Completion Date: September 2014 Ghost Project 12 Ghost Project 12 An 80 foot bridge north of the Fallen Timber South Provincial Recreation Area (PRA) was washed out by the 2013 flood and could not be reinstalled at its original location. It was moved south to a more sustainable crossing. The trail leading up to the bridge was heavily rutted from erosion and was covered in standing water. The ruts were graded out and drainage features were installed to help dry out the trail. Mar 2016 1 of 2 Backcountry Trail Flood Rehabilitation Program Ghost Project 12 © 2016 Government of Alberta Website Information Further information on the program, as well as an interactive web map can be found by visiting: Backcountry Trail Flood Map It is also encouraged to visit the web map before heading into the backcountry within the program area. Trails which are under construction or under a temporary closure are updated weekly so you can Know Before You Go.

Upload: others

Post on 22-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Got Proect 1 - Open Government Program | Alberta.ca · 0.1 0.2 277 = Divided Highway 2 Lane Undivided Road 1 Lane Undivided Road Gravel Road Miscellaneous Minor Road By to Protected

Completion Date: September 2014

Ghost Project 12

Ghost Project 12An 80 foot bridge north of the Fallen Timber South Provincial Recreation Area (PRA) was washed out by the 2013 flood and could not be reinstalled at its original location. It was moved south to a more sustainable crossing. The trail leading up to the bridge was heavily rutted from erosion and was covered in standing water. The ruts were graded out and drainage features were installed to help dry out the trail.

13

Mar 2016 1 of 2Backcountry Trail Flood Rehabilitation ProgramGhost Project 12

© 2016 Government of Alberta

Website InformationFurther information on the program, as well as an interactive web map can be found by visiting:

• Backcountry Trail Flood Map

It is also encouraged to visit the web map before heading into the backcountry within the program area. Trails which are under construction or under a temporary closure are updated weekly so you can Know Before You Go.

Page 2: Got Proect 1 - Open Government Program | Alberta.ca · 0.1 0.2 277 = Divided Highway 2 Lane Undivided Road 1 Lane Undivided Road Gravel Road Miscellaneous Minor Road By to Protected

Mar 2016 Backcountry Trail Flood Rehabilitation Program Ghost Project 12

© 2016 Government of Alberta

2 of 2

BEFORE AFTER

BEFORE AFTER