going green 2011 slides_cundall

54
Sustainability New Rules for 2011 15-20 St Pauls Square Birmingham B3 1RB 0121 262 2720

Upload: daniel-lewis-tomlinson

Post on 06-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 1/54

SustainabilityNew Rules for 2011

15-20 St Pauls SquareBirmingham

B3 1RB

0121 262 2720

Page 2: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 2/54

Who am I?

Robert van Zyl

Cadbury HQ, Bournville

Page 3: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 3/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Day-lighting

Fan power, and riser sizes

Miscellaneous: Air-conditioning

inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emissions factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

8. Route to zero carbon

Page 4: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 4/54

Part L

Revision

Timeline for UK Legislation   Overview

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Energy

Act

ClimateChange

Act

Planning

Act

Part L

Revision

Part L

RevisionPart L

Revision

Renewable

Heat Incentive

CRC

BREEAM 2011

New homes to

be carbon

zero

Feed-In

Tariff 

New public

buildings to

be carbon

zero

All new buildings

to be carbon zero

Page 5: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 5/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Day-lighting

Fan power, and riser sizes

Miscellaneous: Air-conditioning

inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emissions factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Route to zero carbon

Page 6: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 6/54

Reduced limits on Carbon Emissions

25%

Page 7: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 7/54

Reduced limits on Carbon Emissions

Page 8: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 8/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Day-lighting

Fan power, and riser sizes

Miscellaneous: Air-conditioning

inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emissions factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Route to zero carbon

Page 9: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 9/54

Calculation Method   Part L CO2 Target

Does all compliant software give the same results?If not what would be acceptable difference?

-25%

-20%

-15%-10%

-5%

0%

5%

10%

15%

20%

TAS IES IES - sBEM sBEM

4.5% 4.5%

17.8%

-23.3%

Pass

Part L 2010

Fail

Part L 2010

Page 10: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 10/54

Calculation Method   10% Renewables

What about Total Carbon (Including small power and process loads)?

0

5

10

15

20

25

30

35

TAS IES IES - sBEM sBEM

27

23

3235

Page 11: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 11/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Lighting

Fan power, and riser sizes

Miscellaneous: Air-conditioning

inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emissions factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Route to zero carbon

Page 12: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 12/54

Task Lighting   still not considered

Cadburys, Birmingham

BCO 2009 Regional Awards Winner 

BSJ 2007 Sustainability Award Winner 

Page 13: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 13/54

Lighting   Case Study

Double T5 LampSingle T5 Lamp

30% loss of light

Scattering of light

92% light transmission

Refraction of light

Page 14: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 14/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Lighting

Fan power, and riser sizes

Miscellaneous: Air-conditioning

inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emissions factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Recap: How to do it

Steps to low carbon

Page 15: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 15/54

Shortlisted for Brick 2008 Awards

Standton Williams / Morey Smith Architects

Winner of BCO Regional Awards 2009Winner of Brick 2008 Awards

Page 16: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 16/54

Natural Ventilation Case Study: BIC

Page 17: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 17/54

Shading

Building overhangsground floor 

First floor   external

shading

Timber slats to atria

space

Page 18: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 18/54

Natural Ventilation

No cooling Type

  Cross vent on ground

  Single sided on first

Secure night purge

  Ground floor (louvres)

  First floor (high level

windows)

Page 19: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 19/54

Typical internal space

External shading High level automated

openings

Openable Windows

Roller blinds on guidewires

Insulated spandrels

Perimeter lights off due to

daylight

Page 20: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 20/54

Central hub

Page 21: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 21/54

Butterfield Innovation Centre, Luton

Page 22: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 22/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Lighting

Fan power, and riser sizes

Air-conditioning inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emissions factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Recap: How to do it

Steps to low carbon

Page 23: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 23/54

Air Conditioning Inspections

Air Conditioning Inspections (required by EPBD)

250kW or greater January 2009 deadline

12kW or greater January 2011 deadline 5 Year intervals between inspections

Improvement report provided to tenant / land lord

Page 24: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 24/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Lighting

Fan power, and riser sizes

Air-conditioning inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

- Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emissions factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Route to zero carbon

Page 25: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 25/54

Dwellings - Thermal Bridging

Page 26: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 26/54

12%

4% 3%

-6%

1%

-8%-10%

-19%

-6%

-17%-20%

-29%

South

East/West

North

Dwellings - Carbon compliance

Whole house

mech vent + HR

Natural

Ventilation

Option 1   Electric Panel heaterswith mechanical ventilation

- Reduce air permeability

from 5 to <3.5- Reduce roof U-Value

from 0.18 to 0.16

- - value

from 0.08 to 0.04

... Close to PassivHaus®

standard

Mid-Floor 

Pass or fail

Part L 2010 is

to do with area

weighted

results

Top Floor 

Page 27: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 27/54

12%

4% 3%

-6%

1%

-8%-10%

-19%

-6%

-17%-20%

-29%-30%

-25%

-20%

-15%

-10%

-5%

0%

5%

10%

15%

South

East/West

North

Dwellings - Carbon compliance

Natural

Ventilation

Top Floor Mid-Floor 

Option 2   Electric Panel heaters with natural ventilation

- Must add Renewable Energy

(e.g. Solar hot water)

South

East/West

North

Page 28: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 28/54

15% 15%

12%

11%

8%8%

4%3%

4%

2%

-1% -2%

Dwellings - Carbon compliance

Whole house

mech vent + HR

Natural

Ventilation

Option 3 Air Source Heat Pumps (split units)

With Natural Ventilation

- Must improve insulation

and air permeability for top floor, north facing

rooms

South

East/West

North Top Floor Mid-Floor Top Floor  Mid-Floor 

Page 29: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 29/54

4% 3%

9%7%

-2%

-4%

0%

-2%

-7%

-10%

-6%-8%

Dwellings - Carbon compliance

Option 4: Gas condensing boiler 

Natural

Ventilation

Top Floor Mid-Floor 

To pass with Natural ventilation:

- Improve Air Permeability- Improve U-Values

(walls, window and roof)

-

- And improve boiler controls

Page 30: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 30/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Lighting

Fan power, and riser sizes

Air-conditioning inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

- Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emissions factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Recap: How to do it

Steps to low carbon

Page 31: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 31/54

U-values  1.8 - glazing

Limiting overheating in

summer 

  glass area

  g-value

  shading  blinds

Solar gain through any facade

must be less thanSolar gain (kWh) through 1m high

strip window (g=0.68) on east

facade during 4 months in summer 

in your location

EastFacade

1m high strip window

(g=0.68)

Glazing and Overheating

Page 32: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 32/54

Case Study: Vodafone HQ

Vodafone HQ

Page 33: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 33/54

Balance overheating & daylight

Increased glass

height=

higher 

performance

glass (OR

external shading)=

lower visible light

transmission!

1.3m 1.6m 2.5m

1m highwindows

(g=0.68)

=

not enough

daylight!

Page 34: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 34/54

Case Study: Triple Glazing

Wellcome Trust, London

Page 35: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 35/54

Facade solution

Double glazing External Blind

Outer Glass

Ventilated cavity

  Open in summer 

  Closed in winter 

Facade prototype

Page 36: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 36/54

Facade analysis - lots

Page 37: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 37/54

Wellcome Trust, London

Page 38: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 38/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Lighting

Fan power, and riser sizes

Air-conditioning inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

- Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emission factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Recap: How to do it

Steps to low carbon

Page 39: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 39/54

Feed-in- April 2010)

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Energy

Act

Climate

Change

Act

Planning

Act

Feed-InTariff Government are reviewing

upper limit and are consideringrestricting to 50kW max

Page 40: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 40/54

Renewable Heat Incentive

Renewable Heat Incentive Commence 1st April 2011

20th October 2010 spending review   still on

May apply to systems installed in 2010

Biggest rewards for property not on natural gas

grid

Payment for each kWh heat generated (p/kWh)

installations

Page 41: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 41/54

Renewable Heat Incentive (draft)

Technology Scale Tariff

(p/kWh)

Tariff Lifetime

(years)

Small installations

Solid biomass Up to 45kW 9 15

Biodiesel Up to 45kW 6.5 15

Biogas on-site combustion Up to 45kW 5.5 10

Ground source heat pumps Up to 45kW 7 23

Air source heat pumps Up to 45kW 7.5 18

Solar thermal Up to 20kW 18 20

Medium installations

Solid biomass 45kW-500kW 6.5 15

Biogas on-soite combustion 45kW-200kW 5.5 10

Ground source heat pumps 45kW-350kW 5.5 20

Air source heat pumps 45kW-350kW 2 20

Solar thermal 20kW-100kW 17 20

Large installations

Solid biomass 500kW and above 1.6 -2.5 15

Ground source heat pumps 350kW and above 1.5 20

Biomethane injection All scales 4 15

Page 42: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 42/54

Renewables

Rules

- Understand the requirement (Is it Part L compliance, planningor EPC (BREEAM) or zero carbon...)

- Choose right software to meet requirement

- Understand building energy profile

- Carry out steps to low carbon

-

Heat pumps GSHP & ATES CHP Tri-gen Biomass CHP Biodiesel CHP

Page 43: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 43/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Lighting

Fan power, and riser sizes

Air-conditioning inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

- Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emission factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Recap: How to do it

Steps to low carbon

Page 44: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 44/54

Consequential Improvements

No Change

  Applies when existing building TUFA is

>1,000m2 and scope of works consists of 

/ includes:

An extension

Initial provision of M&E services Increase capacity of M&E

  If list on right is >10% of the construction

cost, then ok

  Not required if >15 year payback  If heating is increased, then fabric must

be improved too

Page 45: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 45/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Lighting

Fan power, and riser sizes

Air-conditioning inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

- Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emission factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Recap: How to do it

Steps to low carbon

Page 46: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 46/54

BREEAM 2011

New Street Square

BSJ Sustainable Building Award Winner 2008

What are BREEAM changes?

  Introduction to new rules

received 7th February 2011

  BREEAM 2011 will be launched

Spring / Summer 

  Consolidation of credits and

manual

  BREEAM 2011 only applies to

New Buildings

  Refurbishment can use 2008

rules or 2011

  Fit-out must use 2008 rules

  BREEAM In-Use required for 

Page 47: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 47/54

BREEAM 2011

What are the new BREEAM credits:INNOVATION

10 max credits

MANAGEMENT

Man 1 Sustainable procurement (8)

Man 2 Responsible construction practices (2)

Man 3 Construction site impacts (5)

Man 4 Stakeholder participation (4)

Man 5 Service life planning and costing (3)HEALTH AND WELLBEING

Hea 1 Visual comfort (3-5)

Hea 2 Indoor air quality (6)

Hea 3 Thermal comfort (2)

Hea 4 Water quality (1)

Hea 5 Acoustic performance (2-4)

Hea 6 Safety and security (2)

ENERGY

Ene 1 Reduction of CO 2 Emissions (15)

Ene 2 Energy Monitoring (1-2)

Ene 3 Low or zero carbon technologies (5)

Ene 4 Energy efficient external lighting (1)

Ene 5 Energy efficient cold storage systems (0-3)

Ene 6 Energy efficient transportation systems (0-2)

Ene 7 Energy efficient laboratory systems (0-5)Ene 8 Energy efficient equipment (process) (0-2)

Ene 9 Drying space (building type specific) (0-1)

TRANSPORT

Tra 1 Public transport accessibility (2-6)

Tra 2 Proximity to amenities (0-1)

Tra 3 Cyclists facilities (1-2)

Tra 4 Maximum car parking capacity (0-2)

Tra 5 Travel plan (1)

WATERWat 1 Water Consumption (5)

Wat 2 Water Monitoring (1)

Wat 3 Water leak detection and prevention (2)

Wat 4 Water efficient equipments (process) (2)

MATERIALS

Mat 1 Life cycle impacts (2-6)

Mat 2 Hard landscaping and boundary protection (1)

Mat 3 Responsible sourcing of materials (3)

Mat 4 Insulation (2)

Mat 5 Designing for robustness (1)

WASTE

Wst 1 Construction waste management (4)Wst 2 Recycled aggregates (1)

Wst 3 Operational waste (1)

Wst 4 Speculative floor and ceiling finishes (0-1)

LAND USE AND ECOLOGY

LE 1 Site selection (2)

LE 2 Ecological value of site and

Protection of ecological features (1)

LE 3 Mitigating ecological impact (2)

LE 4 Enhancing site ecology (2-3)LE 5 Long term impact on biodiversity (2)

POLLUTION

Pol 1 Refrigerants (3)

Pol 2 NOx emissions from heating source (2-3)

Pol 3 Surface water run-off (5)

Pol 4 Reduction of night time light pollution (1)

Pol 5 Noise attenuation (1)

Man 1 Commissioning

Thermographic survey

BREEAM AP

Building user guide

Maintenance

Page 48: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 48/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Lighting

Fan power, and riser sizes

Air-conditioning inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

- Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emission factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. Recap: How to do it

Steps to low carbon

f b h k ?

Page 49: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 49/54

EPC v DEC for benchmarking?

Modelled Building loads only Actual Building and Process loads

H 176-200

I 201-225

J 226-250

K 251-275 269

C f

Page 50: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 50/54

Display Energy Certificates

0 2000 4000 6000 8000 10000 12000

A

B

C

D

E

F

G

X

DEC Ratings - 2010

E P f C tifi t

Page 51: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 51/54

Energy Performance Certificates

  EPBD2 rules must be

implemented 2012-2013

  EPBD2 will require more details

recommendations

  EPBD2 requires EPC to be

displayed in buildings >500m2

that are frequently visited by thepublic

C t t N S t i bilit R l

Page 52: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 52/54

Contents: New Sustainability Rules

1. New rules for Energy use:

CO2 Emissions limits Calculation methodology

Lighting

Fan power, and riser sizes

Air-conditioning inspections

2. Interlude: examples

3. New rules for facades:

Air permeability

Thermal bridging

- Effect on dwellings

Glazing and Overheating

4. New rules for Renewable energy

Carbon emission factors Feed-in tariffs

Renewable Heat Incentive

5. New Rules for Refurbishments

Consequential Improvements

6. New Rules for BREEAM

The Future

8. The future: Zero Carbon

Z C b H 2016

Page 53: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 53/54

Zero Carbon Homes - 2016

Zero Carbon

70% of zero carbon target:

  Energy Efficiency

  On-site systems Allowable Solutions

Th k

Page 54: Going Green 2011 Slides_cundall

8/3/2019 Going Green 2011 Slides_cundall

http://slidepdf.com/reader/full/going-green-2011-slidescundall 54/54

Thank you