gorgas wetlands revitalization alabama power company environmental affairs field services gerson...
TRANSCRIPT
Gorgas Wetlands RevitalizationAlabama Power
CompanyEnvironmental AffairsField Services
Gerson Pickett
Background
Recirculating Reducing and Alkalinity Producing System
(ReRAPS) ReRAPS was designed and
built by APC as a EPRI TC in the late 1990’s
Purpose is to treat acidic coal pile runoff
Treatment system is a series of constructed wetland cells
Where it Begins Chemical process begins at the coal pile Pyrite oxidation process occurs:
Pyrite + Bacteria + Moisture acid2FeS2(s)+7O2+2H2O 2Fe2++4SO4
2-+4H+
Water produced is high in dissolved metals Aluminum
Iron
Acidic CPR is harmful to aquatic life
Runoff is routed to a detention basin Coal pile runoff pH ranges between
2.5 and 5.5
ReRAPSReRAPS (Recirculating Reducing and
Alkalinity Producing System)Treats runoff using an alternative constructed
wetland design Provides improved wetland performance Based on partial recirculation of treated water into
detention pond (pH >4.25)Set to 20 to 40 gpm, <6”- 24hr rainSemi-passive RAPS based system
Combined pump/gravity generated systemRecirculation moderate pH in detention pond
Minimize potential Al hydroxide plugging (armoring) of RAPS substrate
11 acre coal pile
Constructed Wetland
Coal Pile
RunoffCollection
DetentionBasin
CattailFilter
OxidationPrecipitation
Basin
RAPS & Stilling Basin
WetlandStorage Basin
Aeration
VegetativeCell
Flow Diagram
RiverDischarge
Coal Pile
RunoffCollection
DetentionBasin
CattailFilter
OxidationPrecipitation
Basin
RAPS & Stilling Basin
WetlandStorage Basin
Aeration
VegetativeCell
Flow Diagram
RiverDischarge
RAPS or Vertical Flow Component
Organic matter is composed of wood chips, also cow, horse , and chicken manure.
Pooled WaterPooled WaterPooled Water
Coal Pile RunoffLow pH
D-FeD-Al
(avoided)Neutral pHLow ORP
D-Fe passes throughOrganicMatter
Pooled Water
Alkalinity productionMetal sulfide precipitation
Limestone
RAPS Chemistry Alkalinity Production
Limestone Dissolution CaCO3 (s)+H+ Ca2+ +HCO3
-
Organic Decomposition 2CH2O+SO4
2- H2S+2HCO3-
Metal sulfide precipitation Me2+
(ag) +S- (ag) MeS2(s)
Background2 acre ReRAPS has
successfully treated coal pile runoff for over 10 yrs. Neutralize acidity Reduce toxicity to aquatic life
0.1 acre RAPS or vertical flow component (VFC) RAPS cell is the heart of the
wetland Performance has
diminished due to decomposition and reduced porosity (plugging).
Waste Characteristics and Disposal•Toxicity Characteristics Leaching Potential (TCLP)
• TCLP results determined that the materials were non hazardous
•Disposal option chosen was off-site landfill•Greenhouse Gas (GHG) Rule reporting avoided
•Cost effectiveness
Hazardous Waste Identification
Test Results Found (mg/l)
TCLP Regulatory
Level (mg/L)
Silver ND (<0.006) 5.0
Arsenic ND (<0.009) 5.0Barium 0.103 100.0
Cadmium 0.003 1.0
Chromium ND (<0.01) 5.0
Mercury ND (<0.0002) 0.2Lead ND (<0.01) 5.0
Selenium ND (<0.02) 1.0
Majority of the decomposed
materials was replaced Through joint efforts between
EA Field Services and Plant Gorgas, the old organics/limestone have been removed and replaced Process was accomplished
by allowing the system to completely dry
Material was removed in layers to assure thorough drying
Dried product then hauled to a off-site landfill.
Waste removal process
Quantity of Material Removed/Replaced-“Revitalizing” the Wetland
• Organic Material• 220 tons • 4 ft in depth•125 ft long• wood chip/manure mixture
•Limestone• 30 tons •1 ft of the original 3 ft• 3 to 4 inch stone
Back In BusinessThe wetland is in full operation mode.With recent rain events, there is now CPR
water to be treated Testing and pH monitoring has confirmed
optimal performance Annual compliance test are TSS, pH and
oil & grease