good safety practices
TRANSCRIPT
-
7/30/2019 Good safety practices
1/39
GOOD SAFETY PRACTI CES
-
7/30/2019 Good safety practices
2/39
Hoarding constructed accordance with Commissioner ofBuilding Control requirements.
-
7/30/2019 Good safety practices
3/39
Piling Machine
Inspected by Approved person
Daily inspection by designatedperson
Warning sign provided
Footing in sound condition
-
7/30/2019 Good safety practices
4/39
Shoring constructed in accordance to P.E. design forexcavation of more than 1.5 metre with the use of
mechanical digger
-
7/30/2019 Good safety practices
5/39
Shoring constructed in accordance to P.E. design forexcavation of more than 4.0 metre.
-
7/30/2019 Good safety practices
6/39
Open side of excavation more than 3 metre depthguarded by adequate barricade
-
7/30/2019 Good safety practices
7/39
Valid LM certificate
Daily check by crane operator
Lifting Supervisor supervising lifting operationRigger and signalman appointed for lifting operation
-
7/30/2019 Good safety practices
8/39
M t i l/ h i t
-
7/30/2019 Good safety practices
9/39
Hoist operated by authorized person
Material/passenger hoist
-
7/30/2019 Good safety practices
10/39
Worksite to be kept clean and free from effluents, nuisancesand conditions that can be detrimental to the workers andPublic health
-
7/30/2019 Good safety practices
11/39
Materials neatly stacked in safe and orderly manner
-
7/30/2019 Good safety practices
12/39
Temporary material
platform constructedand installed in
accordance to PE
design.
-
7/30/2019 Good safety practices
13/39
Generator With Bund Wall
-
7/30/2019 Good safety practices
14/39
Generator fenced off against unauthorized use.
-
7/30/2019 Good safety practices
15/39
Main distribution boardand switch gear
Checked and tested
monthly by LEW
-
7/30/2019 Good safety practices
16/39
-
7/30/2019 Good safety practices
17/39
-
7/30/2019 Good safety practices
18/39
DIESEL STORAGE WITH SIGNAGES
-
7/30/2019 Good safety practices
19/39
DIESEL STORAGE WITH SIGNAGES
AND PROVISION OF BUND WALL.
-
7/30/2019 Good safety practices
20/39
Tower crane base barricaded with warningsign. Free of water and obstructions.
-
7/30/2019 Good safety practices
21/39
Crawler Craneaccess laid withsteel plate
-
7/30/2019 Good safety practices
22/39
Crane access properly constructed and weekly check carried out
-
7/30/2019 Good safety practices
23/39
Scaffold erected in accordance to P.E. design.Working platform at alternate lift.Overlay or screen netting envelope scaffold
-
7/30/2019 Good safety practices
24/39
Base plate secured to soleplate and on solid ground
Scaffold stair providedaccess to working platform
-
7/30/2019 Good safety practices
25/39
Working platform closely decked and continuous with toeboard and guardrails
-
7/30/2019 Good safety practices
26/39
Signboard showingmaximum loads
-
7/30/2019 Good safety practices
27/39
Oxy-acetylene cylinders kept
upright in wheeled trolley
Gas cylinder fitted with
regulating valve andflashback arrestor
-
7/30/2019 Good safety practices
28/39
A worker anchored to a safety belt and anindependent lifeline when working on agondola. Materials on gondola are evenlydistributed
-
7/30/2019 Good safety practices
29/39
Peripheral overhead shelter erected around the building
-
7/30/2019 Good safety practices
30/39
Overhead shelters erected at every point of entry/exit of buildings
-
7/30/2019 Good safety practices
31/39
Formwork checked before, during and after concreting by
formwork supervisor
-
7/30/2019 Good safety practices
32/39
Formwork shall be design by P.E. where the ceilingheight exceed 9.14 metres
P.E. shall be responsible for the supervision of theconstruction and stability of the structure.
-
7/30/2019 Good safety practices
33/39
All openings are closed barricaded or effectively protected
-
7/30/2019 Good safety practices
34/39
Lift opening effectively barricaded
Lifting operation
-
7/30/2019 Good safety practices
35/39
Lifting operation
-
7/30/2019 Good safety practices
36/39
Large bin at lower end of each chute
-
7/30/2019 Good safety practices
37/39
Storage of material 610 mmaway from edge of building
-
7/30/2019 Good safety practices
38/39
Adequate ventilationprovided at work area
Exhaust fan provided to
remove dust particlegenerate from grinding
-
7/30/2019 Good safety practices
39/39
Safety harness