oYn Hkk:jke dkSe es?koa'kh 614/2086 30.00 1 1

102 116xqykcvyh oYn xQwj [kkau dkSe

eqlyeku444/1992 13.00 1 1

103 117xqyke djhn nrd iq= lkgch dkSe

eqlyeku424/1980 40.00 1 1

104 118 xqykedkanj oYn vgenk dkSe eqlyeku 444/2002 20.00 1 1

105 119xqjn;ky gjthjke fi- pkSykjke dkSe

dqEgkj114/1782 20.00

585 5.10

755 42.12

107 123 xksiky oYn txukFk dkSe dqEgkj 153/1803 20.00 1 1

108 125 xksiky oYn ukjk;.k dkSe jktiqr 165 9.01 1 1

167 7.12

208/1 10.00

561 7.05

562 1.09

564/2052 20.00

110 127xksikyjke] [;kyhjke fi- jkepanz dkSe

es?koa'kh556/2042 15.00

111 129 xksikyjke oYn jkepanz dkSe es?koa'kh 555/1 29.02

112 130 xksihjke oYn ykypan tkfr tkV 680/2 19.00

113 131

xkSjT;k nsoh iRuh Lo- gfjizlkn

egs'kdqekj dapu nsoh iq= iq=h

gfjizlkn dkSe fcgk.kh

260/1845/

225.00 1 1

114 133 xkSjh'kadj oYn f'koukjk;.k dkSe eq?kMk 514 48.14 1 1

115 134 xksfoUn oYn cHkwrk dkS njksxk 746 5.19 1 1

116 135 ?ku';ke oYn eksguyky dkSe fcgk.kh 602 33.16 1 1

289 22.03

407 20.00

118 137

pUnzdqekj izeksn yfyr lqthr fi-

lR;ukjk;.k o xk;=h iRuh Lo-

lR;ukjk;.k dkSe egktu

713/2127 41.12 1 1

119 138 panzorh iRuh Hkknjjke tkfr lqFkkj 583/2075 30.00 1 1

200 140 pknk oYn cHkwrk dkSe njksxk 746/1 4.15 1 1

201 141 fpeuyky oYn eq[kjke dkSe Nhaik 164/1 5.04

177 26.00

190/1812 6.00

191 0.01

193/1813 3.00

203 143 pheukjke oYn cLrhjke dkSe uk;d 634/1 42.00 1 1

204 144

pkSek iRuh Lo- lqjtkjke o Fkkukjke]

dkukjke] ckcqyky fi- lqjtkjke dkSe

uk;d

404/1964 76.18 1 1

109 19.08

109/1688 10.00

206 148 pkSFkqjke oYn psrujke dkSe xokfj;k 616/1 25.10 1 1

207 149 Nxuyky iq= cLrhjke tkfr czkgEe.k 638/1 12.10 1 1

208 150 Nxuyky oYn th;kjkr dkSe uk;d 138/2835 25.00 1 1

1 1

1 1

1 1

1 1

fpjkaxnhu oYn eqckjdnhu dkSe

eqlyeku

xksnkojh iRuh xaxkizlkn dkSe czkgEe.k

98

100

106

109

117

202

205

pUnwjke oYn txqjke tkfr lkalh

xqjtVflag lq[ktV flag fi- bUnzflag

dkSe tVfl[k112

xqytkjh oYn jkethyky dkSe dqEgkj114

120

xksiky oYn ';ksukFk dkSe rkjx126

pquhyky] vkseizdk'k txnh'k fi-

euhjke dkSe tkV145

142

136

Page 67: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

209 151 Nsykjke oYn jSgkjke dqEgkj 139 15.09 1 1

210 152 Nksxkjke oYn Hkh[kkjke dkSe es?koa'kh 597/2083 27.00 1 1

200/1821 15.00

211 23.00

291 3.10

212 155 txnh'k oYn mekjke dkSe tkV 757 23.10

213 156txnh'k oYn mekjke dkSe tkV o

y{eh nsoh iRuh n;kjke dkSe tkV713/2128 30.00

95/1775 9.05

116/1791 15.15

116/1792 18.04

117/1793 3.08

544 40.00

561 33.13

216 159

txnh'k oYn gjQwyjke oYn

chjcyjke lksguyky oYn lkgcjke

dkSe tkV

702/2731 27.00

546 16.10

548/2041 15.00

690 19.05

691 22.08

218 161txnh'k izlkn oYn nokjke dkSe

czkgEe.k406 15.00

219 163 txukFk oYn fryksdkjke dkSe dqEgkj 150 39.00 1 1

220 164 txukFk oYn jkexksiky czkgEe.k 681 19.14 1 1

221 165 txeky oYn tks/kkjke dkSe dqEgkj 583/2069 40.00 1 1

222 166 txekyflag oYn lkywflag dkSe jktiqr 614/1 25.00 1 1

198 10.10

265/1 4.06

677/1 25.00

684/1 25.00

411/1967/

215.02

414/2 7.11

535/2030 13.00

1 1

1 1

1 1

1 1txnh'k oYn es?kkjke dkSe rkjx

txnh'k oYn uUnyky dkSe czkgEe.k

t;ukjk;.k iq= es?knkl dkSe cSjkxh

tx:iflag oYn tho.kflag tkfr etch

txnh'k izlkn o Jhjke fi- es?kkjke

dkSe rkjx

teuk iRuh Lo- lq[kjke] dykorh]

pku.kjke] [;kyhjke xhrk fi- lq[kjke

dkSe es?koky

215

217

223

224

225

211

214

txnh'k] eksguyky fi- ys[kjke]

';ksukjk;.k iq= nsohyky lqjsUnz dqekj

iq= nyhpan tkfr tkV

157

169

170

158

160

167

154

Page 68: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

640/1 25.00

640/2096 25.00

600 19.06

602/1 5.14

228 173

tljke oYn ys[kkjke dkSe dqEgkj

1@2 fg- jktkjke oYn ys[kjke 1@2

fg- dkSe dqEgkj

601 44.02 1 1

652/2106 60.00

653 16.10

230 177tkudhizlkn oYn :?kukFk dkSe

isMhoky652/2104 25.00 1 1

231 179 tqxynkl oYn ek?knkl dkSe cSjkxh 414/1 21.00 1 1

232 180 tqxyflag iq= vklqflag dkSe jktiqr 260/1853 30.00 1 1

233 181 tsBkjke oYn uRFkqjke dkSe dqEgkj 699 19.12 1 1

234 182 tsBh iRuh Lo- cn: dkSe czkgEe.k 741 12.08 1 1

235 183 tSrk iq=h Hkh;kjke dkSe rkjx 274 15.01 1 1

194 17.15

213/1 13.07

292 11.08

114/1784 30.00

175/1804 10.00

238 187tSlk] jkes'oj txnh'k lqjtk fi-

x.kir dkSe Mkdksr491 7.01 1 1

239 188

tSrqu iRuh Lo- uwjnhu o T;kueksgEen

ewerkt vyh] lgh eksgEen berkt

vyh fi- uwj eksgEen 1@2 fg- cfgc o

egjnhu oYn bykcDl 1@2 fg- dkSe

eqlyeku

112 10.18 1 1

240 189 tSlk oYn thjkt dkSe jktiqr 752 21.00 1 1

163 4.15

166/1663 12.17

172 8.05

203 13.14

521 24.05

522/2024 40.00

243 192T;iku nsoh iq=h pquhjke thtk Hkwjpan

dkSe dqEgkj448/2003 25.00

422 14.19

423 16.14

424/1982 42.00

245 194>Suk csxe iRuh mLrkn vyh iq= Qjhn

[kka dkSe eqlyeku403 25.00 1 1

535/2028 6.07

536 13.16

305/1870 30.00

564/2051 20.00

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

tlkSnk iq=h ykgk vuh iRuh Lo-

_f"kdsa'k dkSe czkgEe.k

236

237

241

242

244

246

247

226

227

229

Mkynkl oYn HkkxhjFk nkl dkSe cSjkxh195

Mkykjke oYn lktujke dkSe uk;d196

thrjke jkeyky fi- dq'kkyjke dkSe

tkV191

T;kuh iRuh Lo- gsrjke o jruyky]

vkseizdk'k] jkts'kdqekj fi- gsrjke 4@5

fg- o yyhrk iRuh Lo- egkohj dSyk'k

iq= egkohj 1@5 fg- dkSe czkgEe.k

193

tsur iRuh Lo- byenhu lQh eksgEen

[kq'kh eksgEen jQhd] ulhj fi-

byenhu dkSe eqlyeku

186

tksxh iRuh Lo- :ik o cSxkjke

pku.key jktsjke fi- :ikjke dkSe

dqEgkj

190

tSrqu iq= xuh [kka 1@2 fg- cjdr

eq[r;kj vklh cnjh fi- vCnqy [kka

1@2 fg- dkse eqlyeku

185

t;flag oYn gjnokjhjke dkSe tkV172

t;eyjke] nkSyrjke fi0 ekupan 1@2

fg- ekthjke oYn irjke 1@2 fg- dkSe

tkV

171

176

Page 69: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

433 34.12

475 26.04

476/1 10.05

478/2015 8.16

249 200rqyNkjke oYn fgEerkjke o ltuk

iq=h fgEerkjek dkSe rkjx267 23.16 1 1

250 202

rqyNhflag dkdflag taxhj flag Qdhj

flag fi- eqa'khflag xq:n;kyflag oYn

eq[kflag o ikyflag oYn iw.kZflag dkSe

fl[k

445 79.15 1 1

251 203 rstkjke oYn Hkh;kjke dkSe es?koa'kh 114/1781 20.00 1 1

622 4.06

638/2 24.09

273 20.12

401 9.10

128/2836 25.00

280 35.09

605 10.00

605/1681 26.08

635 5.02

636 26.01

147/1800 10.00

149/1801 10.00

153/1802 10.00

258 210

nyhidqekj cuokjhyky lksguyky fi-

lqyrkukjke] lqyrkukjke oYn yk/kqjke

dkSe tkV

457 21.07

259 212 nyhijke oYn jk/kkfdlu dkSe Nhaik114/2826/

120.00

260 214 nk[kk iRuh nyhiflag dkSe jktiqr 705/1 15.00 1 1

683 41.19

688 7.02

477 16.02

545 13.00

564/2047 15.00

263 218

nhipan jkefuokl ';kelqUnj fi-

ykypan Hkkxh nsoh /keZiRuh ykypan

dkSe [kkrh

719 19.01

264 219nyhijke fd'kksjhyky lqjtkjke

jktwjke fi- x.kirjke dkSe tkV718/1 11.08

610 39.12

611 29.00

614/2084 6.00

665 22.15

666 33.05

738 7.16

739 7.18

652/4 34.09

749 20.14

152/1 9.00

153/3 16.00

269 225 nqykjke oYn fy[kehjke dkSe czkgEe.k 702/2113 25.00 1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

nqxkZ izlkn nrdiq= guqeku dkSe

czkgEe.k

nyhi nrdiq= uRFkqjke dkSe czkgEe.k

Fkkukjke dkukjke ckcqyky fi-

lqjtkjke o lqqjtk iRuh Lo- lqjtkjke

257

261

262

265

266

267

268

253

248

254

255

256

252

222

nqykjke oYn jkewjke fudh iq=h jkewjke

dkSe tkV224

nqxkZjke oYn ch>kjke dkSe njksxk223

nkukjke oYn cq/kkjke dkSe es?koa'kh216

nqjtjke oYn uRFkqjke dkSe dqEgkj220

209

nk[kk iRuh Lo- lqjtkjke 'kadjyky

'kSjkjke vkseizdk'k lriky fi-

lqjtkjke dkSe xokfj;k

215

n;kjke oYn Hkknjjke dkSe tkV207

nyhi oYn pquhjke jktwjke fouksn

jktsUnz fi- lkcgjke dkSe tkV208

Fkkukjke oYn lqjtkjke dkSe uk;d206

Mwaxjjke oYn iw.kkZjke dkSe dqEgkj197

rksywjke xksn iq= bejrh iRuh Lo-

Nrqjke dkSe czkgEe.k204

205

Page 70: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

489/2017 25.00

503 15.16

505/2021 30.00

538/2036 15.00

669 14.02

708 18.04

708/1 6.02

709/2118 5.00

709/2118/

115.00

720 17.19

721 13.12

273 229 nsohpan oYn eksguyky dke czkgEe.k 614/2 38.12 1 1

274 230 nsohizlkn oYn xksikypan dkSe jkBh 305/1873 30.00 1 1

275 231nkSyrjke irjke fdluk fi- eaxrqjke

dkSe dqEgkj593 6.00

276 232 nkSykjke oYn fpeukjke dkSe dqEgkj 583/2071 55.00 1 1

277 233 nzksinh iRuh eksgutkV 140/2852 14.00 1 1

278 234

}kjdkizlkn /kUukjke fi- ekywjke 2@3

fg- ehjk iRuh :?kkjke 1@3 fg- tkfr

eksph

637/1 15.13 1 1

271 18.12

416/1 11.16

538/3 5.00

540 9.10

541 45.00

542 32.00

563 1.16

568/3 10.10

280 236 /kUukjke oYn ekywjke dkSe eksph 180/1814 39.00 1 1

281 237/kus'ojh nsoh iRuh xkSjh'kadj tkfr

czkgEe.k649 10.00 1 1

694 33.03

695 20.00

695/1666 6.16

283 239 /kwwMkjke oYn pkS[kkjke dkSe tkV 614/3 20.00 1 1

284 240

uanjke oYn dslwjke 1@2 fg-

nsodhuanu yhyk/kj ijes'ojh ?ku';ke

pEik jk/ks';ke foeyk lqns'k dqekj fi-

rstkjke 1@2 fg- dkSe czkgEe.k

603 11.03 1 1

285 241 uUnjke oYn HkSjkjke dkSe ukbZ 522/2025 10.16 1 1

286 242 uRFkqjke oYn jkewukFk dkSe ukFk 411/1976 6.00 1 1

412 16.12

413 41.08

470 22.08

516 15.12

288 245 uUnjke oYn j.kthr dkSe tkV 481 16.12 1 1

444/2 15.16

444/2000 15.00

469/2 25.00

559 16.00

564/2046 20.00

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

ujlkjke oYn mnkjke dkSe uk;d

uRFkqukFk tho.kukFk fi- jkewukFk dkSe

ukFk

nqyhpan oYn eqdukjke dkSe czkgEe.k271

272

279

282

287

289

270

290

243

227

ucko vyh oYn ltokj [kku tkfr

eqlyeku247

/kUukjke oYn ch>kjke dkSe es?koa'kh235

/kkih iRuh Lo- Nrqjke o dkuhjke

gsrjke lksgu fdlu nsodj.k bejek

pkanh tsBh teuk ikuk :de.kh eSuk fi-

Nrqjke dkSe dqEgkj

238

nsodh iRuh Lo- ckcqyky xkSjh'kadj

Jo.k vkuUndqekj deyk fyNek pEik 228

nqyhpan iq= pkankjke dkSe czkgEe.k226

248

Page 71: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

291 249 ujs'k xkSre iq= irjke dkSe es?koky 538/2033 17.00

292 250 ulhe oYn lykeqnhu dkSe dqjS'kh260/1848/

125.00

180/1815 10.00

180/1815/

125.00

294 252ukFkkjke csxkjke eqa'khjke iw.kkZjke

dsljkjke fi- eqxrqjke dkSe es?koky260/1847 25.00

295 253 ukuw nsoh /keZiRuh Hkwjkjke dkSe Nhaik448/2003/

125.00 1 1

465 36.08

474 8.07

497 3.18

676 13.10

714 8.05

298 257 ukjk;.k iq= tqxyfd'kksj dkSe ew?kMk 586 23.00 1 1

466/1 11.04

467/3 19.15

468/2 8.11

578/2 49.00

300 259ukjk;.kpan oYn eksgujke tkfr

czkgEe.k513 9.00 1 1

301 260 ukjk;.kjke oYn ljnkjkjke dkSe tkV 724/2188 20.00

302 261 ukjk;.kjke oYn fuEckjke dkSe lsox 529/1 11.07 1 1

120/1794 15.10

628 26.10

304 263 fu'kk iRuh eatwj vyh dkSe eqlyeku444/1993/

125.00 1 1

444/1994 20.00

444/1998 15.00

306 265 uwjHkjh iRuh xQwj [kka dkSe eqlyeku 444/1993 25.00 1 1

564/6 15.12

564/2058 30.00

308 267 uwjs [kka oYn egrk dkSe nekeh 281 15.04 1 1

309 268

ukSjax daoj iRuh Lo- Hkwjflag d.kZflag

tkSjk] tlkSnk] pEik] eksguh] :dek fi-

Hkwjflag dkSe jktiqr

745 15.00 1 1

310 270 ukSjaxjke oYn ujlkjke dkSe uk;d 621/1 50.06 1 1

311 271

ukSjk iRuh iksdjjke ykypan oYn

iksdjjke] deyk] yhyk] eksguh] iqf=;ka

eksgujke dkSe dqEgkj

615 22.08

312 272

ukSjk iRuh Lo- izHkqjke txnh'k

lqsxukjke NksVwjke nyhi fi- izHkqjke

fcnyh euksgjh Hkaojh xqM~Mh :de.kh

iqf=;ka izHkqjke dkSe czkgEe.k

564/2 34.15 1 1

313 273iBkuh iRuh lkemu iq= Qjhn [kka dkSe

eqlyeku403/1 25.00 1 1

314 274irjke uRFkqjke izsedqekj fi- HkSjkjke

tkfr lksuh538/2042 25.00

315 277irjke eksguyky dkywjke lqjs'k cqykdh

izlkn fi- dqjMkjke dkSe esgrj176 45.18 1 1

316 278 iukjke oYn dkUgkjke dkSe dqEgkj 538/2037 20.00 1 1

317 279 iIiq nsoh iRuh galjkt tkV 140/2853 14.00 1 1

318 280 iyw [kka oYn Qjhn [kka dkSe eqlyeku 448/2006 50.00 1 1

745/2168 20.001 1

1 1

1 1

1 1

1 1

1 1

307

319

uwjh nsoh tksts iFohjke dkSe lkalh

ukuw nsoh psrujke Hkwjkjke oYn

psrujke dkSe es?koa'kh

ukuwjke oYn bZ'kjke dkSe tkV

ulhe dqjS'kh oYn lykeqnhu dqjS'kh

iou dqekj oYn n;kypan dkSe

czkgEe.k

ukjk;.k oYn jken;ky dkSe es?koa'kh

fudwjke oYn cLrhjke dkSe uk;d

293

296

297

299

303

251

262

258

254

255

266

281

305 264uwjcaD'k oYn gkth vCnqy lrkj dkSe

eqlyeku

Page 72: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

747 20.00

320 282 iou oYn tqxyfd'kksj dkSe ew?kMk 586/1 23.00 1 1

321 283 ikuk iRuh ';ksukFk dkSe njksxk 748 3.10 1 1

322 284 ikuk iq=h chtkjke dkSe es?koa'kh 568/2 50.00 1 1

639 11.14

681/1 8.00

596/2080 19.16

596/2081 20.17

557 13.08

557/1 10.00

558 13.08

326 288 iqj[kkjke oYn csxkjke dkSe tkV 729 17.07 1 1

327 289 iqj[kkjke oYn Hkksekjke dkSe es?koa'kh 114/1780 20.00 1 1

328 290 iqj[kkjke oYn lqjtkjke es?koa'kh 698/2115 31.16 1 1

329 291 iqj[kkjke oYn gjhjke es?koa'kh 448/2007 40.00 1 1

95/1774/1 15.00

96/1 5.00

483 28.14

484 34.01

429/1987 9.18

430 19.02

87 30.00

88 15.12

473 8.05

478 5.00

487 14.03

489 7.00

505/1 6.00

568/1 20.00

568/2004 15.00

336 299isek iRuh Lo- cLrhjke Qwlkjke

eq[kjke] fi- cLrhjke dkSe es?koa'kh538/2034 25.00 1 1

337 300 iskdjjke oYn dkywjke dkSe czkgEe.k 91 42.01 1 1

338 301iksykjke ukSjxjke fi- lghjke dkSe

tkV598 30.00

339 302 iznhiflag oYn cynsoflag tkffr Nhaik 155 12.06

340 303

izHkqjke oYn isekjke 1@2 fg- Qwyknsoh

Lo- iw.kkZjke o xksikykjke vkseizdk'k

dq'kky vaxzst xqM~Mh fi- iw.kkZjke

es?koa'kh

520 19.06 1 1

341 304 ijes'ojh iRuh chjcyjke tkV 707/2770 14.00 1 1

342 305ijes'ojh iRuh Lo- eqjyh/kj o Hkxorh

izlkn oYn eqjyh/kj egktu282 48.14 1 1

343 306 iz;kxnkl oYn inenkl cSjkaxh 448/2008 20.00 1 1

344 307 izselq[k oYn eksgyky dkSe czkgEe.k 507 12.02 1 1

345 308

izsek iRuh Lo- fyNe.kflag Hkxokuflag

iq- y{e.kflag] jktw] dkark] /kkiw] xaxk]

lqeu iqf=;ka y{e.kflg dkSe jktiqr

680/2110 30.00 1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

iqjkjke oYn fryksdkjke dkSe dqEgkj

iqjupan oYn ys[kjke dkSe tkV

iq:"kksre oYn jkepanz dkSe fcgk.kh

324

325

iq"ik iRuh Lo- /kujkt o jktdqekj

jksfgr firk /kujkt dkSe lsox

319

iw.kkZjke nrd iq= gqdeh iRuh Lo

jketh dkSe czkgEe.k

iFohjke oYn Qwlkjke dkSe lkalh298

iqj[kkjke d".kjke vkseizdk'k e?kkjke

fi- txqjke dkSe es?koky

ikjlk iRuh lqHkku [kka dkSe eqlyeku

iou dqekj oYn n;kypan dkSe

czkgEe.k

ikuk nsoh iRuh Lo- cadVyky czkgEe.k323

333

334

335

285

296

297

294332

293

287

292

286

281

330

331

Page 73: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

424/1 25.00

453/2010 35.00

347 310 Qjhn oYn eksgEen dkSe eqlyeku 453/2 5.00 1 1

444/1991/

214.00

452/1 26.06

111 4.05

138/1797 50.00

350 313 Qwyk iRuh Lo- iw.kZjke dkSe es?koa'kh 564/3 15.00 1 1

351 314Qwyk nsoh iRuh Lo- uRFkwey nyhidqekj

nrdiq= uRFkey dkSe czkgEe.k148 37.01 1 1

352 315 Qwljkt oYn iUukyky dkSe czkgEe.k 156 19.11 1 1

353 317Qwlkjke eq[kjke firk cLrhjke dkSe

es?koa'kh467/1 19.14 1 1

193/2680 7.11

205 17.15

355 319 Qwlkjke oYn lqxukjke dkSe lqukj 590 24.00 1 1

356 320 calhyky oYn x.ks'kkjke dkSe czkgEe.k 114/2825 30.00 1 1

357 321 calhyky oYn lqjtkjke dkSe dqEgkj 717 15.11

133 11.16

135 4.07

261 22.16

262/1854 20.00

360 325 cuokjhyky oYn gjhjke dkSe es?koky 564/7 20.00

361 326cuokjhyky gjpan galjkt vkseizdk'k

fi- dklhiwjh i= dkywiqjh dkSe xqlkbZ

406/1966/

140.00

652/1 15.00

753/2133 15.00

363 330cyjke vejpan fi- xaxkty osnizdk'k

NksVwjke fi- lqjtkjke tkV 713/2121 35.00

364 331cyjke vejpan fi- xaxkty osnizdk'k

NksVwjke fi- lqjtkjke tkV 728 17.16

705/4 25.00

754 32.08

366 333cyoku pkanhjke fi- Qwywjke lqjtkjke

oYn jthkjke dkSe ;kno640/2094 40.00 1 1

367 336clhjh Dwjs'kh iRuh lykewnhu tkfr

dqjS'kh260/2851 25.00 1 1

180/1816 35.00

583/2073 15.00

369 338clhjh Dwjs'kh iRuh lykewnhu tkfr

dqjS'kh

260/1849/

147.10

370 340 cldkbZ tksts Hkknj][kk dkSe eqlyeku 451 50.00 1 1

371 341 cLrh jke oYn rqyNkjke dkSe uk;d 260/1850 25.00 1 1

372 342 ckxvyh cYn xQwj [kka dkSe eqlyeku444/1992/

214.00 1 1

1 1

1 1

1 1

1 1

1 1

1 1

cyjke ikykflag egsUnzjke fi- jthjke

iq"ik nsoh iRuh /kukjke tkV 365 332

Qjhn oYn eksgEen dkSe eqlyeku

Qjhn oYn dkcnhu dkSe eqlyeku309

311

354

323

362

368clhjh Dwjs'kh iRuh lykewnhu tkfr

dqjS'kh337

cUus flag oYn esgrkcflag dkSe jktiqr327

Qwlkjke oYn mnkjke dkSe dqEgkj318

c[rkjke oYn nkukjke dkSe czkgEe.k322

cSDlkjke Hkksywjke dkSe xqjMk

Qkrek iRuh Lo- T;ku eksgEen] vehuk

ldhyk eaxrq [kka lkuk] vyhyk 312

359

346

348

349

358

Page 74: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

373 344

ck/kw nsoh iRuh Lo- uanjke jkedj.k]

eksguyky] dksey] eksguyky rqyNks]

nsodh] ekypan] 'kkafr txnh'k fi-

uanjke dskSe czkgEe.k

115 56.19 1 1

374 345 ckyfd'ku oYn dSyk'k dkSe czkgEe.k 698/2808 52.01 1 1

92 16.08

95/1773 48.12

376 347ctyky] lhrkjke dqynhi fi-

lqjtkjke dkSe dqEgkj154 25.15 1 1

377 348chch lsu iRuh ckxvyh iq Qjhn [kka

dkSe eqlyeku403/2 26.12 1 1

617 19.04

618 7.06

620 7.10

379 351chjcy oYn ys[kjke euhjke oYn

tljke dqEgkj588 20.00 1 1

10.06

10.07

381 353 cq/kflag oYn ljukstflag o xqjnhi flag

oYn fuoyflag dkSe etgch gfjtu

265 14.00

609 20.04

640/2093 3.08

682 26.12

383 355 ctyky oYn ys[kkjke dkSe czkgEe.k 730 36.05 1 1

171 3.00

173 5.00

200/1822 6.00

202 9.00

204 2.00

385 358

Hkaojyky fdluyky fi- jkeukjk;.k

xhrk x.kifr] izHkk deyk Hkxorh bUnzk

iqf=;ka jkeukjk;.k dkSe czkgEe

675 49.07 1 1

417 26.00

418 19.02

387 360 Hkaojyky oYn c[rkjke dkSe czkgEe.k 460 30.00 1 1

388 362 Hkaojflag oYn ukuqflag dkSe jktiwr 175/1805 30.00 1 1

1 1

1 1

1 1

Hkaojyky nqxkZnr jruh nsoh fi-

pku.key 3@4 fg- deyk iRuh Lo-

Hkh[kepan vktkn iqtk fi- Hkh[kepan

1@64 Hkaojyky nqxkZnr fi- pku.key

2@16 fg vktkn oYn Hkh[kepan deyk

iRuh Lo- Hkh[kepan 1@16 fg-

fpjathyky ekypan fi- enuyky jkeh

nsoh Loh exuyky cfgu 1@4 fg-

xkSjh'kadj oYn txuukFk 1@4 fg-

uRFkh iRuh Lo- ?ku';ke o vkseizdk'k

cYen izdk'k lq'khy jketdqekj eukst

fi ?ku';ke okfgu 1@4 dkSe egktu

ckxkjke jtwjke pku.kjke :[ke.kh fi-

:ikjke lksuk iRuh Lo- :ikjke dkSe

dqEgkj

chjcyjke oYn jfrjke /keZiky]

nkSyrjke fi-chjcyjke dkSe ckxMh

dqEgkj

ctyky j.kohj fi- uRFkqjke

jkeukjk;.k] fdluyky] fi- eksguyky

dkSe tkV

ckywjke oYn gjHkt dkSe lkalh346

359

354

356

350

583/1

583/3chjcyjke oYn vtqZujke dkSe ;kno352

375

378

380

382

384

386

Page 75: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

389 363 Hkaojjke oYn ekejkt dkSe es?koky 492/2018 13.18 1 1

390 364

Hkaojkjke yhykjke fi- Qwlkjkwe 1@3 fg-

eq[kjke oYn cLrhjke 1@3 isek cSok

cLrhjke 1@3 fg- dkSe es?koa'kh

547 16.10 1 1

391 366Hkxokuflag oYn dj.khflag dkSe

tVfl[k169 27.00

392 367 Hkxokukjke oYn fpekjke dkSe yqgkj 58/2072 20.00 1 1

393 368 Hkxokukjke oYn nkukjke dkSe tkV 138/2674 25.00 1 1

394 369 Hkkxk iRuh gkle vyh dkSe eqlyeku 409/2 25.00 1 1

395 370 Hkkxnkl oYn fpeunkl dkSe cSjkxh564/2607/

110.00 1 1

396 373 HkkxhjFk oYn /kukjke dkSe czkgEe.k652/2102/

125.00 1 1

397 375 HkkxhjFk oYn :ikjke dkSe dqEgkj 157 14.16

398 376 HkkxhjFk oYn f'koyky dkSe tkV 538/2031 10.00

399 377HkkxhjFk gjnsokjke usepan vkseizdk'k fi-

euhjke dkSe es?koa'kh541/1 30.00

400 378 Hkkxqjke oYn fuEckjke dkSe tkV 406/1 35.12 1 1

424/1983 10.00

444/1997 20.00

444/1999 25.00

402 380 Hkknjjke oYn tks/kkjke dkSe dqEgkj 583/2070 50.00 1 1

403 381 Hkknjjke oYn U;kSykjke dkSe dqEgkj 150/1 25.00

404 382 Hkkuhnkl oYn fpeunkl dkSe cSjkxh 564/2607 9.17 1 1

494 4.00

496 24.16

502 22.12

406 384 Hkk:jke oYn lq[kjke dkSe es?koa'kh 459 18.13 1 1

407 385 Hkk:jke oYn lq[kjke dkSe es?koa'kh564/2050/

125.00 1 1

408 387 Hkwjh i=h cn:jke dkSe czkgEe.k 103 18.08 1 1

409 390 HkSjkjke oYn x.ks'kkjke dkSe czkgEe.k 632/2092 25.00 1 1

410 391 HkS:nku oYn rsteky dkSe fcgk.kh 153/1 25.00 1 1

411 392

HkkStkjke [;kyhjke euhjke d1".kjke

izsekjke ykykjke fi- uUnqjke cfgu

13@14 fg- [kseh iRuh Lo- uUnqjke

1@14 fg- dkSe tkV

305/2699 50.00 1 1

306 3.02

399 13.04

552 36.08

413 394Hksktkjke dkywjke ekejkt fi- vejkjke

dkSe uk;d405 16.12 1 1

414 395Hksktkjke dkywjke ekejkt fi- vejkjke

dkSe uk;d406/1966 23.08 1 1

463 3.09

464/2014 11.11

196 28.00

197 2.09

197/1678 10.07

400/1 8.06

670 1.10

680/1 23.10

418 400 eatwj oYn eksgEen dkSe eqlyeku 444/1996 30.00 1 1

444/1991/

132.00

452/2 26.06

420 402 exnkl oYn fpeunkl dkSe cSjkxh564/2607/

210.00 1 1

397 20.00

1 1

1 1

1 1

1 1

1 1

1 1

1 1Hkknj oYn ckyh dkSe eqlyeku

e?kkjke oYn Bkdjflag dkSe czkgEe.k

eatwj oYn eksgEen dkSe eqlyeku401

403

eaxykjke oYn jktwjke dkSe ukbZ398

eatw nsoh iRuh psrujke galjkt iq=

lq[kjke tkfr tkV399

eaxrqnkl oYn inenkl dkSe cSjkxh397

Hkkuhjke oYn uhdwjke dkSe tkV383

393Hksktkjke dkywjke ekejkt fi- vejkjke

dkSe uk;d

379

415

416

412

401

405

417

421

419

Page 76: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

398 12.04

398/1664 40.00

422 404 e?kkjke oYn ekywjke dkSe eksph260/1847/

150.00 1 1

423 405 enu oYn f'koyky dkSe esgrj 656 29.06 1 1

424 407e?kw nsoh 'kekZ iRuh jes'k 'kekZ dkSe

czkgEe.k624 13.12

425 414 euhjke ctyky fi- ekywjke dkSe tkV 409/4 25.00 1 1

426 416euhjke jkeizrki ctyky fi- ewykjke

dkSe tkV409/3 70.12

477/1 4.16

479 11.06

428 418 euhjke oYn txeky 614/2724 50.00 1 1

429 419 euhjke oYn tSlkjke dkSe tkV114/2670/

112.17 1 1

430 420 euhjke oYn :ikjke dkSe es?koa'kh 693 24.13 1 1

431 421 euhjke oYn 'ksjkjke dkSe es?koa'kh 564/4 40.00 1 1

174 5.16

201 10.08

660 15.10

743 12.18

434 424 egkohj oYn cnzhukjk;.k dkSe fcgk.kh 177/1808 30.00 1 1

411/1967/

124.18

429/1988 20.00

533 10.15

436 427egkohj iq= uxekyflag 1@2 fg- tkfr

tkV614/2087 19.03

437 429 egs'k oYn gj}klhjke dkSe tkV 122 25.00

438 430ekaxh cSok vejpan vkSadkjey] ykypan]

fi- vejpan dkSe lsox538/2035 25.00 1 1

439 431 ekaxhyky iq= tsBey tkfr ck?kyk 89/2665 20.04 1 1

440 432 ekaxhyky oYn xksiky dkSe jktiqr 594/2079 20.04 1 1

441 433 ekaxhyky oYn euQwy dkSe tkV 753/2 17.10

442 434 ekaxhyky oYn ekywjke dkSe czkgEe.k 419/1979 10.00 1 1

443 436

ekMwjke jkeizrki Hkwjkjke] Hkwjkjke

lkgcjke [;kyhjke fi- nsohpanz dkSe

dqEgkj

260/1851 25.00

444 437 ekynkl oYn fpeunkl dkSe cSjkxh564/2607/

310.00 1 1

445 439 ekypan oYn uanyky dkSe czkgEe.k 652/2100 32.07 1 1

446 440 ekyukFk oYn nqyukFk dkSe ukFk 725 2.05 1 1

447 441

ekykjke nsohyky jkeyky dsljjke

n;kyjke fdlukjke fi- dqjMkjke dkSe

Hkaxh

290 36.10 1 1

448 442ekyjke Hkaojyky nqxkZjke fi- e?kkjke

cfgu dkSe czkgEe.k458 34.02 1 1

1 1

1 1

1 1

1 1

egkohjnkl oYn e?knkl dkSe cSjkxh

euhjke oYn dkukjke dkSe uk;d

e?kkjke oYn Bkdjflag dkSe czkgEe.k

425

euksgjh iq=h fryksdkjke dkSe esgrj422

eydhrflag iq= 'ksjflag dkSe tVfl[k423

417

403421

427

432

433

435

Page 77: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

449 443 ekyh iRuh bZ'ojjke dkSe czkgEe.k 90 41.13 1 1

450 444

ekyh iRuh Lo- eqykjke Hkaojyky pank

nsoh foeyk fdluk bUnzk dkark lykspuk

fi- eqykjke dkSe czkgEe.k

713/1 25.00 1 1

451 445ewykjke ckywjke tkywjke c[kqjke fi-

iFohjke dkSe lkalh285 10.16

452 446 ekywjke oYn eYykjke dkSe czkgEe.k419/1979/

110.00 1 1

98 11.15

99 38.00

564/2044 45.00

524 47.04

524/1660 10.00

455 450 ehjka nsoh iRuh :?kkjke dkSe eksph 637 10.08 1 1

456 451 eq[kjke oYn vtqZu dkSe tkV 108/2668 25.00 1 1

457 452 eq[kjke oYn xksiky dkSe es?koa'kh 151 21.06 1 1

458 454eq[R;kj cjdr vyh fi- vCnqyk dkSe

eqlyeku195 18.15 1 1

459 455eq[R;kj vyh oYn vCnqyk dkSe

eqlyeku177/1807 10.00 1 1

89/1769 35.00

102/1778 20.00

623 13.16

658 24.06

744 25.00

462 459eqerkt vyh oYn xQwj [kka dkSe

eqlyeku

444/1992/

113.00 1 1

424/1981 35.00

443 14.00

444/2001 15.00

453/1 11.00

469/3 14.05

500/2 9.14

464 461 eqykjke oYn HkSjkjke dkSe es?koa'kh 707/2771 36.10 1 1

465 462eqyh cSok fgjk uSrjke Qwykjke fi-

gjhjke dkSe es?koa'kh107 19.14 1 1

466 463 esok nsoh iRuh uRFkey dkSe ew?kMk 614/4 30.00 1 1

401/2 20.01

564/2049/

117.01

640/2095 25.00

646 9.08

469 467 eksMwjke oYn teukjke dkSe lqukj 702/2768 30.00 1 1

470 468eksrhjke iukjke es?kkjke fi- iFohjke

dkSe lkalh285/1 8.00

686 7.05

689 97.17

472 471 eksguyky oYn ykypan tkfr ckfYedh 556/2 5.00

473 472

eksguyky euLo:I fi- flywjke eSuk

iRuh flywjke jktdqekj uRFkqjke fi-

f'koyky dkSe dqEgkj

616/2089 20.00

1 1

1 1

1 1

1 1

1 1

1 1

1 1

eksgujke oYn uRFkq jke dkSe dqEgkj

eqa'khjke oYn jktkjke dkSe uk;d

470

es?kkjke oYn tksjkjke dkSe ckthxj464

eksMwjke Nxuyky ctyky fi- jkes'oj

dkSe tkV466

458

eqerkt vyh oYn ltokjs [kka dkSe

eqlyeku460

ekywjke gMeku nqxkZjke ewykjke fi-

jkewjke 'kdqUryk] lykspuk iqf=;ka

jkewjke

448

eq[kjke iq= iqj[kkjke dkSe tkV456

ekywjke iq= lq[kkjke dkSe dqEgkj447453

454

460

461

463

467

468

471

Page 78: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

97/1767 25.00

97/1776 25.00

116/1790 35.00

475 474eksguyky lqxukjke fi- eq[kjke dkSe

NhEik160/4 9.06

476 475

eksguh iRuh vklkjke tqxyfd'kksj

dluh firk vklkjke 1@2 fg- eqyh Lo

Nxuyky egkohj jk/ks';ke] ';kelqUnj

jktw iq"ik larks"k fi- Nxuyky 1@2 fg-

dkSe ew?kMk

652/2105 25.00 1 1

727 26.12

727/2129 20.00

736 3.01

95/1771 10.00

632/2091 5.00

118 4.06

631 16.12

178 3.12

179 6.16

180/1809 2.00

185 4.02

192 16.10

185/1810 9.00

190/1811 4.00

191/1 18.02

85 7.09

86 13.10

483 482;kdqc vyh oYn Qjhr [kka oYn nkjs

[kka eqlyeku403/3 25.00 1 1

484 483 ;klhu [kka oYn ucnhu dkSe rsyh 583/2 15.00 1 1

480 40.00

499 27.16

486 485jthjke jken;ky fi- fcjcyjke dkSe

tkV159 49.06 1 1

487 487 jthjke oYn Hkha;kjke dkSe tkV 614/2088 10.00

488 489 j.kthr oYn x.ks'kkjke es?koa'kh 110/1779 30.00 1 1

158 26.00

160/3 25.00

160/5 13.09

490 491 j.kohj flag oYn irjke es?koa'kh538/2033/

117.00

272 21.00

305/2604 3.00

492 493 jruyky oYn es?kjkt dkSe ew?kMk 607 20.04 1 1

493 494 jruyky oYn guqekuey dkSe czkgEe.k 715 35.12 1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

jthjke dklhjke j.kthr tks/kkjke fi-

cyjke tkV

eksguh iRuh Lo eksguyky uRFkey

dsljh pan iou dqekj fi- eksguyky

dkSe egktu

jruyky oYn vtqZunkl dkSe isMhoky492

484

j.kthr oYn Hkknjjke o dqjMkjke oYn

Mwaxjjke dkSe NhEik490

eksgEen eqLrkd vyh vgen iq=

fpjkaxnhu tkfr eqlyeku480

eksgEen vyh iq= fde [kka tkfr

eqlyeku481

478

eksgEen mLeku eksg n;kflag ekSg-

glkd firk fpjkxnhu dkSe eqlyeku479

eksguh iRuh Lo- f[ka;kjke xkssfoUnjke

fxj/kkjh dsljkjkje jkedqekj] fi-

f[kojkt dkSe czkgEe.k

476

eksguh iRuh Lo- x.ks'kkjke HkS:nku

es?kjkt ca'khyky nqxkZ fyNek ykyh fi-

x.ks'kkjke dkSe czkgEe.k

477

eksguyky oYn uanyky dkSe czkgEe.k473474

477

478

479

480

481

482

485

489

491

Page 79: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

419/1978 25.00

568/2065 30.00

495 496 jruh nsoh iRuh ekywjke czkgEe.k419/1979/

210.00 1 1

496 497jrhjke iq= ekukjke iq= fdlukjke

tkV400 46.14

497 498 jfrjke jkepanz czkgEEk.k 97/2666 27.15 1 1

125 4.12

126 8.00

126/1 14.10

128 6.13

499 500

jger iRuh Lo- djhe cDl ekyw [kka

cjdr lnhd uljj fi- djhe cDl

dkSe eqlyeku

584 41.12 1 1

500 502 jger vyh i= 'ksj eksgEen tkfr rsyh 283/2692 15.00

437 13.05

517 3.04

502 504 jktsUnz dqekj oYn irjke dkSe es?koky538/2033/

216.00

503 506 jktsunz izdk'k iq= ukuwjke tkfr tkV754/2167/

110.00

504 507 jktsjke oYn psukjke dkSe dqEgkj 685 56.04 1 1

650/6 25.00

667 12.01

506 509jk/ks';ke mQZ jk/kkfdlu iq= eqdukjke

dkSe czkgEe.k708/2 6.02 1 1

707/2117 25.00

709/2119 25.00

713/2125 25.00

508 511

jk/ks';ke oYn eqdkukjke 1@5 fg- iou

dqekj iq= n;kykjke 2@3 fg dkSe

czkgEe.k

669/1 38.18 1 1

105 27.19

114/1789 20.00

568/2061 25.00

604 24.04

652/2099 25.00

511 514 jkedqekj oYn ekseujke dkSe dqEgkj 595 19.10

512 515jkedqekj Hkjrdqekj fi- txnh'k dkSe

tkV614/2085 20.00

513 516

jkedqekj /keZiky Hkknj feJhjke fi-

gjhjke 2@3 fg- ofgr lqHkk"k panz oYn

cuokjhyky 1@3 fg dkSe tkV

539 48.04

514 517 jkedqekj oYn :?kukFk dkSe isMhoky 652/2103 40.00 1 1

515 519jkepanz xksihjke /kekZjke fi- rqyNkjke

dkSe dqEgkj593/1 30.00

516 520

jkepanz oYn dklhjke 1@2 fg

lkyxjke oYn Vhdwjke 1@2 fg dkSe

czkgEe.k

678 15.15 1 1

93 9.08

93/1669 17.19

518 522 jkepanz oYn 'kfDrnku dkSe uk;d 210 13.03 1 1

519 523 jkenso oYn cnzhjke dkSe fcgk.kh 510 8.14 1 1

520 524jkeukjk;.k ekukjke lghjke fi-

galjkt dkSe tkV213 26.04

1 1

1 1

1 1

1 1

1 1

1 1

jkts nsoh iRuh xksikyjke 1@3 fg-

'kkjknk nsoh iRuh dklhjke 1@3 fg-

clUrh nsoh jkeflag lhrk nsoh iRuh

jktsUnz dqekj 1@3 fg- cfg tkfr tkV

jtk nsoh iRuh dew[kka dkSe eqlyeku

jkedj.k uRFkqjke fi- Mqaxjjke dkSe

czkgEe.k

521

503

499

512

jkedj.k oYn uUnyky dkSe czkgEe.k513

jkepanz oYn dklhjke dkSe czkgEe.k

jruyky oYn gsrjke dkSe czkgEe.k495

jk/ks';ke oYn eqdkukjke dkSe czkgEe.k510

je'sk iq= fpjthyky 'kekZ

508

494

498

501

505

507

509

510

517

Page 80: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

521 525

jkeukjk;.k ekukjke lghjke fi-

galjkt cfgu ljcrh iq=h galjkt

1@2 fg- dkSe tkV

209 39.19

522 526

jkeI;kjh iRuh Lo- fdluyky o

Hkaojyky iq= fdluyky 2@3 fg.

cfgu o 'khyk iRuh Lo- Bkdqjnkl

eksguyky] 'kadjyky fi- Bkdjnkl

1@3 fg- [k=h

625/1 9.05 1 1

523 528 jkeizrki jkefdlu euhjke dkSe NhEik 650/3 25.00

524 530 jkejru oYn fugkyk dkSe vksM114/2825/

116.05

525 532 jkeyky oYn dq'kkykjke dkSe tkV 515/1 17.00 1 1

526 533 jkeyky oYn fyNehpan czkgEe.k 114/1786 25.00 1 1

527 534 jkeh tksts jkeckx dkSe czkgEe.k 696 10.16 1 1

528 536 jkewjke oYn Mwaxjjke dkSe NhEik 650/2 11.07

529 537jkes'ojyky jktkjke fi- eq[kjke dkSe

NhEik160/1 9.04

530 538jkes'oj jkeLo:I fi- jaxyky dkSe

egkczkgEe.k512/1 50.00

531 539 jkes'oj oYn pquhyky dkSe czkgEe.k 439 43.04 1 1

532 540 jkes'oj oYn Nrqjke dkSe czkgEe.k 623/2090 20.00 1 1

533 541 jkes'oj oYn Nksxkjke dkSe uk;d 538/2039 11.00 1 1

416 11.16

449 14.19

454 11.10

543 15.12

568/4 30.00

568/2063 4.08

535 543 jkes'oj oYn HkkxhjFk dkSe czkgEe.k 131 36.04 1 1

536 544 jkes'oj oYn eqdukjke dkSe esgrj 698/2730 50.00 1 1

612 10.16

614/2608 15.00

526/2026 20.00

527 18.16

539 548:dek nsoh tksts dqjMkjke n;kykjke

oYn dq.Mkjke dkSe gfjtu415 10.09 1 1

540 549 :dek nsoh iq=h iqueey dkSe dqEgkj 94 26.14

541 550 :ikjke oYn ekywjke dkSe czkgEe.k419/1979/

310.00 1 1

542 551 :ijke oYn eksrhjke dkSe es?koa'kh 410 23.01 1 1

705/2116 10.00

713/2123 20.00

305/1709 18.00

305/1871 10.00

564/2052/

110.00

545 555 jsoUrh nsoh iRuh tSlkjke dkSe tkV 403/4 25.00 1 1

546 556 js'kek iRuh yky [kka dkSe eqlyeku 409/5 25.00 1 1

547 557y{ehukjk;.k fi- eksgEen eksguh nsoh

dkSe czkgEe.k672 15.15 1 1

144/1799 6.15

146 28.05

652/2102 35.00

753/2130 15.00

1 1

1 1

1 1

1 1

1 1

1 1

jkes'oj oYn fxtkjke dkSe es?koa'kh

jsoUrjke oYn Nksxkjke dkSe tkV

558

jk;flag oYn chjcyjke tkfr tkV

jkes'oj oYn ykHkqjke dkSe tkV

554

559yyhr iznhi jkedqekj fi- vkSadkjey

dkS'kY;k iRuh Lo- vkSadkjey dkSe

y{ehukjk;.k oYn xksiky dkSe czkgEe.k

jsoUrjke oYn Nksxkjke dkSe uk;d

542

545

547

553

534

537

538

543

544

548

549

Page 81: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

550 560 ykHkkjke oYn Vkykjke dkSe 140/2677 27.11 1 1

551 561 ykypan rqyNhjke dkSe lqukj 1@2 fg 462 42.06

552 563 ykypan oYn lqjtkjke dkSe dqEgkj 717/1 15.11

553 564 ykyh iRuh pUn: egsUnz dqekj 564/2045 50.00 1 1

554 566 fy[keh pUn oYn fo/kjke dkSe lsfB;k 121 14.16 1 1

119 1.18

123 2.17

626 23.00

627 12.13

630 1.18

556 568

fyNek iRuh lkywflag o uRFkqflag

txekyflag jkeflag eksguflag bUnzflag

fi- lkywflag dkSe jktiqr

170 23.04 1 1

557 569 fyNek nsoh iRuh nqyhpan dkSe czkgEe.k 709 12.00 1 1

558 570

fyNhjke pku.key fi- jkejru o ekyh

nsoh xhrk nsoh iqf=;ka jkejru dkSe

czkgEe.k

701 37.10 1 1

450 16.16

461 34.07

560 572yhyk/kj iq= f'koukjk;.k Hkaojh larks"k

eSuk iqf=;ka f'koukjk;.k dkSe czkgEe.k644 8.04 1 1

187 7.00

188 13.00

189/1819 17.16

562 576 fo'oukFk oYn cnzhukjk;.k dkSe fcgk.kh 592/2078 30.00 1 1

563 577 osnizdk'k oYn chjcyjke dkSe tkV 490 16.06 1 1

425/2719 9.10

440 39.02

565 579

'kkafr iRuh Hktunkl vkseizdk'k

ctyky :dek] deyk f'keyk fi-

Hktunkl dkSe cSjkxh

619 23.04

554 18.00

554/1640 10.00

553 10.00

553/2043 30.00

478/2016 50.00

486 6.08

183/1817 30.00

209/1 2.16

652/3 10.04

654/1 12.00

571 585 'ksjkjke iq= ekywjke dkSe dqEgkj 214 46.08 1 1

572 586

'kksHkkjke Hkwjkjke dUgS;kyky fi

nkukjke 4@5 ekaxh iRuh Lo- vejpan

vkSadkjey ykypan fi- vejkjke 1@5

fg- dkSe lsox

428 16.18 1 1

573 587

';keizdk'k vksseizdk'k fi- jkes'oj jk/kk

nsoh Lo- jkes'oj 1@6 fg- 'kkafr iRuh

Lo xtkuUn 1@6 fg- lR;ukjk;.k oYn

xtkuan 1@6 fg- cnzh ukjk;.k oYn

Jhjke 1@6 fg- jkorey oYn

x.kirjke 1@4 fgLlk dkSe ekgs'ojh

511 14.10 1 1

199 19.18

266 9.16

1 1

1 1

1 1

1 1

1 1

1 1

f'koyky oYn 'ksjkjke dkSe es?koa'kh

f'koyky euhjke fi- 'ksjkjke dkSe

es?koa'kh

'kkafr /keZiRuh t;ukjk;.k dkSe tkV

'ksjkjke iq= trqjke tkfr ckthxj

'ks[kQjhn oYn lqyseku dkSe eqlyeku

584

';ksdj.k behyky iRuh /kUukjke dkSe

es?koky588

yw.kkjke oYn ljnkjkjke dkSe esgrj

fyPNqjke fi- rk:jke dkSe es?koky

574

580

581

578

571

583

'kqHkdj.k Jo.kdqekj dkSe czkgEe.k582

567

fyNek iRuh pqUuhyky 1@2 fg- xkserh

iRuh eksguyky uFkey dsljhpan

iquedqekj fi- eksguyky cfg 1@2 fg-

dkSe egktu

555

559

561

564

566

567

568

569

570

574

Page 82: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

575 590 ';ksyky oYn pqMkjke dkSe tkV 448/2004 20.00 1 1

576 592 Jo.kjke oYn gjh'k pan dkSe dqEgkj 177/2678 13.09

577 593 Jhpan oYn Mqwaxjjke dkSe NhEik 650/4 25.00

270/1855 48.00

406/1965 6.00

408 24.00

614/6 24.00

411/1973 25.00

444/1651 24.00

441 28.16

442 82.16

451/1 20.18

583/2067 15.00

591 10.11

114/1 12.14

122/1 16.12

134 12.06

411/1970 25.00

583 599

lR;ukj;.k 'kadjyky ykypan fi-

jkepanz tkudh cSok jkepanz ofg-1@3

fg- ;Kir exynr fi- y{ehnr bUnzk

nsoh iq=h y{ehnr cfg 1@3 fg-

Bkdqnnr oYn Hkwjkjke 1@3 fg- dkSe

czkgEe.k

687 30.16 1 1

677/2107 40.00

712 19.08

585 601 lnhd oYn djhek dkSe yhyxj 587 25.00 1 1

401/3 20.01

564/2055 30.00

587 603 lQh oYn nyenhu dkSe eqlyeku 114/1783 30.00 1 1

588 604 ljthr oYn Hkknjjke dkSe NhEik 650/5 25.00

183/2 20.00

260/1845/

125.00

288 11.03

713/2124 20.00

411/1977 19.04

498 15.12

726 32.00

102/1777 34.15

114/1785 15.00

455 26.02

456 22.19

594 610

lkoyh iRuh Lo yk/kwwjke x.ks'kkjke

gMekukjke fi- yk/kqjke fyNek fouksn

ljcrh ikuk iqf=;ka yk/kqjke dkSe

es?koa'kh

186 31.16 1 1

595 612

lk;j daoj iRuh Lo jkeflag izrkiflag

dsljhflag iqueflag fi- jkeflag Hkaojh

daoj larks"k daoj iqf=;ka jkeflag dkSe

jktiqr

753/2131 30.00 1 1

100 44.00

101 47.10

208 25.19

597 619 lkgcjke oYn ';ksyky dkSe tkV538/2031/

110.00

645/2097 20.00

648 29.06

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1ltoj oYn lq[ks [kka dkSe eqlyeku

lkaoykjke oYn ';ksukFk dkSe rkjx614

lhek iRuh vkseizdk'k fo|k iRuh

cnzhjke dkSe tkV621

608

lghjke oYn cLrhjke dkSe uk;d609

lghjke iq= ckywjke tkfr tkV606

lghjke Hkxokukjke pkoyh fi- [ksrjke

dkSe es?koky607

lghjke oYn /kukjke dkSe es?koa'kh

602

lykenhu oYn gkth uwjeksgEen tkfr

folk;rh605

lR;ukjk;.k oYn jkewjke dkSe czkgEe.k598

lR;ukjk;.k oYn n;kypan dkSe

czkgEe.k600

lUnjke oYn nwnkjke dkSe uk;d

596

lrkj [kka oYn vCnqy jgeku dkSe

eqlyeku597

Jhjke oYn es?kkjke dkSe rkjx594

ltuk iRuh ewykjke lqYrku gMeku

iIiwjke euhjke ijes'ojh lq'khyk fi-

ewykjke dkSe es?koky

595

578

579

580

589

590

593

596

598

591

581

582

584

586

592

Page 83: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

599 622 lq[kjke oYn yk/kqjke dkSe tkV 734 13.15 1 1

560/1 15.00

564/2049 22.19

564/2056/

112.01

601 624 lqxunkl oYn ine nkl dkSe cSjkxh 448/2009 10.00 1 1

509 4.05

703 14.18

603 626

lqxuh iRuh Lo tSlkjke pnzkoyh

:[kek :ik iqf=;ka tSlkjke 4@5 fg-

o /kUuh iRuh Lo dksMkjke HkSjkjke

jkewjke fi- dksMkjke 1@5 fg- dkSe

uk;d

550 18.16 1 1

604 627 lquhrk iq=h ykypan tkfr ckfYedh 556/1 10.00

605 628lqUnjflag esgUnz flag fi- jkgMflag dkSe

gfjtu284 20.16

606 629lqHkk"k panz lqjsUnz dqekj fi- enuyky

tkfr tkV95/1774 10.00

607 630 lqfe=k nsoh iRuh enuyky czkgEe.k 200/2602 18.10 1 1

620 20.00

621 23.18

1 1

1 1lqtk iRuh Lo es?kjke eqjyh/kj cuokjh

yky foeyk fi- es?kjkt dkSe laox632

623

lqxuk nsoh iRuh Lo- :?kkjke izsepan

nsohyky egkohj 'kkafr] d".kk Qwyk

ekedkSjh fi- :/kkjke 1@3 fg-

xksikykjke :ikjke vtqZujke WwQwlkjke

ijes'ojh xqM~Mh /kUuh nsoh eksguh

ekedkSjh fi- lqxukjke 9@30 fg- ek;k

nsoh iRuh Lo- pqUuhyky :isUnz 'kkafr

nsoh iq"ik nsoh ukuw nsoh fi- pquhyky

1@30 fg- sdkukjkw eksaMwjke fi- teukjke

cfg 1@3 fg- dkSe lqukj

625

lq[kjke ';ksdj.k ikyhjke lkgcjke

jkeizrki fi- ekykjke tkfr es?koky600

602

608

Page 84: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

609 634 lqjtkjke oYn Hkxokukjke dkSe dqEgkj 102/2667 24.18 1 1

610 635

lqjth nsoh iRuh cq/kjke izHkqnr ewykjke

Hkojyky fi- cq/kjke o dslj fdluh

Hkaojh iqf=;ka cq/kjke dkSe tkV

568/2722 25.00 1 1

611 637 lqykspuk iRuh txnh'k tkfr tkV 700 15.10

679 10.02

680/2108 30.00

613 639

lksuk iRuh ekyw [kka vehu [kka vuoj

[kka ;klhu [kka fcfLeYyk jfg'kk fi-

ekyw [kka dkSe eqlyeku

692/2847 14.08 1 1

740 24.00

745/2732 2.00

615 641 lksguyky oYn Hkh;kjke dkSe es?koky 404 12.19

402 20.19

564/2054 5.00

617 643 gsljkt oYn ';ksyky dkSe tkV538/2031/

210.00

618 644 gtkjhjke gqdepan fi- euhjke dqEgkj 129 30.01 1 1

619 645 guqjke oYn xksj[kkjke 142 9.06 1 1

620 647 gMeku oYn jkewukFk dkSe czkgEe.k 655 13.13 1 1

621 648 gMeku oYn yk/kqjke tkfr tkV 632/1 28.18 1 1

656 7.08

757/1 14.00

273/1 20.11

401/1 9.10

305/1869 15.00

305/1872/

115.00

424/1984 25.00

530 15.16

531 6.07

534 11.11

535/2029 6.06

626 655 gjpan nsohyky fi- ekejkt dkSe xqlkbZ 411/1 20.00

627 657 gjpan fugky dkSe vkSM114/2826/

220.00

628 660 gj}kjhjke oYn x.kirjke dkSe lqFkkj583/2075/

130.00

657 0.10

750 16.161 1

1 1

1 1

1 1

1 1

1 1

1 1

gjyky oYn ljnkjkjke dkSe tkV

gjdkSjh iRuh Lo 'ksjkjke Qwwlkjke

behyky fi- 'ksjkjke dkSe uk;d

662

653

gjpan txnh'k cyoar fot;flag fi-

[;kyhjke dkSe tkV654

gehn [kka jetku [kka firk jghe cDl

tkfr eqlyeku651

gjdkSjh iRuh Lo 'ksjkjke Qwwlkjke

behyky fi- 'ksjkjke jktw iq=h 'ksjkjke

dkSe uk;d

652

640

galjkt oYn lqjtjke 1@2 iIiwnsoh

iRuh galjkt 1@2 fg- tkfr Hkknw tkV642

lksuk iRuh Lo vejflag gfjflag

fyNe.kflag HkS:flag eksguflag

gMekuflag fdluflag txekyflag fi-

vejflag dkSe jktiqr

638

lksgu oYn Qwlkjke dkSe Mkdksr

612

614

616

622

623

624

625

629

Page 85: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

180/1 25.00

183/1818 25.00

631 666 gjhjke oYn nkukjke dkSe tkV 138/2673 25.00 1 1

632 667 gjhjke oYn nqykjke dkSe tkV616/2720/

136.18 1 1

270/1 10.00

411/1974 25.00

634 669 gjhjke oYn inekjke dkSe dqEgkj 206 16.18

411 15.00

411/1972/

15.00

636 672 gjhjke iq= txqjke tkfr dqEgkj 145 21.12 1 1

637 673 gjnkl oYn c'kd nkl dkSe czkgEe.k 138/2672 27.14 1 1

638 674 gsrjke oYn vklkjke dkSe [kkrh 583/2068 25.00

639 677 bUnzpan oYn ewypan dkSe egktu 436 2.05 1 1

640 678 dsljkjke oYn xksfoUnjke dkSe ukbZ 713/2 50.00 1 1

641 679 [ksrk oYn gtkjh dkSe esa?koa'kh 726/1 1.00 1 1

642 680

xhrk iRuh Lo- n;kypan 'kkark deyk

/kus'ojh nsoh xksih lqeu yhyk

lR;ukjk;.k egkohj izlkn iou dqekj

n;ky pan tkfr czkgEe.k

737/3 15.00 1 1

643 681txnh'k izlkn Jhjke oYn es?kkjke

dkSe rkjx 548/2040 1.10 1 1

644 683thrjke jkeyky fi- dq'kkyjke dkSe

tkV518 3.04 1 1

645 685 nqykjke oYn fy[kehpan dkSe czkgEe.k 737/2 20.00 1 1

646 686 ukjk;.kjke oYn jken;ky dkSe es?koa'kh 538/1 2.16 1 1

647 687 uhdwjke oYn cLrhjke dkSe uk;d 120 1.19 1 1

648 688 Qyw [kka oYn Qjhn [kka dkSe eqlyeku 448/2059 1.04 1 1

649 689iq"ik oSok /kUukjke jktdqekj

jkfgrdqekj fi- /kUukjke 96/2 1.01 1 1

650 690 cDrkjke oYn nkukjke dkSe pkj.k 144 2.17 1 1

651 692 Hkaojyky oYn pku.key dkSe isMhoky 480/1 0.16 1 1

652 693 Hkwjh iq=h cn:jke dkSe czkgEe.k 104 0.10 1 1

653 695Hkksyh cSokg izHkqjke xksihjke Jo.kjke fi-

izHkqjke dkSe HkkV753/1 7.10 1 1

654 696 eatwj oYn eksgEenk dkSe eqlyeku 444/1 0.15 1 1

594 0.11

596 1.00

656 698 eqdukjke oYn HkSjkjke dkSe es?koky 492 3.14 1 1

657 699 eqjyh/kj oYn HkSjkjke dkSe es?koky 435 2.15 1 1

658 700 jkeyky oYn dq'kykjke tkV 515 0.10 1 1

659 701 jkes'oj oYn Nksxkjke dkSe uk;d 551 14.00 1 1

660 702 jkes'oj HkkxhjFk dkSe czkgEe.k 132 2.00 1 1

661 703 fyPNqjke fi- rk:jke dkSe es?koky 556 1.12 1 1

662 704';kek cSokg egj'kkg xUuh [kka bdcky

fi- egj'kkg dkSe eqlyeku472 0.12 1 1

663 705 ltokjk oYn lqts[kka dkSe eqlyeku 460/1 3.12 1 1

664 706lR;ukjk;.k eqjyh/kj vkSadkjey fi

dUgS;kyky dkSe ekgs'ojh528 2.17 1 1

665 707 lnhd oYn djhek dkSe yhyxj 587/1 2.00 1 1

666 708

lqxuh cSokg tSlkjke pnzkoyh :dek

:ik iqf=;ka tSlkjke 4@5 fg- /kUuh

cSokg dksMkjke HkSjkjke jkewjke firk

dksMkjke 1@5 fg- dkSe uk;d

549 22.10 1 1

1 1

1 1

1 1

ekasxhyky oYn xksiky dkSe jktiqr

gjhjke tho.kjke fi- ekejkt dkSe

xqlkbZ671

gjhjke oYn x.kirjke dkSe tkV665

gjhjke oYn /kUukjke dkSe es?koa'kh668

697

633

635

655

630

Page 86: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

532 1.17

535 0.14

668 710 gjQwy oYn tSlkjke dkSe tkV 463/2012 40.00 1 1

669 711 gjyky oYn ljnkjkjke dkSe tkV 751 3.19 1 1

670 712 gsrjke oYn dqaHkkjke tkV 117/1 25.00 1 1

671 713dLVksfM;e foHkkx jk"Vªh;ifr Hkou

Hkkjr ljdkj113 8.14

672 271

ftUnk cSok dkle vyh futke xqyke

cfj;ke jetku ;klhu fi-m dkle

vyh eqlyeku

1107 16.05 1 1

673 300thrjke jkeyky fi- dq'kkyjke dkSe

tkV1135/2315 20.00 1 1

674 341fnyhidqekj oYn guqeku izlkn

czkgEe.k1135/1 22.18 1 1

1106 18.10

1106/2294 25.00

676 536ckx vyh lekmu fi Qjhn [kka

eqlyeku1104 36.00 1 1

677 549 fcjycjke oYn /kUukjke dkSe tkV 1105/2779 25.00 1 1

678 610 Hkwiflag oYn jkeflag dkSe tkV 1105/2777 25.00 1 1

679 652 euhjke oYn guqeku izlkn czkgEe.k 1135/2 23.00 1 1

680 737 eksgEen lnhd oYn fuoktk 1106/2781 16.10 1 1

681 757 ;kdqc vyh oYn Qjhn [kka 1105 21.00 1 1

1100 10.00

1101 33.12

683 907

'kkg vyh oYn gk'kevyh lrkj vyh

oYn yky [kka ;klhu [kk oYn gkle

vyh

1104/1 36.00 1 1

684 1034 guqqeku oYn jkewjke dkSe czkgEe.k 1135/2317 20.00 1 1

685 867 yky [kka oYn nkjs [kka 1051/1 10.13 1 1

686 480 Qjhn [kka oYn nkjs [kka eqlyeku 1051/2 10.13 1 1

687 1071 gkde vyh oYn nkjs [kka 1051/3 10.13 1 1

688 1072 gklevyh oYn nkjs [kka 1091/4 10.13 1 1

689 390uaUnyky HkSjkjke dkSe ukbZ lk- nsg

[kkrsnkj1135/2316 23.18 1 1

dqy ##### 452 452

dqy {ks=Qy

gSa-#####

1 1

1 1jkeh cSok ghjkyky ek.kdpan o vU;

dkSe czkgEe.k839

1 1gMeku oYn xksikynkl dkSe fcgk.kh709

Qjhn [kka oYn nkjs [kka eqlyeku481

667

675

682

Page 87: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

dz-l- [krkSuh ua- [kkrsnkj e; firk dk uke [kljk ua-{ks=Qy ¼ch?kk½

1 50 8.00

158 4.18

162 4.19

178 2.08

228 4.12

230 4.18

315/2 14.09

319/1 4.16

326/475 6.15

333/1 2.17

336/3 20.00

366/2 15.00

371 1.05

381 7.00

383 4.01

403/1 47.19

416/2 2.05

465 5.00

467/476 10.10

472 1.04

82 1.10

139 1.00

255 1.00

363 2.07

16 2.11

38 1.14

39 2.07

40 0.04

42 0.03

43 0.07

45 0.09

47 0.12

85 2.13

186 7.00

250 6.12

253 4.03

284 3.17

317 4.00

338 2.08

345 1.17

369 3.17

399 3.19

344 3.01

351 312.00

252 0.12

367 0.17

368 1.00

58 6.00

83 13.07

140 7.16

256 8.07

282 4.10

364 18.02

flok;pd ukdkfcy dk'r xkspj

vkxksj

vjkthjkt

flok; pd ukdkfcy dk'r

tksgMik;ru

ykHkkfFkZ;ksa dh lwph e; izLrkfor dk;Z xzzke & lkcfu;ktyxzg.k {ks= & chdkusj XXII

flok; pd ukdkfcy dk'r jkLrk

tyxzg.k lfefr

& tSriqj

flok;pd ukdkfcydk'r xkspj

Page 88: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

81 2.08

95 6.03

365 1.00

84/2 5.00

96/2 11.00

187/1 1.15

187/2 3.00

251 95.17

315/1 4.00

315/3 5.02

336/1 2.00

366\1 2.00

366/3 11.12

416/1 2.00

416/3 4.00

dz-l- [krkSuh uEcj [kkrsnkj e; firk dk uke [kljk ua-{ks=Qy

¼ch?kk½

ty dq.M

dh la[;k

dEiksLV

fiV~l

1 3vuksiflag oYn Hkksikyflag dkSe jktiqr

lk-nsg [kkrsnkj469 120.03 1 1

2 4

vejkjke oYn cq/kkjke dkSe es?koa'kh lk-

nsg [kkrsnkj jgu fcyk dCtk ogd

,lchchts 'kk[kk tSriqj bZ-u- 819

178/632 25.00 1 1

221 2.04

173 4.09

174 3.10

203/2 3.00

222 5.18

223 11.13

231/1 20.10

4 6

vtwZujke oYn dkywjke dkSe ukbZ lk-

nsg [kkrsnkj jgu fcyk dCtk ogd

,lchchts tSriqj bZ- 795

351/1/645/

220.00 1 1

353/579 12.06

354/2 0.15

355/580 2.14

357 16.12

6 8vtqZujke oYn yk/kqjke dkSe tkV lk-

nsg [kkrsnkj159/534 25.00 1 1

11 30.00

304 13.03

318 4.10

333/568 24.07

13\2 11.00

148/610 40.00

283/557 20.00

240 11.16

278 47.16

280 3.17

446 14.12

445 18.05

299/621 2.18

313 4.05

11 13bUnzkt iq= f[kjkt dkSe tkfxM

czkgEe.k [kkrsnkj272 15.00 1 1

1 1

1 1

1 1

1 1

1 1

1 1

14.09

9 11vklqjke oYn /kUukjke dkSe es?koa'kh lk-

nsg [kkrsnkj

10 12

vklqjke oYn fy[kekjke dkSe tkV lk-

nsg [kkrsnkj jgufcyk dCtk ogd

,lchchts tSriqj

5 7vtqZujke oYn dkywjke dkSe ukbZ lk-

nsg [kkrsnkj

7

elku ?kkV ¼pkjkxkg ds fy, ugha½

xSj eqefdu vkcknh

275

53

8 10

9

vklkjke Qjlkjke pqukjke fi -

yw.kkjke 6@7 fg cfgc pkoyh iRuh

Ko [ksrkjke 1@7 fg dkSe uk;d lk-

nsg [kkrsnkj

vklkjke oYn yw.kkjke dkSe uk;d lk-

nsg [kkrsnkj

vejh iRuh Lo- chjcyjke] eq[kjke

ekejkt] gjfd'ku] fdLrqjh] :de.kh]

'kkafr fi- chjcyjke dkSe es?koky lk-

nsg cfgc [kkrsnkj

Page 89: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

269/551 15.00

331 40.03

59 5.00

60/1 14.00

336/573 15.00

366/583 20.00

229 25.00

307 8.19

309 11.00

325 6.08

366/4 28.05

452 18.05

236 2.18

237/1 38.03

361 48.06

362/1 7.12

362/2 0.05

274 5.05

312 25.18

18 21vkseizdk'k oYn f[kjktjke dkSe lqFkkj

lk-nsg [kkrsnkj260/549 30.00 1 1

19 22vkseizdk'k oYn /kwMkjke dkSe tkV lk-

nsg [kkrsnkj336/2 8.10 1 1

272//481/1 9.05

428/1 5.15

346/1 3.04

346/480 33.03

117 23.02

322 20.00

322/496 16.05

332 26.07

442 5.03

444/1 3.00

145/525 10.00

212/542/1 10.00

268 12.00

291 31.05

291/491 7.00

315/653 30.00

25 30d".kdqekj oYn bZljjke tkfr lk-nsg

[kkrsnkj

351/1/645/

115.00 1 1

26 31dsljk dwjMk dqaHkk rstk fi- oSsnk dkSe

es?koa'kh lk- nsg [kkrsnkj208 6.04 1 1

385 17.00

386 15.00

386/489 30.00

28 33

[;kyhjke oYn chjcyjke o mnkjke

oYn :.kspkjke dkSe tkV lk-nsg

[kkrsnkj cfgc jgufcyk dCtk ogd

tSriqj xzk lsok lgdkjh lfefr fy-

403/619 25.00 1 1

29 34

xaxk iRuh isekjke ] pkSFkqjke oYn

isekjke 1@3 fg- Hkh[kkjke dslwjke fi

js[kkjke 2@3 fg- dkSe es?koa'kh lk-nsg

[kkrsnkj

224/473 3.02 1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

117 20 1

16 18mnkjke oYn yk/kqjke dkSe tkV lk-nsg

[kkrsnkj

mekjke] vklqjke fi- fy[kekjke dkSe

tkV lk-nsg [kkrsnkj

1 1

1 1

1 1

1 1

22 26

fdlukjke oYn dkukjke dkSe lkalh

lk-nsg [kkrsnkj jfgr eqrZfgu ,lchchts

'kk[kk tSriqj

23 27

fdlukjke oYn gsekjke dkSe es?koa'kh

lk- nsg [kkrsnkj jgu ewrZghu ,lchchts

tSriqj

27 32

f[ko.kh iRuh Lo- lqxukjke jkej[k izsek

fi- lqxukjke dkSe tkV lk-nsg cfgc

[kkrsnkj

vkseizdk'k oYn f[kjktjke dkSe tkafxM

czkgEe.k lk-nsg [kkrsnkj

21 24dkuh iq=h HkSjkjke dkSe ukbZ lk-nsg

[kkrsnkj

20 23

bZ'ojjke oYn jkedj.k dkSe czkgEe.k

lk-nsg [kkrsnkj

15 17mnkjke oYn Hkk:jke dkSe es?koa'kh lk-

nsg [kkrsnkj

13 15

2824

12 14

dqaHkkjke oYn x.kirjke dksSe uk;d lk-

nsg [kkrsnkj jgufcyk dCtk ogd

,lchchts tSriqj

14 16bZ'ojjke oYn yk/kwjke dkSe tkV lk-

nsg [kkrsnkj

bZ'oj oYn x.kir dkSe uk;d lk-nsg

[kkrsnkj jgufcyk dCtk ogd

,lchchts tSriqj

Page 90: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

96/518 5.00

113 9.08

114/1 23.15

115 30.08

117/501 5.05

5 21.17

110 2.10

203\1 3.00

108 9.00

109/612 20.00

206 2.18

207 8.10

372 11.00

376 16.18

376/585 25.00

94 25.09

181 13.00

181/487 102.10

238 15.09

443 13.12

152 6.18

153 28.12

154/530 25.00

177 8.16

116 4.12

123 11.12

136 50.15

143/1 18.01

165 15.18

64 10.15

279 2.08

279/554 9.05

340 20.16

341 7.15

38 44 pkoyh csok [ksrkjke 403/609 30.00 1 1

404 11.00

414 26.12

412/492 22.19

412 20.00

34 1.05

266/2 25.00

289 2.15

377 21.01

14/505 22.00

35 29.00

36 3.02

392 14.03

409 14.00

42 48 psrjke iq= txeky 336/575 20.00 1 1

76/1 10.00

183/2 8.17

198 12.01

159 7.17

354/3 3.0011Nxuyky iq= dkywjke5144

40

41 47 1 1

43 49 pkSFkwjke iq= isekjke 1 1

psrjke] iuukjke fi- gtkjhjke] xhrk]

dek] Qwlh iqf=;ka gtkjhjke o tho.kh

iRuh Lo- gtkjhjke cfgc 6@7 fg]

nqykjke iq= ekejkt] tlkSnk iq=h

ekejkt o deyk iRuh Lo- ekejkt

cfgc 1@7 fg-

1 1

1146

45

36 41 xksikyjke iq= fpeukjke 1 1

11xksfoUnjke iq= x.ks'kkjke4337

1 1

1 1

35 40 xqykc iq= Hkk#jke 1 1

fxj/kkjhjke] jkepUnz] fdlukjke]

dsljkjke] fi- gsekjke

1 1

1 1

1 1

psrjke iq= dqEHkkjke

psrjke iq= dqqEHkkjke] teuk iRuh Lo-

dqEHkkjke 2@4 fg-] 'kadjyky]

jkevorkj fi- psrjke 2@4 fg-

x.ks'kkjke iq= jkorkjke31

30 35x.ks'kkjke oYn fpeukjke dkSe es?koa'kh

lk-nsg [kkrsnkj

39

37

3934

36

fxj/kkjhjke] eskgujke fi- gqdekjke3833

32 fxj/kkjh iq= gsekjke

Page 91: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

45 52 Nksxkjke iq= Hkkstkjke 148 20.18 1 1

46 53 txnh'k iq= f[kjkt 428/2 15.00 1 1

47 54 txnh'k iq= bZljjke 366/5 17.13 1 1

48 55 txnh'k iq= euhjke 131 18.15 1 1

168 37.04

213 14.13

229/3 25.03

230/545 10.00

259/2 18.13

336/572 30.00

51 58 txjke iq= fugky 172 16.01 1 1

260/637 16.13

418 10.08

26 15.05

84/1 21.11

154 4.07

170 7.18

187/539 1.10

217 4.11

217/543/1 11.15

237/2 8.16

242 20.10

435 17.05

436 10.13

339/644/2 23.00

339/1 4.00

66/1/2 3.02

346/2 4.05

347 17.02

54 25.00

156 11.02

176 33.02

59 67

nywjke] enuyky fi- [kqek.kkjke]

foeyk iq=h [kqek.kkjke] ijes'ojh iRuh

Lo- [kqek.kkjke

319/565 50.00 1 1

5/2 25.17

231/2 6.09

23 13.10

413/1 6.08

413 20.00

394 11.19

62 71 /kuiky iq= Jhjke 333/2 0.18 1 1

63 72 /kUusflag iq= Hkksikyflag 469/1 120.02 1 1

64 73 /kUusflag] vuksiflag fi- Hkksikyflag 470 42.16 1 1

74/2 7.19

336/576 15.04

379/1 16.00

403/590 7.17

425/2 22.07

461 17.03

66 75/kwM+h iRuh Lo- vtZu o ykypUn iq=

vtZu122 30.10 1 1

67 76 /kksady iq= f[kjkt 272/481/2 15.00 1 1

269 16.08

270 9.01

11/kwM+kjke iq pks[kkjke7465

68 77 /kksady iq= f[kjkt 1 1

116960

61 70 1 1

11rqyNk iq=h HkSjkjke6557

58 66 rstkjke iq= Hkksekjke 1 1

11tkudhizlkn iq= fd'kuyky6355

56 64 rk#jke iq= x.kirjke 1 1

11tM+ko iq=h ghjkjke6053

54 62 tLlwjke iq= Hkk#jke 1 1

11txeky iq= jkedj.k5750

52 59 txwjke iq= f[kjktjke 1 1

49 56 txeky iq= Hkksek 1 1

nqjtkjke iq= jkorkjke

nqykje iq= ekejkt] tlkSnk iq=h

ekejkt] deyk iRuh Lo- ekejkt

Page 92: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

102 8.10

102/486 8.00

178/538 15.07

243 55.01

76/2 25.17

93 5.11

71 80 uoykjke iq= gqdekjke 472/2 15.00 1 1

72 81 ukuwjke] yw.kkjke fi- Hkkxwjke 9 1.05 1 1

72 20.05

73 22.08

88 0.10

89 2.13

91 1.16

379/2 16.17

397 5.06

398 1.05

415 3.03

416/598 42.00

447 26.10

246/546 2.01

247 12.19

248 8.10

17 20.00

403/592 25.00

76 85

iUukjke] x.ks'kkjke] nqjtkjke fi-

jkorkjke 3@4 fg- cfgc vejh iRuh

Lo- chjcy] eq[kjke] ekejkt]

gjhfd'ku] fdLrwjh] #de.kh] 'kkfUr fi-

chjcy 1@4 fg-

6 2.03 1 1

77 86 iUusflag iq= j.khtflag 468 121.05 1 1

78 87 iUusflag] guqekuflag fi- j.kthrflag 471 42.00 1 1

79 88 ijrkjke iq= x.kirjke 339/644/1 27.00 1 1

229/4 25.00

258 10.09

259/3 10.00

336/574 30.00

10 18.05

262 19.14

293 6.08

305/1 13.10

336/571 10.00

69/2 13.13

155 30.10

192 20.10

245 30.04

83 92 ikysjke iq= lqjtkjke 84/628 50.00 1 1

134 15.10

135 18.16

359/581 25.00

378 21.13

389 19.10

389/478 18.06

389/485 36.10

96/657 45.00

193/2 3.05

226/1 2.17

86 95 iqj[kkjke iq= ghjkjke 1 1

84 93 iqj[kkjke iq= Hkksekjke 1 1

11iqj[kkjke iq= ';ksyky 9485

81 90ikjk iRuh Lo- ukuwjke] ewykjke]

nsnkjke] ijes'ojh] jkesrh fi- ukuwjke1 1

11ikjh iRuh Lo- dqjM+kjke o lksguyky

iq= dqjM+jke9182

75 84 irjke iq= chjcy 1 1

11ijrkjke iq= jkedj.k8980

73 82 ukuwjke iq= pkS[kkjke 1 1

11fudwjke iq= xksj/ku8374

11ukFkwjke] ukxjjke fi- jkewjke7869

70 79uRFkwjke] jsoUrjke] pkoyh] ikuk] deyk

fi- ds'kwjke1 1

225 23.05

Page 93: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

87 96 iwjkjke iq= f[kjktjke 112 25.08 1 1

88 97 iwjkjke iq= f[kjktjke 126 49.15 1 1

161 40.09

162/631 9.11

28 25.17

169 5.00

169/500 10.00

111 3.01

120 6.17

121 3.05

124 16.18

129 13.19

194 11.02

92 103 isekjke iq= yk/kwjke 145/528 25.00 1 1

93 104 izseizdk'k iq= lqxukjke 96/659 54.05 1 1

8 51.19

7 1.00

424 109.19

95 106

izseflag] eksrhflag] lqesjflag fi-

j?kwohjflag] lk;j] fd'kuh] gokdaoj]

lUrks"k] cq[rj] j?kwohjflag] lqjtka iRuh

Lo- j?kwohjflag

281 31.14 1 1

80/512 15.13

283/558 6.07

84/513 3.00

336/4 4.11

387 21.16

405 9.06

158/533 45.00

336/570 15.00

166 35.01

432 15.10

435/603 14.10

100 111 Qwljke iq= txekyjke 230/1 4.00 1 1

212 31.13

356 7.05

371/1 7.15

195 3.07

350 22.14

420 6.11

96/520 1.05

137 38.15

239 7.15

261 5.00

265 7.10

154/531 10.00

158/532 5.00

106 117 ctyky iq= fy[kekjke 244/1 23.09 1 1

20 23.03

408 11.11

11ckxkjke iq= ghjkjke116105

107 118chjcy] iqj[kkjke] jkepUnz] ekywjke]

jkes'oj] lqxuk] pqUuh fi- ';ksyky tkV1 1

11cn# iq= lqxukjke114103

104 115 cLrhjke iq= yk/kwjke 1 1

11Qwlkjke iq= ghjkjke 112101

102 113 Qwlkjke iq= ghjkjke 1 1

11izsekjke iq= yk/kwjke10998

99 110 Qjlkjke iq= jkepUnz 1 1

96

97 108 izsekjke iq= txeky 1 1

1

11izseflag iq= j?kwohjflag107

91

izseflag] eksrhflag] lqesjflag fi-

j?kwohjflag] lk;j] fd'kuh] gokdaoj]

lUrks"k] cq[rj] j?kqohjflag o lwjtka

iRuh Lo- j?kwohjflag 1@2 fg- cfgc]

leUnj daoj] iRuh Lo- lqtkuflag]

/khojdaoj] #[kekdaoj] izrkiflag]

vuksidaoj] xqykcflag] gokdaoj

10594 3

90 100 iwjk iq=h jk/kk 1 1

1 1

iwjkjke iq= f[kjktjke] 1@2 fg- jsoUr]

fyNe.k] gj[kh] /kkih] euksgjh fi-

txeky 1@2 fg

101

11iw.kZjke iq= ckywjke 9989

Page 94: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

402/587 16.12

403/2 31.06

439/1 3.12

440/1 13.04

441/604 35.00

467/476/6

178.08

25 39.11

384 9.07

384/495 59.07

384/1 15.13

227/2 8.09

184 6.17

226/2 21.00

416/600 3.10

427/3 8.03

427/1 0.13

67/2 7.15

77/2 3.05

133 24.14

68 8.13

79/1 6.05

97 12.03

380 25.05

218 18.10

401 12.12

433 10.01

13 12.05

14/613 5.03

37 7.13

266/1 5.00

287 5.00

288/1 5.07

116 129 Hkaojkjke iq= jkepUnz 269/551/1 15.00 1 1

65/2/1 6.00

66/2/1 10.00

141/626/2 2.00

219 4.00

403/594 30.00

119 134 HkkxhjFkjke iq= iqj[kkjke 359 6.12 1 1

50/511 3.12

51 31.08

246/636 20.05

121 136 Hkkuhjke iq= yk/kwjke 145/526 45.00 1 1

146/484 12.00

175 17.05

183/1 8.10

123 139 Hkkstkjke iq= psrujke 429 12.07 1 1

167 33.08

203/4 3.00

210 15.03

271 7.13

71 17.03

87 28.11

105/519 10.00

96/521 17.06

454 22.14

128 144 e?kkjke iq= bZljjke 228/1 4.10 1 1

109 12.16

11euQwy iq= lghjke146129

11

eaxykjke] cUukjke] eksgu fi- /kUukjke

4@5 fg- cfgc] euksgjh iRuh Lo-

'kadjjk] pUnwjke] vkseizdk'k] Qwyka fi-

'kadjjke cfgc 1@5 fg-

142126

127 143 eaxykjke iq= Fkkukjke 1 1

11eaxrwjke] Qjlkjke] tSlkjke fi-

iUukjke140124

125 141 eaxrwjke iq= ukudjke 1 1

11HkkxhjFk iq= Hkksekjke135120

122 137 Hkh[kkjke iq= js[kkjke 1 1

11Hkaojh iRuh gsrjke132117

118 133 Hkaxokuk iq= jkepUnz 1 1

11ctyky iq= yk/kwjke126114

115 128 Hkaojyky iq= psrjke 1 1

11cq/kh iq=h xksikyjke124112

113 125

cteksgu] eqjyh/kj] lR;ukjk;.k]

nhun;ky bZejrh] xqìh] lUrks"k fi-

jkewjke o #[kek iRuh Lo- jkewjke

1 1

11chjcy iq= ghjkjke121110

111 122 cq/kkjke iq= jkewjke 1 1

11chjcy iq= x.ks'kkjke119108

109 120 chjcy iq= ';ksyky 1 1

Page 95: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

151/3 12.00

215/1 8.04

216/1 3.00

130 147 euQwy iq= lqjtkjke 150 24.19 1 1

75/1 11.18

277 19.15

467 57.01

467/476/5

0214.11

440/2 13.04

441/2 17.17

467/476/6

0525.00

133 151

euhjke] fxj/kkjh fi- nqykjke] tSrk]

lksuk] Qwlh] rhtk] xqMh] cq[rjke]

nqykjke o jsoUrh iRuh nqykjke 1@2

cfgc] chjcy iq= x.ks'kkjke 1@2 fg-

444/2 3.08 1 1

134 152 euhjke iq= fugky 151/1 16.12 1 1

135 153 euhjke iq= ckywjke 283/556 10.00 1 1

136 154 euhjke iq= chjcyjke 403/652 35.13 1 1

137 155 euksgjh iRuh Lo- f'konku 114/3 20.00 1 1

138 156euksgjh iRuh Lo- pSykjke] nsohyky iq=

pSykjke96/658 20.00 1 1

86 10.10

105 15.18

148/611 25.00

23/624 25.00

33 12.13

27 2.10

141 159 ekykjke oYn jkes'oj 430 8.16 1 1

391 39.15

416/599 45.00

416/614 20.00

18/1 6.08

390 2.15

143 161 feBwjke iq= fugky es?koky 162/1 16.14 1 1

151/4 18.16

337 7.16

145 163 eqypUn iq= fy[kekjke 244/2 23.08 1 1

354/1 17.00

374 13.05

171 27.09

214 10.09

215/2 8.01

165/474/2 16.10

148 169 ewykjke iq= xksj/ku 323 30.03 1 1

149 170 ewykjke iq= ukuwjke 315/654 40.00 1 1

150 173 eksVkjke iq= yk/kwjke 416/597 40.00 1 1

151 174 eksrhflag iq= j?kwohjflag 435/656 20.17 1 1

152 175

eksfu;k iq= ckywjke 2@3 fg-] gjhjkwe]

[ksekjke fi- dkukjke] ekuk] #ik]

iqf=;ka dkukjke 1@3 fg- cfgc

273 42.07 1 1

11ewykjke iq= x.ks'kkjke168147

11eq[kjke iq= xksikyjke 162144

146 165 ewykjke iq= dkywjke 1 1

11

ekaxw daoj iRuh Lo- vklwflag]

leUnjflag] izrkiflag] cyohjflag]

Hakojh daoj fi- vklwflag cfgc 5@6 fg-

ukuw daoj iRuh eksguflag] mRreflag]

'kksHkkdaoj] iwueflag] vkseohjflag fi-

ekguflag cfgc 1@6 fg-

158140

142 160 ekywjke iq= ';ksyky 1 1

11150132

139 157euksgjh iRuh Lo- 'kadjjke] pUnwjke]

vkseizdk'k] qQwyka fi- 'kadjjke1 1

11euQwy iq= lghjke146129

131 148euhjke] fd'kukjke] iw.kkZjke] lksuk]

ijes'ojh fi- ckywjke1 1

euhjke] fxj/kkjh fi- nqykjke] tSrk]

lksuk] Qwlh] rhtk] xqMh] cq[rjke]

nqykjke o jsoUrh iRuh nqykjke

Page 96: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

276 41.19

314 6.07

180/1 25.02

227/1 4.07

155 178 j.kthr iq= x.ks'kkjke 331/641 25.00 1 1

156 179 jrhjke iq= jkepUnz 141 5.05 1 1

157 180 jktkjke iq= lq[kjke 290 8.01 1 1

158 181 jktsUnzdqekj iq= ewykjke 472/1 15.00 1 1

212/544 2.19

233 47.01

234 29.08

234/479 5.12

235 6.10

403/588 15.00

431/1 14.03

466 15.04

1 10.00

2 9.05

382 36.12

388 35.12

407/606 20.00

96/1 4.07

96/515 15.00

125 16.10

435/656/1 29.03

437 18.12

162 185 jkeukjk;.k iq= ';ksnku 328/3 8.00 1 1

163 186 jkej[k] izsekjke fi- lqxukjke 383/1 7.13 1 1

379/3 16.00

462 18.02

411/595 25.00

430/601 20.00

431/2 28.10

466/1 17.09

457/1 15.03

410 2.16

164 24.00

164/1 3.13

18 25.01

19 22.09

21 15.13

22 6.11

23/506 7.16

403/608 12.12

407/607 12.08

168 191 #[kek iRuh /kksdy 141/626/1 19.00 1 1

169 192j?kwohj iq= #ikjke] Jo.k dqekj] iq=

gsekjke200 29.09 1 1

23/507 35.00

400 15.14

403/589 9.06

118 11.13

118/497 12.10

172 195 jsoUrjke iq= txeky 212/634 50.00 1 1

264 14.01

450 23.03

138 28.06

190 16.12

450/490 7.09

11yk/kwjke iq= /kukjke196173

11jkeyky iq= /kwM+kjke187164

165 188 jkes'oj iq= eqdukjke 1 1

11jkePkUnz iq= ';ksyky183160

161 184 jkepUnz iq= gsekjke 1 1

11eksgujke nRrdiq= ';ksnkujke177154

159 182 jkepUnz iq= eqdukjke 1 1

153 176 eksfu;k iq= ckywjke 1 1

11jke'soj iq= f'konku189166

167 190 jkes'oj iq= ';ksyky 1 1

#.kspk iq= chjcy

jsoUrjke] fyNe.k fi- txeky

11193170

171 194 1 1

Page 97: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

74/1 6.00

334 1.19

334/569 40.00

379/494 16.00

425/1 22.06

175 198 'kadjyky iq= fpeukjke 136/1 25.00 1 1

176 199 'kkfUrnsoh iRuh lksguyky 546/547 10.02 1 1

453 31.14

451 6.06

451/483 27.10

178 201 ';ksdksjh iq=h yk/kwjke 149 23.05 1 1

145/630 14.11

147 10.17

180 203 lR;ukjk;.k iq= fd'kuyky 299/639 25.00 1 1

12 9.01

90 13.06

90/488 24.13

147/477 6.08

263 8.02

103 14.04

104 8.01

70 5.01

241 9.16

92 20.09

107 21.05

330/3 12.15

336/643 33.15

143/3 4.06

189/3 4.14

329 2.02

330/1 8

44 8.10

46 26.02

48 7.04

49 30.00

254 2.10

296 23.10

324 34.15

455 15.10 1 1

267 3.01 1 1

270/553 1.19

295 7.15

297 8.08

99 9.10

101 13.07

98 7.01

77/3 11.00

96/517 20.00

142 20.09

151/529 20.00

328/2 33.00

189 213 lw.Mkjke iq= xksj/ku 145/629 25.00 1 1

52 16.10

53 1.05

69/1 16.08

188 212 lqxukjke iq= fpeukjke 1 1

11

lwjtka iRuh Lo- Hkksek 1@2 fg-]

rstkjke] iqj[kkjke] HkkxhjFk] tSlkjke]

Hkxokukjke] fi] Hkksekjke

214190

186 210 lq[kjke iq= txeky 1 1

11la[kjke iq= jkewjke211187

11lkwy iq= ';ksnku207183

185 209 lq[kjke iq= yk/kwjke

208184

11lghjke iq= /kUukjke205181

182 206

lkcqyk] vehpUn] vtZujk fi- mnkjke

1@2 fg-] lqxuk iRuh Lo- jkewjke]

uRFkkjke] ukSjaxjke- fi- jkewjke] eaxyk]

cuokjh] eksgu] ekyhnsoh fi- Fkkukjke]

euksgjh iRuh Lo- 'kadj] pUnwjke]

vkseizdk'k] Qwyk fi- 'kadj 1@2 fg-

1 1

11';ksdj.k iq= /kUukjke200177

179 202 ';ksyky iq= lghjke 1 1

174 197 ys[kwjke iq= gqdekjke 1 1

lq[kjke eksVkjke mnkjke isekjke

vtqZujke bZljjke gMeku rkjk lqth fi-

yk/kqjke dkSe tkV

Page 98: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

55 11.00

61 1.08

65/1 7.10

66/1/1 16.10

406 7.06

360/647 18.15

78 24.11

96/516 27.04

159/535 25.00

77/1 10.19

449 4.07

449/498 20.00

196 1.10

326/475/6

22

10.00

351/1/577 25.00

421 9.06

180/2 29.08

283/555 30.00

403/3 18.06

463 18.00

463/1 3.02

30 33.14

348 4.03

458 3.04

459 34.15

460 29.08

464 14.06

143/2 8.14

328/1 4.00

330/2 4.00

182 40.10

197 1.15

199 6.18

200 227gM+eku iq= yk/kwjke 1@2 fg- d".kjke

iq= bZljjke 1@2 fg-353/578 35.00 1 1

358 6.07

373 22.13

468/1 112.05

469/503 9.00

302 6.03

320/1 1.07

204 233 gjhfd'ku iq= rstkjke 84/514 25.00 1 1

11guqekuflag iq= j.kthrflag230202

203 232 gjpUnjke iq= yk/kwjke 1 1

11lksguyky iq= pkSFkwjke 1@2 fg-

pkSFkwjke iq= isekjke 1@2 fg- 226199

201 228 gM+eku iq= yk/kwjke 1 1

197 224

'kSrkuflag] izseflag] vejflag] vtZuflag]

isiflag] pSuflag fi- bZljflag 1@4 fg-]

eSuk daoj iRuh Lo- bZljflag]

egkohjflag] 'kSrkuflag] izseflag]

vejflag] vtZuflag] isiflag] pSuflag]

jktdaoj] bUnzdaoj] Jo.kh daoj]

xksihdaoj] lqjKkudaoj fi- bZljflag

cfgc 1@4 fg-] ekaxwdaoj iRuh Lo-

vklwflag] lwUnjflag] izrkfiflag]

cyohjflag] Hkaojh daoj fi- vklwflag

cfgc 5@24 fg-] ukuwdaoj iRuh Lo-

eksguflag] mRreflag] 'kksHkkdoj]

iwueflag] vkseohjflaga fi- eksguflag

cfgc 1@24 fg- xqekuflag fi- eq-

[kq'kkyflag 1@4 fg-

1 1

198 225 lksgujke iq= f'konku 1 1

195 221 lwjtkjke iq= ghjkjke 1 1

11'kSrkuflag] izseflag] vejflag] vtZuflag]

isiflag] pSuflag fi- bZljflag223196

194

1 1

11lwjtkjke iq= ghjkjke220

193 218 lwjtkjke iq= jkewjke

191 215 lwjtka iq=h HkSjkjke 1 1

11lwjtkjke iq= iqj[kkjke217192

Page 99: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

411/596 17.12

403/593 17.08

456 25.04

457/2 35.19

3 3.05

4 6.19

15 1.15

31 40.00

32 4.10

75/2 12.13

160 24.05

426 14.01

100 15.16

106 9.08

127/2 20.12

212/541 15.00

209 239 gjhjke iq= la[kjke 57 15.11 1 1

210 240 gjhjke iq= dkukjke 422 13.09 1 1

427/2 3.01

65/2/2 4.00

66/2/2 10.00

141/626/3 4.00

342 9.05

342/482 28.00

301/3 7.04

303/2 12.03

319/2 3.15

375 11.02

214 245 gsrjke] xksihjke fi- lq[kjke 56 16.13 1 1

24 1.00

288/2 0.14

216 2 vx#jke iq= fpeukjke 114/2 33.00 1 1

165/474/5

3621.10

dqy 10197.10 218 216

dqy

{ks=QygSa-

esa

2581.54

11gqdekjke iq= yk/kwjke244213

215 246 gsrjke iq= dqEHkkjke 1 1

11241211

212 242

ghjknsoh iRuh Lo- dkukjke 1@5 fg]

euQwy] lUrjk] eq[kjke] d".kyky]

gsrjke] dk'khjke] esgjpsUn] xhrk]

#de.kh fi- dkukjke 3@10 fg-]

xkseUnjke iq= x.ks'kkjke 1@2 fg-

1 1

ghjk iRuh bUnzkt

11gjhjke] [ksekjke fi- dkukjke] ekuk]

#ik iqf=;ka dkukjke236207

208 238 gjhjke iq= txeky 1 1

11gjhfd'ku iq= eqdukjke234205

206 235 gjhfd'ku iq= eqdukjke 1 1

Page 100: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Insert thematic Base map

Presentation of Salient features of DPR BKN-XXII (IWMP)

Page 101: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

District Bikaner

Block Loonkarnsar

Name of Project (as per GOI) BKN-XXII

(IWMP)

Name of watershed area(local name) Jaitpur-

Sabniya

Geographical Area 7169 Hac

Net treatable Area 7000 Hac

Cost of Project 10.50 Cr

Macro/micro

Name of Gram

Panchayat

Name of Villages

Covered

Project Area

Cluster Jaitpur Jaitpur 4500 Hac

Sabniya 2500 Hac

Page 102: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Progress Institutional arrangements• No of WDT members placed :- 4

• No.of WC constituted :- 1

• No. of WC whose Account opened :- 1

Insert Photo Of Gram

Sabha

Insert Photo IEC activity Insert Photo Of Slogan

writing in project areaInsert Photo Of Gram

Sabha

TRAINING, STUDY TOUR & WALL PAINTING PHOTOS

Page 103: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

EPA

Insert Photo Of EPA

activities

Insert Photo Of EPA

activities

Insert Photo Of EPA

activities

1 2 3 4 5 6 7 8

S.

No

Name of

villages

Amount earmarked for

EPA

Entry Point

Activities

Estimated

cost

Expenditure

incurred

Balance

Expected outcome

Actualoutcome

1 Jaitpur 27 Lacs 1 public jal kund 1.90 Lacs 1.86 Lacs 0.04

Lacs

Ful fill

potable water

reqruirment

Ful fill potable

water

reqruirment

Pipe line length

9500 rm

25.10 Lacs -------- 25.10

Lacs

Ful fill

potable water

reqruirment

-

2 Sabniya 15 Lacs 1 public jal kund 1.90 Lcs 1.86 Lacs 0.04

Lacs

Ful fill

potable water

reqruirment

Ful fill potable

water

reqruirment

Repair of WHS 13.10 Lacs --------- 13.10

Lacs

Ful fill

potable water

reqruirment

-

Insert Photo Of EPA Insert Photo Of EPA

activities

Insert Photo Of EPA

EPA ACTIVITIES PHOTOS

Page 104: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

S.no Name of the

village/Habitation

Date on which PRA

conducted

1 Jaitpur 12-10-2011

2 Sabniya 14-10-2011

PRA exercise

Insert Photo Of PRA Insert Photo Of PRA Insert scanned copy of

house hold survey

Insert scanned copy of

house hold survey

Insert scanned copy of

house hold survey

PRA & HOUSEHOLD SURVEY PHOTOS

Page 105: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Total Population

Male Female Total SC ST

3635 3360 6995 2083 --------

Household Details

BPL

household L. Less

Marginal

Farmer

Small

Farmer

Middle

Farmer

Big

Farmer

Total

household

SC

household

485 485 117 231 241 451 1525 326

Socio Economics

Activities (On Farm)

Name of

activity*

No of House

holds

Average annual

income from the

Cultivators 1320 6.10 Cr

Dairying 954 1.90 Cr

Land less (Ag. Labour)

354 2.86 Cr

Major activities (Off Farm)

Name of activity

Households/individ

uals

Average annual

income from the

Carpenter 10 3.62 LacsBlack smith

2 0.52 Lacs

Lather Craft

15 3.79 lacs

Porter 4 1.13 LacsMason 14 6.72 Lacs

Page 106: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Livelihood Plan

Activity Unit Quantity Unit cost

Total

cost

Cost from

Project Fund

Convergence

Fund

SHG training No 8 0.48Lacs 3.84 Lacs 3.84 Lacs

Vat. Treat.

Camp No 10 1.2 Lacs

12.00

Lacs 12.00 Lacs

Bull

Distribution No 3 0.5 Lacs 1.50 Lacs 1.50 Lacs

Individual

entrepreneur

Micro

Enterprises ---------- ---------- -------

101.26

Lacs 101.26 Lacs

Page 107: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

S.

N

o.

Description

of animals

(Breed)

Populatio

n in No.

Yield Per Year

Milk Mutton Wool

1 Cows 3691 3745130 LtrIndigenous -----

Crossbrid ----

2 Buffaloes 652684600 Ltr

3 Goat 3637 723400 Ltr4 Sheep 8506 11669 Kg

5 Camel 402

6 Donkey 83

Total 16971 5153130 Ltr 11669 Kg.

Livestock Status

Fodder deficiency 245868 Qt.(Requirement is 276348 Qt. and

availability 30480 Qt.)

Page 108: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Activity Unit Quantity Unit cost

Total

cost

Cost from

Project Fund

Convergence

Fund

Vat. Treat.

Camp No 10 0.24 Lacs 2.40 Lacs 2.40 Lacs

Bull

Distribution No 3 0.5 Lacs 1.50 Lacs 1.50 Lacs

SHG training No 8 0.84Lacs 3.84 Lacs 3.84 Lacs

Micro

Enterprises --------- -------

101.26

Lacs 101.26 Lacs

Livelihood Plan

Page 109: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Insert thematic map of Land

use and land cover

Page 110: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Land Use Total area in Ha.

Private Panchayat Government Community Total

Temporary fallow 1198 ----- 32 ---- 1230

Permanent Fallow 155 ----- 11 ---- 166

Cultivated Rainfed 4923 ------- 151 ------ 5074

Cultivated irrigated 15

--------- --------- ---------- 15

Net Sown Area 4938 -------- 151 ------- 5089

Net Area sown more

than once

15

-------- -------- ------ 15

Area under Rabi 100 ----- -------- --------- 100Area under Kharif 4838 ----- 151 ------- 4989Forest --------- -------- --------- -------- -------

Non Arable 355 ------- 12 ------- 367

Pastures ----- 177 -------- -------- 177

Others ------- 140 ----- ------ 140

Total 6963 317 206 --------- 7169

Land Use

Page 111: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Activity Unit Quantity

Unit

cost

(Lacs)

Total

cost

(Lacs)

Cost from

Project

Fund

Convergence

Fund

Beneficiary

Contribution

*

Construction

of public

jalkund

No 7 1.90 13.30 13.30 ------- NIL

Pasture

development

Hac. 100 50 22.80 22.80 ---------- NIL

Diggy No 7 8.00 56.00 56.00 NIL

Activity wise Total Abstract of cost

Conservation measures for non arable land

Page 112: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Activity Unit Quantity

Unit

cost

Total

cost

Cost from

Project

Fund

Convergence

Fund

Beneficiary

Contribution*

Construction

of jalkund No 670

0.63

Lacs

422.10

Lacs

422.10

Lacs

------ 33.67 Lacs

Activity wise Total Abstract of cost

Conservation measures for arable land

Page 113: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Activity Unit Quantity

Unit

cost(lac)

Total

cost(lac)

Cost from

Project

Fund

Convergence

Fund

Beneficiary

Contribution

*

Plantation work No. 10000 0.00035 3.50 3.50 ----- ----------

Pasture development Hac. 100 73.80 73.80 96.60 ---------- ---------

Activity wise Total Abstract of cost

Production measures for non arable land

Page 114: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

S.No Source No. Functional

depth ( m)

Dry Area

irrigated

Water

availability(days)

i) Dug wells -----

ii) Shallow tube wells -----

iii) Pumping sets ----

iv) Deep Tube Wells 8 450 Ft 3 15 365

Total 8 3 15 365

Ground Water

Proposed Structures in Arable land (tanka):

S.No WHS No Storage Capacity (ltr)

Total Storage Capacity (ltr)

1 Jalkund 670 20000 13400000

Total 670 20000 13400000

Proposed Structures in Non Arable land:

S.No WHS No

Storage Capacity (ltr)

TotalStorage Capacity (ltr)

1 Jal kund 7 50000 350000

2 Diggi 7 1400000 9800000

Total 10150000

Page 115: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Abstract of cropped Area(ha)

Area under Single crop 5074

Area under Double crop 15

Area under Multiple crop --------

Agriculture status

Soil fertility Status

Kg/ha

Recommended

N 10 25-30 Kg/Hact

P 36 35-40 KG/Hact

K 84

150-200

KG/Hact

Micronutrients PPM PPM

Zn 16 50

Fe 16 50

Cu 3 50

Mn 4 50

Croping Status

SNo Season Crop

sownRain Fed Irrigated

Varieties Area

(ha)

Production

(Ton)

Productivi

ty (Kg/ha)

Varieti

es

Area

(ha)

Producti

on (Ton)

Product

ivity

(Kg/ha)

Area

(ha)

Production

(Ton)

1 Karif Gaur Desi 4178 1169.84 280 4178 1169.84

Moth Desi 497 178.92 360 497 178.92

Bajra Desi 314 100.48 320 314 100.48

2 Rabi Gram Desi 85 32.3 380 Desi 12 33.6 2800 12 33.6

Mustard Desi 3 3.24 1080 3 3.24

Total 5074 1481.5 1340 15 36.84 3880 5089 1518.38

Page 116: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Production System and micro enterprise

Activity Unit Quantity

Unit

cost

Total

cost

Cost from

Project

Fund

Convergen

ce Fund

Beneficiary

Contribution

Micro

Enterprises --- --------- --------

101.26

Lacs 101.26 Lacs -------- ----------

Crop demo. 2000 ----- 0.005

10.00

Lacs 10.00 Lacs ----------- ---------

Page 117: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Component wise Abstract of cost

Activity Unit Quantity

Unit

cost

(Lacs)

Total

cost

(Lacs)

Cost from

Project Fund

Convergence

Fund

Beneficiary

Contribution*

Jalkund NO. 670 0.63 422.10 422.10 ---- 33.76 lacs

Public jal kund NO. 7 1.90 13.30 13.30 ----- -------

Diggy NO. 7 8.00 56.00 56.00 ------ ------

Pasture

Development Hac.. 2 50 96.60 96.60 ------- ------

Kitchen gardening NO. 100 0.004 0.40 0.40 0.12

Compost pit NO. 668 0.1 66.80 66.80 20.04

Soil testing NO. 2000 0.0001 0.20 0.20

Plantation along

the road NO. 10000 0.00035 3.50 3.50

Crop

demonstration NO. 2000 0.005 10.00 10.00 3.00

Vat. treat. camp NO. 10 0.24 2.4 2.4

Bull distribution NO. 3 0.5 1.50 1.50

SHG Training NO. 8 0.48 3.84 3.84

Micro enterprises 101.26 101.26

Page 118: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

Annual Action Plan

ActivityQuantity

1st year 2nd year 3rd year 4th year 5th year 6th year Total

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin FinPrivate jal

kund 670 ---- ------ 24 15 158 99.54 266

167.5

8 113 71.19 109 68.67 422.10Public jal

kund 7 ---- ------ 3 5.70 2 3.80 1 1.90 1 1.90 ----- ----- 13.30

Diggi 7 ---- ------ 3 24.00 2 16.00 1 8.00 1 8.00 ----- ---- 56.00Pasture

developm

ent 2 ---- ------ 28.68 27.66 22.02 13.41 4.83 96.60Kitchen

garden 100 ---- ------ 100 0.40 0.00 0.00 0.00 0.40Compost

pit 668 ---- ------ 170 17.00 198 19.8 200 20.00 100 10.0 0.00 66.80Soil

testing 2000 ---- ------ 500 0.05 500 0.05 500 0.05 500 0.05 0.00 0.20Plantation

along the

road 10000 ---- ------ 1000 0.35 5000 1.75 4000 1.40 0.00 0.00 3.50Crop

demo. 2000 ---- ------ 0.00 700 3.5 700 3.5 600 3.0 0.00 10.00Vet. Tret.

Camp 10 ---- ------ 2 2.40 2 2.40 2 2.40 2 2.40 2 2.40 12.00

Bull dist. 3 ---- ------ 2 1.00 1 0.50 0.00 0.00 1.50SHG

training 8 ---- ------ 0.00 4 1.92 0.00 4 1.92 0.00 3.84Micro

enter. ---- ------ 1.20 21.68 24.65 35.13 18.60 101.26

Page 119: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages

S.

No Scheme

Name of

the

department

Key interventions

under the Scheme

Targeted

Beneficiaries

Provisions

under the

Scheme

1 MNREGA P.S.LKS Employment 53

Private

tanka

2 SGSY P.S.LKS SHG Deal 30 Micro entr.

3 IAY P.S.LKS House for BPL 33 House

Other Development Schemes in the project area

Page 120: Government of Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed... · 2020-03-05 · Details of infrastructure in the project areas Parameters Status (i) No. of villages