gore st -...

3
QUEEN ST HOBSON ST GALWAY ST TYLER ST WELLESLEY ST WEST VICTORIA ST EAST CUSTOMS ST WEST MILLS LANE SWANSON ST WYNDHAM ST DURHAM ST WEST FORT ST SHORTLAND ST MILLS LANE LOWER ALBERT ST WYNDHAM ST KINGSTON ST FEDERAL ST DURHAM LANE QUEEN ST WELLESLEY ST WEST SWANSON ST QUEEN ST ALBERT ST ALBERT ST CUSTOMS ST WEST MILLS LANE COMMERCE ST COMMERCE ST MAYORAL DRIVE CUSTOMS ST EAST QUAY ST WOLFE ST GORE ST GALWAY ST TYLER ST FANSHAWE ST VICTORIA ST WEST VICTORIA ST WEST FEDERAL ST FORT LANE ELLIOT ST DARBY ST CLIENT DATE TITLE REVISION DETAILS DATE REV APPROVED CHECKED APPROVED PROJECT DRAWN DESIGNED TYPE REVISION ZONE ELEMENT DISCIPLINE SCALE SIZE . SHEET PROJECT DOCUMENT 0 20mm 40 60 80 100 300 200 400 500 600 700 800 ORIGINAL SIZE A1 LEGEND 0 SCALE 1:1250 12.5 25 50m BRITOMART BLUESTONE WALL CITY RAIL LINK ALBERT ST STORMWATER REALIGNMENT LOCATION PLAN CRL PAT EPD 000 DRG 0001 1.0 PRELIMINARY NOT FOR CONSTRUCTION 1:1250 B.HINGSTON R.ALEA M.MORADALIZADEM B.NEMNS 1.0 28.10.14 FOR CONSENT 13/11/2014 3:09:11 p.m. Auckland pw:\\DESIGNSHARE.AU.AURECON.INFO:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link (CDE)\01-WIP\Drawings\CRL-PAT-EPD-000-DRG-0001.dwg ALBERT ST STORMWATER MAIN REALIGNMENT TEMPORARY WORKS SUPPORT AREA. REFER STAGING DRAWINGS FOR DETAILS EXTENT OF PIPE JACKING WORKS EXTENT OF PIPE JACKING WORKS TEMPORARY WORKS SUPPORT AREA. REFER STAGING DRAWINGS FOR DETAILS TEMPORARY WORK SUPPORT AREA. ORAKEI MAIN SEWER STRENGTHENING. REFER STAGING DRAWINGS FOR DETAILS EXTENT OF ORAKEI MAIN SEWER STRENGTHENING WORKS ORAKEI MAIN SEWER STRENGTHENING WORKS PROPOSED ALBERT STREET STORM WATER REALIGNMENT WORKS PROPOSED ORAKEI MAIN SEWER STRENGTHENING WORKS CONSTRUCTION SUPPORT AREA

Upload: dinhhanh

Post on 09-Mar-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: GORE ST - temp.aucklandcouncil.govt.nztemp.aucklandcouncil.govt.nz/EN/ratesbuildingproperty/consents/get... · client date title revdate revision details approved checked approved

QUEEN ST

HOBSON ST

GALWAY ST

TYLER STW

ELLE

SLEY

ST

WES

T

VICT

ORIA

ST

EAST

CUSTOMS ST WEST

MILL

S LA

NE

SWAN

SON

ST

WYN

DHAM

ST

DURH

AM S

T W

EST

FORT ST

SHORTLAND ST

MILLS LANE

LOWER ALBERT ST

WYN

DHAM

ST

KING

STON

ST

FEDERAL ST

DURHAM LANE

QUEEN ST

WEL

LESL

EY S

T W

EST

SWAN

SON

ST

QUEEN ST

ALBERT ST ALBERT ST

CUSTOMS ST WEST

MILLS LANE

COMMERCE STCOMMERCE ST

MAYORAL DRIVE

CUSTOMS ST EAST

QUAY ST

WOL

FE S

T

GORE ST

GALWAY ST

TYLER ST

FANSHAWE ST

VICT

ORIA

ST

WES

TVI

CTOR

IA S

T W

EST

FEDERAL ST

FORT LANE

ELLIOT ST

DARB

Y ST

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

TYPE REVISIONZONE ELEMENTDISCIPLINE

SCALE SIZE

.

SHEETPROJECT

DOCUMENT

0 20mm 40 60 80 100 300200 400 500 600 700 800ORIGINAL SIZE

A1

LEGEND

0

SCALE 1:1250

12.5 25 50m

BRITOMART

BLUESTONE WALL

CITY RAIL LINK

ALBERT ST STORMWATER REALIGNMENTLOCATION PLAN

CRL PAT EPD 000 DRG 0001 1.0

PRELIMINARYNOT FOR CONSTRUCTION1:1250

B.HINGSTON

R.ALEA

M.MORADALIZADEM B.NEMNS

1.0 28.10.14 FOR CONSENT

13/11

/2014

3:09

:11 p.

m.Au

cklan

dpw

:\\DES

IGNS

HARE

.AU.

AURE

CON.

INFO

:PW

_PRO

D_AU

\Doc

umen

ts\Pr

ojects

\23xx

xx\23

9933

- Ci

ty Ra

il Link

(CDE

)\01-

WIP

\Dra

wing

s\CRL

-PAT

-EPD

-000

-DRG

-000

1.dwg

ALBERT ST STORMWATER MAIN REALIGNMENT

TEMPORARY WORKS SUPPORTAREA. REFER STAGINGDRAWINGS FOR DETAILS

EXTENT OF PIPEJACKING WORKS

EXTENT OF PIPEJACKING WORKS

TEMPORARY WORKS SUPPORTAREA. REFER STAGINGDRAWINGS FOR DETAILS

TEMPORARY WORK SUPPORT AREA.ORAKEI MAIN SEWER STRENGTHENING.REFER STAGING DRAWINGS FOR DETAILS

EXTENT OF ORAKEIMAIN SEWERSTRENGTHENINGWORKS

ORAKEI MAIN SEWERSTRENGTHENING WORKS

PROPOSED ALBERT STREET STORMWATER REALIGNMENT WORKSPROPOSED ORAKEI MAIN SEWERSTRENGTHENING WORKS

CONSTRUCTION SUPPORT AREA

Page 2: GORE ST - temp.aucklandcouncil.govt.nztemp.aucklandcouncil.govt.nz/EN/ratesbuildingproperty/consents/get... · client date title revdate revision details approved checked approved

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

TYPE REVISIONZONE ELEMENTDISCIPLINE

SCALE SIZE

.

SHEETPROJECT

DOCUMENT

0 20mm 40 60 80 100 300200 400 500 600 700 800ORIGINAL SIZE

A10

SCALE 1:250

2.5 5 10m CITY RAIL LINK

ALBERT ST STORMWATER REALIGNMENTSWANSON SHAFT WORKSITE AND TTM

CRL PAT EPD 000 DRG 0011 1.0

PRELIMINARYNOT FOR CONSTRUCTIONAS SHOWN

B.HINGSTON

R.ALEA

M.MORADALIZADEH D.ANDERSON

1.0 29.10.14 FOR CONSENT D.ANDERSON

13/11

/2014

3:11

:24 p.

m.Au

cklan

dpw

:\\DES

IGNS

HARE

.AU.

AURE

CON.

INFO

:PW

_PRO

D_AU

\Doc

umen

ts\Pr

ojects

\23xx

xx\23

9933

- Ci

ty Ra

il Link

(CDE

)\01-

WIP

\Dra

wing

s\CRL

-PAT

-EPD

-000

-DRG

-001

1.dwg

0

SCALE 1:100

1 4m2

PROPOSEDSTORMWATERDIVERSION

EXISTINGSTORMWATERDRAIN

PROPOSED6.5m x 3.5m SHAFT

1

DETAIL 1-1:100

PROPOSEDSTORMWATERDIVERSION

EXISTINGSTORMWATERDRAINABANDONED

EXISTINGSTORMWATERDRAIN

PROPOSED WORKSITEWITH HOARDING

EXISTINGKERB LINE

EXISTINGKERB LINE

C

PILE WALL

3.5m6.5m

BLUESTONE WALL30

m

8.0m

LEGENDEXISTING STORMWATER DRAINPROPOSED STORMWATER DIVERSION ALIGNMENTPROPOSED JACKING SHAFT PILE WALLPROPOSED HOARDING

PROPOSED TEMPORARY CONSTRUCTION ZONEPROPOSED TEMPORARY VEHICLE TRAFFIC LANE

PROPOSED TEMPORARY VEHICLE TRAFFIC DIRECTIONPROPOSED TEMPORARY PEDESTRIAN PATH

PROPOSED LONG 750mm Ø PILE

PROPOSED SHORT 750mm Ø PILEPROPOSED 500mm Ø PILEPROPOSED 300mm Ø PILEPROPOSED LAGGING / JGP BELOW UTILITIES

ALBERT STREET STORMWATER MAIN DIVERSION

Page 3: GORE ST - temp.aucklandcouncil.govt.nztemp.aucklandcouncil.govt.nz/EN/ratesbuildingproperty/consents/get... · client date title revdate revision details approved checked approved

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

TYPE REVISIONZONE ELEMENTDISCIPLINE

SCALE SIZE

.

SHEETPROJECT

DOCUMENT

0 20mm 40 60 80 100 300200 400 500 600 700 800ORIGINAL SIZE

A10

SCALE 1:250

2.5 5 10m CITY RAIL LINK

ALBERT ST STORMWATER REALIGNMENTVICTORIA SHAFT WORKSITE AND TTM

CRL PAT EPD 000 DRG 0012 1.0

PRELIMINARYNOT FOR CONSTRUCTIONAS SHOWN

B.HINGSTON

R.ALEA

M.MORADALIZADEH D.ANDERSON

1.0 24.10.14 FOR CONSENT D.ANDERSON

13/11

/2014

3:16

:41 p.

m.Au

cklan

dpw

:\\DES

IGNS

HARE

.AU.

AURE

CON.

INFO

:PW

_PRO

D_AU

\Doc

umen

ts\Pr

ojects

\23xx

xx\23

9933

- Ci

ty Ra

il Link

(CDE

)\01-

WIP

\Dra

wing

s\CRL

-PAT

-EPD

-000

-DRG

-001

2.dwg

0

SCALE 1:100

1 4m2

PROPOSEDSTORMWATERDIVERSION

EXISTINGSTORMWATERDRAIN

2

BLUESTONE WALL

EXISTING STORMWATER DRAIN

DETAIL 2-NTS

ORAKEI MAIN SEWER

LEGENDEXISTING STORMWATER DRAINPROPOSED STORMWATER DIVERSION ALIGNMENTPROPOSED JACKING SHAFT PILE WALLPROPOSED HOARDING

PROPOSED TEMPORARY CONSTRUCTION ZONEPROPOSED TEMPORARY VEHICLE TRAFFIC LANE

PROPOSED TEMPORARY VEHICLE TRAFFIC DIRECTIONPROPOSED TEMPORARY PEDESTRIAN PATH

PROPOSED LONG 750mm Ø PILE

PROPOSED SHORT 750mm Ø PILEPROPOSED 500mm Ø PILEPROPOSED 300mm Ø PILEPROPOSED LAGGING / JGP BELOW UTILITIES

STEEL DECK PLACEDOVER SHAFT

NOTE:GANTRY CRANE ABOVE SHAFT

70m

SLURRYSEPARATION

CONTROL UNIT

PIT

TANKS

SHORT PILESABOVE OMS

EXISTING STORMWATER DRAIN

6.3m

5.3m4.5m 3.5m 3.0m 8.9m

LAUNCH SHAFT

PIPE STORAGE

ORAKEI MAIN SEWER

1.5m

EDGE OF CANOPY

DIVERT STORMWATER DRAIN JACKING FRAMES (3m WIDTH)

B

PIPESTORAGE

BLOCK SEAL

TEMPORARY DIVERSION (MINED)

6.2m

9.8m

ALBERT STREET STORMWATER MAIN DIVERSION