going green 2011 slides_cundall
TRANSCRIPT
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 1/54
SustainabilityNew Rules for 2011
15-20 St Pauls SquareBirmingham
B3 1RB
0121 262 2720
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 2/54
Who am I?
Robert van Zyl
Cadbury HQ, Bournville
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 3/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Day-lighting
Fan power, and riser sizes
Miscellaneous: Air-conditioning
inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emissions factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
8. Route to zero carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 4/54
Part L
Revision
Timeline for UK Legislation Overview
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Energy
Act
ClimateChange
Act
Planning
Act
Part L
Revision
Part L
RevisionPart L
Revision
Renewable
Heat Incentive
CRC
BREEAM 2011
New homes to
be carbon
zero
Feed-In
Tariff
New public
buildings to
be carbon
zero
All new buildings
to be carbon zero
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 5/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Day-lighting
Fan power, and riser sizes
Miscellaneous: Air-conditioning
inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emissions factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Route to zero carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 6/54
Reduced limits on Carbon Emissions
25%
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 7/54
Reduced limits on Carbon Emissions
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 8/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Day-lighting
Fan power, and riser sizes
Miscellaneous: Air-conditioning
inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emissions factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Route to zero carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 9/54
Calculation Method Part L CO2 Target
Does all compliant software give the same results?If not what would be acceptable difference?
-25%
-20%
-15%-10%
-5%
0%
5%
10%
15%
20%
TAS IES IES - sBEM sBEM
4.5% 4.5%
17.8%
-23.3%
Pass
Part L 2010
Fail
Part L 2010
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 10/54
Calculation Method 10% Renewables
What about Total Carbon (Including small power and process loads)?
0
5
10
15
20
25
30
35
TAS IES IES - sBEM sBEM
27
23
3235
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 11/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Lighting
Fan power, and riser sizes
Miscellaneous: Air-conditioning
inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emissions factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Route to zero carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 12/54
Task Lighting still not considered
Cadburys, Birmingham
BCO 2009 Regional Awards Winner
BSJ 2007 Sustainability Award Winner
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 13/54
Lighting Case Study
Double T5 LampSingle T5 Lamp
30% loss of light
Scattering of light
92% light transmission
Refraction of light
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 14/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Lighting
Fan power, and riser sizes
Miscellaneous: Air-conditioning
inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emissions factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Recap: How to do it
Steps to low carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 15/54
Shortlisted for Brick 2008 Awards
Standton Williams / Morey Smith Architects
Winner of BCO Regional Awards 2009Winner of Brick 2008 Awards
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 16/54
Natural Ventilation Case Study: BIC
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 17/54
Shading
Building overhangsground floor
First floor external
shading
Timber slats to atria
space
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 18/54
Natural Ventilation
No cooling Type
Cross vent on ground
Single sided on first
Secure night purge
Ground floor (louvres)
First floor (high level
windows)
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 19/54
Typical internal space
External shading High level automated
openings
Openable Windows
Roller blinds on guidewires
Insulated spandrels
Perimeter lights off due to
daylight
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 20/54
Central hub
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 21/54
Butterfield Innovation Centre, Luton
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 22/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Lighting
Fan power, and riser sizes
Air-conditioning inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emissions factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Recap: How to do it
Steps to low carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 23/54
Air Conditioning Inspections
Air Conditioning Inspections (required by EPBD)
250kW or greater January 2009 deadline
12kW or greater January 2011 deadline 5 Year intervals between inspections
Improvement report provided to tenant / land lord
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 24/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Lighting
Fan power, and riser sizes
Air-conditioning inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
- Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emissions factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Route to zero carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 25/54
Dwellings - Thermal Bridging
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 26/54
12%
4% 3%
-6%
1%
-8%-10%
-19%
-6%
-17%-20%
-29%
South
East/West
North
Dwellings - Carbon compliance
Whole house
mech vent + HR
Natural
Ventilation
Option 1 Electric Panel heaterswith mechanical ventilation
- Reduce air permeability
from 5 to <3.5- Reduce roof U-Value
from 0.18 to 0.16
- - value
from 0.08 to 0.04
... Close to PassivHaus®
standard
Mid-Floor
Pass or fail
Part L 2010 is
to do with area
weighted
results
Top Floor
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 27/54
12%
4% 3%
-6%
1%
-8%-10%
-19%
-6%
-17%-20%
-29%-30%
-25%
-20%
-15%
-10%
-5%
0%
5%
10%
15%
South
East/West
North
Dwellings - Carbon compliance
Natural
Ventilation
Top Floor Mid-Floor
Option 2 Electric Panel heaters with natural ventilation
- Must add Renewable Energy
(e.g. Solar hot water)
South
East/West
North
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 28/54
15% 15%
12%
11%
8%8%
4%3%
4%
2%
-1% -2%
Dwellings - Carbon compliance
Whole house
mech vent + HR
Natural
Ventilation
Option 3 Air Source Heat Pumps (split units)
With Natural Ventilation
- Must improve insulation
and air permeability for top floor, north facing
rooms
South
East/West
North Top Floor Mid-Floor Top Floor Mid-Floor
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 29/54
4% 3%
9%7%
-2%
-4%
0%
-2%
-7%
-10%
-6%-8%
Dwellings - Carbon compliance
Option 4: Gas condensing boiler
Natural
Ventilation
Top Floor Mid-Floor
To pass with Natural ventilation:
- Improve Air Permeability- Improve U-Values
(walls, window and roof)
-
- And improve boiler controls
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 30/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Lighting
Fan power, and riser sizes
Air-conditioning inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
- Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emissions factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Recap: How to do it
Steps to low carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 31/54
U-values 1.8 - glazing
Limiting overheating in
summer
glass area
g-value
shading blinds
Solar gain through any facade
must be less thanSolar gain (kWh) through 1m high
strip window (g=0.68) on east
facade during 4 months in summer
in your location
EastFacade
1m high strip window
(g=0.68)
Glazing and Overheating
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 32/54
Case Study: Vodafone HQ
Vodafone HQ
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 33/54
Balance overheating & daylight
Increased glass
height=
higher
performance
glass (OR
external shading)=
lower visible light
transmission!
1.3m 1.6m 2.5m
1m highwindows
(g=0.68)
=
not enough
daylight!
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 34/54
Case Study: Triple Glazing
Wellcome Trust, London
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 35/54
Facade solution
Double glazing External Blind
Outer Glass
Ventilated cavity
Open in summer
Closed in winter
Facade prototype
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 36/54
Facade analysis - lots
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 37/54
Wellcome Trust, London
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 38/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Lighting
Fan power, and riser sizes
Air-conditioning inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
- Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emission factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Recap: How to do it
Steps to low carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 39/54
Feed-in- April 2010)
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Energy
Act
Climate
Change
Act
Planning
Act
Feed-InTariff Government are reviewing
upper limit and are consideringrestricting to 50kW max
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 40/54
Renewable Heat Incentive
Renewable Heat Incentive Commence 1st April 2011
20th October 2010 spending review still on
May apply to systems installed in 2010
Biggest rewards for property not on natural gas
grid
Payment for each kWh heat generated (p/kWh)
installations
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 41/54
Renewable Heat Incentive (draft)
Technology Scale Tariff
(p/kWh)
Tariff Lifetime
(years)
Small installations
Solid biomass Up to 45kW 9 15
Biodiesel Up to 45kW 6.5 15
Biogas on-site combustion Up to 45kW 5.5 10
Ground source heat pumps Up to 45kW 7 23
Air source heat pumps Up to 45kW 7.5 18
Solar thermal Up to 20kW 18 20
Medium installations
Solid biomass 45kW-500kW 6.5 15
Biogas on-soite combustion 45kW-200kW 5.5 10
Ground source heat pumps 45kW-350kW 5.5 20
Air source heat pumps 45kW-350kW 2 20
Solar thermal 20kW-100kW 17 20
Large installations
Solid biomass 500kW and above 1.6 -2.5 15
Ground source heat pumps 350kW and above 1.5 20
Biomethane injection All scales 4 15
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 42/54
Renewables
Rules
- Understand the requirement (Is it Part L compliance, planningor EPC (BREEAM) or zero carbon...)
- Choose right software to meet requirement
- Understand building energy profile
- Carry out steps to low carbon
-
Heat pumps GSHP & ATES CHP Tri-gen Biomass CHP Biodiesel CHP
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 43/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Lighting
Fan power, and riser sizes
Air-conditioning inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
- Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emission factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Recap: How to do it
Steps to low carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 44/54
Consequential Improvements
No Change
Applies when existing building TUFA is
>1,000m2 and scope of works consists of
/ includes:
An extension
Initial provision of M&E services Increase capacity of M&E
If list on right is >10% of the construction
cost, then ok
Not required if >15 year payback If heating is increased, then fabric must
be improved too
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 45/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Lighting
Fan power, and riser sizes
Air-conditioning inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
- Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emission factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Recap: How to do it
Steps to low carbon
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 46/54
BREEAM 2011
New Street Square
BSJ Sustainable Building Award Winner 2008
What are BREEAM changes?
Introduction to new rules
received 7th February 2011
BREEAM 2011 will be launched
Spring / Summer
Consolidation of credits and
manual
BREEAM 2011 only applies to
New Buildings
Refurbishment can use 2008
rules or 2011
Fit-out must use 2008 rules
BREEAM In-Use required for
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 47/54
BREEAM 2011
What are the new BREEAM credits:INNOVATION
10 max credits
MANAGEMENT
Man 1 Sustainable procurement (8)
Man 2 Responsible construction practices (2)
Man 3 Construction site impacts (5)
Man 4 Stakeholder participation (4)
Man 5 Service life planning and costing (3)HEALTH AND WELLBEING
Hea 1 Visual comfort (3-5)
Hea 2 Indoor air quality (6)
Hea 3 Thermal comfort (2)
Hea 4 Water quality (1)
Hea 5 Acoustic performance (2-4)
Hea 6 Safety and security (2)
ENERGY
Ene 1 Reduction of CO 2 Emissions (15)
Ene 2 Energy Monitoring (1-2)
Ene 3 Low or zero carbon technologies (5)
Ene 4 Energy efficient external lighting (1)
Ene 5 Energy efficient cold storage systems (0-3)
Ene 6 Energy efficient transportation systems (0-2)
Ene 7 Energy efficient laboratory systems (0-5)Ene 8 Energy efficient equipment (process) (0-2)
Ene 9 Drying space (building type specific) (0-1)
TRANSPORT
Tra 1 Public transport accessibility (2-6)
Tra 2 Proximity to amenities (0-1)
Tra 3 Cyclists facilities (1-2)
Tra 4 Maximum car parking capacity (0-2)
Tra 5 Travel plan (1)
WATERWat 1 Water Consumption (5)
Wat 2 Water Monitoring (1)
Wat 3 Water leak detection and prevention (2)
Wat 4 Water efficient equipments (process) (2)
MATERIALS
Mat 1 Life cycle impacts (2-6)
Mat 2 Hard landscaping and boundary protection (1)
Mat 3 Responsible sourcing of materials (3)
Mat 4 Insulation (2)
Mat 5 Designing for robustness (1)
WASTE
Wst 1 Construction waste management (4)Wst 2 Recycled aggregates (1)
Wst 3 Operational waste (1)
Wst 4 Speculative floor and ceiling finishes (0-1)
LAND USE AND ECOLOGY
LE 1 Site selection (2)
LE 2 Ecological value of site and
Protection of ecological features (1)
LE 3 Mitigating ecological impact (2)
LE 4 Enhancing site ecology (2-3)LE 5 Long term impact on biodiversity (2)
POLLUTION
Pol 1 Refrigerants (3)
Pol 2 NOx emissions from heating source (2-3)
Pol 3 Surface water run-off (5)
Pol 4 Reduction of night time light pollution (1)
Pol 5 Noise attenuation (1)
Man 1 Commissioning
Thermographic survey
BREEAM AP
Building user guide
Maintenance
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 48/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Lighting
Fan power, and riser sizes
Air-conditioning inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
- Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emission factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. Recap: How to do it
Steps to low carbon
f b h k ?
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 49/54
EPC v DEC for benchmarking?
Modelled Building loads only Actual Building and Process loads
H 176-200
I 201-225
J 226-250
K 251-275 269
C f
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 50/54
Display Energy Certificates
0 2000 4000 6000 8000 10000 12000
A
B
C
D
E
F
G
X
DEC Ratings - 2010
E P f C tifi t
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 51/54
Energy Performance Certificates
EPBD2 rules must be
implemented 2012-2013
EPBD2 will require more details
recommendations
EPBD2 requires EPC to be
displayed in buildings >500m2
that are frequently visited by thepublic
C t t N S t i bilit R l
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 52/54
Contents: New Sustainability Rules
1. New rules for Energy use:
CO2 Emissions limits Calculation methodology
Lighting
Fan power, and riser sizes
Air-conditioning inspections
2. Interlude: examples
3. New rules for facades:
Air permeability
Thermal bridging
- Effect on dwellings
Glazing and Overheating
4. New rules for Renewable energy
Carbon emission factors Feed-in tariffs
Renewable Heat Incentive
5. New Rules for Refurbishments
Consequential Improvements
6. New Rules for BREEAM
The Future
8. The future: Zero Carbon
Z C b H 2016
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 53/54
Zero Carbon Homes - 2016
Zero Carbon
70% of zero carbon target:
Energy Efficiency
On-site systems Allowable Solutions
Th k
8/3/2019 Going Green 2011 Slides_cundall
http://slidepdf.com/reader/full/going-green-2011-slidescundall 54/54
Thank you