go - digital library/67531/metadc834711/... · · 2018-02-19 - ul\ wpp \ldj hp\ ,608 p pf\ 1308 w...
TRANSCRIPT
7
11
1.5x1.25 1.5-CA98-AA1
€H COMPRESSED AIR
1B 1.5x1.25
1.5-S24-AB1 Q |
STEAM
14A
Ki
AfvA
SLIT'01 NT 60 PSIC
BMS1
SPTPOINI 1 ' 0 PSIG
BMS1 CC1
■~i
1 1 / 4 " iOO # RF HANGED CONNECTION
WINDBOX MOUNTFD
3 /4 -C127-AB1
3/4x1/2
— D -
HV
tA l
-4
/i iv NX \
603/OA
^ _
/'MX \
<p> -
UL\
WPP
H P \ ,608 <>P
pf\ 1308 W
)
J 1 l / " "
I
.6081
/P i t \ldJ0
13
i^OS/p)
BMS1
gO ag) XUMby
M IfOBJOi ¥ f>
J—ltV<Jh
STEAM TRAP HEADER
/HV
A 1 1/4*
|JH 1
T
Li 0«L»).
CC1
F A I L CLOSED LOSS OF S I G N A L F A I L I N PLACE LOSS OF POWER
Pph/fP
L J
SETPOINT 94 PSIG
SI I P O I P l lw.0 PPJG
BMS1
1/ ^ J
1x3/4
17
FUEL OIL
1-F080-AA1 O
WINDBOX MOUNTED
- f>
CC1
5 / 4 " 150 # RF FLANCED CONNECTION
SETPOINT 118 PSIG
Pi
HV 1)05
l J ~ ibmij}) ~ LJ
XH BH
|rf)j90,
u 1* , V N
BMS1 bFFPOJNt 1b PSIC
UL W S I I )
A
I
7\
\
-X / ^ BUPNHj
OQ1L1P MO j
ATOMIZING AIR 2 0 SCFM 90 PSIG SUPPLY PRESSURE, STABLE AND REGULATED
ATOMIZING STEAM SATURATED STEAM 300 LBS/HR 150 PSIG SUPPLY PRESSURE, STABLE
#2 FUEL OIL 3,060 LBS/HR 18,775 BTU/LBS HHV 130 PSIG SUPPLY PRESSURE, STABLE 40 SSU VISCOSITY
REV. DATE
4-05-10 6-3-10
9-7-10
1_ DESCRIPT ION
ISSUED FOR REVIEW
I N PROCESS
ISSUED FOR CONSTRUCTION
DWN
LPW
DCA
DCA
CHK
SEW
SEW
SEW
D
C
m^mmm •II
oV
N \ \ t un i / /SyMled Only When Signed in Blue Ink
= m f STEVEN E WOPATA-fn = - 9,". 062 049436 •£? ~
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881 16041 Foster
P.O. Box 1000 Stilwell, Kansas 66085-1000
Illinois License # 184-000823
EASTEI ILLINOIS U N I V E R S I T Y
EIU PROJECT ®: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING Sc INSTRUMENTATION DIAGRAM
BOILER NO. 1 BURNER SHEET 1 A
DESIGN BY:
S. WOPATA DRAWN BY:
LWEST CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
11 ■02-09 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P & I D 3 B DRAWING NO.
P&ID3B REV.
2 N \ 2009 \09140 \dwgs \me \09140 -PMD3B dwg 9 / 7 / 1 0 1 29pm dalexander
7 2
CC1 r~\
V6031Q, * SETPOINT
/ ^ > ~ N 1 6 P S I G
SETPOINT 8 PSIG
BMS1
1.5-NG94-BA1
WALL
VENT
i—A<J— J th=:
\8037f|I|03?g)
3-NG46-BA1
NATURAL GAS SUPPLY
18" 32" MINIMUM STRAIGHT LENGTH
T
WINDBOX MOUNTED
3" 150 # R.F. FLANGED CONNECTION
BMS1 1 A ' 2 " NPT
CONNECTION
CC1
IPOINT PSIG •
AiA \|30350,
3 X 3 / 4
HV
| WINDBOX MOUNTED
; , p T . uuNhtOTIGN
U 3 / 4 - N G 4 6 - B A 1
HV 160100/
NATURAL PROPANE GAS
{ > < ] _
11)0575/
AAi
BABMJ2I
3/4-NG100-BA1
WALL HOV\
VENT
SETPOINT 1 PSIG
3 / 4 " MPT CONNECTION
BSVN
.60150/
i
< > 1 1 1
BMS1
I I I ,
I1MLXQR
'BSVN
.HV mmj ' nvA
\G0105/
_i BMS1
WINDBOX MOUNTED PROPANE BOTTLE
BMS1
FO V61280/
11 1/2-CA99-AA1
COMPRESSED AIR
8H A291P
-6 'BSA wimj
TO SCANNERS FOR COOLING AIR
NATURAL GAS 59,900 SCFH 1,000 BTU / SCF HHV 20 PSIG SUPPLY PRESSURE, STABLE
PROPANE GAS PILOT 200 SCFG 2,525 BTU / SCF HHV TBA PSIG SUPPLY PRESSURE, STABLE
PLANT AIR DRY AND OIL FREE 90 PSIG SUPPLY PRESSURE, STABLE AVERAGE CONSUMPTION 7 SCFM PEAK CONSUMPTION 9 SCFM
* PROVIDED BY NEBRASKA BOILER
REV.
O
DATE 4-05-10
6-3-10 9-7-10
1 DESCRIPTION ISSUED FOR REVIEW
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN LPW DCA DCA
CHK SEW SEW SEW
D
C
U!. mm(^wm Sealed Only When Signed in Blue Ink
= uJ : STEVEN E. WOPATA"; pfj = ~ 9 / . 062.049436 »Q1 =f ^ ^ \ /*C ■ i ♦ j> >-
'"'tnmu** B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
EASTEI I L L I N O I S U N I V E R S I T Y
EIU PROJECT *■ 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM BOILER NO. 1 BURNER SHEET 2
A
DESIGN BY: S. WOPATA
DRAWN BY: •LWEST
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 11-02-09
SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P & I D 3 C
DRAWING NO.
P&ID3C REV.
2 N:\2009\09140\dwgs\me\09140-P&ID3C.dwg 9 / 7 / 1 0 1:29pm dalexander
7 3
11 1.5—CA101 —AA1
E«3— 1.5x1.25
O COMPRESSED AIR
I I / 4 " 500 # P L
rLANCED CONN!
WINPBOx MOUN._. -r>
SlITPOINI CO PSJG
* FP01NF 1?0 PSIG
10 1.5-S25-AB1 1.5x1.25
O
: , ) VhiULp.
0 Y I
BMS2 0 Y I
BMS2
<>-
CC2
, j _ - - -
STEAM
14 3/4-C141-AB1
3/4x1/2
—D—
- v /
L—C^l-H | -<B>
STEAM TRAP HEADER
I I I
PA
p, /PPJjO,
\ 1
An PJ09S1
A Sii 0950.
D
\ A s L PQJ
b
BMS2
f I PA \40*k?A
{>--IU
7SH' i ^ \405A
f ^ I 11 AcvA
JPLB/0/
Oosdv
V .,
'PI
,4l'lA
PCV\
mm) FAIL CLOSED LOSS OF SIGNAL FAIL IN PLACE LOSS OF POWER
CC2
1/?* NPT CONNECTION
x:
/ f iv pP3/tP ' P D A
P(Wo/
A A ■ <
!
SLlPOlNT 94 PSIG
7VTBMS2
1-F081-AA1 1x3/4
17
FUEL OIL
WINDBOX MOUNTED ^ BMS2
3 / 4 " 150 # RF FLANGED CONNECTION
Pi ,40530/
-D-1/2" -a
CC2 r~"
SI Tf^OJNT 1,50 PSIG
7V1BMS2
A
/fcv\ \4mmJ
/PSHHi
^ ' - A] a
BMS2 ct ' P O I N l
16 PPIG
«0J9WOM
Pi XL A
iM A A
r A
DA
■X
J
iOP
/ 'P I \40jP
HV ,4059
/ " \ BliRNLII
TO LIANA A
A J
ATOMIZING AIR 20 SCFM 90 PSIG SUPPLY PRESSURE, STABLE AND REGULATED
ATOMIZING STEAM SATURATED STEAM 300 LBS/HR 150 PSIG SUPPLY PRESSURE, STABLE
#2 FUEL OIL 3,060 LBS/HR 18,775 BTU/LBS HHV 130 PSIG SUPPLY PRESSURE, STABLE 40 SSU VISCOSITY
REV. DATE
1-15-10
4-05-10
6-3-10
9-7-10
I DESCRIPTION
ISSUED FOR REVIEW
IN PROCESS
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN
DCA
LPW
DCA
DCA
CHK
SEW
SEW
SEW
SEW
D
C
c .
Sealed Only When Signed in Blue Ink
= 03 : STEVEN E WOPATA • ^ = Z. 9 / . 062 049436 ; <J> Z
X^OFl tA> xxx
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
EASES] ILLINOIS U N I V E R S I T Y
EIU PROJECT *•■ 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
BOILER NO. 2 BURNER SHEET 1 A
DESIGN BY:
S. WOPATA DRAWN BY:
LWEST CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
1 1 - 0 2 - 0 9 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P M D 3 D
DRAWING NO.
P&ID3D REV.
3 N \ 2009 \09140 \dwgs \me \09140 -PMD3D DWG 9 / 7 / 1 0 1 29pm dalexander
7 4
CC2
U W /AFT SLIPOINI 8 PSIG
BMS2
1.5-NG82-BA1
WAI
■A A x-
* SETPOINT 16 PSIG
A-NG47-BA1
NATURAL GAS SUPPLY
30" 30 MINIMUM STRAIGHT LENGTH
A
WfMPROX MOON FPU
3" 150 § PI I L ANCLE) CONNECTION
40510A
A^i\ #339/
. i
RMS? 1 VA
f l P !
CONNIPTION
VENT
BMS2 1 n O U T """( I PP
CC2
i
X- A:
i-1 1>^A
WoA A\
I(pA - A
■f btih\
(10 57 V / I 1 A P 01 a
1/2" DR
< CD I
I s-O z I
^* \ to
3 X 3 / 4 TPCA/SCV'PC? 40VQMOMOA40* A V - :t
y__/nv A Appi
•iN-U
zioYzsc Wcv W;b(WDo)0AJ03'i(J/ _ V ' H
l H I Alv A A
L1
J v i n j i / ,
/An , Ai ny
7 / ii\
c 1 BMS2
- i D | II
'O/APPPI/
PlAMLiP
Bv.ilFP5 i jO^Z
P A pp v)
/
WAi
L.
W I N D B O X M O U N J L D
BMS2 ?M%1 } } YIPPA
3/1" NPI CONNl CTIOM
I
SI IP0IN1 1 1 PSIG |
V.4013Q/ ) Ul~ A M P
3 /4 -NG83-BA1
5/1 NPF CONNECTION
VENT *
BMS2
A
HV PPOICW
T C A 140100/
A
/bSV\_ V A V4.01W A A i
SETPOINT LI 5 PSIG
P4CP1P
NATURAL PROPANE GAS
PosvP MOW
HvYzsVlT v40liy\0lM^Q1!P _
_ V. J HV r " A \401m
L' 1
API
/ bPV V*uiC0,
HvA ,40165/
V / H V r A "Voibo,
[Jl
A P I ) V0165/
1: Bit otoa
--r , . ^ i/: i
I.ONJ I OF
yoisy
PROPANE BOTTLE WINDBOX MOUNTED
l/J>" UP I CONNPC non
Ao\ U'imj
11 3/4-CA102-AA1
COMPRESSED A I R
BMS2
/ HP Ui;ou,
-iH
/ B S V V41210
/ I 0 ) \4umj
PI
(BH) V1"A
-I h - O -v "/
TO SCANNERS FOR COOLING AIR
NATURAL GAS 59,900 SCFG 1,000 BTU / SCF HHV 20 PSIG SUPPLY PRESSURE, STABLE
PROPANE GAS PILOT 200 SCFG 2,525 BTU / SCF HHV TBA PSIG SUPPLY PRESSURE, STABLE
PLANT AIR DRY AND OIL FREE 90 PSIG SUPPLY PRESSURE, STABLE AVERAGE CONSUMPTION 7 SCFM PEAK CONSUMPTION 9 SCFM
* PROVIDED BY NEBRASKA BOILER
REV. DATE
1-15-10
4-05-10
6-3-10
9-7-10
DESCRIPTION
ISSUED FOR REVIEW
IN PROCESS
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN
DCA
LPW
DCA
DCA
CHK
SEW
SEW
SEW
SEW
D
c
i/fi©i]lJ(WVfCf(*?t!
Sealed Only When Signed in Blue Ink
/#$ •••••&A = w : STEVEN E WOPATA; m = ■S <3 \ 062 049436 - ^ r
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
EASTEI I L L I N O I S U N I V E R S I T Y
EIU PROJECT m-. 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
BOILER NO. 2 BURNER SHEET 2 A
DESIGN BY: S. WOPATA
DRAWN BY:
LWEST CLIENT I.D.
HON00103
CHECKED BY: S. WOPATA
DATE: 1 1 - 0 2 - 0 9
SEGA P R O J E C T NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P & I D 3 E
DRAWING NO.
P&ID3E REV.
3 N \ 2009 \09140 \dwgs \me \09140 -PMD3Edwg 9 / 7 / 1 0 1 29pm dalexander
7 4 3
COMBUSTION AIR
(b CM 6P020 X
BMS1
SETPOINT ISETPOINTJ 2.72" w.c. |0.06" w.cl
r8 7 0 5 5 |820JO
©
SILENCER
b z u / U
r -* (Pm
Y \ A 8 20 A)
]A' CC1
BMS1
I I I
620 *A ' A . A A
BMS1
A 6 2 0 / 0 62070
CC1
CC1 CC1
STACK
<§> f.
" )80
CC1
INLET BOX
MIXING BOX
I
A'A OP i /o
<&_—£] FLUE GAS
RECIRCULATION
i , \
CC1
WINDBOX
~7\ ]BMS1
61300
^7\1BMS1
EA
"1
1 1 1 1 J
0 BMS1
i I I I I i
0 CC1 CO
<
3
SETPOINT 180 PSIG
SETPOINT 185 PSIG
SETPOINT 12.5" w.c.
BMS1
BMS1
I
61410 ^
FURNACE
i
P:
STEAM; - ■! RECYCLE' - ,
BMS1
EX 1300"
8 1 A "
BOILER BY NBC
SEE PMD 1B
BMS1
BS |0 61300 I R / U V = FOR OIL AND GAS
TO SCANNER FROM PLANT AIR LINE
REV. DATE
4-05-10
6-3-10
9-7-10
I DESCRIPTION
ISSUED FOR REVIEW
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN LPW DCA DCA
CHK SEW SEW SEW
D
C
! i.r pA
Sealed Only When Signed in Blue Ink
= 2 : STEVEN E WOPATA; m |
V>; ...<#/ Ax \
""IIUHW** B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
< # ^
EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT ** 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
BOILER NO. 1 BURNER SHEET 3 A
DESIGN BY:
C. WARD DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
11-02-09 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P & I D 3 F
DRAWING NO.
P&ID3F REV.
2 N \ 2009 \09140 \dwgs \me \09140 -PMD3Fdwg 9 / 7 / 1 0 1 29pm dalexander
7 2
COMBUSTION AIR
^Tcf^\__ 42070
BMS2
SETPOINT ISETPOINT| 2.72" w.c. J0.06" w.cl
A. 0\
;o
r \ Ao
SILENCER
A
A A i? 207(1
!,'",: CC2
/ * Y Tr
i 4 2 0 / 0 42070
BMS2
N .
CC2
I v j f ■ . 'O • , : 'A JV
42070
MJ
-I J
CC2 CC2
STACK
BMS2
4208542080
CC2 VFU M
A 1 47)70
INLET BOX
MIXING BOX *r—LJ
FLUE GAS RECIRCULATION
CC2
WINDBO PT
42071'
U^<]A
HV 42071
BMS2
I
ZS 4130C
BMS2
zscyz^H '421 70 4217i
. J BMS2
CC2 o GO
< o LJ =3
SETPOINT 180 PSIG
SETPOINT 185 PSIG
SETPOINT 12.5" w.c.
BMS2 BMS2
BMS2
I
H ^
i ' >
'SHI-
' 4 1 4 1 0 '
FURNACE
STEAM • . A , RECYCLE . , .)'
O
I I
A A 4347 ;
STEAMICH^ DRUM43471
O
Hiwll
A *',
BOILER BY NBC
l __ . SEE PMD 1C
BMS2
°ri : ( / ;/ / l l ' \" J I R / U V = FOR OIL AND GAS
! TO SCANNER l ^ _ _ _ _ _ F R Q M PLANT
AIR LINE
REV.
0
DATE 4-05-10
6-3-10
9-7-10
1_ DESCRIPTION
ISSUED FOR REVIEW
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN
LPW
DCA
DCA
CHK
SEW
SEW
SEW
D
C
WMC^fW(£§
Sealed Only When Signed in Blue Ink
^ ^ E S S / 0 4 / %
§0S I uKSTEVrNE WOPATA-^ = S 9- / . 062 049436 *G? C
%1^0FStA^iA ' ' " i l l l l l l ^
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881 16041 Foster
P.O. Box 1000 Stilwell, Kansas 66085-1000
Illinois License # 184-000823
E^STE] ILLINOIS U N I V E R S I T Y
EIU PROJECT *•• 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
BOILER NO. 2 BURNER SHEET 3 A
DESIGN BY: C. WARD
DRAWN BY: C. WARD
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 11-02-09
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P & I D 3 G
DRAWING NO.
P&ID3G REV.
2 N \ 2009 \09140 \dwgs \me \09140 -PMD3G dwg 9 / 7 / 1 0 1 29pm dalexander
7
r
EXISTING TUNNEL
1_ C~
<
A
OLD BOILER HOUSE
RENEWABLE ENERGY CENTER
1A 12-S07-AB1
NEW PLANT
14A 3 / 4 - C 7 3 - A B 1
STEAM TRAP HEADER O 3 / 4
AB1 „
BB1
4 3 2
BOILER 4 & 5
BOILER 1 BOILER 2
- } TUNNEL
< I
Is-O en I
oo
T A i i '■A BOILER 2
a GO
0-
I
M
m < I
I s-o GO
I 00
A
14X8
■O
AB1 BB1
STEAM TUNNEL
14-S07-BB1
3 / 4
i '
C
3 /4 -C128-AB1
CONDENSATE RETURN TANK
3/4-CF13-AB1 3 / 4 FOR POTENTIAL X FUTURE CHEMICAL FEED
X I
I s-o <S)
i 14x12
STEAM TUNNEL
14-S07-BB1 4A 4B
14-S07-BB1
STEAM TUNNEL STEAM TUNNEL
REV. DATE
1-15-10
6-3-10
9-7-10
DESCRIPTION ISSUED FOR REVIEW
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN DCA DCA DCA
CHK SEW SEW SEW
D
C
t v t OP i !! lf (tl
s t i
M ,*@l
Sealed Only When Signed in Blue Ink
- S> • • ' 5 1 -: a i : STEVEN E WOPATA ; f , = : 9 . " 062 049436 .'«/» «;
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
<»► BASTE! I L L I N O I S U N I V E R S I T Y
OlS
EIU PROJECT ®* 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
EXISTING PLANT/TUNNEL STEAM A
DESIGN BY: S. WOPATA
DRAWN BY: J. MILLER
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 8-20-08
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P & I D 4
DRAWING NO.
P&ID4 REV.
2 N \ 2 0 0 9 \ 0 9 1 4 0 \ d w g s \ m e \ 0 9 1 4 0 - P M D 4 d w g 9 / 7 / 1 0 1 29pm dalexander
7 6
4B
EJ-38 EJ-35
- a — O 6-C45-BA1
STEAM TUNNEL
EJ-27 Q rjEJ- 30
4C 2-C45-BA1
CARMEN HALL
4B
EJ-37
O EJ-34
STEAM TUNNEL
- f X J ™
X3—I 1 " | 1"
1.5"
*-""0" 14-S07-BB1
10"
o
3 /4:
-{X3—=[]J—fX—i ►
<X3 V 4 \ 3 / 4 "
X X 3 / 4 "
4B
EJ-39
-CD—*•
V SUMP
EJ-36
■a-2-C44-BB1
STEAM TUNNEL
EJ-26
EJ-29
CD GQ
I Is-O GO I
CD
4C 6-S07-BB1
0 1 '
EJ-32
CARMEN HALL
a 1
X — -tx}—
10"
4 3 2
NOTES 1: TRAP VALVE STATION W/ INTEGRAL ISOLATION VALVES, STRAINER AND CHECK VALVE. 2. DRAIN PIPING WILL TIE INTO CONDENSTATE RETURN TANK OVERFLOW PIPING.
EJ-15 EJ-10
O 6-C45-BA1
EJ-18 0 EJ-24 EJ-21
a fY>
~'l
EJ-17 y
EJ-23 EJ-20
o 10"
3 / 4 "
MID-
EJ-14
-o-EJ-12 EJ-9
L»*AJ
10" 10'
i r I i r
NOTE 1 3/4»
3 / 4 " -CX}— *- 3 / 4 "
O 14-S07-BB1 EJ-7
-o NOTE 1
O
NOTE 1 -fX3—^J—CX3 r ►
3 / 4 " X X
3 / 4 4><3--^JH><3 1 ►
HX* 3 / 4 "
^ -{XJ 3 / 4 "
■ ^
3 / 4 "
EJ-25
0*43
3 / 4 "
Y SUMP
3 / 4 " X X
V SUMP
EJ-16
-o-EJ-13
3 / 4 "
V SUMP
i r
EJ-11 EJ-8
-co EJ-19
EJ-22
EJ-28
EJ-31
m I
■-t-
o I
EJ-33
3 / 4 "
1.5"
NOTE 1 3 / 4 4x3-iJ-i><H-
-X-3 / 4 "
3 / 4 "
SUMP
6-C45-BA1 11
EJ-5
-CD—*
EO-AA
6A
CONDENSATE RETURN TANK
EJ-4
-o-10'
1 4X3—
1 " HX3—
1"
1.5"
EJ-1
14-S07-BB1
NEW PLANT
NOTE 1 3 / 4 » -{Xh-TJHXJ™
4X3—^—^ 3 / 4 "
X X
3 / 4 "
EJ-6
€3-
V SUMP
0 EJ-3
2-C44-BB1 14
STEAM TRAP HEADER
REV. DATE 6-3-10 9-7-10
1_ DESCRIPTION IN PROCESS ISSUED FOR CONSTRUCTION
DWN
DCA
DCA
CHK
SEW
SEW
^ 0 f E S S / 0 4 / %
Sealed Only When Signed in Blue Ink
= i f ] : STEVEN E WOPATA ; S = ~~ 9-"" 062 049436 ; " ? r
<, <9vA .♦ . A j -
* • % & ' • " ' • ' .: y
vA ^>iA?oriA%xA
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
E A S T E I ILLINO U N I V E R S I T Y
EIU PROJECT *■ 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
STEAM TUNNEL DESIGN BY:
S. WOPATA DRAWN BY:
J. MILLER CLIENT I.D.
HON00103
CHECKED BY: S. WOPATA
DATE: 9-11-08
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P & I D 4 A
DRAWING NO.
P&ID4A REV.
1 N: \2009\09140\dwgs\me\09140-PMD4A.dwg 9 / 7 / 1 0 1:29pm dalexander
7 6
14-S07-BB1
OLD BOILER HOUSE
EJ-76
NOTE 1 3 / 4 "
3 / 4 "
-X-^[JHXH
V4" ^^ it
SUMP V
3 / 4 "
EJ-73 i^pmaBactaaaamaJL Jam
EJ-70
O 10'
10" NOTE 1
H l t f l B 3 / 4 "
3 / 4 " 3 / 4 "
■X3~iJHXJ-
3 / 4 " ^ 4———{Xj-
EJ-67
O
—XJ-
1'
1.5"
SUMP V
EJ-75
HD3~ 2-C44-BB1
EJ-72
3 / 4 "
EJ-69
-o-EJ-66
OBA I Impu
EJ-63
0 EJ-60
0 EJ-57
EJ-54
EJ-51
EJ-48
EJ-45
EJ-42
4
2-C44-BB1
CRU-01
6-C45-BA1
EJ-64
NOTE 1 3 / 4 "
3 / 4 " u
SUMP V
A
4X3™Tj--i><-} 3 / 4 "
3 / 4 " XJ-
10"
3 / 4 "
10
3 / 4 "
3 / 4 "
NOTE 1
3 / 4 " X-
SUMP V
3 / 4 "
NOTE 1 10" 3 / 4 "
3 / 4 "
■iXH(J-X3-
3 / 4 " -X-
SUMP V
3 / 4 "
EJ-77 EJ-74
-a—o
0 EJ-61
EJ-58
EJ-55
0 EJ-52
EJ-49
EJ-46
EJ-43 0 10"
3 / 4 "
3 / 4 "
3 / 4 "
SUMP
NOTE 1
4 X H T J — X -
3 / 4 " < 1X3-
}>
i '
Y 4A
3r ■ X — .£X|""""~
STEAM TUNNEL
EJ-40
14-S07-BB1 < C 4A
3 2
NOTE 1: TRAP VALVE STATION W/ INTEGRAL ISOLATION VALVES, STRAINER AND CHECK VALVE.
EJ-71 EJ-68
■a—o
o 1.5"
STEAM TUNNEL
EJ-65
-O-i 0 EJ-62
EJ-59
EJ-56
EJ-53
EJ-50
EJ-47
L>-44
0 EJ-41
6-C45-BA1 4A
STEAM TUNNEL
REV.
0
DATE 6-3-10
9-7-10
I DESCRIPTION
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN
DCA
DCA
CHK
SEW
SEW
D
C
Sealed Only When Signed in Blue Ink
: V: : m ." STEVEN E WOPATA; = : 9,
:. 062.049436 -Q ~
i -J *♦ »* ~° C
/.%/- *'" ,A\° ^ * " / / i i i i u ^
x
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
<m^ EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT n= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
STEAM TUNNEL A
DESIGN BY: S. WOPATA
DRAWN BY: C. WARD
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 9- ■11-08
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P & I D 4 B
DRAWING NO.
P&ID4B REV.
1 N: \2009\09140\dwgs\me\09140-PMD4B.dwg 9 / 7 / 1 0 1:29pm dalexander
7 4 3 2
10-S72-BA1 INSTALL BIRDSCREEN
I i
3 / 8 " SS TUBING
4A O 4-S07-AB1
6x4 STEAM TUNNEL
3 /4 -C130-AB1
CONDENSATE RETURN TANK IN CARMEN HALL
■ X -3 / 4 "
3 / 8 " SS TUBING
12 PSI CONTROL PRESSURE IN CARMEN CAPACITY = 8,000 Ib/hr
SOUND ORIFICE
1 6x2 S132-2 -O—{XH
1/2" 1/2"
8x6
-a—i
SOUND ORIFICE
I 4x1 S132-3 8x4
4-S132-AA1
PCV\ 13 PSI CONTROL PRESSURE 6 2 3
) CAPACITY = 2,500 Ib/hr
O
X3/
4"
TO SYSTEM *""* Y "~>
3 / 4 " DRAIN
8-S132-AA1 S132-1
-iXH 6"x 8"
535 j SET PRESSURE = 15 PSI CAPACITY = 12,000 Ib/hr
CONNECT TO EXISTING PIPE WITH REINFORCED FITTING
1?"
) EXISTING FIRE rUBL" BOILER 0(20,000,000 BTU INPUT)
AFTER BOILER DEMO REMOVE VALVE AND INSTALL BLIND
3/4-C131-AA1
X3/
4"
3/4" -X" CONDENSATE RETURN TANK IN CARMEN HALL
TO BOILER
ADD LEVEL CONTROL VALVE TO MAINTAIN LEVEL IN CRU TANK
4A 2-C45-AB1
-DQ3
STEAM TUNNEL 3 / 4 " FOR CHEM FEED
1/2" SAMPLE
\
J
o X-
Xr
— EXISTING ROTH CRU 3 HP MOTOR 1,760 RPM 50 PI (FSTIMATT)
N: \2009\09140\dwgs\me\09140-PMD4C.dwg 10 /22 /10 9:44am dalexander
REV. DATE
9-14-10
10-21-10
I DESCRIPTION
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN
DCA
DCA
CHK SEW
SEW
D
C
t l
Sealed Only When Signed in Blue Ink
£ < $ ^A% £#/ '$& J OJ,' * $ . " " " = g ! STEVEN E WOPATA-.m = = 9 - 062.049438 ; i g ~ **• ^ *.. *> ^ •5. *V A & , .$"
" " l l l l l t i t ^
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
< W ^ EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT «= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
CARMEN HALL A
DESIGN BY: C. WARD
DRAWN BY: D. ALEXANDER
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 6-30-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P M D 4 C
DRAWING NO.
P&ID4C REV.
1
7 5 4 3 2
FROM TUNNEL
< I
■ « -
00 o I
4-C84-AB1
n
I
~l
1
HIGH ALARM (6" ABOVE NWL)
LOW ALARM (6" BELOW NWL)
PUMP TRIP (LOCATION BY VENDOR)
m < I
rh O I
M/W
q ?
WAI ■*- VENT
NWL=21'
~(m)
3/4-C128-AB1
HIGH PRESSURE STEAM TRAP
f~*\ 3-PD104-AB1
6x4 4-C45-BA1 O 6-C45-BA1
4B
STEAM TUNNEL
CRU-01 OLD BOILER HOUSE CRU CAPACITY, GPM 200 DESIGN PRESSURE, PSI 40 MOTOR, HP 10 (EST.) TANK CAPACITY, GAL 500
* PROVIDED BY UNITED LABORATORIES
REV. DATE
1-15-10
4-05-10
6-3-10
9-7-10
1_ DESCRIPTION
ISSUED FOR REVIEW
IN PROCESS
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN
DCA
LPW
DCA
DCA
CHK
SEW
SEW
SEW
SEW
Wkm\\^fwm }\
Sealed Only When Signed in Blue Ink
= uJ : STEVEN E WOPATA * ft ~ - O * ""- ~
''llluxwW^
Engineers - Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^ W ^ EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT st= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
EXISTING PLANT/TUNNEL CONDENSATE RETURN DESIGN BY:
S. WOPATA DRAWN BY:
J. MILLER CLIENT I.D.
HON00103
CHECKED BY: S. WOPATA
DATE: 8-20-08
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P & I D 5
DRAWING NO.
P&ID5 REV.
3
D
C
B
A
N: \2009 \09140\dwgs \me\09140-PMD5.dwg 9 / 7 / 1 0 1:29pm dalexander
7 5 4 3
3-V105-AA1
TK-01: CONDENSATE RETURN TANK
CAPACITY, GAL 2,500 DIAMETER, FT 6 LENGHT, FT 12 MATERIAL CS
PU-06 A/B: CONDENSATE RETURN PUMP
CAPACITY, GPM 118 TDH, FT 100 MOTOR 7.5
REV. DATE 1-15-10 4-05-10 6-3-10 9-7-10
I DESCRIPTION ISSUED FOR REVIEW IN PROCESS IN PROCESS ISSUED FOR CONSTRUCTION
DWN DCA LPW DCA DCA
CHK SEW SEW SEW SEW
D
C
iH.kBlJlie^wet!
Sealed Only When Signed in Blue Ink
^V>*" .7AA i •£: \^9 -= m : SI EVEN E WOPATA: ft = = Q " : 062 049436 ; C j Z
\^oPl<A B
GL> eaa ® V
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^ m ^ EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT a* 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
CONDENSATE RETURN A
DESIGN BY: S. WOPATA
DRAWN BY: L WEST
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 9-23-09
SEGA PROJECT NO. 090140
CADD FILE NAME: 09140-P&ID6A DRAWING NO.
P&ID6A REV.
3 N:\2009\09140\dwgs\me\09140-P&ID6A.dwg 9/7/10 1:29pm dalexander
7 2
WTR
r
16A 2-CW48
Dxx3-
_ J
k> /\l I FI OW // f VI
\ "\s \
A, ^N V
* . - ;
<i /
i L
i P A I N ! t>U i A
> II P]Pi 0 I A
PI
1 P A - I ' J - Pr)l A/S
/
\
3-C109-AA1
■ ^
SCALE 0-100 PSIG
CITY WATER INLET
J E- l
A
■ A
A
SAMPLE
V. 3/4" ISO
\ A
1 JO
7E 1 5 -BR114-PA1
I ' '(LSCJ—
flSi) \ ® A A /
FROM BRINE PUMP SKID
_ . J
SCALE / , , " 0-100 PSIG V IP '
■•AMI'I I
oPl A A —
r USO
II!
A A )
i; LSO
r / \
si OH
\
6A
> "
■2*
1 ' , (•
POALi 0-100 PSIG
PI
J cj
I A))
/ r
\ _
4] !* ] - \
(1 A
x IT
1 C P A
■- i ! i
o • ) J
SAMPtL
>t . <
,1 A
SO ■ V J
A !T- _
SCAI r
0 100 PSTO
L
BRINE MEASURING TANK
24" DIAx&Q" HIGH
r^LsA 1 Aivir i r
/ ^ frL>
I ' - i i . S C
MCP- 30'. • WDFNSATE-PO< ' " " TANK
50" DIAx60" SIDEbHELL 100 LB WORKING PRESSURE
ASyL CODE 15 CO FT 10% CROSS LINK
PC V
A A i . v ~
PH A
SL1 P01N1 ?b GPM
LSO)-
\ . .
! •■ )
. L
'A4,:
PA
1 {{SO
P:I HOP 50P0 ; CONDI NSAIfc
SUING P*MK xPO A D t s n n i 1RP1NO f m OSURf A C COPL
A U P I 107 IWOS* i 1NP
50 m
^ '
_l
CONDENSATE INLET
L_ _( n p ,-
DP
U
n ' cv
SLl POINT PP GPM
P / - 2
A -
A At l CA '00 GPM
4 A C Ma
NOTjEA LSL CLOSFS r V - / ON I OW LEVEL LSH CLOSES PV-8 ON HIGH LFVEL, FV- 8 OPEN ON TANK RbFHL
^
Ol
> -
V A
A i ro iMT 20 P ,10
A
-f* - -
3-C110-BA1
POLISHED WATER OUTLET
1 5-C111-AA1
REFER TO MARLO DWG E P 0 9 - 0 2 3 7 - 0 7 - 0 6
CONDENSATE POLISHER SKID
V
CONDENSATE POLISHER CONDENSATE POLISHER
DESIGN FLOW, GPM 100 PRESSURE, PSI XXX MAX TEMPERATURE, F 200*
REV DATE 1-15-10 4-05-10 6-3-10 9-7-10
1_ DESCRIPTION ISSUED FOR REVIEW IN PROCESS IN PROCESS ISSUED FOR CONSTRUCTION
DWN DCA LPW DCA DCA
CHK SEW SEW SEW SEW
D
c
II n mrm^iim:
Sealed Only When Signed in Blue Ink
" " / / J I I I I H ^ B
Eng inee rs — A r c h i t e c t s — T e c h n i c i a n s Design — C o n s t r u c t i o n — Field Serv ice
( 9 1 3 ) 6 8 1 - 2 8 8 1
16041 F o s t e r P.O. Box 1 0 0 0
St i lwe l l , K a n s a s 6 6 0 8 5 - 1 0 0 0 I l l inois L icense § 1 8 4 - 0 0 0 8 2 3
EASTEI I L L I N O U N I V E R S I T Y
EIU PROJECT ■- 10-4535
EASTERN ILLINOIS UNIVERSITY E I U R E N E W A B L E E N E R G Y CENTER
P I P I N G Sc I N S T R U M E N T A T I O N D I A G R A M
C O N D E N S A T E P O L I S H E R
DESIGN BY S. WOPATA
DRAWN BY-
L. WEST CLIENT I D
HONOO103
CHECKED BY S. WOPATA
DATE: 12-28-09
SEGA PROJECT NO 090140
CADD FILE NAME 0 9 1 4 0 - P & I D 6 B
DRAWING NO
P&ID6B REV
3 N \ 2009 \09140 \dwgs \me \09140 -PMD6B dwg 9 / 7 / 1 0 1 29pm dalexander
7
FROM BRINE PUMP SKID
WTR
1 1 i (APIA , ; I I IP
v\ \ M, All V " \ A
1 0% VAI A b
- V Px A w
If p I
f • I )
II Oil if A P i
r! i< )i
P5 - - H F-1
I5PA _l
H
1"
SCAl E 0-100 PSIG
L_
r - \
i©-.. ,
r
A A.
/ \
kr> FV-5A
(LPCJ
-A-— SAMPLE
3/4"
r
r' j
p AJ Fv 7
-U-J
PA-
so A
TV-1A A |
A I
APO i
SCAtF 0-100 FV 4A PSIG
r;A
LSO 1
-+-+-
|@J
A if i
I. ••' A
PCS V ;
' ' / ' I V V
FV-8
1.5-BR114-PA1
t i
I V • '< '•
SAMPLE
; '3 r\
L ISO A isc
- MTI
rv- PA
f
p A J
\
P
/
A
1 30)
0/1 > J \ M
i _
/ - ! i
A A 0-100 P A
L A A .
V 11
PAN Pi r
L 1
r )
p.o) vA SO
p
1 (A)
I-V-6A
> Lip SLT POINT 50 GPM
MR - 8 0 0 - 5 WATER SOFTENFP PL PPA60" SIDESHELL
10P A FORKING PRESSURE JONF CODE
PO CI I n CAIiON PLAN
A -J
A A t f 0-100 f v 4b
PJ
. t ,_.
.AMPLt /
U) _ J
\/ ; | ,
P;P J t
. . 1 1
/ , (r
)
u
J (iso
LP x
_ . _ ^P j -T
1 A A
P
rv- bB
PI
-H^ —■
MP-GOO A V/AirR POPiLNLR A " P J A A A SfDLPIPII
100 LB WORKING PFAS30PL NONP COOP
»0 (Ufr (AHON RFPIP
\
!
BRINE MEASURING TANK
36" DIAx60" HIGH
NOT PA LSL CLOSES f-V-7 ON LOW LFVLL LSH CLOSES EV-8 ON HIGH IEVFL, TV 3 OPEN ON TANK RCFHL
I I I
A 1 F
SFT POINT 30 GPM
FOP
" ) > -
I 1/2-0A38-BG1
3-CW48
COMPRESSED AIR
16A
CITY WATER INLET
SCAl [ 0 POO GPIP
' - PO PA
TYPE "L" COPPER
3-TW50-PA1 7B
SOFT WATER OUTLET TO RO UNIT
3-TW51-PA1 ,p.
REFER TO MARLO DWG E P 0 9 - 0 2 3 7 - 0 7 - 0 1
WATER SOFTENER SKID
REV DATE
1-15-10
6-3-10
9-7-10
I DESCRIPTION
ISSUED FOR REVIEW
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN
DCA
DCA
DCA
CHK SEW
SEW
SEW
D
C
[if miw^mm
Sealed Only When Signed in Blue Ink
vN^r i f tSS/Oyi / /^
0 \ \ = m : STEVCN E WOPATA; m = = 9.1 062 049436 • J£ =
V ' " ' / J i l l l l ^
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
EASTEI ILLINOIS U N I V E R S I T Y
EIU PROJECT ti= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
WATER SOFTENER A
DESIGN BY: S. WOPATA
DRAWN BY: T. OSTERTAG
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 09-09-08
SEGA PROJECT NO 090140
CADD FILE NAME: 09140-P&ID7A DRAWING NO.
P&ID7A REV.
2 N \ 2009 \09140 \dwgs \me \09140-P&ID7Adwg 9 / 7 / 1 0 1 29pm dalexander
7 3 2
0.5" VT
7A 3"-TW50-PA1 3"-TW52-PA1
FROM WATER SOFTENER t
r NO H OW SWHPH
S
IhK) FLOW , SW1KH
H H
LS
6
70
IJUNOUOIM nox JPI
WTR TO RO UNIT
T OP l>
L« ALl ON
ob > f PUP SYSTEM
50 GAl I ON 0AOS HP f l F D
SASTPy
O 50 GALLON
ANTI -SCAl AN A ED SYSTi M
REFER TO MARLO DWG E P - 0 9 0 2 3 7 - 0 7 - 0 4
CHEMICAL PRETREATMENT SKID
REV.
0 DATE
1-15-10
6-3-10
9-7-10
DESCRIPTION ISSUED FOR REVIEW
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN DCA DCA DCA
CHK SEW SEW SEW
D
c
RflcijniiesrWd
Sealed Only When Signed in Blue Ink
LU : STEVEN E WOPATA *: m ~ 9 ; 052 049406 • *£ Z
''"inniu** B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
EASTE U N I V E R S I T Y
EIU PROJECT ®= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
RO CHEMICAL PRETREATMENT A
DESIGN BY: S. WOPATA
DRAWN BY: L WEST
CLIENT I.D. H0N00103
CHECKED BY: S. WOPATA
DATE: 12-29-09
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P M D 7 B
DRAWING NO.
P&ID7B REV.
2 N \2009 \09140 \dwgs \me\09140-P&ID7B DWG 9 / 7 / 1 0 1 29pm dalexander
7
460V/60HZ/3PH 1 120V/60HZ/1PH
r . H MCC1 ! FPO. i
MOTOR I I STARTER f"
_
WTR
0.5" VT !
7B 3-TW52-PA1
& r ZI—J
FEED WATER INLET
A-A FV-1
MEMBRANE ARRAY
5 MICRON PREFILTER
304SS
11 3 / 4 - C A 6 2 - A A 1 3/4x1 / 4 1/4"
- - — i / / — A / S
COMPRESSED AIR 80-125 PSI REGULATOR
30HP 304SS
3-TW54-PA1
l-p-p CC-4A
uv~z
7D
RO TANK
GO :o - L" I
S j t f 50 MEMBRANE
CLEAN IN PLACE
SOLUTION TANK
h e n — CC-2B
K
MP!
| - C > — - - i M CC-1B CO-1A
r { ) s
</
ov ; I- i !
i i «
T
-5B
! 'A: . i
i
| -\ 'OV-5
y j ^ i B M E ^ L E L ^ Y S I E M . P - 2
CIP PUMP 7.5HP 304SS
! i ' . \ . ( t ' { ' , 'M
CIP FILTER, 304SS
CC-7
- i - A / S
CIP HOSE
CC-3A
A A 1.5-TW55-PA1
CV-1
REFER TO MARLO DWG E P - 0 9 0 2 3 7 - 0 7 - 0 4 V
REV. DATE 1-15-10 4-05-10 6-3-10 9-7-10
I DESCRIPTION ISSUED FOR REVIEW IN PROCESS IN PROCESS ISSUED FOR CONSTRUCTION
DWN DCA LPW DCA DCA
CHK SEW SEW SEW SEW
D
C
[Htoi?n<^w©l
Sealed Only When Signed in Blue Ink
£$/ % € l ih : STEVEN E. WOPATA; f^ =
' ' / , ' ' * OF l l ^ x *
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
EASTS I L L I N O I S U N I V E R S I T Y
EIU PROJECT n: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
RO CHEMICAL PRETREATMENT A
DESIGN BY:
S. WOPATA DRAWN BY:
L. WEST CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
12-29-09 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P & I D 7 C
DRAWING NO.
P&ID7C REV.
3 N:\2009\09140\dwgs\me\09140-PMD7C.DWG 9 / 7 / 1 0 1:29pm dalexander
5 3
VENT
6"
REV. 0
1 2
3 4
DATE 1-15-10
4-05-10
6-3-10
9-7-10
10-21-10
DESCRIPTION ISSUED FOR REVIEW
IN PROCESS
IN PROCESS
ISSUED FOR CONSTRUCTION
REVISED
DWN DCA
LPW
DCA
DCA
DCA
CHK SEW
SEW
SEW
SEW
SEW
1 HOUR RO SYSTEM MAKEUP =6,000 GAL
>2-0
< Q. I m oo Q-
Y D
HIGH ALARM 29'-3
RO STOP
RO START
LOW ALARM 21'-6
PU 07 A/B PERMISSIVE O'-O - V LOCAL
2 9 - 0 "
2 2 - 0 "
PUMP INTERLOCK
a—
LAH (19.7 mA)
LSH (19.6 mA)
LSL (16.8 mA)
LAL (16.6 mA)
RO WATER STORAGE TANK
TK-02
HDOdl
TW57-1 I—Doa—
TW54-1 Doa—i
DA LEVEL CONTROL CRU/REC
3-TW86-CA1
\T1DA/ BFP
T-D—fXH-|M_-3X2
1 : [XH
H—D«3—C3-3X2
-DOO SPEC CA1
A
SPEC PA1
^Tl DA/BFP
-3-TW57-PA1 -
2-TW53-PA1
a-
a-CV-4
PU-07A
3-TW57-PA1
NT] DA/BFP <
If)
^Tl DA/BFP
I0O
Ih-o
REFER TO MARLO DWG E P - 0 9 0 2 3 7 - 0 7 - 0 7
REPRESSURE PUMP SKID
t 2x1
L>
2x1 1/2
3-TW54-PA1
2-TW112-PA1
1.5-TW87-PA1
A
1-TW53-PA1
1.5-TW87-PA1
< I
<
7C <
RO UNIT
8 <
TURBINE COOLING WATER
< 10B
SAMPLE COOLER
DESUPERHEATING WATER
- 4 1G
TURBINE COOLING WATER
-f 10A
SAMPLE COOLER
>
>
c
Honeywell Sealed Only When Signed in Blue
B
a> Qeaa ® v_x
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881 16041 Foster
P.O. Box 1000 Stilwell, Kansas 66085-1000
Illinois License # 184-000823
< # ^
EASTERN I L L I N O I S U N I V E R S I T Y
PROJECT «= 10-4 53
PU-07 A/B: RO WATER PUMP CAPACITY, GPM TDH, FT MOTOR, HP
120 70 5
TK-02: RO WATER STORAGE TANK CAPACITY, GAL 25,882 DIAMETER, FT 12 HEIGHT, FT 32 MATERIAL FIBER GLASS
iASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
RO STORAGE
DESIGN BY: S. WOPATA
DRAWN BY: C WARD
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE! 11-23-09
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 Q - P & I D 7 D
DRAWING NO.
P&ID7D REV.
4
A
I-0-P&ID7D.DWG 10 /22 /10 1:28pm dalexander
7 4 3
1-CW48
CITY WATER
1.5-CW48 -hO-
1
_ ._l
HOLD
A
i
BRINE MAI 8' DIA X 15'
11'
0F
i i
4 '
SAL! », DUST j ; BAG j | FILTER
_ L lOUID A A A CONTROL LCH
L I 4" QUICK SALT A LI
1" WAFER CONNECTION
-fco}-
-C01- . J U 1 . J
BY MARLO
16PV/CAP /5pP - 10 WAlF
n
M»r I I N M IP P
WTR
'-PJ A A A
M Ai r
MCC
2-BR113-PA1 A
*5h- i ; , h
nt • H > ' . !
1-1/?■ ^
-5---
A OK
A''" PU-03A
;H
J /2*
M - ^ i6i v.
WTR
1-1/P
K5I - - '--n A A- o P
/ P J x SCALP { 10 100 A|A| SA
Y^-i/?" HA - Pi -
1.5-BR114-PA1
7A
WATER SOFTENER
6B
CONDENSATE POLISHER
PU-03B
BRINE MAKER SKID REFER TO MARLO DWG E P 0 9 - 0 2 3 7 - 0 7 - 0 3
PU-Q3A/B: BRINE TRANSFER PUMP CAPACITY, GPM 12 TDH, FT 77 MOTOR, HP 1
REV.
0
DATE
1-15-10
4-05-10
6-3-10
9-7-10
1_ DESCRIPTION
ISSUED FOR REVIEW
IN PROCESS
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN
DCA
LPW
DCA
DCA
CHK
SEW
SEW
SEW
SEW
D
C
n Li 1 iflDfniejftWG 3
,,,rjSealed Only When Signed in Blue Ink
= UJ : STEVEN E WOPATA ; f n -
7- 9%". 062 04943G «!£ Z
y^ O F I C V ^ ^
x
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
< # ^
EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT 8: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
BRINE MAKER A
DESIGN BY: S. WOPATA
DRAWN BY: L WEST
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 12-30-09
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P & I D 7 E
DRAWING NO.
P&ID7E REV.
3 N \2009 \09140\dwgs \me\09140-PMD7EDWG 9 / 7 / 1 0 1 29pm dalexander
7 6 4 3 2
1-CW48
EQUIPMENT LIMIT
1"-CW48
SKID LIMIT
REV. 0
DATE
6-3-10
9-7-10
I DESCRIPTION
IN PROCESS
ISSUED FOR CONSTRUCTION
DWN
DCA
DCA
CHK
SEW
SEW
D
C
" l » / A \ PA As
; n i (h J f I-, l A,o J r
Sealed Only When Signed in Blue Ink
^VtSS/04,.%. 3 > \<%p-
—■ cT * • 01 *£ = w : STEVEN E WOPATA; ^ = l=i H \ 062 049436 • i£» r
s *«Q *«,
%^foF^y ' " / / J J I I I l l ^
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License § 184-000823
EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT *•■ 10-4535
EASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER
PIPING Sc INSTRUMENTATION DIAGRAM
CLOSED COOLING LOOP A
DESIGN BY: S. WOPATA
DRAWN BY: J. MILLER
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 8-21-2008
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P & I D 8
DRAWING NO.
P&ID8 REV.
1 N: \2009 \09140\dwgs \me\09140-PMD8.dwg 9 / 7 / 1 0 1:29pm dalexander
1 REV. DATE DESCRIPTION DWN CHK
0 6-3-10 IN PROCESS DCA SEW
8-19-10 IN PROCESS DCA SEW
9-7-10 ISSUED FOR CONSTRUCTION DCA SEW
D
C
I f ! <*■>■,
Hioo %0-J\
Sealed Only When Signed in Blue Ink
= JiA'sTFVLNE WOPATA i ^ = - or
' " ' / / i in i i^ x N
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
<»► EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT 8= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING & INSTRUMENTATION DIAGRAM
CHEMICAL FEED A
DESIGN BY: S. WOPATA
CHECKED BY: S. WOPATA
DRAWN BY: L. WEST
DATE: 8- ■12-2010
CLIENT I.D. HON00103
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P & I D 9
DRAWING NO.
P&ID9 REV.
2
T7
PIPING KEYPLAN 20 2
40
S C A L E I N F E E T
\ n n n n \ nn i /i n\ _i..._. _ \ _ \ nn i /i n n i nn _i _, cr / r* /1 r\ o .
2 REV.
A DATE
5-6-10
] DESCRIPTION
IN PROCESS
DWN
DCA
CHK
SEW
D
C
Honeywell Sealed Only When Signed in Blue
B
GD Qeaa • \*j
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
< # ^
EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT •> 10-451
KERN ILLINOIS UNIVERSITY RENEWABLE ENERGY CENTER
PIPING KEYPLAN
DESIGN BY: S. WOPATA
DRAWN BY: D. ALEXANDER
CLIENT I.D. H0N00103
CHECKED BY: S. WOPATA
DATE: 4-29-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P 1 0 0 DRAWING NO.
P100 REV.
A
7 4 1
K
o CO CN
O J "co CN
S C A L E I N F E E T
REV.
0
DATE
8-30-10
DESCRIPTION
ISSUED FOR CONSTRUCTION
DWN
DCA
CHK
SEW
D
NOTES:
1. DRAIN PIPING WILL SLOPE 1/8" PER FOOT MINIMUM.
2. FLOOR DRAIN PIPE WILL BE CAST IRON, HUBLESS, UNLESS NOTED OTHERWISE
* PROVIDED BY NEBRASKA BOILER.
Sealed Only When Signed in Blue Ink
H i f f STEVEN E WOPATA : m = %^\ 0C2 049436 > ™ Z
"OFUAxV .«\\\ Y\*
Engineers — Architects — Technicians Design — Construction - Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License § 184-000823
< # ^
EASTERN I L L I N O I S kj &H J V C I \ 3 i I 1
EIU PROJECT ®= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
LOW PIPING PLAN - SHT. 1 A
DESIGN BY: S. WOPATA
DRAWN BY: D. ALEXANDER
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE:
4-29-10 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 0 6
DRAWING NO
P106 REV.
0 N \2009\09140\dwgs\me\09140-P106 dwg 8/31/10 2 33pm dalexander
7
K
CD CM
CD CM
HIGH PIPING PLAN - SHT. 1 0
S C A L E I N F E E T
8
REV.
0 DATE
8-30-10
1_ DESCRIPTION
ISSUED FOR CONSTRUCTION
DWN DCA
CHK
SEW
NOTES:
1. DRAIN PIPING WILL SLOPE 1/8" PER FOOT MINIMUM.
2. ALL FLOOR DRAINS WILL HAVE 4" PIPE CONNECTIONS.
3. FLOOR DRAIN PIPE WILL BE CAST IRON, HUBLESS, UNLESS NOTED OTHERWISE.
LEGEND:
PD FD CO V CO TEE
PROCESS DRAIN
FLOOR DRAIN
CLEAN OUT
VENT
CLEAN OUT TEE
Sealed Only When Signed in Blue Ink
= ui : STEVEN E WOPATA ■ ^ = 5 9 U 062 049436 /OT Z ■£ -
1 *. ♦• ~° C
%;^OFI\^AASS
Engineers - Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
<#y EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT *■• 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
HIGH PIPING PLAN - SHT. 1
DESIGN BY: S. WOPATA
DRAWN BY: D. ALEXANDER
CLIENT I.D. HONOO103
CHECKED BY: S. WOPATA
DATE: 4-29-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 09140-P106A DRAWING NO.
P106A REV.
0 N \ 2009 \09140 \dwgs \me\09140-P106A dwg 8 /31 /10 1 25pm dalexander
7
CO CM
H
CO CM
CO CM
p
1 1 1
I I
I 1
1 1
1 1
I
I 1
I I
I I
I I
I 1
I I
I I
J SEE DWG. P110 FOR CONTINUATION
LOW PIPING PLAN - SHT. 2
S C A L E I N F E E T
REV. DATE 8-30-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION DWN
DCA
CHK
SEW
D
NOTES:
PROVIDED BY NEBRASKA BOILER. C
Of
f%f^^'«^^^-^'Seiird:5Sh1| When Signed in Blue Ink
= S : STEVEN E. WOPATA : S § = O". 062.049436 ; " 7 -
' • i **♦ »** ■? "<• «oA. .♦* So £■
S U > ♦»» „«♦ CVS o
"'//niin^vN
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License § 184-000823
<#y EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT n= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
LOW PIPING PLAN - SHT. 2
DESIGN BY: S. WOPATA
DRAWN BY: D. ALEXANDER
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 5-3-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P 1 0 8
DRAWING NO.
P108 REV.
0 N:\2009\09140\dwgs\me\09140-P108.dwg 8/31/10 2:49pm dalexander
7
S C A L E I N F E E T
I 1 1
I I
I I I
I I 1
I 1 I
I I 1
I § 1
I I I
I I I
I I I
m m ■sJP
REV. DATE
8-30-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION DWN DCA
CHK SEW
D
Sealed Only When Signed in Blue Ink
x<O^ t S S | 0/^ % A V *
~ S : STEVEN E WOPATA-^ = = 9 " . 062 049436 ; £ r Z
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stllwell, Kansas 66085-1000 Illinois License # 184-000823
EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT *• 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
HIGH PIPING PLAN - SHT. 2 A
DESIGN BY: S. WOPATA
DRAWN BY: D. ALEXANDER
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 4-29-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P 1 0 8 A DRAWING NO.
P108A REV.
0 N \2009\09140\dwgs\me\09140-P108Adwg 8/31/10 1 07pm dalexander
7
F n
o J CO CN
to CN
D
CO CN
27-8" 1.3
27-8" 1.7
22-0" 2) (2.1
4 - 0 "
r i i
i
SEE DWG. P108 FOR CONTINUATION
1 I
I 1 I
1 I
I 1
I § 1
1 1 I
I I
\
I I
I I I
I I
I
6-S14-AB1
5-9 3/32"
ro
@S3f-
1 i
i
i i
i i i
i i
i i
5 -4 "
;i i
1 1
o J Tn
J L J W & J L — n mmmmmmmmm*^
3-S142-AB1
o J CD
I I
I I I
O I
To
SEE DWG. P112 FOR CONTINUATION
LOW PIPING PLAN - SHT. 3 0
J 2 - 8 "
S C A L E I N F E E T
REV.
0 DATE
8-30-10
1_ DESCRIPTION ISSUED FOR CONSTRUCTION
DWN DCA
CHK SEW
D
C
Sealed Only When Signed in Blue Ink
= 2 : STEVEN CWOPATA:^ = = 9 " 062 049436 ; C =
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License § 184-000823
< # ^
I L L I N O I S U N I V F R S I T Y
EIU PROJECT *= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
LOW PIPING PLAN - SHT. 3 A
DESIGN BY: S. WOPATA
DRAWN BY: D. ALEXANDER
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 5-3-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 09140-P110 DRAWING NO.
P110 REV.
0 N \2009\09140\dwgs\me\09140-P110 dwg 8/31/10 1 04pm dalexander
7 4
o I
CN
HIGH PIPING PLAN - SHT. 3 SEE DWG. P112A FOR CONTINUATION
8
1
I 1 I
I 1 I
I I 1
I
1 1
I I I
1 I
I 1 1
I I
I I
m m mmmm^S
REV. DATE
8-30-10
2. DESCRIPTION
ISSUED FOR CONSTRUCTION
DWN DCA
CHK SEW
NOTE: * DENOTES ITEMS FURNISHED BY RENTECH.
SHIPPED LOOSE. TO BE INSTALLED IN PIPING.
;.
■i V.
Sealed Only When Signed in Blue Ink
03 : STEVEN E WOPATA ■ f?j S 9 / . 062 049436 •£? 5 »"m -
S C A L E I N F E E T
Engineers — Architects — Technicians Design — Construction - Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
< W ^ EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT n= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
HIGH PIPING PLAN - SHT. 3
DESIGN BY: S. WOPATA
DRAWN BY: D. ALEXANDER
CLIENT I.D. HONOO103
CHECKED BY: S. WOPATA
DATE:
5-3-10 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 1 0 A DRAWING NO.
P110A REV.
0 N \2009\09140\dwgs\me\09140-P110A dwg 8/31/10 12 58pm dalexander
7 6 4
27-8" 1.3
27-8" 1.7
22-0
SEE DWG. P110 FOR CONTINUATION cn
CD CN
B
o J "CD CN
A
3-S143-AB1
I
I I
I I §
I 1
5 - 8 "
CD
ro
a> I
to
I iln I.MBI! JME l i a r 3HE
I I
£/
2.5-S143-AB1
I I
I 1 I
1 I
I I 1
I 1 I
I
I I
I I I
I
LOW PIPING PLAN - SHT. 4 8
S C A L E I N F E E T
REV. DATE
8-30-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION DWN
DCA
CHK
SEW
D
C
Sealed Only When Signed in Blue Ink
= S = STEVEN E WOPATA s S = = 9 1 062 049436 • " * = ■?. ■** *• i? ^
' " / / I I I I U ^ B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
U N I V E R S I T Y
EIU PROJECT *•• 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
LOW PIPING PLAN - SHT. 4 A
DESIGN BY: S. WOPATA
DRAWN BY: D. ALEXANDER
CLIENT I.D. HONOO103
CHECKED BY: S. WOPATA
DATE: 5-3-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P 1 1 2
DRAWING NO.
P112 REV.
0 N \ 2009 \09140 \dwgs \me\09140-P112 dwg 8 /31 /10 12 55pm dalexander
7
2 7 - 8 " 1.3
2 7 - 8 "
2.5-FW29-AB1 3-FW29-AB1
CM
o CD CN
B
CD CN
A
§ I
SEE DWG. P110A FOR CONTINUATION
\ \
I I
1 I
I I
I 1 1
I I 1
I I 1
a , t >r
■ '=£•
5 - 7 15/16"
CD
\ ro en
I to
V
nV
2.5-S143-AB1
1
I §
1 I
1 1
I 1
I I
I I 1
I I
1 I
1 I
I I 1
I 1
HIGH PIPING PLAN - SHT. 4 4 2 0 4 8
S C A L E I N F E E T
REV. DATE
8-30-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
DWN
DCA
CHK
SEW
D
M Q I E L DENOTES ITEMS FURNISHED BY RENTECH. SHIPPED LOOSE. TO BE INSTALLED IN PIPING. C
Q
.uui..Seaed Ony When Signed in Bue Ink
<y^\ - . . 4 / /'s.
u 3 : STEVENE WOPATA;^ = 9 : . 062049436 | C =
' " i J l l i U ^
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
< M ^ EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT *■■ 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
HIGH PIPING PLAN - SHT. 4 A
DESIGN BY: S. WOPATA
DRAWN BY-
D. ALEXANDER CLIENT I.D.
HON00103
CHECKED BY: S. WOPATA
DATE-
5-3-10 SEGA PROJECT NO
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 1 2 A
DRAWING NO.
P112A REV.
0 N \ 2009 \09140 \dwgs \me\09140-P112A dwg 8 /31 /10 12 54pm dalexander
7 4
1.3
<t RO TANK
C_ EL 7 4 6 ' - 2
4 -C45-BA1
C_ EL 715-11
C_ EL. 7 1 4 - 4 1/2"
C_ EL 7 0 9 - 1 3 / 4 " _ i _
f l i
MEZZANINE T.O.C. EL. 7 1 8 - 2 "
C_ EL. 7 1 3 - 7 3 / 4 "
C_ EL. 7 1 2 - 5 "
8 x 4 " CONC. RDCR. C_ EL 7 0 6 ' - 4 "
6 PROCESS DRAIN
8-FP49 (FIRE WATER)
S C A L E I N F E E T
REV.
0
DATE
8-30-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
DWN
DCA
CHK
SEW
D
... Sealed Only When Signed in Blue Ink
i<?> ••%% m". STEVENE,WOPATA-^ = 9 , 1 062.049436 «W C
Mfe- -^/ B
Engineers — Architects — Technicians Design - Construction - Field Service
(913) 681-2881 16041 Foster
P.O. Box 1000 Stilwell, Kansas 66085-1000
Illinois License # 184-000823
mp» EXTERN I L L I N O I S U N I V E R S J T Y
EIU PROJECT ** 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPING SECTIONS
DESIGN BY: S. WOPATA
DRAWN BY: D. ALEXANDER
CLIENT I.D. HON00103
CHECKED BY: S. WOPATA
DATE: 7-13-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P 1 2 5
DRAWING NO.
rlcO REV.
o N: \2009\09140\dwgs\me\09140-P125.dwg 8 /31 /10 12:38pm dalexander
J
COL. ROW 1 WALL OPENINGS ELEVATION LOOKING EAST 4 0 4 8 12
5 S C A L E I N F E E T
D C B
ACCOUSTICALLY LINED 90 DEGREE FAN DISCHARGE ELBOW SEE DWG. HV101 FOR LOCATION
11-0"
1 A
13"0 WALL OPENING FOR 10-S91-BA1 SEE DWG. A525 DETAIL A2 AND A4
A •CONVEYOR NO. 8 OPENING •SEE DWG. S274 FOR STEEL LOCATION
/(FIELD DETERMINE FINAL I WALL OPENING SIZE f AND LOCATION) VSEE DWG. A525 DETAIL A51
LAND C5.
1'-5 3/A 1'-6"
<t EL 737'-0"
6"0 WALL OPENING
►FOR FLOOR DRAIN VENT
ISEE DWG. A525 DETAIL A2 AND A4
A
^ \ :CONVEYOR NO. 9 OPENING SSEE DWG. S274 TOR STEEL LOCATION VFIELD DETERMINE FINAL (WALL OPENING SIZE >AND LOCATION) SEE DWG VA525 DETAIL A5 AND C5
A
EXHAUST DUCT SEE DWG. S274 FOR LOCATION
OPENING
■ 6"0 WALL \OPENING
FOR FLOOR >DRAIN VENT SEE DWG. A525
TAIL A2 AND
DOOR OPENING SEE DWG. S274 FOR DETAIL
COL ROW 1 WALL OPENINGS ELEVATION LOOKING EAST
S C A L E I N F E E T
3
p OPENING FOR ASH CONVEYOR IN STEM WALL SEE DWG. S274 FOR LOCATION
REV. 0 1
DATE 10-7-10 10-29-10
DESCRIPTION ISSUED FOR CONSTRUCTION REVISED
DWN DCA DCA
CHK SEW SEW
NOTES:
1. ELECTRICAL CONTRACTOR WILL FIELD LOCATE PENETRATIONS IN WEST WALL.
Honeywell Sealed Only When Signed in Blue
a> Qeaa ® v»>/
Engineers — Arch i tec ts — Technicians Design — Const ruc t ion — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
<m^ EASTERN I L L I N O I S U N I V E R S I T Y
PROJECT «: 10-4
iASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
COL ROW 1 WALL OPENINGS
ELEVATION LOOKING EAST
DESIGN BY: C. WARD
DRAWN BY: P. ALEXANDER
CLIENT I.D. HONOO103
CADD FILE NAME: 091 40—P1 3 0
DRAWING NO.
CHECKED BY: C. WARD
DATE! 9 - 1 5 - 1 0
SEGA PROJECT NO. 090140
P130 REV.
1 \ i~t r \ r \ r \ \ r \ n i A r \ \ / i / - i r\ i i~t. o *">..
7 4 3 2 1
RENEWABLE ENERGY CENTER PIPE SUPPORT LOCATIONS T.O.C. EL. 703-6" 8 4 0 8 16
S C A L E I N F E E T
REV. DATE
6-29-10
5-17-10
DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink
i °i/ ' y \ / " 062-049436 ' \ I •' REGISTERED '• | l i ( \ PROFESSIONAL : * = \ ■-. ENGINEER .■' I \ ^ ,
V ^ ' ^ - V I V N ^ E X P
- D A T E 11-30-2011
">o,.. OF I V '* 2L.U5*'
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^ik EASTERN 11L I N O LS u N I V !■ R S 1 T Y
EIU PROJECT * 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT LOCATION
DESIGN BY: C. WARD
DRAWN BY: C. HAYTON
CLIENT I.D. HONOO103
CHECKED BY: C. WARD
DATE: 6-22-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P 1 5 0
DRAWING NO.
P150 REV.
N \ 2009 \09140 \dwgs \me \09140-P150 dwg 8/18 /10 11 24am chayton
7 2
PIPE SUPPORT LOCATIONS T.O.C. EL. 703-6"
Z 16
S C A L E I N F E E T
FW28-2 FW29-40 FW28-3
BOILER FEED PUMP AREA PIPE SUPPORT LOCATIONS
16
S C A L E I N F E E T
REV.
0
DATE 8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
DWN
DCA
CHK
SEW
1 ! ' » » , « . . *
Sealed Only When Signed in Blue Ink
/£/' *%" es W! STEVEN E. WOPATA : m = S < & \ 062.049438 ; JgJ =
\<&S :i#V
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
EIU PROJECT n= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT LOCATION
BOILER FEEDWATER DESIGN BY:
C. WARD DRAWN BY:
C. HAYTON CLIENT I.D.
HON00103
CHECKED BY: C. WARD
DATE: 7-1-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P 1 5 1
DRAWING NO.
P151 REV.
0 N:\2009\09140\dwgs\me\09140-P151.dwg 8 /18 /10 11:25am chayton
7 4 3
RENEWABLE ENERGY CENTER PIPE SUPPORT LOCATIONS T.O.C. EL. 703-6"
S C A L E I N F E E T
REV. DATE
8-17-10
I DESCRIPTION ISSUED FOR CONSTRUCTION
DWN
DCA
CHK
SEW
/ i_
Sealed Only When Signed in Blue Ink
m' STEVEN E. WOP ATA: m = Q ; 062.049436 ; £ J =
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
EASTEJ ILLINOIS U N I V E R S I T Y
EIU PROJECT n* 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT LOCATION CONDENSATE SYSTEM
DESIGN BY: C. WARD
DRAWN BY: C. HAYTON
CLIENT I.D. HONOO103
CHECKED BY: C. WARD
DATE: 7-1-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P 1 5 2
DRAWING NO.
P152 REV.
0 N: \2009\09140\dwgs\me\09140-P152.dwg 8 /18 /10 11:27am chayton
7 4
1.3
RENEWABLE ENERGY CENTER PIPE SUPPORT LOCATIONS T.O.C. EL 703-6"
8
S C A L E I N F E E T
REV. DATE
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
DWN
DCA
CHK SEW
D
C
!Uj)/!K!":jvA^f(Dl
Sealed Only When Signed in Blue Ink
i gfsfiVCN'E WOPATA; m = ^ (/ $ Wi 062.049436 ;™ Z |
' / / A v ' V O ^ J
" " / * I I I I I I I ^ N
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^ M ^ EASTERN LUJLNOlS U N I V E R S I T Y
EIU PROJECT 11= 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT LOCATION
NATURAL GAS A
DESIGN BY: C. WARD
DRAWN BY: C. HAYTON
CLIENT I.D. HON00103
CHECKED BY: C. WARD
DATE: 7-1-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 0 9 1 4 0 - P 1 5 3
DRAWING NO.
P153 REV.
0 N: \2009\09140\dwgs\me\09140-P153.dwg 8 /18 /10 11:27am chayton
7 4 1
PIPE SUPPORT LOCATIONS BELOW BOILERS NO. 3 & 4 PLATEORM TOC EL 703-6" 8 4 0 8 16
S C A L E I N F E E T
REV.
0 DATE
8-19-10
DESCRIPTION
ISSUED FOR CONSTUCTION
DWN
DCA
CHK
SEW
D
C
a
«**'
Sealed Only When Signed in Blue Ink ^iiiiiimir//,,,
"'*/,.
/£ V\ # 062-049436 % l REGISTERED ! | * PROFESSIONAL * J I ENGINEER I %ty J?/
'""/, PF \\&y EXP. DATE 11-30-2011 '" 'MIIIIIIIHWW"
B
Engineers — Architects - Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
<#y EASTERN IJLLIM.QJS UN I V E R S ] ! Y
EIU PROJECT #: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT LOCATIONS
BELOW BOILERS NO. 3 & 4 PLATFORM A
DESIGN BY: C. WARD
DRAWN BY: D. ALEXANDER
CLIENT I D HONOO103
CHECKED BY: C. WARD
DATE: 7-12-10
SEGA PROJECT NO 090140
CADD FILE NAME: 0 9 1 4 0 - P 1 5 4
DRAWING NO
P154 REV
0 N \2009 \09140 \dwgs \me \09140 -P154dwg 8 / 2 3 / 1 0 9 06am dalexander
7 4
PIPE SUPPORT LOCATIONS SOOT BLOWING PIPE T.O.C. EL. 703-6" 8 4 0 8 16
S C A L E I N F E E T
1 REV. DATE
8-19-10 DESCRIPTION ISSUED FOR CONSTRUCTION
DWN
DCA
CHK
SEW
D
C
Mi Q#
Sealed Only When Signed in Blue Ink
4^3X = :' 062-049436 ': \
REGISTERED '• I PROFESSIONAL : * 1
ENGINEER / I 1\ %w V5\-
^ O F ^ EXP
- °A T E 1 1
-3 0
-2 0 1 1
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^mp» EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT #: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT LOCATIONS
SOOT BLOWING PIPE A
DESIGN BY: C. WARD
DRAWN BY: D. ALEXANDER
CLIENT I.D. H0N00103
CHECKED BY: C. WARD
DATE: 7- ■30-10
SEGA PROJECT NO. 090140
CADD FILE NAME: 09140-P154A DRAWING NO.
P154A REV.
0 N:\2009\09140\dwgs\me\09140-P154A.dwg 8/23/10 9:16am dalexander
7
PIPE HANGER SKETCH S01-1
5
PIPE HANGER SKETCH S01-2
4 3
PIPE HANGER SKETCH S01-3
BOILER 1 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL 7 4 2 - 6 '
STRUCTURAL STEEL W12x40 J A
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY TYPE
212128
a>^ ^ a • ENGINEERING
STILWELL, KANSAS
S01-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL:398 LBS, HL354 LBS, SR:190 LBS, TM: 0.229 EYE NUT I ^ T l N C " THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS
REF. DWGS.
3.
TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S01-1
SHEET 1 OF 1
REV. n NO. U
BOILER 1 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09 -140
CONTRACT_NO
T.O.S. EL. 7 4 1 - 6 " NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 359 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
_5LEL 7 3 0 - 3 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
GOx^ s% a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 1 - 2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2" UNC W/ HEX NUTS" TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S01-2
SHEET 1 OF 1
REV. A NO. I
BOILER 1 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 "
NOTE: ALL COMPONENTS SHALL BE LOAD GROUP 3
NOTES: SEE DRAWING P150 FOR LOCATIONS.
REV NO.
ITEM NO. QTY TYPE
213228
a>^ ^ a • ENGINEERING
STILWELL, KANSAS
S01-3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL1068 LBS, HL943 LBS, SR:190 LBS, TM: 0.659 EYE NUT 5/8"~UNC" THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS
REF. DWGS.
3.
TEMP. 366 F
REV. DATE BY CHK.
0 6-9-10
CMW SEW
SPEC-AB1
1
INSUL. THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S01-3
SHEET 1 OF 1
REV. NO. 0
PIPE HANGER SKETCH S 0 2 - 2 PIPE HANGER SKETCH S 0 2 - 3 PIPE HANGER SKETCH S03-1
BOILER 2 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 '
A NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 344 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 3 0 - 3 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>^ ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 2 - 2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S02-2
SHEET 1 OF 1
REV. n NO. U
BOILER 2 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
REV NO.
ITEM NO. QTY TYPE
213328
GOx^ s% a • ENGINEERING
STILWELL, KANSAS
S 0 2 - 3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL927 LBS, HL861 LBS, SR:95.2 LBS, TM: 0.691 EYE NUT 5/8"~UNC" THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS
REF. DWGS.
3.
TEMP. 366 F
REV. DATE BY CHK.
0 6-9-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S02-3
SHEET 1 OF 1
REV. n NO. U
BOILER 3 MAIN STEAM Client ID
Job No.
Contract No.
09-140
T<- q_ EL 7 0 6 - 6 "
NOTES: SEE DRAWING P150 FOR LOCATIONS.
4 PIPE
ADD GRAPHITE GREASE TO ALLOW PLATE TO
4 ) SLIDE OVER SUPPORT
REV NO.
ITEM NO. QTY TYPE
212128
a>^ Seg a • ENGINEERING
STILWELL, KANSAS
S03-1
MATERIAL DESCRIPTION CS SQUARE TUBING - 2 1/2"x2 1/2"x1/4" (LENGTH AS REQUIRED) PLATE - 6"x6"x3/8" PLATE - 6"x1"x1/4" LISEGA SPRING CAN - CL323 LBS, HL359 LBS, SR:19Q LBS, TM: - .20 HILTI KWIK BOLT 3 EXPANSION. 3/8"0. 304SS. MIN. EMBEDMENT OF 3"
REF. DWGS.
3.
TEMP. 550 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AC1
1
INSUL. THK. 3.5" PIPE SIZE 4 '
PIPING SYSTEM HGR. NO. S03-1
SHEET 1 OF 1
REV. NO. 0
2
PIPE HANGER SKETCH S02-1
BOILER 2 MAIN STEAM Client ID EIU
Job No. 09-140
Contract No.
T.O.S. EL. 7 4 2 ' - 6 "
JSTT^UCTURAL STEEL W12x40 J / \
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY TYPE
212128
a>^ ^ a • ENGINEERING
STILWELL, KANSAS
S02-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL386 LBS, HL343 LBS, SR:190 LBS, TM: 0.226 EYE NUT ^/2'
rTmC
THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS
REF. DWGS.
3.
TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL. THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S02-1
SHEET 1 OF 1
REV. NO. 0
PIPE HANGER SKETCH S 0 3 - 2
BOILER 3 MAIN STEAM Client ID EIU
Job No. 09-140
Contract No.
T.O.S. EL. 7 2 2 - 0 "
ISC PIPE SUPPORT STEEL
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY TYPE
212228
a>^ ^ a • ENGINEERING
STILWELL, KANSAS
S 0 3 - 2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL388 LBS, HL361 LBS, SR:95.2 LBS, TM: 0.287 EYE NUT ^/2'
rTmC
THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS
REF. DWGS.
3.
TEMP. 550 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AC1
1
INSUL. THK. 3.5" PIPE SIZE 4 "
PIPING SYSTEM HGR. NO. S03-2
SHEET 1 OF 1
REV. NO.
REV. DATE
6-29-10
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,
/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \
■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #
W - ->°> EXP. DATE 11-30-2011
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^Wk JLJJIVJ I XJ1. \ .L .N
N O I S u N I V !■ K
EIU PROJECT «: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
STEAM PIPING DESIGN BY:
S. WOPATA DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
6-24-10 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 0
DRAWING NO.
P160 REV.
1 N \ 2009 \09140 \dwgs \me \09140-P160 dwg 8/18 /10 11 16am dalexander
7
PIPE HANGER SKETCH S 0 3 - 3
BOILER 3 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 4 2 - 6
ROOF TRUSS T1 \ A
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY TYPE
212328
a>r-: m a • ENGINEERING
STILWELL, KANSAS
S03-3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL356 LBS, HL327 LBS, SR:47.6 LBS EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC' THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S03-3 SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S04-1
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 ' NOTES: SEE DRAWING P150 FOR LOCATIONS.
Ir^D
NOTE: LOAD = 173 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 2 8 - 1
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: m a • ENGINEERING
OVERLAND PARK, KANSAS
S04-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1 / 2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-1 SHEET 1 OF 1
REV. n NO. U
5
PIPE HANGER SKETCH S 0 3 - 4
BOILER 3 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
NOTES: LOOKING WEST TOWARD TURBINE
4" PIPE
T.O.C. 7 0 3 - 6 "
NOTES: SEE DRAWING P150 FOR LOCATIONS.
ADD GRAPHITE GREASE TO ALLOW PLATE TO
4 ) SLIDE OVER SUPPORT
REV NO.
ITEM NO. QTY TYPE
212128 212128
a>r-: m a • ENGINEERING
STILWELL, KANSAS
S03-4
MATERIAL DESCRIPTION CS SQUARE TUBING - 2 1/2"x2 1/2"x1/4" (LENGTH AS REQUIRED) PLATE - 6"x6"x3/8" LISEGA SPRING CAN - CL395 LBS, HL394 LBS, SR:190 LBS LISEGA SPRING CAN - CL467 LBS, HL468 LBS, SR:190 LBS HILTI KWIK BOLT 3 EXPANSION 3/8"0, 304SS, MIN. EMBEDMENT OF 3" PLATE 2 1/2" x 2 1/2" x 1/4" PLATE TO CAP TUBING" 1/4" HOLE DRILLED TO ALLOW PRESSURE TO ESCAPE AFTER WELDING
REF. DWGS. TEMP. 550 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AC1
1
INSUL THK. 3.5' PIPE SIZE 4 "
PIPING SYSTEM HGR. NO. S03-4 SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 0 4 - 2
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6
STRUCTURAL STEEL W12x40
NOTES: SEE DRAWING P150 FOR LOCATIONS.
TUT
Ir^D
NOTE: LOAD = 515 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 2 8 - 3 '
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: m a • ENGINEERING
OVERLAND PARK, KANSAS
S04-2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-2 SHEET 1 OF 1
REV. n NO. U
4 3 2
PIPE HANGER SKETCH S 0 3 - 5
BOILER 3 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
REV NO.
ITEM NO. QTY TYPE
213328
a>r-: a • ENGINEERING
STILWELL, KANSAS
S03-5
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL1085 LBS, HL1037 LBS, SR:95.2 LBS, TM: 0.497 EYE NUT 5/8*~UNC" THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC" THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-9-10
CMW SEW
SPEC-AB1
1
INSUL. THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S03-5 SHEET 1 OF 1
REV. A NO. I
PIPE HANGER SKETCH S 0 4 - 3 PIPE HANGER SKETCH S 0 4 - 4
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6
STRUCTURAL STEEL W12x40
NOTES: SEE DRAWING P150 FOR LOCATIONS.
t—<D
NOTE: LOAD = 430 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 3 3 ' - 9 '
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: a • ENGINEERING
OVERLAND PARK, KANSAS
S04-3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL. THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-3 SHEET 1 OF 1
REV. n NO. U
BOILER 4 MAIN STEAM Client ID EIU
Job No. 09-140
Contract No.
T.O.S. EL. 7 4 2 - 6
A NOTES: SEE DRAWING P150 FOR LOCATIONS.
i—<D
NOTE: LOAD = 270 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
Q_EL 7 3 3 - 1 0 '
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: a • ENGINEERING
OVERLAND PARK, KANSAS
S04-4
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL. THK. 2" PIPE SIZE 6'
PIPING SYSTEM HGR. NO. S04-4 SHEET 1 OF 1
REV. n NO. U
REV. DATE
6-29-10
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,
/ A y ' ''■■^y\ / £ y '■??% f / 0 6 2 - 0 4 9 4 3 6 \ \
■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #
W - ->°> EXP. DATE 11-30-2011
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^Wk JLJJIVJ I XJ1.\.L.N
N O I S U N I V !■ K
EIU PROJECT «: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
STEAM PIPING DESIGN BY:
S. WOPATA DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
6-24-10 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 1
DRAWING NO.
P161 REV.
1 N \ 2009 \09140 \dwgs \me\09140-P161 dwg 8/18 /10 11 16am dalexander
7
PIPE HANGER SKETCH S 0 4 - 5
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 "
STRUCTURAL STEEL W10x26 ) / \
NOTES: SEE DRAWING P150 FOR LOCATIONS.
§ ©
NOTE: LOAD = 297 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 3 4 - 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
G>T-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 4 - 5
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. T PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-5
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 0 4 - 9
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 "
STRUCTURAL STEEL W10x26
NOTES: SEE DRAWING P150
A FOR LOCATIONS.
§ ©
NOTE: LOAD = 315 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 3 4 - 6
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
G>T-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 4 - 9
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. T PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-9
SHEET 1 OF 1
REV. n NO. U
5
PIPE HANGER SKETCH S 0 4 - 6
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 4 2 - 6 '
A NOTES: SEE DRAWING P150 FOR LOCATIONS.
TUT
ir^D
NOTE: LOAD = 291 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 3 4 - 1
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
G>T-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 4 - 6
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX "NUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2' PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-6
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S04-10
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 4 2 ' - 6 "
A NOTES: SEE DRAWING P150 FOR LOCATIONS.
TUT
ir^D
NOTE: LOAD = 506 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 3 4 - 8
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
G>T-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S04-10
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX "NUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2' PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-10
SHEET 1 OF 1
REV. n NO. U
4 3
PIPE HANGER SKETCH S 0 4 - 7
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6
STRUCTURAL STEEL W10x26
NOTES: SEE DRAWING P150
A FOR LOCATIONS.
t—<D
NOTE: LOAD = 286 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 3 4 - 3
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: 3% a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 4 - 7
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX'NUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-7
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S04-11
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL 7 4 2 - 6
STRUCTURAL STEEL W10x26
NOTES: SEE DRAWING P150
) A FOR LOCATIONS.
I—<D
NOTE: LOAD = 231 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 3 4 - 1 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
OChri ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S04-11
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2' PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-11
SHEET 1 OF 1
REV. n NO. U
2
PIPE HANGER SKETCH S 0 4 - 8
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 "
A NOTES: SEE DRAWING P150 FOR LOCATIONS.
i—<D
NOTE: LOAD = 306 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 3 4 - 5
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
Q>r-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 4 - 8
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-8
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S04-12
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
NOTES: SEE DRAWING P150 FOR LOCATIONS.
Jr-3 §_ EL. 7 3 5 - 1
NOTE: ALL COMPONENTS SHALL BE LOAD GROUP 3
REV NO.
ITEM NO. QTY TYPE
213128
GO Se9 a • ENGINEERING
OVERLAND PARK, KANSAS
S04-12
MATERIAL DESCRIPTION WELD ON CLEVIS EYE NUT VAR.SPRING HANGER CL938 LBS, HL858 LBS, SR: 381 LBS, TM: 0.211 EYE NUT 5/8" UNC THREE BOLT CLAMP (8" STD PIPE SIZE) HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC - AB1
1
INSUL THK. 2 PIPE SIZE 8"
PIPING SYSTEM HGR. NO. S04-12
SHEET 1 OF 1
REV. n NO. U
REV. DATE
6-29-10
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,
/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \
■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #
W - ->°> EXP. DATE 11-30-2011
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^Wk JLJJIVJ I XJ1.\.L.N
N O I S u N I V !■ K
EIU PROJECT «: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
STEAM PIPING DESIGN BY:
S. WOPATA DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
6 - 2 4 - 1 0 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 2
DRAWING NO.
P162 REV.
1 N \ 2009 \09140 \dwgs \me \09140-P162 dwg 8/18 /10 11 16am dalexander
7
PIPE HANGER SKETCH S04-13
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 4 2 - 6
A NOTES: SEE DRAWING P150 FOR LOCATIONS.
s—<3>
q_ EL 7 3 0 - 6
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY TYPE
212228
CD Se9 a • ENGINEERING
OVERLAND PARK, KANSAS
S04-13
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL420 LBS, HL381 LBS, SR:95.2 LBS, TM: 0.409 EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. T PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-13
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 0 5 - 3
TURBINE EXHAUST Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 4 2 - 6
Z \ STRUCTURAL STEEL WISXSO
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP
REV NO.
ITEM NO. QTY TYPE
213228
CD Se9 a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 5 - 3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL759 LBS, HL667 LBS, SR:190 LBS, TM: 0.483 EYE NUT 5/8" UNC THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGTHS THREADED ROD 5/8" UNC FIELD VERIFY LENGTHS
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. T PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S05-3
SHEET 1 OF 1
REV. n NO. U
5
PIPE HANGER SKETCH S04-14
BOILER 4 MAIN STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 1 - 6 NOTES: SEE DRAWING P150 FOR LOCATIONS.
s—<3L
$_ EL 7 3 0 - 6
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP
REV NO.
ITEM NO. QTY TYPE
213228
GO Se9 a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 4 - 1 4
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL809 LBS, HL728 LBS, SR:190 LBS, TM: 0.426 EYE NUT 5/8" UNC THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2' PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S04-14
SHEET 1 OF 1
REV. A NO. I
PIPE HANGER SKETCH S 0 5 - 4
TURBINE EXHAUST Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 2 2 - 0 ' NOTES: SEE DRAWING P150 FOR LOCATIONS.
TUT
ir^D
NOTE: LOAD = 920 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
q_ EL. 7 1 8 - 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
G>T-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 5 - 4
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5/8 UNC W/ HEXHUTS" THREE BOLT PIPE CLAMP (MATCH TO PIPE SIZE)
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2' PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S05-4
SHEET 1 OF 1
REV. n NO. U
4 3
PIPE HANGER SKETCH S05-1
TURBINE EXHAUST Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL 7 4 2 - 6
A NOTES: SEE DRAWING P150 FOR LOCATIONS.
I—<D
NOTE: LOAD = 123 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 3 0 - 0
REV NO.
ITEM NO. QTY FIG. NO./
OODE NO.
OChri ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S05-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2' PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S05-1
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 0 5 - 5
TURBINE EXHAUST Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6
A ( ROOF TRUSS T1 J
NOTES: SEE DRAWING P150 FOR LOCATIONS.
t—<D
NOTE: LOAD = 477 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 1 8 - 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: 3% a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 5 - 5
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX'NUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S05-5
SHEET 1 OF 1
REV. n NO. U
2
PIPE HANGER SKETCH S 0 5 - 2
TURBINE EXHAUST Client ID
Job No.
Contract No.
EIU
09 -140
NOTES: SEE DRAWING P150 FOR LOCATIONS.
iT^ $_ EL 7 3 0 - 0
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY TYPE
211228
GO Se9 a • ENGINEERING
OVERLAND PARK, KANSAS
S 0 5 - 2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL214 LBS, HL198 LBS, SR:47.6 LBS, TM: 0.337 EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC - AB1 INSUL. THK. 2' PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S05-2
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 0 5 - 6
TURBINE EXHAUST Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL 7 2 2 - 0
MISC PIPE SUPPORT STEEL ) /K
NOTES: SEE DRAWING P150 FOR LOCATIONS.
Sr^D
NOTE: LOAD = 335 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 1 8 - 0
REV NO.
ITEM NO. QTY TYPE
GChri S^e a • ENGINEERING
STILWELL, KANSAS
S 0 5 - 6
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS.
2. 3. 4.
TEMP. 366 F
REV. DATE BY CHK.
0 6-9-10
CMW SEW
SPEC - AB1
1
INSUL. THK. 2' PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S05-6
SHEET 1 OF 1
REV. A NO. I
REV. DATE
6-29-10
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,
/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \
■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #
<9Ll^ EXP. DATE 11-30-2011
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^Wk JLJJIVJ I XJ1. \ .L .N
N O I S u N I V !■ K
EIU PROJECT «: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
STEAM PIPING DESIGN BY:
S. WOPATA DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
6 - 2 4 - 1 0 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 3
DRAWING NO.
P163 REV.
1 N \ 2009 \09140 \dwgs \me \09140-P163 dwg 8/18 /10 11 16am dalexander
7
PIPE HANGER SKETCH S 0 5 - 7
TURBINE EXHAUST Client ID
Job No.
Contract No.
EIU
09-140
NOTES: SEE DRAWING P150 FOR LOCATIONS.
q_ EL. 7 1 8 - 0
XD N l
A
MONORAIL STRUCTURE
REV NO.
ITEM NO. QTY TYPE
292128
acne ^ a • ENGINEERING
STILWELL, KANSAS
S05-7
MATERIAL DESCRIPTION 3" OS PIPE - LENGTH AS REQUIRED PLATE - 6"x6"x3/8" PLATE - 6"x1"x1/4" LISEGA SPRING CAN - CL303 LBS, HL275 LBS, SR:190 LBS 3/8" BOLT, 2 1/2" LONG W/ WASHERS AND NUT I/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING
REF. DWGS.
2.
TEMP. 450 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC - AB1 INSUL THK. 2" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S05-7
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 0 6 - 2
STEAM HEADER Client ID
Job No.
Contract No.
EIU
09-140
W14 (EXISTING)
W14 (EXISTING)
NOTES: SEE DRAWING P150 FOR LOCATIONS.
REV] NO
ITEM NO. QTY TYPE
G > d §pg a • ENGINEERING
STILWELL, KANSAS
S06-2
MATERIAL DESCRIPTION OS SQUARE TUBING - 4 1/2"x 4 1/2"x1/4" - LENGTH AS REQUIRED 3" CS PIPE (LENGTH AS REQUIRED) PLATE - 4 1/2"x4 1/2"x3/8" ANGLE - 2"x2"x1/4", 4" LONG. TRIM TO LEG LENGTHS SPECIFIED PLATE - 4 1/2" x 4 1/2" x 1/4" PLATE TO CAP ENDS OF TUBING 1/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING PLATE - 4 1/2" x 4 1/2" x 1/4" PLATE TO CAP ENDS OF TUBING
REF. DWGS.
2.
4.
TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC - AB1 INSUL. THK. 2.5':
PIPE SIZE 12"
PIPING SYSTEM HGR. NO. S06-2
SHEET 1 OF 1
REV. n NO. U
5
PIPE HANGER SKETCH S 0 5 - 8
TURBINE EXHAUST Client ID
Job No.
Contract No.
EIU
09-140
NOTES: SEE DRAWING P150 FOR LOCATIONS.
({_ EL. 7 1 8 - 0 "
MONORAIL STRUCTURE
REV NO.
ITEM NO. QTY TYPE
292128
OChH ^ a • ENGINEERING
STILWELL, KANSAS
S05-8
MATERIAL DESCRIPTION 3" OS PIPE - LENGTH AS REQUIRED PLATE - 6"x6"x3/8" PLATE - 6"x1"x1/4" LISEGA SPRING CAN - CL339 LBS, HL277 LBS, SR:190 LBS 3/8" BOLT, 2 1/2" LONG W/ WASHERS AND NUT 1/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING
REF. DWGS.
2.
4.
TEMP. 4 5 0 F
REV. DATE BY CHK.
0 6-9-10
CMW SEW
SPEC - AB1
1
INSUL. THK. 2' PIPE SIZE 6'
PIPING SYSTEM HGR. NO. S05-8
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S07-1
STEAM HEADER TO CAMPUS Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 " NOTES: SEE DRAWING P150 FOR LOCATIONS.
Jr^ <$_ EL 7 3 0 - 0
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 5
REV NO.
ITEM NO. QTY TYPE
215228
OChH ^ a • ENGINEERING
STILWELL, KANSAS
S07-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL2388 LBS, HL2186 LBS, SR: 761 LBS TM: 0.247 EYE NUT 1 UNC THREE BOLT CLAMP
UNC HEXAGONAL NUT 1 THREADED ROD 1" UNC FIELD VERIFY LENGHTS THREADED ROD 1" UNC FIELD VERIFY LENGHTS
REF. DWGS.
2.
4.
TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC - AB1
1
INSUL. THK. 2.5' PIPE SIZE 12"
PIPING SYSTEM HGR. NO. S07-1
SHEET 1 OF 1
REV. n NO. U
4 3
PIPE HANGER SKETCH S 0 5 - 9
TURBINE EXHAUST Client ID
Job No.
Contract No.
EIU
09-140
LOOKING EAST TOWARD TURBINE
6" PIPE
1 - 0 " 1 - 0 "
TYP
TYP
NOTES: SEE DRAWING P150 FOR LOCATIONS.
10x6 REDUCER
T.O.C. 7 0 3 - 6
o cn o
A A A A
REV NO.
ITEM NO. QTY TYPE
291128 291128
G>T-: 3% a • ENGINEERING
STILWELL, KANSAS
S05-9
MATERIAL DESCRIPTION CS SQUARE TUBING - 2 1/2"x2 1/2"x1/4" - LENGTH AS REQUIRED PLATE - 6"x6"x3/8" LISEGA SPRING CAN - CL174 LBS, HL173 LBS, SR:95.2 LBS LISEGA SPRING CAN - CL191 LBS HL190 LBS, SR:95.2 LBS HILTI KWIK BOLT 3 EXPANSION, 1/4"0, 304SS! EMBEDMENT OF 3 1/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING PLATE - 2 1/2" x 2 1/2" x 1/4" PLATE TO CAP ENDS OF TUBING
REF. DWGS.
2. 3. 4.
TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2" PIPE SIZE 10"
PIPING SYSTEM HGR. NO. S05-9
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 0 7 - 2
STEAM HEADER TO CAMPUS Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6
/ \ ( STRUCTURAL STEEL W12x30
NOTES: SEE DRAWING P150 FOR LOCATIONS.
t—<D
NOTE: LOAD = 2119 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4
q_ EL. 7 2 0 - 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S07-2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT
THREADED ROD 3/4 UNC W/ HEX NUTS TURNBUCKLE
TIE ROD 3/4 UNC W/ HEX "NUTS' THREE BOLT PIPE CLAMP (MATCH TO PIPE SIZE)
REF. DWGS. EMP. 366 F
REV. DATE BY
CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2.5' PIPE SIZE 12"
PIPING SYSTEM HGR. NO. S07-2
SHEET 1 OF 1
REV. n NO. U
2
PIPE HANGER SKETCH S06-1
STEAM HEADER Client ID
Job No.
Contract No.
EIU
09 -140
3 - 9 1 - 6
NOTES: SEE DRAWING P150 FOR LOCATIONS.
12" PIPE
W14 (EXISTING)
W14 (EXISTING)
■—► A
W14 (EXISTING)
SECTION A - A
REV NO.
ITEM NO. QTY TYPE
GChri S^e a • ENGINEERING
STILWELL, KANSAS
S06-1
MATERIAL DESCRIPTION CS SQUARE TUBING (ASTM A500 GR. 0 - 4 1/2"x4 1/2"x1/4" - LENGTH AS REQUIRED PLATE - 6"x6"x1/2" I/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING PLATE - 4 1/2" x 4 1/2" x 1/4" PLATE TO CAP ENDS OF TUBING 1/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING
REF. DWGS.
2. 3. 4.
TEMP. 366 F
REV. DATE BY CHK.
0 6-9-10
CMW SEW
SPEC - AB1
1
INSUL. THK. 2.5'1
PIPE SIZE 12"
PIPING SYSTEM HGR. NO. S06-1
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 0 7 - 3
STEAM HEADER TO CAMPUS Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL 7 4 2 - 6
/ \ (STRUCTURAL STEEL W8x10
NOTES: SEE DRAWING P150 FOR LOCATIONS.
Sr^D
NOTE: LOAD = 1340 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4
q_ EL. 7 2 0 - 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
O C h d S g a • ENGINEERING
OVERLAND PARK, KANSAS
S07-3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT
THREADED ROD 3/4 UNC W/ HEX NUTS TURNBUCKLE
TIE ROD 3/4 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP (MATCH TO PIPE SIZE)
REF. DWGS. IMP. 366 F
REV. DATE BY
CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL. THK. 2.5'1
PIPE SIZE 12"
PIPING SYSTEM HGR. NO. S07-3
SHEET 1 OF 1
REV. n NO. U
REV. DATE
6-29-10
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,
/ A y ' ''■■^y\ / £ y '■??% f / 0 6 2 - 0 4 9 4 3 6 \ \
■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #
<9Ll^ EXP. DATE 11-30-2011
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^Wk JLJJIVJ I XJ1. \ .L .N
N O I S U N I V !■ K
EIU PROJECT «: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
STEAM PIPING DESIGN BY:
S. WOPATA DRAWN BY:
C. W A R D CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
6 - 2 4 - 1 0 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 4
DRAWING NO.
P164 REV.
1 N \ 2009 \09140 \dwgs \me \09140-P164 dwg 8/18 /10 11 16am dalexander
7
PIPE HANGER SKETCH S 0 7 - 4
STEAM HEADER TO CAMPUS Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 4 2 - 6
C ROOF TRUSS T1 J /K
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4
REV NO.
ITEM NO. QTY TYPE
214228
G>^-: S ^ a • ENGINEERING
STILWELL, KANSAS
S 0 7 - 4
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL1712 LBS, HL1509 LBS, SR: 381 LBS TM: 0.534 EYE NUT 3/4" UNC THREE BOLT CLAMP HEXAGONAL NUT 3/4" UNC THREADED ROD 3/4" UNC FIELD VERIFY LENGTHS THREADED ROD 3/4" UNC FIELD VERIFY LENGTHS
REF. DWGS.
2.
4.
TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. 2.5'1
PIPE SIZE 12"
PIPING SYSTEM HGR. NO. S07-4
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 0 8 - 4
DA STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 4 2 - 6
( STRUCTURAL! STEEL W10x22 ) A
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY TYPE
212128
a>r-: ^ a • ENGINEERING
STILWELL, KANSAS
S 0 8 - 4
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL422 LBS, HL402 LBS, SR:190 LBS, TM:.103 EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS
REF. DWGS.
2.
4.
TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AM INSUL. THK. T PIPE SIZE 3"
PIPING SYSTEM HGR. NO. S08-4 SHEET 1 OF 1
REV. n NO. U
5
PIPE HANGER SKETCH S08-1
DA STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 "
( STRUCTURAL STEEL W8x10 J A
NOTES: SEE DRAWING P150 FOR LOCATIONS.
^ - ^
<$_ EL 7 3 2 - 1
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
NOTE: ALL COMPONENTS SHALL BE LOAD GROUP 2
f!EV JO.
ITEM NO. QTY TYPE
212228
OChri ^ a • ENGINEERING
STILWELL, KANSAS
S08-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL320 LBS, HL291 LBS, SR:95.2 LBS, TM: 0.314 EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC - AB1
1
INSUL. THK. 2' PIPE SIZE 3'
PIPING SYSTEM HGR. NO. S08-1
SHEET 1 OF 1
REV. A NO. I
PIPE HANGER SKETCH S10-1
SILENCER Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 "
NOTES: SEE DRAWING P150 FOR LOCATIONS.
Jr^ <$_ EL 7 3 2 - 1
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP D
f!EV JO.
ITEM NO. QTY TYPE
21D229
OChri ^ a • ENGINEERING
STILWELL, KANSAS
S10-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL65.8 LBS, HL60.7 LBS, SR:47.6 LBS, TM:.108 EYE NUT 3/8" UNC THREE BOLT CLAMP HEXAGONAL NUT 3/8" UNC THREADED ROD 3/8" UNC FIELD VERIFY LENGTHS THREADED ROD 3/8" UNC FIELD VERIFY LENGTHS
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC - AB1
1
INSUL. THK. 2' PIPE SIZE 4 '
PIPING SYSTEM HGR. NO. S10-1
SHEET 1 OF 1
REV. A NO. I
4 3
PIPE HANGER SKETCH S 0 8 - 2
DA STEAM Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 ' - 6 "
( STRUCTURAL STEEL W10x26A A NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY TYPE
212128
G>T-: 3% a • ENGINEERING
STILWELL, KANSAS
S 0 8 - 2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL344 LBS, HL322 LBS, SR:190 LBS, TM:.116 EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS
REF. DWGS.
2. 3. 4.
TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AA1
1
INSUL THK. 2" PIPE SIZE 8"
PIPING SYSTEM HGR. NO. S08-2
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S10-2
SILENCER Client ID
Job No.
Contract No.
EIU
09-140
T.O.S._EL 7 4 2 ' - 6 " NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
REV NO.
ITEM NO. QTY TYPE
213128
G>T-: 3% a • ENGINEERING
STILWELL, KANSAS
S 1 0 - 2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL607 LBS, HL550 LBS, SR: 381 LBS EYE NUT 5/8" UNC THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGTHS THREADED ROD 5/8" UNC FIELD VERIFY LENGTHS
REF. DWGS.
2. 3. 4.
TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2" PIPE SIZE 4 "
PIPING SYSTEM HGR. NO. S10-2
SHEET 1 OF 1
REV. A NO. I
2
PIPE HANGER SKETCH S 0 8 - 3
DA STEAM Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL 7 4 2 - 6
STRUCTURAL STEEL W10x26 ^ A
NOTES: SEE DRAWING P150 FOR LOCATIONS.
fc—<&
$_ EL 7 3 2 - 1
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP
REV NO.
ITEM NO. QTY TYPE
211128
a>r-: S^e a • ENGINEERING
STILWELL, KANSAS
S 0 8 - 3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL260 LBS, HL227 LBS, SR:95.2 LBS, TM: 0.344 EYE NUT 3/8" UNC THREE BOLT CLAMP HEXAGONAL NUT 3/8" UNC THREADED ROD 3/8" UNC FIELD VERIFY LENGTHS THREADED ROD 3/8" UNC FIELD VERIFY LENGTHS
REF. DWGS.
2. 3. 4.
TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC - AB1
1
INSUL. THK. 2' PIPE SIZE 3"
PIPING SYSTEM HGR. NO. S08-3
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S14-1
TURBINE BYPASS Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL. 7 2 2 - 0 ' NOTES: SEE DRAWING P150 FOR LOCATIONS.
MISC PIPE SUPPORT STEEL
I—<D
NOTE: LOAD = 1279 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4
q_ EL. 7 1 6 - 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
GChri S^g a • ENGINEERING
OVERLAND PARK, KANSAS
S14-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 3/4 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 3/4 UNC W/ HEXUUTs' THREE BOLT PIPE CLAMP
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. 2' PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S14-1
SHEET 1 OF 1
REV. A NO. I
REV. DATE
6-29-10
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,
/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \
■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #
<9Ll^ EXP. DATE 11-30-2011
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^Wk JLJJIVJ I XJ1. \ .L .N
N O I S u N I V !■ K
EIU PROJECT «: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
STEAM PIPING DESIGN BY:
S. WOPATA DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
6-24-10 SEGA PROJECT NO.
090140 CADD FILE NAME: 09140-P165 DRAWING NO.
P165 REV.
1 N \ 2009 \09140 \dwgs \me \09140-P165 dwg 8/18 /10 11 16am dalexander
7
PIPE HANGER SKETCH S14-2
TURBINE BYPASS Client ID EIU
Job No. 09-140
Contract No.
T.O.S. EL. 7 4 2 - 6 '
ROOF TRUSS T1 ^ / \
NOTES: SEE DRAWING P 1 5 0 FOR LOCATIONS.
MT^D
NOTE: LOAD = 173 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 1 6 - 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S 1 4 - 2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX "NUTS' THREE BOLT PIPE CLAMP (MATCH TO PIPE SIZE)
REF. DWGS. TEMP. 3 6 6 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL. THK. 2' PIPE SIZE 6 "
PIPING SYSTEM HGR. NO. S14-2
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S41-1
BOILER 2 VENT Client ID EIU
Job No. 09-140
Contract No.
NOTES: SEE DRAWING P150 FOR LOCATIONS.
MT^D
NOTE: LOAD = 660 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
q_ EL. 7 2 8 - 7
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S41-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5 / 8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5 / 8 UNC W/ HEXHUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 3 6 6 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0,: PIPE SIZE 6 "
PIPING SYSTEM HGR. NO. S41-1
SHEET 1 OF 1
REV. A NO. I
5
PIPE HANGER SKETCH S14-3
4 3
PIPE HANGER SKETCH S 1 4 - 4
TURBINE BYPASS Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 2 2 - 0
ISC PIPE SUPPORT STEEL
NOTES: SEE DRAWING P150 FOR LOCATIONS.
a—o
NOTE: LOAD = 339 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 1 6 - 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
Q>T-: §pg a • ENGINEERING
OVERLAND PARK, KANSAS
S14-3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX'NUTS' THREE BOLT PIPE CLAMP (MATCH TO PIPE SIZE)
REF. DWGS. TEMP. 3 6 6 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 2" PIPE SIZE 6 "
PIPING SYSTEM HGR. NO. S14-3
SHEET 1 OF 1
REV. A NO. I
TURBINE BYPASS Client ID
Job No.
Contract No.
EIU
09-140
1 - 0 "
ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3 RE NO
vTTTEr NO 1
QTY TYPE
293218
a>r-: 3% a • ENGINEERING
STILWELL, KANSAS
S 1 4 - 4
MATERIAL DESCRIPTION CS SQUARE TUBING - 2 1/2"x2 1/2"x1/4" - LENGTH AS REQUIRED PLATE - 6"x6"x3/8" PLATE - 6"x1"x1/4" LISEGA SPRING CAN - CL569 LBS HL636 LBS, SR:190 LBS HILTI KWIK BOLT 3 EXPANSION, 3/8"0 , 304SS, I EMBEDMENT OF 3 1/4" HOLE DRILLED IN TUBING PLATE - 2 1/2" x 2 1/2" x 1/4" TO CAP TUBING
REF. DWGS.
2. 3. 4.
TEMP. 5 5 0 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL THK. 3.5' PIPE SIZE 4 "
PIPING SYSTEM HGR. NO. S14-4
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S42-1 PIPE HANGER SKETCH S 4 2 - 2
BOILER 3 VENT Client ID
Job No.
Contract No.
EIU
09-140
NOTE: LOAD = 456 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
NOTES: SEE DRAWING P 1 5 0 FOR LOCATIONS.
q_ EL. 7 2 5 - 9
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
413911
achd S% a • ENGINEERING
OVERLAND PARK, KANSAS
S42-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5 / 8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5 / 8 UNC W/ HEXlJUTS" CLEVIS WITH PIN WELD ON L U G ~ W THK
REF. DWGS. TEMP. 3 6 6 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL THK. 0,: PIPE SIZE 6 "
PIPING SYSTEM HGR. NO. S42-1
SHEET 1 OF 1
REV. A NO. I
BOILER 3 VENT Client ID
Job No.
Contract No.
EIU
09 -140
SEE DRAWING P150 FOR LOCATIONS.
I—<D
NOTE: LOAD = 797 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
q_ EL. 7 3 5 - 9
REV NO.
ITEM NO. QTY FIG. NO./
OODE NO.
OChri ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S 4 2 - 2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5 /8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5 / 8 UNC W/ HEXlJUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 3 6 6 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-B
1
INSUL THK. 0,:
PIPE SIZE 6 "
PIPING SYSTEM HGR. NO. S42-2
SHEET 1 OF 1
REV. n NO. U
2
PIPE HANGER SKETCH S40-1
BOILER 1 VENT Client ID
Job No.
Contract No.
EIU
09 -140
NOTES: SEE DRAWING P150 FOR LOCATIONS.
Sr^D
NOTE: LOAD = 637 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
q_ EL. 7 2 8 - 7
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(3>r-: S^e a • ENGINEERING
OVERLAND PARK, KANSAS
S40-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5 /8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5 / 8 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 3 6 6 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0,: PIPE SIZE 6 "
PIPING SYSTEM HGR. NO. S40-1
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 4 2 - 3
BOILER 3 VENT Client ID
Job No.
Contract No.
EIU
09 -140
NOTES: SEE DRAWING P150 FOR LOCATIONS.
Sr^D
NOTE: LOAD = 478 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(3>r-: S^e a • ENGINEERING
OVERLAND PARK, KANSAS
S 4 2 - 3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX~NUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 3 6 6 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0,: PIPE SIZE 6 "
PIPING SYSTEM HGR. NO. S42-3
SHEET 1 OF 1
REV. n NO. U
REV. DATE
6-29-10
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,
/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \
■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #
<9Ll^ EXP. DATE 11-30-2011
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^Wk JLJJIVJ I XJ1.\.L.N
N O I S u N I V !■ K
EIU PROJECT «: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
STEAM PIPING DESIGN BY:
S. WOPATA DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
6 - 2 4 - 1 0 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 6
DRAWING NO.
P166 REV.
1 N \ 2009 \09140 \dwgs \me\09140-P166 dwg 8/18 /10 11 16am dalexander
7
PIPE HANGER SKETCH S43-1
BOILER 4 VENT Client ID EIU
Job No. 09-140
Contract No.
T.O.S. EL. 7 4 2 - 6 ' NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 569 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S43 -1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5/8 UNC W/ HEXHUTS" CLEVIS WITH PIN
ON LUG 1/2"~THK" WELD
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0,:
PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S43-1
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 7 6 - 3
TURBINE EXHAUST VENT Client ID EIU
Job No. 09-140
Contract No.
T.O.S. EL. 7 4 2 - 6 ' NOTES: SEE DRAWING P150 FOR LOCATIONS.
q_ 7 3 3 - 0
NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>r-: ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S 7 6 - 3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX "NUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0,:
PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S76-3
SHEET 1 OF 1
REV. n NO. U
5
PIPE HANGER SKETCH S 4 3 - 2
BOILER 4 VENT Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 NOTES: SEE DRAWING P150 FOR LOCATIONS.
q_ 7 3 7 - 0 "
NOTE: LOAD = 456 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
OChd S% a • ENGINEERING
OVERLAND PARK, KANSAS
S 4 3 - 2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL THK. 0,: PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S43-2
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 7 6 - 4
TURBINE EXHAUST VENT Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6
STRUCTURAL STEEL W18x50 ) A
NOTES: SEE DRAWING P150 FOR LOCATIONS.
q_ 7 3 3 - 0
NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
OChd S% a • ENGINEERING
OVERLAND PARK, KANSAS
S 7 6 - 4
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL THK. 0,: PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S76-4
SHEET 1 OF 1
REV. n NO. U
4 3
PIPE HANGER SKETCH S76-1
TURBINE EXHAUST/BYPASS VENT Client ID
Job No.
Contract No.
EIU
09 -140
1 - 0 1 - 0
NOTES:
A SEE DRAWING P150 FOR LOCATIONS.
TYP
NOTE: LOADS = 600 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
INSTALL 2 NUTS
REV NO.
ITEM NO. QTY FIG. NO./
OODE NO.
OChri ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S76-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5/8 UNC W/ HEXlJUTS' L3x3x1/4, 30" LONG WT2x6.5, 8 LONG THREE BOLT CLAMP 6" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-B
1
INSUL THK. 0,: PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S76-1
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S 7 6 - 5
TURBINE EXHAUST VENT Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL 7 2 2 - 0 NOTES: SEE DRAWING P150 FOR LOCATIONS.
A
NOTE: LOAD = 660 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
REV NO.
ITEM NO. QTY FIG. NO./
OODE NO.
OChri ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S 7 6 - 5
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5/8 UNC W/ HEXlJUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-B
1
INSUL THK. 0,: PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S76-5
SHEET 1 OF 1
REV. n NO. U
2
PIPE HANGER SKETCH S 7 6 - 2
TURBINE EXHAUST VENT Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL 7 4 2 - 6 " NOTES: SEE DRAWING P150 FOR LOCATIONS.
q_ 7 3 3 - 0 '
NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(3>r-: S^e a • ENGINEERING
OVERLAND PARK, KANSAS
S 7 6 - 2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX~NUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0,: PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S76-2
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S78-1
DA VENT Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL 7 4 2 - 6 NOTES: SEE DRAWING P150 FOR LOCATIONS.
q_ 7 3 5 - 0
NOTE: LOAD = 320 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(3>r-: S^e a • ENGINEERING
OVERLAND PARK, KANSAS
S78-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX~NUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0,: PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S78-1
SHEET 1 OF 1
REV. n NO. U
REV. DATE
6-29-10
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,
/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \
■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #
<9Ll^ EXP. DATE 11-30-2011
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^Wk JLJJIVJ I XJ1. \ .L .N
N O I S u N I V !■ K
EIU PROJECT «: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
STEAM PIPING DESIGN BY:
S. WOPATA DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
3-23-10 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 7
DRAWING NO.
P167 REV.
1 N \ 2009 \09140 \dwgs \me \09140-P167 dwg 8/18 /10 11 16am dalexander
7
PIPE HANGER SKETCH S 7 8 - 2
5
PIPE HANGER SKETCH S91-1
4 3
PIPE HANGER SKETCH S91-2
2
PIPE HANGER SKETCH S91-3
DA VENT Client ID EIU
Job No. 09-140 Contract No.
T.O.S. EL 7 4 2 - 6 '
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 797 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
q_ 7 3 5 - 0 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(jyy, a • ENGINEERING
OVERLAND PARK, KANSAS
S78-2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 5/8 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S78-2
SHEET 1 OF 1
REV. NO. 0
SOUTH VENT HEADER Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 4 2 - 6 '
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 486 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ 7 3 7 - 0 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(jyy a • ENGINEERING
OVERLAND PARK, KANSAS
S91-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 10" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1 INSUL. THK. 0" PIPE SIZE 10"
PIPING SYSTEM HGR. NO. S91-1
SHEET 1 OF 1
REV. NO. 0
SOUTH VENT HEADER Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 '
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 1020 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP
q_ 7 3 7 - 0 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(jyy, a • ENGINEERING
OVERLAND PARK, KANSAS
S91-2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 5/8 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 10" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0" PIPE SIZE 10'
PIPING SYSTEM HGR. NO. S91-2
SHEET 1 OF 1
REV. n NO. U
SOUTH VENT HEADER Client ID EIU
Job No. 09-140 Contract No.
T.O.S. EL 7 4 2 - 6 '
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 778 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP
q_ 7 3 7 - 0 '
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
oiyy, ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S91-3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 5/8 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 10" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0" PIPE SIZE 10"
PIPING SYSTEM HGR. NO. S91-3
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH S115-1 PIPE HANGER SKETCH S115-2 PIPE HANGER SKETCH S115-3 PIPE HANGER SKETCH S115-4
TURBINE BYPASS VENT Client ID EIU
Job No. 09-140 Contract No.
T.O.S. EL 7 4 2 ' - 6 '
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ 7 3 4 - 0 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(jyy, a • ENGINEERING
OVERLAND PARK, KANSAS
S115-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S115-1
SHEET 1 OF 1
REV. NO. 0
TURBINE BYPASS VENT Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 4 2 ' - 6 '
A NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ 7 3 4 - 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(jyy a • ENGINEERING
OVERLAND PARK, KANSAS
S115-2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1 INSUL. THK. 0" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S115-2
SHEET 1 OF 1
REV. NO. 0
TURBINE BYPASS VENT Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL. 7 4 2 - 6 "
STRUCTURAL STEEL W18x50 j /K NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP
q_ 7 3 4 - 0
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(jyy, a • ENGINEERING
OVERLAND PARK, KANSAS
S115-3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S115-3
SHEET 1 OF 1
REV. n NO. U
TURBINE BYPASS VENT Client ID EIU
Job No. 09-140 Contract No.
T.O.S. EL 7 2 2 - 0 '
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 683 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
oiyy, ^ a • ENGINEERING
OVERLAND PARK, KANSAS
S115-4
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 5/8 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. S115-4
SHEET 1 OF 1
REV. A NO. I
REV. DATE
6-29-10 8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,
/ A y ' ''■■^y\ / £ y '■??% f / 0 6 2 - 0 4 9 4 3 6 \ \
■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #
<9Ll^ EXP. DATE 11-30-2011
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^Wk J L ^ / \ 3 I XJ1.\.L.N
N O I S u N I V I- K
EIU PROJECT «: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
STEAM PIPING DESIGN BY:
S. WOPATA DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
6 - 2 4 - 1 0 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 8
DRAWING NO.
P168 REV.
1 N \ 2009 \09140 \dwgs \me \09140-P168 dwg 8/18 /10 11 16am dalexander
7
PIPE HANGER SKETCH S117-1
5
PIPE HANGER SKETCH S117-2
4 3 2
PIPE HANGER SKETCH S117-3
NORTH VENT HEADER Client ID EIU
Job No. 09-140
Contract No.
T.O.S. EL 7 4 2 - 6 "
STRUCTURAL STEEL W12x30 j /K NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 1502 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4
q_ 7 2 8 - 7 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(jyy, a • ENGINEERING
OVERLAND PARK, KANSAS
S117-1
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 3/4 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 3/4 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 16" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0" PIPE SIZE 16"
PIPING SYSTEM HGR. NO. S117-1
SHEET 1 OF 1
REV. NO. 0
NORTH VENT HEADER Client ID
Job No.
Contract No.
EIU
09-140
T.O.S. EL 7 4 2 - 6 '
NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 1427 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4
q_ 7 2 8 - 7 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(jyy a • ENGINEERING
OVERLAND PARK, KANSAS
S117-2
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 3/4 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 3/4 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 16" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1 INSUL. THK. 0" PIPE SIZE 16"
PIPING SYSTEM HGR. NO. S117-2
SHEET 1 OF 1
REV. NO. 0
NORTH VENT HEADER Client ID
Job No.
Contract No.
EIU
09 -140
T.O.S. EL. 7 4 2 - 6 '
A NOTES: SEE DRAWING P150 FOR LOCATIONS.
NOTE: LOAD = 1201 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4
q_ 7 2 8 - 7 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
(jyy, a • ENGINEERING
OVERLAND PARK, KANSAS
S117-3
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 3/4 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 3/4 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 16" PIPE SIZE
REF. DWGS. TEMP. 366 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BA1
1
INSUL. THK. 0" PIPE SIZE 16'
PIPING SYSTEM HGR. NO. S117-3
SHEET 1 OF 1
REV. n NO. U
REV. DATE
6-29-10
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED
DWN
CMH
CMH
CHK
SEW
SEW
Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,
/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \
■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #
<9Ll^ EXP. DATE 11-30-2011
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
^Wk JLJJIVJ I XJ1.\.L.N
N O I S u N I V !■ K
EIU PROJECT «: 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
STEAM PIPING DESIGN BY:
S. WOPATA DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
6-24-10 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 9
DRAWING NO.
P169 REV.
1 N \ 2009 \09140 \dwgs \me\09140-P169 dwg 8/18 /10 11 16am dalexander
7
PIPE HANGER SKETCH FW28-1
6
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU 0 9 - 1 4 0
CONTRACTJMO
T.O.S. EL 7 1 7 - 6 3 / 4 " NOTES: SEE DRAWING P151
MEZZANINE STRUCTURAL STEEL W18x40 4 -FOR LOCATIONS.
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP
G_ EL. 7 2 7 - 6
REV NO
ITEM NO 1
QTY FIG. NO./ CODE NO
211128
ayy. &3 a ®
ENGINEERING OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL184 LBS, HL180 LBS, SR:95.2 LBS EYE NUT 1/2" UNC THREE BOLT CLAMP 6 PIPE SIZE HEXAGONAL NUT 1/2HJNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS"
REF. DWGS. TEMP. 2 2 8 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BG1
1 INSUL. THK. 1' PIPE SIZE 6'1
PIPING SYSTEM HGR. NO. FW28-1 SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH F W 2 9 - 2
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09-140 CONTRACT_NO
T.O.S. EL 7 1 7 - 6 3 / 4 " NOTES: SEE DRAWING P151 FOR LOCATIONS.
NOTE: LOAD = 128 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
G_EL 715'-2"
REV NO.
ITEM NO. 1
QTY FIG. NO./ CODE NO.
ach-; O n a ® m-ENGINEERING
OVERLAND PARK, KANSAS
FW29-2
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNC
REF. DWGS. TEMP. 2 2 8 F
REV. DATE BY CHK.
0
6-09-10 CMW SEW
SPEC-AB1
1
INSUL. THK. 1' PIPE SIZE 3 "
PIPING SYSTEM HGR. NO.
SHEET 1 OF 1
W29-2
REV. n NO. U
PIPE HANGER SKETCH F W 2 8 - 2
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09 -140
CONTRACT_NO
T.O.S EL. 7 1 7 - 6 3 / 4 " NOTES: SEE DRAWING P151 FOR LOCATIONS.
MEZZANINE STRUCTURAL STEEL W14x30
NOTE-ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3
G_ E L 7 2 7 ' - 6 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
213128
GD-r S^g a • ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL1099 LBS, HL1068 LBS, SR: 381 LBS EYE NUT 5/8MJNC THREE BOLT CLAMP 6" PIPE SIZE HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGTHS
REF. DWGS. TEMP. 2 2 8 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BG1
1
INSUL. THK. 1' PIPE SIZE 6':
PIPING SYSTEM HGR. NO. F W 2 8 - 2 SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH F W 2 9 - 3
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09 -140
CONTRACTJMO
HOLD
NOTES: SEE DRAWING P151 FOR LOCATIONS.
NOTE: LOAD = 147 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
G_EL 7 1 5 - 2 "
REV NO.
ITEM NO. 1
QTY FIG. NO./ CODE NO.
a>r-: ^ a ®
ENGINEERING OVERLAND PARK, KANSAS
FW29-3
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1 / 2 " UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2"~UNC~
3 PIPE SIZE
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL. THK. 1" PIPE SIZE 3"
PIPING SYSTEM HGR. NO. FW29-3 SHEET 1 OF 1
REV. NO. 0
4 3
PIPE HANGER SKETCH F W 2 8 - 3
BOILER FEEDWATER Client ID
Job No
Contract No.
EIU
0 9 - 1 4 0
CONTRACT_NO
T.O.S EL 7 1 7 - 6 3 / 4 " NOTES: SEE DRAWING P151 FOR LOCATIONS.
MEZZANINE STRUCTURAL STEEL W14x30
NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4
G_ EL 7 2 7 - 6
REV NO.
ITEM NO. QTY FTGTNa/
CODE NO.
214128
GO— £$ a • ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL1918 LBS, HL1847 LBS, SR:761 LBS EYE NUT 3/4" UNC THREE BOLT CLAMP 6 PIPE SIZE I ^AG0 l^TAOuT37 fUNC THREATJEDR0D3^^
REF DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-BG1 INSUL THK. 1" PIPE SIZE 6"
PIPING SYSTEM HGR. NO. F W 2 8 - 3
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH F W 2 9 - 4
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09 -140
CONTRACT_NO
HOLD
NOTES: *SEE DRAWING P151 FOR LOCATIONS.
NOTE: LOAD = 135 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
G E L 7 1 5 - 2 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a>>e a ®
ENGINEERING OVERLAND PARK, KANSAS
FW29-4
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC ~ THREADED ROD 1 / 2 " UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT T72"TJNC"
3 PIPE SIZE
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL. THK. 1" PIPE SIZE 3"
PIPING SYSTEM HGR. NO. FW29-4
SHEET 1 OF 1
REV. n NO. U
2
PIPE HANGER SKETCH FW29-1
BOILER FEEDWATER
Client ID
Job No.
Contract No.
EIU
09-140 CONTRACT__NO
T.O.S. EL 7 1 7 - 6 3 / 4 "
MEZZANINE STRUCTURAL STEEL W14x30
NOTES: SEE DRAWING P151 FOR LOCATIONS.
NOTE: LOAD = 140 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
G_EL 7 1 1 - 1 1 '
REV NO.
ITEM NO 1
QTY FIG. NO./ CODE NO.
GD-c-J ^ a ®
ENGINEERING OVERLAND PARK, KANSAS
FW29-1
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2 UNC THREADED ROD 1 / 2 " UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNO
REF DWGS TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL. THK. 1' PIPE SIZE 3
PIPING SYSTEM HGR. NO. FW29-1
SHEET 1 OF 1
REV. NO. 0
PIPE HANGER SKETCH S 2 9 - 5
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09 -140
HOLD
NOTES: SEE DRAWING P151 FOR LOCATIONS.
NOTE: LOAD = 189 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
G_EL 7 1 5 - 2 "
REV NO.
ITEM NO.
QTY FIG. NO./ CODE NO.
cs>^; a • ENGINEERING
OVERLAND PARK, KANSAS
FW29-5
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNC
REF DWGS TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1
INSUL. THK. 2" PIPE SIZE 3"
PIPING SYSTEM HGR. NO. SHEET 1 OF 1
W29-5
REV. NO. 0
REV. DATE
8-17-10
1_ DESCRIPTION
ISSUED FOR CONSTRUCTION
DWN
DCA
CHK
SEW
D
C
vy/t Jti^'A/ \j\J\yj
Sealed Only When Signed in Blue Ink
| S ? STEVEN E WOPATA*; ff, = 5 g : 062 049436 ; . ' " : ;
% W>f v\"^° vV
B
e a a ® v /
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
<#y Jz#/&1 JbKJNI ILLINOIS U N I V E R S I T Y
ESU PROJECT ®* 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
FEEDWATER PIPING A
DESIGN BY:
C. WARD DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
6- •24-10 SEGA PROJECT NO.
090140
CADD FILE NAME: 0 9 1 4 0 - P 1 6 0
DRAWING NO.
P170 REV.
0 N \2009 \09140 \dwgs \me \09140 -P170dwg 8 /18 /10 1 00pm dalexander
7
PIPE HANGER SKETCH FW29-6
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09 -140
CONTRACTJMO
T.O.S. EL. 7 1 4 - 1 0 "
BOILER 1 ACCESS PLATFORM STEEL
NOTES: SEE DRAWING P151 FOR LOCATIONS.
NOTE. LOAD = 100 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
_G_EL 7 1 2 - 6 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
ao-d; O M Q ® m ENGINEERING
OVERLAND PARK, KANSAS
FW29-6
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2" "UNC"
3 PIPE SIZE
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL THK. 1" PIPE SIZE 3"
PIPING SYSTEM HGR. NO. FW29-6
SHEET 1 OF 1
REV. ^ NO. U
PIPE HANGER SKETCH FW29-10 AND FW30-5
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09 -140
CONTRACTJMO
STRUCTURAL STEEL W12x40 T.O.S. EL 7 4 2 - 6 "
NOTES: SEE DRAWING P151 FOR LOCATIONS.
L3x3x1/4 20" LONG
FW30-5 NOTE: LOAD = 100 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
q_ EL 7 2 7 ' - 6 "
FW29-10
REV NO
ITEM NO. QTY FIG. NO./
CODE NO
a>^ ^ a ®
ENGINEERING OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION NUT WASHER _ _ _ THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2"TJNC"
3 PIPE SIZE
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL THK. 1" PIPE SIZE 3"
PIPING SYSTEM HGR. NO.
SHEET 1 OF 1
REV. NO. 0
PIPE HANGER SKETCH FW29-7
BOILER FEEDWATER Client ID EIU
Job No. : 09 -140
Contract No. CONTRACTJMO
^J-O-S- _EL 71_4'-10"
BOILER 2 ACCESS PLATFORM STEEL
NOTES: SEE DRAWING P151 FOR LOCATIONS.
NOTE: LOAD = 100 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP
G_EL 7 1 2 - 6 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
®>S C(*r\Q » & & ENGINEERING
OVERLAND PARK, KANSAS
FW29-7
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1 / 2 " UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNO
REF. DWGS. TEMP. 2 2 8 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. 1" PIPE SIZE 3"
PIPING SYSTEM HGR. NO.
SHEET 1 OF 1
W29-7 REV. n NO. U
PIPE HANGER SKETCH FW29-11 AND FW30-6
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09 -140
CONTRACTJMO
T.O.S. EL 7 4 2 - 6 '
STRUCTURAL STEEL W12x40
NOTES: SEE DRAWING P151 FOR LOCATIONS.
FW30-6 NOTE: LOAD = 300 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
q_ EL. 7 2 7 - 6 "
FW29-11
REV NO
ITEM NO. QTY FIG. NO./
CODE NO.
a>e ^ a ®
ENGINEERING OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC' THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2"
3 PIPE SIZE UNC
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL THK. 1" PIPE SIZE 3"
PIPING SYSTEM HGR. NO. SHEET 1 OF 1
REV. n NO. U
4
PIPE HANGER SKETCH FW29-8 AND FW30-3
3
BOILER FEEDWATER Client ID
Job No.
Contract No
EIU
09 -140
CONTRACTJMO
T.O.S. EL. 7 1 7 - 6 3 / 4 " NOTES: SEE DRAWING P151
MEZZANINE STRUCTURAL STEEL W14x22 FOR LOCATIONS.
FW30-3 NOTE: LOAD = 340 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2
G_ EL 7 1 3 - 7 . 5 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO
GD-o &3 a ® ENGINEERING
OVERLAND PARK, KANSAS rW29-8
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC " " ~
"THREADED ROD 1 / 2 " UNC W/ HEX NUTS TURNBUCKLE THREADED R0D1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLM^PTPIPESIZE EYE NUT 1/2" UNC
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL. THK. 1' PIPE SIZE 3 "
PIPING SYSTEM HGR. NO. SHEET 1 OF 1
W29-8 REV. NO. 0
PIPE HANGER SKETCH FW29-12 AND FW30-7
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09 -140
CONTRACTJMO
STRUCTURAL STEEL W12x40 T.O.S. EL 7 4 2 - 6 "
NOTES: SEE DRAWING P151 FOR LOCATIONS.
L 3 X 3 X 1 / 4 20" LONG
FW30 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
G_ EL 727 ' -6 ' ;
FW29-12
REV NO.
ITEM NO. 1
QTY FIG. NO./ CODE NO
GD-e ^ a • ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION NUT WASHER THREADED ROD 1/2" UNC W/ HEX NUTS~ TURNBUCKLE THREADED RObl/YLj^CWTHEXNUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT T7zHjNC
REF DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL. THK. PIPE SIZE 3"
PIPING SYSTEM HGR. NO. SHEET 1 OF 1
REV. NO. 0
2
PIPE HANGER SKETCH FW29-9 AND FW30-4
BOILER FEEDWATER Client ID EIU
Job No. 09-140 Contract No. : CONTRACTJMO
T.O.S1 EL. _742'-6"
STRUCTURAL STEEL W12x30
NOTES: SEE DRAWING P151 FOR LOCATIONS.
G_ EL 7 2 7 - 6
FW30-4
NOTE-ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
G_ EL 7 2 7 - 6 "
FW29-9
REV NO.
ITEM NO. QTY
1
FIG. NO./ CODE NO.
211128
211128
GO-e ^ 9 a • ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL128 LBS, HL118 LBS, SR-.95.2 LBS EYE NUT 1/2" UNC THREE BOLT CLAMP 3 PIPE SIZE HEXAGONAL NUT 1/2" UNC" THREADED ROD MT UNC FIELD VERIFY LENGTHS VAR.SPRING HANGER CL132 LBS, HL123 LBS, SR:95.2 LBS
REF. DWGS TEMP. 2 2 8 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC- INSUL THK. 1' PIPE SIZE 3 "
PIPING SYSTEM HGR. NO.
SHEET 1 OF 1
REV. NO. 0
PIPE HANGER SKETCH FW29-13 AND FW30-8
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09 -140
CONTRACTJMO
STRUCTURAL STEEL W12x40 T.O.S. EL. 7 4 2 - 6 "
NOTES: SEE DRAWING P151 FOR LOCATIONS.
L3x3x1/4 20" LONG
FW30 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
G,_ EL 727 ' -6 ' i
FW29-13
REV NO.
ITEM NO QTY FIG. NO./
CODE NO.
GD-r5 a • ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION NUT WASHER THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2"~UNC"
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL. THK. 1" PIPE SIZE 3"
PIPING SYSTEM HGR. NO. SHEET 1 OF 1
REV. NO. 0
REV. DATE
8-17-10
]_ DESCRIPTION
ISSUED FOR CONSTRUCTION
DWN
DCA
CHK SEW
D
C
v.\ Off
Sealed Only When Signed in Blue Ink
sE iff-STEVEN E WOPATA-ft = ; 9 , i 062 049436 :jT7 =
y f--:\ yk ^ ' ' " t i n
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
< W ^ EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT m-. 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
FEEDWATER PIPING A
DESIGN BY:
C. WARD DRAWN BY:
C. WARD CLIENT I.D.
H0N00103
CHECKED BY:
S. WOPATA DATE:
6-24- 0 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 7 1
DRAWING NO.
P171 REV.
0 N \2009 \09140 \dwgs \me\09140-P171 dwg 8 /18 /10 1 00pm dalexander
7
PIPE HANGER SKETCH FW29-14 AND FW30-9
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
0 9 - 1 4 0
CONTRACT_NO
STRUCTURAL STEEL W12x40 T.O.S. EL. 7 4 2 - 6 "
FW30 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
NOTES: SEE DRAWING P151 FOR LOCATIONS.
L3x3x1/4 20" LONG
G_ EL. 7 2 7 ' - 6 "
FW29-14
REV NO.
ITEM NO. QTY
1
FIG. NO./ CODE NO.
GD-^ ^ a ®
ENGINEERING OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION NUT WASHER THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1 / 2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP EYE NUT 1/2"~UNC"
3 PIPE SIZE
REF. DWGS. TEMP. 2 2 8 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL THK. 1" PIPE SIZE 3"
PIPING SYSTEM HGR. NO. SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH FW29-18 AND FW30-12
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
0 9 - 1 4 0
CONTRACT_NO
T.O.S. EL 7 4 2 - 6 NOTES: SEE DRAWING P151 FOR LOCATIONS.
FW30-12 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
G_ EL 7 2 7 ' - 6 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
a> -: S^9 a ® ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1 / 2 UNC W/ HEX NUTS' TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2^
3 PIPE SIZE UNC
REF. DWGS. TEMP. 2 2 8 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL THK. 1" PIPE SIZE 3"
PIPING SYSTEM HGR. NO.
SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH FW29-15 AND FW30-10
BOILER FEEDWATER Client ID EIU
Job No. 09-140
Contract No. : CONTRACT_NO
STRUCTURAL STEEL W12x40 T.O.S. EL. 7 4 2 - 6 "
FW30 NOTE: LOAD = 160 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
NOTES: SEE DRAWING P151 FOR LOCATIONS.
L3x3x1/4 20" LONG
G^EL 7 2 7 ' - 6 "
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
ao-d; S^e a ® ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION NUT WASHER THREADED RODI /Z ' UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNC
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL. THK. 1" PIPE SIZE 3"
PIPING SYSTEM HGR. NO. SHEET 1 OF 1
REV. NO. 0
PIPE HANGER SKETCH FW29-19 AND FW30-13
BOILER FEEDWATER Client ID : EIU
Job No. 09 -140
Contract No. : CONTRACT_NO
T.O.S. EL. 7 4 2 - 6 '1 NOTES:
SEE DRAWING P151 FOR LOCATIONS.
FW30-13 NOTE: LOAD = 120 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
G EL 7 2 7 ' - 6 "
FW29-19
REV NO,
ITEM NO. 1
QTY FIG. NO./ CODE NO.
GD-^: S<29 a ® ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNC
REF. DWGS. TEMP. 2 2 8 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL THK. 1 PIPE SIZE 3
PIPING SYSTEM HGR. NO.
SHEET 1 OF 1
REV. n NO. U
4
PIPE HANGER SKETCH FW29-16 AND FW30-10A
3
BOILER FEEDWATER Client ID : EIU
Job No. : 09 -140
Contract No. : CONTRACT_NO
STRUCTURAL STEEL W12x40 T.O.S. EL. 7 4 2 - 6 "
FW30 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
NOTES: SEE DRAWING P151 FOR LOCATIONS.
L3x3x1/4 20" LONG
q_ EL. 7 2 7 - 6
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
GD-^ ^ a ®
ENGINEERING OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION NUT WASHER THREADED ROD T72" UNC~W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/T"UNC"
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL THK. PIPE SIZE 3"
PIPING SYSTEM HGR. NO. SHEET 1 OF 1
REV. NO. 0
PIPE HANGER SKETCH FW29-20 AND FW30-14
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09 -140
CONTRACT_NO
STRUCTURAL STEEL W10x26 T.O.S. EL. 7 4 2 - 6 "
NIA
NOTES: SEE DRAWING P151 FOR LOCATIONS.
L3x3x1/4 20" LONG
FW30 NOTE: LOAD = 120 LB EACH COMPONENTS SHALL BE LISEGA LOAD GROUP 1
G_ EL 7 2 7 ' - 6 "
REV NO
ITEM NO. QTY FIG. NO./
CODE NO.
GD-d S ^ a ® ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION NUT WASHER _ _ ™ _ THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNC
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1
1 INSUL. THK. 1' PIPE SIZE 3"
PIPING SYSTEM HGR. NO.
SHEET 1 OF 1
REV. NO. 0
PIPE HANGER SKETCH FW29-17 AND FW30-11
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09-140
C0NTRACT_JN0
ROOF TRUSS T1 T.O.S. EL. 7 4 2 ' - 6 "
FW30-11 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
NOTES: SEE DRAWING P151 FOR LOCATIONS.
L3x3x1/4 20" LONG
G_ EL. 7 2 7 - 6
REV NO
ITEM NO. 1
QTY FIG. NO./ CODE NO.
GD-^ §P9 a • ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION NUT WASHER THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP TPIPE SIZE EYE NUT 1/2TJNC"
REF. DWGS. TEMP. 228 F
REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC- INSUL THK. 1 PIPE SIZE 3"
PIPING SYSTEM HGR. NO. SHEET 1 OF 1
REV. n NO. U
PIPE HANGER SKETCH FW29-21 AND FW30-15
BOILER FEEDWATER Client ID
Job No.
Contract No.
EIU
09-140
CONTRACT_NO
STRUCTURAL STEEL W12x30 T.O.S. EL 7 4 2 - 6 "
FW29-21 TEMP =228 F
EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1
NOTE: LOAD = 150 LB
NOTES: SEE DRAWING P151 FOR LOCATIONS.
L3x3x1/4 20" LONG
G EL 727 ' -6 ':
FW30-15 TEMP=525 F
REV NO.
ITEM NO. QTY FIG. NO./
CODE NO.
G>S 9 a ® ENGINEERING
OVERLAND PARK, KANSAS
MATERIAL DESCRIPTION NUT WASHER „ _ _ _ THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC^W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2
iT~UNC~
3 PIPE SIZE
TWO BOLT PIPE CLAMP 2.5 PIPE SIZE
REF. DWGS. REV. DATE BY CHK.
0 6-09-10
CMW SEW
SPEC-AB1 INSUL. THK. 1' PIPE SIZE 3"
PIPING SYSTEM HGR. NO. SHEET 1 OF 1
REV. n NO. U
REV.
0
DATE
8-17-10
I DESCRIPTION
ISSUED FOR CONSTRUCTION
DWN
DCA
CHK
SEW
D
C
i_ 11 j) (w
Sealed Only When Signed in Blue Ink
£ 4?/ w -z. £ §: \% c. 5 m - STEVEN E WOPATA • j?j r S f i ' . 062.049436 -*.Ti = 3 . «"■"* # * -4J -*»
W # * * * *«
B
Engineers — Architects — Technicians Design — Construction — Field Service
(913) 681-2881
16041 Foster P.O. Box 1000
Stilwell, Kansas 66085-1000 Illinois License # 184-000823
jm^ EASTERN I L L I N O I S U N I V E R S I T Y
EIU PROJECT *■• 10-4535
EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER
PIPE SUPPORT DETAILS
FEEDWATER PIPING A
DESIGN BY:
C. WARD DRAWN BY:
C. WARD CLIENT I.D.
HON00103
CHECKED BY:
S. WOPATA DATE:
7-8-10 SEGA PROJECT NO.
090140 CADD FILE NAME: 0 9 1 4 0 - P 1 7 2
DRAWING NO.
P172 REV.
0 N \ 2009 \09140 \dwgs \me \09140 -P172 dwg 8 /18 /10 1:00pm dalexander