go - digital library/67531/metadc834711/... ·  · 2018-02-19 - ul\ wpp \ldj hp\ ,608 p pf\ 1308 w...

50
7 11 1.5x1.25 1.5-CA98-AA1 €H COMPRESSED AIR 1B 1.5x1.25 1.5-S24-AB1 Q | STEAM 14A Ki AfvA SLIT'01 NT 60 PSIC BMS1 SPTPOINI 1 '0 PSIG BMS1 CC1 ■~i 1 1/4" iOO # RF HANGED CONNECTION WINDBOX MOUNTFD 3/4-C127-AB1 3/4x1/2 —D- HV tAl -4 /iiv NX \ 603/OA ^_ /'MX \ <p> - UL\ WPP HP\ ,608 <>P pf\ 1308 W ) J 1 l/"" I .6081 /Pit \ldJ0 13 i^OS/p) BMS1 gO ^ ag) XUMby M IfOBJOi ¥ f> J —ltV<Jh STEAM TRAP HEADER /HV A 1 1/4* | J H1 T Li 0«L»). CC1 FAIL CLOSED LOSS OF SIGNAL FAIL IN PLACE LOSS OF POWER Pph/fP L J SETPOINT 94 PSIG SI IPOIPl lw.0 PPJG BMS1 1/ ^J 1x3/4 17 FUEL OIL 1-F080-AA1 O WINDBOX MOUNTED -f> CC1 5/4" 150 # RF FLANCED CONNECTION SETPOINT 118 PSIG Pi HV 1)05 lJ ~ ibmij}) ~ LJ XH BH |rf)j90, u 1* ,VN BMS1 bFFPOJNt 1b PSIC UL WSII ) A I 7\ \ -X / ^ BUPNHj OQ1L1P MO j ATOMIZING AIR 20 SCFM 90 PSIG SUPPLY PRESSURE, STABLE AND REGULATED ATOMIZING STEAM SATURATED STEAM 300 LBS/HR 150 PSIG SUPPLY PRESSURE, STABLE #2 FUEL OIL 3,060 LBS/HR 18,775 BTU/LBS HHV 130 PSIG SUPPLY PRESSURE, STABLE 40 SSU VISCOSITY REV. DATE 4-05-10 6-3-10 9-7-10 1_ DESCRIPTION ISSUED FOR REVIEW IN PROCESS ISSUED FOR CONSTRUCTION DWN LPW DCA DCA CHK SEW SEW SEW D C m^mmm •II oV N \\tuni//SyMled Only When Signed in Blue Ink = mf STEVEN E WOPATA-fn = - 9,". 062 049436 •£? ~ B Engineers Architects Technicians Design Construction Field Service (913) 681-2881 16041 Foster P.O. Box 1000 Stilwell, Kansas 66085-1000 Illinois License # 184-000823 EASTEI ILLINOIS UNIVERSITY EIU PROJECT ®: 10-4535 EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER PIPING Sc INSTRUMENTATION DIAGRAM BOILER NO. 1 BURNER SHEET 1 A DESIGN BY: S. WOPATA DRAWN BY: LWEST CLIENT I.D. HON00103 CHECKED BY: S. WOPATA DATE: 11 ■02-09 SEGA PROJECT NO. 090140 CADD FILE NAME: 09140-P&ID3B DRAWING NO. P&ID3B REV. 2 N \2009\09140\dwgs\me\09140-PMD3B dwg 9/7/10 1 29pm dalexander

Upload: vantuong

Post on 20-Mar-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

7

11

1.5x1.25 1.5-CA98-AA1

€H COMPRESSED AIR

1B 1.5x1.25

1.5-S24-AB1 Q |

STEAM

14A

Ki

AfvA

SLIT'01 NT 60 PSIC

BMS1

SPTPOINI 1 ' 0 PSIG

BMS1 CC1

■~i

1 1 / 4 " iOO # RF HANGED CONNECTION

WINDBOX MOUNTFD

3 /4 -C127-AB1

3/4x1/2

— D -

HV

tA l

-4

/i iv NX \

603/OA

^ _

/'MX \

<p> -

UL\

WPP

H P \ ,608 <>P

pf\ 1308 W

)

J 1 l / " "

I

.6081

/P i t \ldJ0

13

i^OS/p)

BMS1

gO ag) XUMby

M IfOBJOi ¥ f>

J—ltV<Jh

STEAM TRAP HEADER

/HV

A 1 1/4*

|JH 1

T

Li 0«L»).

CC1

F A I L CLOSED LOSS OF S I G N A L F A I L I N PLACE LOSS OF POWER

Pph/fP

L J

SETPOINT 94 PSIG

SI I P O I P l lw.0 PPJG

BMS1

1/ ^ J

1x3/4

17

FUEL OIL

1-F080-AA1 O

WINDBOX MOUNTED

- f>

CC1

5 / 4 " 150 # RF FLANCED CONNECTION

SETPOINT 118 PSIG

Pi

HV 1)05

l J ~ ibmij}) ~ LJ

XH BH

|rf)j90,

u 1* , V N

BMS1 bFFPOJNt 1b PSIC

UL W S I I )

A

I

7\

\

-X / ^ BUPNHj

OQ1L1P MO j

ATOMIZING AIR 2 0 SCFM 90 PSIG SUPPLY PRESSURE, STABLE AND REGULATED

ATOMIZING STEAM SATURATED STEAM 300 LBS/HR 150 PSIG SUPPLY PRESSURE, STABLE

#2 FUEL OIL 3,060 LBS/HR 18,775 BTU/LBS HHV 130 PSIG SUPPLY PRESSURE, STABLE 40 SSU VISCOSITY

REV. DATE

4-05-10 6-3-10

9-7-10

1_ DESCRIPT ION

ISSUED FOR REVIEW

I N PROCESS

ISSUED FOR CONSTRUCTION

DWN

LPW

DCA

DCA

CHK

SEW

SEW

SEW

D

C

m^mmm •II

oV

N \ \ t un i / /SyMled Only When Signed in Blue Ink

= m f STEVEN E WOPATA-fn = - 9,". 062 049436 •£? ~

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881 16041 Foster

P.O. Box 1000 Stilwell, Kansas 66085-1000

Illinois License # 184-000823

EASTEI ILLINOIS U N I V E R S I T Y

EIU PROJECT ®: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING Sc INSTRUMENTATION DIAGRAM

BOILER NO. 1 BURNER SHEET 1 A

DESIGN BY:

S. WOPATA DRAWN BY:

LWEST CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

11 ■02-09 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P & I D 3 B DRAWING NO.

P&ID3B REV.

2 N \ 2009 \09140 \dwgs \me \09140 -PMD3B dwg 9 / 7 / 1 0 1 29pm dalexander

7 2

CC1 r~\

V6031Q, * SETPOINT

/ ^ > ~ N 1 6 P S I G

SETPOINT 8 PSIG

BMS1

1.5-NG94-BA1

WALL

VENT

i—A<J— J th=:

\8037f|I|03?g)

3-NG46-BA1

NATURAL GAS SUPPLY

18" 32" MINIMUM STRAIGHT LENGTH

T

WINDBOX MOUNTED

3" 150 # R.F. FLANGED CONNECTION

BMS1 1 A ' 2 " NPT

CONNECTION

CC1

IPOINT PSIG •

AiA \|30350,

3 X 3 / 4

HV

| WINDBOX MOUNTED

; , p T . uuNhtOTIGN

U 3 / 4 - N G 4 6 - B A 1

HV 160100/

NATURAL PROPANE GAS

{ > < ] _

11)0575/

AAi

BABMJ2I

3/4-NG100-BA1

WALL HOV\

VENT

SETPOINT 1 PSIG

3 / 4 " MPT CONNECTION

BSVN

.60150/

i

< > 1 1 1

BMS1

I I I ,

I1MLXQR

'BSVN

.HV mmj ' nvA

\G0105/

_i BMS1

WINDBOX MOUNTED PROPANE BOTTLE

BMS1

FO V61280/

11 1/2-CA99-AA1

COMPRESSED AIR

8H A291P

-6 'BSA wimj

TO SCANNERS FOR COOLING AIR

NATURAL GAS 59,900 SCFH 1,000 BTU / SCF HHV 20 PSIG SUPPLY PRESSURE, STABLE

PROPANE GAS PILOT 200 SCFG 2,525 BTU / SCF HHV TBA PSIG SUPPLY PRESSURE, STABLE

PLANT AIR DRY AND OIL FREE 90 PSIG SUPPLY PRESSURE, STABLE AVERAGE CONSUMPTION 7 SCFM PEAK CONSUMPTION 9 SCFM

* PROVIDED BY NEBRASKA BOILER

REV.

O

DATE 4-05-10

6-3-10 9-7-10

1 DESCRIPTION ISSUED FOR REVIEW

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN LPW DCA DCA

CHK SEW SEW SEW

D

C

U!. mm(^wm Sealed Only When Signed in Blue Ink

= uJ : STEVEN E. WOPATA"; pfj = ~ 9 / . 062.049436 »Q1 =f ^ ^ \ /*C ■ i ♦ j> >-

'"'tnmu** B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

EASTEI I L L I N O I S U N I V E R S I T Y

EIU PROJECT *■ 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM BOILER NO. 1 BURNER SHEET 2

A

DESIGN BY: S. WOPATA

DRAWN BY: •LWEST

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 11-02-09

SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P & I D 3 C

DRAWING NO.

P&ID3C REV.

2 N:\2009\09140\dwgs\me\09140-P&ID3C.dwg 9 / 7 / 1 0 1:29pm dalexander

7 3

11 1.5—CA101 —AA1

E«3— 1.5x1.25

O COMPRESSED AIR

I I / 4 " 500 # P L

rLANCED CONN!

WINPBOx MOUN._. -r>

SlITPOINI CO PSJG

* FP01NF 1?0 PSIG

10 1.5-S25-AB1 1.5x1.25

O

: , ) VhiULp.

0 Y I

BMS2 0 Y I

BMS2

<>-

CC2

, j _ - - -

STEAM

14 3/4-C141-AB1

3/4x1/2

—D—

- v /

L—C^l-H | -<B>

STEAM TRAP HEADER

I I I

PA

p, /PPJjO,

\ 1

An PJ09S1

A Sii 0950.

D

\ A s L PQJ

b

BMS2

f I PA \40*k?A

{>--IU

7SH' i ^ \405A

f ^ I 11 AcvA

JPLB/0/

Oosdv

V .,

'PI

,4l'lA

PCV\

mm) FAIL CLOSED LOSS OF SIGNAL FAIL IN PLACE LOSS OF POWER

CC2

1/?* NPT CONNECTION

x:

/ f iv pP3/tP ' P D A

P(Wo/

A A ■ <

!

SLlPOlNT 94 PSIG

7VTBMS2

1-F081-AA1 1x3/4

17

FUEL OIL

WINDBOX MOUNTED ^ BMS2

3 / 4 " 150 # RF FLANGED CONNECTION

Pi ,40530/

-D-1/2" -a

CC2 r~"

SI Tf^OJNT 1,50 PSIG

7V1BMS2

A

/fcv\ \4mmJ

/PSHHi

^ ' - A] a

BMS2 ct ' P O I N l

16 PPIG

«0J9WOM

Pi XL A

iM A A

r A

DA

■X

J

iOP

/ 'P I \40jP

HV ,4059

/ " \ BliRNLII

TO LIANA A

A J

ATOMIZING AIR 20 SCFM 90 PSIG SUPPLY PRESSURE, STABLE AND REGULATED

ATOMIZING STEAM SATURATED STEAM 300 LBS/HR 150 PSIG SUPPLY PRESSURE, STABLE

#2 FUEL OIL 3,060 LBS/HR 18,775 BTU/LBS HHV 130 PSIG SUPPLY PRESSURE, STABLE 40 SSU VISCOSITY

REV. DATE

1-15-10

4-05-10

6-3-10

9-7-10

I DESCRIPTION

ISSUED FOR REVIEW

IN PROCESS

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN

DCA

LPW

DCA

DCA

CHK

SEW

SEW

SEW

SEW

D

C

c .

Sealed Only When Signed in Blue Ink

= 03 : STEVEN E WOPATA • ^ = Z. 9 / . 062 049436 ; <J> Z

X^OFl tA> xxx

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

EASES] ILLINOIS U N I V E R S I T Y

EIU PROJECT *•■ 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

BOILER NO. 2 BURNER SHEET 1 A

DESIGN BY:

S. WOPATA DRAWN BY:

LWEST CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

1 1 - 0 2 - 0 9 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P M D 3 D

DRAWING NO.

P&ID3D REV.

3 N \ 2009 \09140 \dwgs \me \09140 -PMD3D DWG 9 / 7 / 1 0 1 29pm dalexander

7 4

CC2

U W /AFT SLIPOINI 8 PSIG

BMS2

1.5-NG82-BA1

WAI

■A A x-

* SETPOINT 16 PSIG

A-NG47-BA1

NATURAL GAS SUPPLY

30" 30 MINIMUM STRAIGHT LENGTH

A

WfMPROX MOON FPU

3" 150 § PI I L ANCLE) CONNECTION

40510A

A^i\ #339/

. i

RMS? 1 VA

f l P !

CONNIPTION

VENT

BMS2 1 n O U T """( I PP

CC2

i

X- A:

i-1 1>^A

WoA A\

I(pA - A

■f btih\

(10 57 V / I 1 A P 01 a

1/2" DR

< CD I

I s-O z I

^* \ to

3 X 3 / 4 TPCA/SCV'PC? 40VQMOMOA40* A V - :t

y__/nv A Appi

•iN-U

zioYzsc Wcv W;b(WDo)0AJ03'i(J/ _ V ' H

l H I Alv A A

L1

J v i n j i / ,

/An , Ai ny

7 / ii\

c 1 BMS2

- i D | II

'O/APPPI/

PlAMLiP

Bv.ilFP5 i jO^Z

P A pp v)

/

WAi

L.

W I N D B O X M O U N J L D

BMS2 ?M%1 } } YIPPA

3/1" NPI CONNl CTIOM

I

SI IP0IN1 1 1 PSIG |

V.4013Q/ ) Ul~ A M P

3 /4 -NG83-BA1

5/1 NPF CONNECTION

VENT *

BMS2

A

HV PPOICW

T C A 140100/

A

/bSV\_ V A V4.01W A A i

SETPOINT LI 5 PSIG

P4CP1P

NATURAL PROPANE GAS

PosvP MOW

HvYzsVlT v40liy\0lM^Q1!P _

_ V. J HV r " A \401m

L' 1

API

/ bPV V*uiC0,

HvA ,40165/

V / H V r A "Voibo,

[Jl

A P I ) V0165/

1: Bit otoa

--r , . ^ i/: i

I.ONJ I OF

yoisy

PROPANE BOTTLE WINDBOX MOUNTED

l/J>" UP I CONNPC non

Ao\ U'imj

11 3/4-CA102-AA1

COMPRESSED A I R

BMS2

/ HP Ui;ou,

-iH

/ B S V V41210

/ I 0 ) \4umj

PI

(BH) V1"A

-I h - O -v "/

TO SCANNERS FOR COOLING AIR

NATURAL GAS 59,900 SCFG 1,000 BTU / SCF HHV 20 PSIG SUPPLY PRESSURE, STABLE

PROPANE GAS PILOT 200 SCFG 2,525 BTU / SCF HHV TBA PSIG SUPPLY PRESSURE, STABLE

PLANT AIR DRY AND OIL FREE 90 PSIG SUPPLY PRESSURE, STABLE AVERAGE CONSUMPTION 7 SCFM PEAK CONSUMPTION 9 SCFM

* PROVIDED BY NEBRASKA BOILER

REV. DATE

1-15-10

4-05-10

6-3-10

9-7-10

DESCRIPTION

ISSUED FOR REVIEW

IN PROCESS

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN

DCA

LPW

DCA

DCA

CHK

SEW

SEW

SEW

SEW

D

c

i/fi©i]lJ(WVfCf(*?t!

Sealed Only When Signed in Blue Ink

/#$ •••••&A = w : STEVEN E WOPATA; m = ■S <3 \ 062 049436 - ^ r

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

EASTEI I L L I N O I S U N I V E R S I T Y

EIU PROJECT m-. 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

BOILER NO. 2 BURNER SHEET 2 A

DESIGN BY: S. WOPATA

DRAWN BY:

LWEST CLIENT I.D.

HON00103

CHECKED BY: S. WOPATA

DATE: 1 1 - 0 2 - 0 9

SEGA P R O J E C T NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P & I D 3 E

DRAWING NO.

P&ID3E REV.

3 N \ 2009 \09140 \dwgs \me \09140 -PMD3Edwg 9 / 7 / 1 0 1 29pm dalexander

7 4 3

COMBUSTION AIR

(b CM 6P020 X

BMS1

SETPOINT ISETPOINTJ 2.72" w.c. |0.06" w.cl

r8 7 0 5 5 |820JO

©

SILENCER

b z u / U

r -* (Pm

Y \ A 8 20 A)

]A' CC1

BMS1

I I I

620 *A ' A . A A

BMS1

A 6 2 0 / 0 62070

CC1

CC1 CC1

STACK

<§> f.

" )80

CC1

INLET BOX

MIXING BOX

I

A'A OP i /o

<&_—£] FLUE GAS

RECIRCULATION

i , \

CC1

WINDBOX

~7\ ]BMS1

61300

^7\1BMS1

EA

"1

1 1 1 1 J

0 BMS1

i I I I I i

0 CC1 CO

<

3

SETPOINT 180 PSIG

SETPOINT 185 PSIG

SETPOINT 12.5" w.c.

BMS1

BMS1

I

61410 ^

FURNACE

i

P:

STEAM; - ■! RECYCLE' - ,

BMS1

EX 1300"

8 1 A "

BOILER BY NBC

SEE PMD 1B

BMS1

BS |0 61300 I R / U V = FOR OIL AND GAS

TO SCANNER FROM PLANT AIR LINE

REV. DATE

4-05-10

6-3-10

9-7-10

I DESCRIPTION

ISSUED FOR REVIEW

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN LPW DCA DCA

CHK SEW SEW SEW

D

C

! i.r pA

Sealed Only When Signed in Blue Ink

= 2 : STEVEN E WOPATA; m |

V>; ...<#/ Ax \

""IIUHW** B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

< # ^

EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT ** 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

BOILER NO. 1 BURNER SHEET 3 A

DESIGN BY:

C. WARD DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

11-02-09 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P & I D 3 F

DRAWING NO.

P&ID3F REV.

2 N \ 2009 \09140 \dwgs \me \09140 -PMD3Fdwg 9 / 7 / 1 0 1 29pm dalexander

7 2

COMBUSTION AIR

^Tcf^\__ 42070

BMS2

SETPOINT ISETPOINT| 2.72" w.c. J0.06" w.cl

A. 0\

;o

r \ Ao

SILENCER

A

A A i? 207(1

!,'",: CC2

/ * Y Tr

i 4 2 0 / 0 42070

BMS2

N .

CC2

I v j f ■ . 'O • , : 'A JV

42070

MJ

-I J

CC2 CC2

STACK

BMS2

4208542080

CC2 VFU M

A 1 47)70

INLET BOX

MIXING BOX *r—LJ

FLUE GAS RECIRCULATION

CC2

WINDBO PT

42071'

U^<]A

HV 42071

BMS2

I

ZS 4130C

BMS2

zscyz^H '421 70 4217i

. J BMS2

CC2 o GO

< o LJ =3

SETPOINT 180 PSIG

SETPOINT 185 PSIG

SETPOINT 12.5" w.c.

BMS2 BMS2

BMS2

I

H ^

i ' >

'SHI-

' 4 1 4 1 0 '

FURNACE

STEAM • . A , RECYCLE . , .)'

O

I I

A A 4347 ;

STEAMICH^ DRUM43471

O

Hiwll

A *',

BOILER BY NBC

l __ . SEE PMD 1C

BMS2

°ri : ( / ;/ / l l ' \" J I R / U V = FOR OIL AND GAS

! TO SCANNER l ^ _ _ _ _ _ F R Q M PLANT

AIR LINE

REV.

0

DATE 4-05-10

6-3-10

9-7-10

1_ DESCRIPTION

ISSUED FOR REVIEW

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN

LPW

DCA

DCA

CHK

SEW

SEW

SEW

D

C

WMC^fW(£§

Sealed Only When Signed in Blue Ink

^ ^ E S S / 0 4 / %

§0S I uKSTEVrNE WOPATA-^ = S 9- / . 062 049436 *G? C

%1^0FStA^iA ' ' " i l l l l l l ^

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881 16041 Foster

P.O. Box 1000 Stilwell, Kansas 66085-1000

Illinois License # 184-000823

E^STE] ILLINOIS U N I V E R S I T Y

EIU PROJECT *•• 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

BOILER NO. 2 BURNER SHEET 3 A

DESIGN BY: C. WARD

DRAWN BY: C. WARD

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 11-02-09

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P & I D 3 G

DRAWING NO.

P&ID3G REV.

2 N \ 2009 \09140 \dwgs \me \09140 -PMD3G dwg 9 / 7 / 1 0 1 29pm dalexander

7

r

EXISTING TUNNEL

1_ C~

<

A

OLD BOILER HOUSE

RENEWABLE ENERGY CENTER

1A 12-S07-AB1

NEW PLANT

14A 3 / 4 - C 7 3 - A B 1

STEAM TRAP HEADER O 3 / 4

AB1 „

BB1

4 3 2

BOILER 4 & 5

BOILER 1 BOILER 2

- } TUNNEL

< I

Is-O en I

oo

T A i i '■A BOILER 2

a GO

0-

I

M

m < I

I s-o GO

I 00

A

14X8

■O

AB1 BB1

STEAM TUNNEL

14-S07-BB1

3 / 4

i '

C

3 /4 -C128-AB1

CONDENSATE RETURN TANK

3/4-CF13-AB1 3 / 4 FOR POTENTIAL X FUTURE CHEMICAL FEED

X I

I s-o <S)

i 14x12

STEAM TUNNEL

14-S07-BB1 4A 4B

14-S07-BB1

STEAM TUNNEL STEAM TUNNEL

REV. DATE

1-15-10

6-3-10

9-7-10

DESCRIPTION ISSUED FOR REVIEW

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN DCA DCA DCA

CHK SEW SEW SEW

D

C

t v t OP i !! lf (tl

s t i

M ,*@l

Sealed Only When Signed in Blue Ink

- S> • • ' 5 1 -: a i : STEVEN E WOPATA ; f , = : 9 . " 062 049436 .'«/» «;

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

<»► BASTE! I L L I N O I S U N I V E R S I T Y

OlS

EIU PROJECT ®* 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

EXISTING PLANT/TUNNEL STEAM A

DESIGN BY: S. WOPATA

DRAWN BY: J. MILLER

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 8-20-08

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P & I D 4

DRAWING NO.

P&ID4 REV.

2 N \ 2 0 0 9 \ 0 9 1 4 0 \ d w g s \ m e \ 0 9 1 4 0 - P M D 4 d w g 9 / 7 / 1 0 1 29pm dalexander

7 6

4B

EJ-38 EJ-35

- a — O 6-C45-BA1

STEAM TUNNEL

EJ-27 Q rjEJ- 30

4C 2-C45-BA1

CARMEN HALL

4B

EJ-37

O EJ-34

STEAM TUNNEL

- f X J ™

X3—I 1 " | 1"

1.5"

*-""0" 14-S07-BB1

10"

o

3 /4:

-{X3—=[]J—fX—i ►

<X3 V 4 \ 3 / 4 "

X X 3 / 4 "

4B

EJ-39

-CD—*•

V SUMP

EJ-36

■a-2-C44-BB1

STEAM TUNNEL

EJ-26

EJ-29

CD GQ

I Is-O GO I

CD

4C 6-S07-BB1

0 1 '

EJ-32

CARMEN HALL

a 1

X — -tx}—

10"

4 3 2

NOTES 1: TRAP VALVE STATION W/ INTEGRAL ISOLATION VALVES, STRAINER AND CHECK VALVE. 2. DRAIN PIPING WILL TIE INTO CONDENSTATE RETURN TANK OVERFLOW PIPING.

EJ-15 EJ-10

O 6-C45-BA1

EJ-18 0 EJ-24 EJ-21

a fY>

~'l

EJ-17 y

EJ-23 EJ-20

o 10"

3 / 4 "

MID-

EJ-14

-o-EJ-12 EJ-9

L»*AJ

10" 10'

i r I i r

NOTE 1 3/4»

3 / 4 " -CX}— *- 3 / 4 "

O 14-S07-BB1 EJ-7

-o NOTE 1

O

NOTE 1 -fX3—^J—CX3 r ►

3 / 4 " X X

3 / 4 4><3--^JH><3 1 ►

HX* 3 / 4 "

^ -{XJ 3 / 4 "

■ ^

3 / 4 "

EJ-25

0*43

3 / 4 "

Y SUMP

3 / 4 " X X

V SUMP

EJ-16

-o-EJ-13

3 / 4 "

V SUMP

i r

EJ-11 EJ-8

-co EJ-19

EJ-22

EJ-28

EJ-31

m I

■-t-

o I

EJ-33

3 / 4 "

1.5"

NOTE 1 3 / 4 4x3-iJ-i><H-

-X-3 / 4 "

3 / 4 "

SUMP

6-C45-BA1 11

EJ-5

-CD—*

EO-AA

6A

CONDENSATE RETURN TANK

EJ-4

-o-10'

1 4X3—

1 " HX3—

1"

1.5"

EJ-1

14-S07-BB1

NEW PLANT

NOTE 1 3 / 4 » -{Xh-TJHXJ™

4X3—^—^ 3 / 4 "

X X

3 / 4 "

EJ-6

€3-

V SUMP

0 EJ-3

2-C44-BB1 14

STEAM TRAP HEADER

REV. DATE 6-3-10 9-7-10

1_ DESCRIPTION IN PROCESS ISSUED FOR CONSTRUCTION

DWN

DCA

DCA

CHK

SEW

SEW

^ 0 f E S S / 0 4 / %

Sealed Only When Signed in Blue Ink

= i f ] : STEVEN E WOPATA ; S = ~~ 9-"" 062 049436 ; " ? r

<, <9vA .♦ . A j -

* • % & ' • " ' • ' .: y

vA ^>iA?oriA%xA

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

E A S T E I ILLINO U N I V E R S I T Y

EIU PROJECT *■ 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

STEAM TUNNEL DESIGN BY:

S. WOPATA DRAWN BY:

J. MILLER CLIENT I.D.

HON00103

CHECKED BY: S. WOPATA

DATE: 9-11-08

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P & I D 4 A

DRAWING NO.

P&ID4A REV.

1 N: \2009\09140\dwgs\me\09140-PMD4A.dwg 9 / 7 / 1 0 1:29pm dalexander

7 6

14-S07-BB1

OLD BOILER HOUSE

EJ-76

NOTE 1 3 / 4 "

3 / 4 "

-X-^[JHXH

V4" ^^ it

SUMP V

3 / 4 "

EJ-73 i^pmaBactaaaamaJL Jam

EJ-70

O 10'

10" NOTE 1

H l t f l B 3 / 4 "

3 / 4 " 3 / 4 "

■X3~iJHXJ-

3 / 4 " ^ 4———{Xj-

EJ-67

O

—XJ-

1'

1.5"

SUMP V

EJ-75

HD3~ 2-C44-BB1

EJ-72

3 / 4 "

EJ-69

-o-EJ-66

OBA I Impu

EJ-63

0 EJ-60

0 EJ-57

EJ-54

EJ-51

EJ-48

EJ-45

EJ-42

4

2-C44-BB1

CRU-01

6-C45-BA1

EJ-64

NOTE 1 3 / 4 "

3 / 4 " u

SUMP V

A

4X3™Tj--i><-} 3 / 4 "

3 / 4 " XJ-

10"

3 / 4 "

10

3 / 4 "

3 / 4 "

NOTE 1

3 / 4 " X-

SUMP V

3 / 4 "

NOTE 1 10" 3 / 4 "

3 / 4 "

■iXH(J-X3-

3 / 4 " -X-

SUMP V

3 / 4 "

EJ-77 EJ-74

-a—o

0 EJ-61

EJ-58

EJ-55

0 EJ-52

EJ-49

EJ-46

EJ-43 0 10"

3 / 4 "

3 / 4 "

3 / 4 "

SUMP

NOTE 1

4 X H T J — X -

3 / 4 " < 1X3-

}>

i '

Y 4A

3r ■ X — .£X|""""~

STEAM TUNNEL

EJ-40

14-S07-BB1 < C 4A

3 2

NOTE 1: TRAP VALVE STATION W/ INTEGRAL ISOLATION VALVES, STRAINER AND CHECK VALVE.

EJ-71 EJ-68

■a—o

o 1.5"

STEAM TUNNEL

EJ-65

-O-i 0 EJ-62

EJ-59

EJ-56

EJ-53

EJ-50

EJ-47

L>-44

0 EJ-41

6-C45-BA1 4A

STEAM TUNNEL

REV.

0

DATE 6-3-10

9-7-10

I DESCRIPTION

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN

DCA

DCA

CHK

SEW

SEW

D

C

Sealed Only When Signed in Blue Ink

: V: : m ." STEVEN E WOPATA; = : 9,

:. 062.049436 -Q ~

i -J *♦ »* ~° C

/.%/- *'" ,A\° ^ * " / / i i i i u ^

x

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

<m^ EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT n= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

STEAM TUNNEL A

DESIGN BY: S. WOPATA

DRAWN BY: C. WARD

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 9- ■11-08

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P & I D 4 B

DRAWING NO.

P&ID4B REV.

1 N: \2009\09140\dwgs\me\09140-PMD4B.dwg 9 / 7 / 1 0 1:29pm dalexander

7 4 3 2

10-S72-BA1 INSTALL BIRDSCREEN

I i

3 / 8 " SS TUBING

4A O 4-S07-AB1

6x4 STEAM TUNNEL

3 /4 -C130-AB1

CONDENSATE RETURN TANK IN CARMEN HALL

■ X -3 / 4 "

3 / 8 " SS TUBING

12 PSI CONTROL PRESSURE IN CARMEN CAPACITY = 8,000 Ib/hr

SOUND ORIFICE

1 6x2 S132-2 -O—{XH

1/2" 1/2"

8x6

-a—i

SOUND ORIFICE

I 4x1 S132-3 8x4

4-S132-AA1

PCV\ 13 PSI CONTROL PRESSURE 6 2 3

) CAPACITY = 2,500 Ib/hr

O

X3/

4"

TO SYSTEM *""* Y "~>

3 / 4 " DRAIN

8-S132-AA1 S132-1

-iXH 6"x 8"

535 j SET PRESSURE = 15 PSI CAPACITY = 12,000 Ib/hr

CONNECT TO EXISTING PIPE WITH REINFORCED FITTING

1?"

) EXISTING FIRE rUBL" BOILER 0(20,000,000 BTU INPUT)

AFTER BOILER DEMO REMOVE VALVE AND INSTALL BLIND

3/4-C131-AA1

X3/

4"

3/4" -X" CONDENSATE RETURN TANK IN CARMEN HALL

TO BOILER

ADD LEVEL CONTROL VALVE TO MAINTAIN LEVEL IN CRU TANK

4A 2-C45-AB1

-DQ3

STEAM TUNNEL 3 / 4 " FOR CHEM FEED

1/2" SAMPLE

\

J

o X-

Xr

— EXISTING ROTH CRU 3 HP MOTOR 1,760 RPM 50 PI (FSTIMATT)

N: \2009\09140\dwgs\me\09140-PMD4C.dwg 10 /22 /10 9:44am dalexander

REV. DATE

9-14-10

10-21-10

I DESCRIPTION

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN

DCA

DCA

CHK SEW

SEW

D

C

t l

Sealed Only When Signed in Blue Ink

£ < $ ^A% £#/ '$& J OJ,' * $ . " " " = g ! STEVEN E WOPATA-.m = = 9 - 062.049438 ; i g ~ **• ^ *.. *> ^ •5. *V A & , .$"

" " l l l l l t i t ^

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

< W ^ EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT «= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

CARMEN HALL A

DESIGN BY: C. WARD

DRAWN BY: D. ALEXANDER

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 6-30-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P M D 4 C

DRAWING NO.

P&ID4C REV.

1

7 5 4 3 2

FROM TUNNEL

< I

■ « -

00 o I

4-C84-AB1

n

I

~l

1

HIGH ALARM (6" ABOVE NWL)

LOW ALARM (6" BELOW NWL)

PUMP TRIP (LOCATION BY VENDOR)

m < I

rh O I

M/W

q ?

WAI ■*- VENT

NWL=21'

~(m)

3/4-C128-AB1

HIGH PRESSURE STEAM TRAP

f~*\ 3-PD104-AB1

6x4 4-C45-BA1 O 6-C45-BA1

4B

STEAM TUNNEL

CRU-01 OLD BOILER HOUSE CRU CAPACITY, GPM 200 DESIGN PRESSURE, PSI 40 MOTOR, HP 10 (EST.) TANK CAPACITY, GAL 500

* PROVIDED BY UNITED LABORATORIES

REV. DATE

1-15-10

4-05-10

6-3-10

9-7-10

1_ DESCRIPTION

ISSUED FOR REVIEW

IN PROCESS

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN

DCA

LPW

DCA

DCA

CHK

SEW

SEW

SEW

SEW

Wkm\\^fwm }\

Sealed Only When Signed in Blue Ink

= uJ : STEVEN E WOPATA * ft ~ - O * ""- ~

''llluxwW^

Engineers - Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^ W ^ EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT st= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

EXISTING PLANT/TUNNEL CONDENSATE RETURN DESIGN BY:

S. WOPATA DRAWN BY:

J. MILLER CLIENT I.D.

HON00103

CHECKED BY: S. WOPATA

DATE: 8-20-08

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P & I D 5

DRAWING NO.

P&ID5 REV.

3

D

C

B

A

N: \2009 \09140\dwgs \me\09140-PMD5.dwg 9 / 7 / 1 0 1:29pm dalexander

7 5 4 3

3-V105-AA1

TK-01: CONDENSATE RETURN TANK

CAPACITY, GAL 2,500 DIAMETER, FT 6 LENGHT, FT 12 MATERIAL CS

PU-06 A/B: CONDENSATE RETURN PUMP

CAPACITY, GPM 118 TDH, FT 100 MOTOR 7.5

REV. DATE 1-15-10 4-05-10 6-3-10 9-7-10

I DESCRIPTION ISSUED FOR REVIEW IN PROCESS IN PROCESS ISSUED FOR CONSTRUCTION

DWN DCA LPW DCA DCA

CHK SEW SEW SEW SEW

D

C

iH.kBlJlie^wet!

Sealed Only When Signed in Blue Ink

^V>*" .7AA i •£: \^9 -= m : SI EVEN E WOPATA: ft = = Q " : 062 049436 ; C j Z

\^oPl<A B

GL> eaa ® V

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^ m ^ EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT a* 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

CONDENSATE RETURN A

DESIGN BY: S. WOPATA

DRAWN BY: L WEST

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 9-23-09

SEGA PROJECT NO. 090140

CADD FILE NAME: 09140-P&ID6A DRAWING NO.

P&ID6A REV.

3 N:\2009\09140\dwgs\me\09140-P&ID6A.dwg 9/7/10 1:29pm dalexander

7 2

WTR

r

16A 2-CW48

Dxx3-

_ J

k> /\l I FI OW // f VI

\ "\s \

A, ^N V

* . - ;

<i /

i L

i P A I N ! t>U i A

> II P]Pi 0 I A

PI

1 P A - I ' J - Pr)l A/S

/

\

3-C109-AA1

■ ^

SCALE 0-100 PSIG

CITY WATER INLET

J E- l

A

■ A

A

SAMPLE

V. 3/4" ISO

\ A

1 JO

7E 1 5 -BR114-PA1

I ' '(LSCJ—

flSi) \ ® A A /

FROM BRINE PUMP SKID

_ . J

SCALE / , , " 0-100 PSIG V IP '

■•AMI'I I

oPl A A —

r USO

II!

A A )

i; LSO

r / \

si OH

\

6A

> "

■2*

1 ' , (•

POALi 0-100 PSIG

PI

J cj

I A))

/ r

\ _

4] !* ] - \

(1 A

x IT

1 C P A

■- i ! i

o • ) J

SAMPtL

>t . <

,1 A

SO ■ V J

A !T- _

SCAI r

0 100 PSTO

L

BRINE MEASURING TANK

24" DIAx&Q" HIGH

r^LsA 1 Aivir i r

/ ^ frL>

I ' - i i . S C

MCP- 30'. • WDFNSATE-PO< ' " " TANK

50" DIAx60" SIDEbHELL 100 LB WORKING PRESSURE

ASyL CODE 15 CO FT 10% CROSS LINK

PC V

A A i . v ~

PH A

SL1 P01N1 ?b GPM

LSO)-

\ . .

! •■ )

. L

'A4,:

PA

1 {{SO

P:I HOP 50P0 ; CONDI NSAIfc

SUING P*MK xPO A D t s n n i 1RP1NO f m OSURf A C COPL

A U P I 107 IWOS* i 1NP

50 m

^ '

_l

CONDENSATE INLET

L_ _( n p ,-

DP

U

n ' cv

SLl POINT PP GPM

P / - 2

A -

A At l CA '00 GPM

4 A C Ma

NOTjEA LSL CLOSFS r V - / ON I OW LEVEL LSH CLOSES PV-8 ON HIGH LFVEL, FV- 8 OPEN ON TANK RbFHL

^

Ol

> -

V A

A i ro iMT 20 P ,10

A

-f* - -

3-C110-BA1

POLISHED WATER OUTLET

1 5-C111-AA1

REFER TO MARLO DWG E P 0 9 - 0 2 3 7 - 0 7 - 0 6

CONDENSATE POLISHER SKID

V

CONDENSATE POLISHER CONDENSATE POLISHER

DESIGN FLOW, GPM 100 PRESSURE, PSI XXX MAX TEMPERATURE, F 200*

REV DATE 1-15-10 4-05-10 6-3-10 9-7-10

1_ DESCRIPTION ISSUED FOR REVIEW IN PROCESS IN PROCESS ISSUED FOR CONSTRUCTION

DWN DCA LPW DCA DCA

CHK SEW SEW SEW SEW

D

c

II n mrm^iim:

Sealed Only When Signed in Blue Ink

" " / / J I I I I H ^ B

Eng inee rs — A r c h i t e c t s — T e c h n i c i a n s Design — C o n s t r u c t i o n — Field Serv ice

( 9 1 3 ) 6 8 1 - 2 8 8 1

16041 F o s t e r P.O. Box 1 0 0 0

St i lwe l l , K a n s a s 6 6 0 8 5 - 1 0 0 0 I l l inois L icense § 1 8 4 - 0 0 0 8 2 3

EASTEI I L L I N O U N I V E R S I T Y

EIU PROJECT ■- 10-4535

EASTERN ILLINOIS UNIVERSITY E I U R E N E W A B L E E N E R G Y CENTER

P I P I N G Sc I N S T R U M E N T A T I O N D I A G R A M

C O N D E N S A T E P O L I S H E R

DESIGN BY S. WOPATA

DRAWN BY-

L. WEST CLIENT I D

HONOO103

CHECKED BY S. WOPATA

DATE: 12-28-09

SEGA PROJECT NO 090140

CADD FILE NAME 0 9 1 4 0 - P & I D 6 B

DRAWING NO

P&ID6B REV

3 N \ 2009 \09140 \dwgs \me \09140 -PMD6B dwg 9 / 7 / 1 0 1 29pm dalexander

7

FROM BRINE PUMP SKID

WTR

1 1 i (APIA , ; I I IP

v\ \ M, All V " \ A

1 0% VAI A b

- V Px A w

If p I

f • I )

II Oil if A P i

r! i< )i

P5 - - H F-1

I5PA _l

H

1"

SCAl E 0-100 PSIG

L_

r - \

i©-.. ,

r

A A.

/ \

kr> FV-5A

(LPCJ

-A-— SAMPLE

3/4"

r

r' j

p AJ Fv 7

-U-J

PA-

so A

TV-1A A |

A I

APO i

SCAtF 0-100 FV 4A PSIG

r;A

LSO 1

-+-+-

|@J

A if i

I. ••' A

PCS V ;

' ' / ' I V V

FV-8

1.5-BR114-PA1

t i

I V • '< '•

SAMPLE

; '3 r\

L ISO A isc

- MTI

rv- PA

f

p A J

\

P

/

A

1 30)

0/1 > J \ M

i _

/ - ! i

A A 0-100 P A

L A A .

V 11

PAN Pi r

L 1

r )

p.o) vA SO

p

1 (A)

I-V-6A

> Lip SLT POINT 50 GPM

MR - 8 0 0 - 5 WATER SOFTENFP PL PPA60" SIDESHELL

10P A FORKING PRESSURE JONF CODE

PO CI I n CAIiON PLAN

A -J

A A t f 0-100 f v 4b

PJ

. t ,_.

.AMPLt /

U) _ J

\/ ; | ,

P;P J t

. . 1 1

/ , (r

)

u

J (iso

LP x

_ . _ ^P j -T

1 A A

P

rv- bB

PI

-H^ —■

MP-GOO A V/AirR POPiLNLR A " P J A A A SfDLPIPII

100 LB WORKING PFAS30PL NONP COOP

»0 (Ufr (AHON RFPIP

\

!

BRINE MEASURING TANK

36" DIAx60" HIGH

NOT PA LSL CLOSES f-V-7 ON LOW LFVLL LSH CLOSES EV-8 ON HIGH IEVFL, TV 3 OPEN ON TANK RCFHL

I I I

A 1 F

SFT POINT 30 GPM

FOP

" ) > -

I 1/2-0A38-BG1

3-CW48

COMPRESSED AIR

16A

CITY WATER INLET

SCAl [ 0 POO GPIP

' - PO PA

TYPE "L" COPPER

3-TW50-PA1 7B

SOFT WATER OUTLET TO RO UNIT

3-TW51-PA1 ,p.

REFER TO MARLO DWG E P 0 9 - 0 2 3 7 - 0 7 - 0 1

WATER SOFTENER SKID

REV DATE

1-15-10

6-3-10

9-7-10

I DESCRIPTION

ISSUED FOR REVIEW

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN

DCA

DCA

DCA

CHK SEW

SEW

SEW

D

C

[if miw^mm

Sealed Only When Signed in Blue Ink

vN^r i f tSS/Oyi / /^

0 \ \ = m : STEVCN E WOPATA; m = = 9.1 062 049436 • J£ =

V ' " ' / J i l l l l ^

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

EASTEI ILLINOIS U N I V E R S I T Y

EIU PROJECT ti= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

WATER SOFTENER A

DESIGN BY: S. WOPATA

DRAWN BY: T. OSTERTAG

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 09-09-08

SEGA PROJECT NO 090140

CADD FILE NAME: 09140-P&ID7A DRAWING NO.

P&ID7A REV.

2 N \ 2009 \09140 \dwgs \me \09140-P&ID7Adwg 9 / 7 / 1 0 1 29pm dalexander

7 3 2

0.5" VT

7A 3"-TW50-PA1 3"-TW52-PA1

FROM WATER SOFTENER t

r NO H OW SWHPH

S

IhK) FLOW , SW1KH

H H

LS

6

70

IJUNOUOIM nox JPI

WTR TO RO UNIT

T OP l>

L« ALl ON

ob > f PUP SYSTEM

50 GAl I ON 0AOS HP f l F D

SASTPy

O 50 GALLON

ANTI -SCAl AN A ED SYSTi M

REFER TO MARLO DWG E P - 0 9 0 2 3 7 - 0 7 - 0 4

CHEMICAL PRETREATMENT SKID

REV.

0 DATE

1-15-10

6-3-10

9-7-10

DESCRIPTION ISSUED FOR REVIEW

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN DCA DCA DCA

CHK SEW SEW SEW

D

c

RflcijniiesrWd

Sealed Only When Signed in Blue Ink

LU : STEVEN E WOPATA *: m ~ 9 ; 052 049406 • *£ Z

''"inniu** B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

EASTE U N I V E R S I T Y

EIU PROJECT ®= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

RO CHEMICAL PRETREATMENT A

DESIGN BY: S. WOPATA

DRAWN BY: L WEST

CLIENT I.D. H0N00103

CHECKED BY: S. WOPATA

DATE: 12-29-09

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P M D 7 B

DRAWING NO.

P&ID7B REV.

2 N \2009 \09140 \dwgs \me\09140-P&ID7B DWG 9 / 7 / 1 0 1 29pm dalexander

7

460V/60HZ/3PH 1 120V/60HZ/1PH

r . H MCC1 ! FPO. i

MOTOR I I STARTER f"

_

WTR

0.5" VT !

7B 3-TW52-PA1

& r ZI—J

FEED WATER INLET

A-A FV-1

MEMBRANE ARRAY

5 MICRON PREFILTER

304SS

11 3 / 4 - C A 6 2 - A A 1 3/4x1 / 4 1/4"

- - — i / / — A / S

COMPRESSED AIR 80-125 PSI REGULATOR

30HP 304SS

3-TW54-PA1

l-p-p CC-4A

uv~z

7D

RO TANK

GO :o - L" I

S j t f 50 MEMBRANE

CLEAN IN PLACE

SOLUTION TANK

h e n — CC-2B

K

MP!

| - C > — - - i M CC-1B CO-1A

r { ) s

</

ov ; I- i !

i i «

T

-5B

! 'A: . i

i

| -\ 'OV-5

y j ^ i B M E ^ L E L ^ Y S I E M . P - 2

CIP PUMP 7.5HP 304SS

! i ' . \ . ( t ' { ' , 'M

CIP FILTER, 304SS

CC-7

- i - A / S

CIP HOSE

CC-3A

A A 1.5-TW55-PA1

CV-1

REFER TO MARLO DWG E P - 0 9 0 2 3 7 - 0 7 - 0 4 V

REV. DATE 1-15-10 4-05-10 6-3-10 9-7-10

I DESCRIPTION ISSUED FOR REVIEW IN PROCESS IN PROCESS ISSUED FOR CONSTRUCTION

DWN DCA LPW DCA DCA

CHK SEW SEW SEW SEW

D

C

[Htoi?n<^w©l

Sealed Only When Signed in Blue Ink

£$/ % € l ih : STEVEN E. WOPATA; f^ =

' ' / , ' ' * OF l l ^ x *

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

EASTS I L L I N O I S U N I V E R S I T Y

EIU PROJECT n: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

RO CHEMICAL PRETREATMENT A

DESIGN BY:

S. WOPATA DRAWN BY:

L. WEST CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

12-29-09 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P & I D 7 C

DRAWING NO.

P&ID7C REV.

3 N:\2009\09140\dwgs\me\09140-PMD7C.DWG 9 / 7 / 1 0 1:29pm dalexander

5 3

VENT

6"

REV. 0

1 2

3 4

DATE 1-15-10

4-05-10

6-3-10

9-7-10

10-21-10

DESCRIPTION ISSUED FOR REVIEW

IN PROCESS

IN PROCESS

ISSUED FOR CONSTRUCTION

REVISED

DWN DCA

LPW

DCA

DCA

DCA

CHK SEW

SEW

SEW

SEW

SEW

1 HOUR RO SYSTEM MAKEUP =6,000 GAL

>2-0

< Q. I m oo Q-

Y D

HIGH ALARM 29'-3

RO STOP

RO START

LOW ALARM 21'-6

PU 07 A/B PERMISSIVE O'-O - V LOCAL

2 9 - 0 "

2 2 - 0 "

PUMP INTERLOCK

a—

LAH (19.7 mA)

LSH (19.6 mA)

LSL (16.8 mA)

LAL (16.6 mA)

RO WATER STORAGE TANK

TK-02

HDOdl

TW57-1 I—Doa—

TW54-1 Doa—i

DA LEVEL CONTROL CRU/REC

3-TW86-CA1

\T1DA/ BFP

T-D—fXH-|M_-3X2

1 : [XH

H—D«3—C3-3X2

-DOO SPEC CA1

A

SPEC PA1

^Tl DA/BFP

-3-TW57-PA1 -

2-TW53-PA1

a-

a-CV-4

PU-07A

3-TW57-PA1

NT] DA/BFP <

If)

^Tl DA/BFP

I0O

Ih-o

REFER TO MARLO DWG E P - 0 9 0 2 3 7 - 0 7 - 0 7

REPRESSURE PUMP SKID

t 2x1

L>

2x1 1/2

3-TW54-PA1

2-TW112-PA1

1.5-TW87-PA1

A

1-TW53-PA1

1.5-TW87-PA1

< I

<

7C <

RO UNIT

8 <

TURBINE COOLING WATER

< 10B

SAMPLE COOLER

DESUPERHEATING WATER

- 4 1G

TURBINE COOLING WATER

-f 10A

SAMPLE COOLER

>

>

c

Honeywell Sealed Only When Signed in Blue

B

a> Qeaa ® v_x

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881 16041 Foster

P.O. Box 1000 Stilwell, Kansas 66085-1000

Illinois License # 184-000823

< # ^

EASTERN I L L I N O I S U N I V E R S I T Y

PROJECT «= 10-4 53

PU-07 A/B: RO WATER PUMP CAPACITY, GPM TDH, FT MOTOR, HP

120 70 5

TK-02: RO WATER STORAGE TANK CAPACITY, GAL 25,882 DIAMETER, FT 12 HEIGHT, FT 32 MATERIAL FIBER GLASS

iASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

RO STORAGE

DESIGN BY: S. WOPATA

DRAWN BY: C WARD

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE! 11-23-09

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 Q - P & I D 7 D

DRAWING NO.

P&ID7D REV.

4

A

I-0-P&ID7D.DWG 10 /22 /10 1:28pm dalexander

7 4 3

1-CW48

CITY WATER

1.5-CW48 -hO-

1

_ ._l

HOLD

A

i

BRINE MAI 8' DIA X 15'

11'

0F

i i

4 '

SAL! », DUST j ; BAG j | FILTER

_ L lOUID A A A CONTROL LCH

L I 4" QUICK SALT A LI

1" WAFER CONNECTION

-fco}-

-C01- . J U 1 . J

BY MARLO

16PV/CAP /5pP - 10 WAlF

n

M»r I I N M IP P

WTR

'-PJ A A A

M Ai r

MCC

2-BR113-PA1 A

*5h- i ; , h

nt • H > ' . !

1-1/?■ ^

-5---

A OK

A''" PU-03A

;H

J /2*

M - ^ i6i v.

WTR

1-1/P

K5I - - '--n A A- o P

/ P J x SCALP { 10 100 A|A| SA

Y^-i/?" HA - Pi -

1.5-BR114-PA1

7A

WATER SOFTENER

6B

CONDENSATE POLISHER

PU-03B

BRINE MAKER SKID REFER TO MARLO DWG E P 0 9 - 0 2 3 7 - 0 7 - 0 3

PU-Q3A/B: BRINE TRANSFER PUMP CAPACITY, GPM 12 TDH, FT 77 MOTOR, HP 1

REV.

0

DATE

1-15-10

4-05-10

6-3-10

9-7-10

1_ DESCRIPTION

ISSUED FOR REVIEW

IN PROCESS

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN

DCA

LPW

DCA

DCA

CHK

SEW

SEW

SEW

SEW

D

C

n Li 1 iflDfniejftWG 3

,,,rjSealed Only When Signed in Blue Ink

= UJ : STEVEN E WOPATA ; f n -

7- 9%". 062 04943G «!£ Z

y^ O F I C V ^ ^

x

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

< # ^

EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT 8: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

BRINE MAKER A

DESIGN BY: S. WOPATA

DRAWN BY: L WEST

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 12-30-09

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P & I D 7 E

DRAWING NO.

P&ID7E REV.

3 N \2009 \09140\dwgs \me\09140-PMD7EDWG 9 / 7 / 1 0 1 29pm dalexander

7 6 4 3 2

1-CW48

EQUIPMENT LIMIT

1"-CW48

SKID LIMIT

REV. 0

DATE

6-3-10

9-7-10

I DESCRIPTION

IN PROCESS

ISSUED FOR CONSTRUCTION

DWN

DCA

DCA

CHK

SEW

SEW

D

C

" l » / A \ PA As

; n i (h J f I-, l A,o J r

Sealed Only When Signed in Blue Ink

^VtSS/04,.%. 3 > \<%p-

—■ cT * • 01 *£ = w : STEVEN E WOPATA; ^ = l=i H \ 062 049436 • i£» r

s *«Q *«,

%^foF^y ' " / / J J I I I l l ^

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License § 184-000823

EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT *•■ 10-4535

EASTERN ILLINOIS UNIVERSITY EIU ENERGY CENTER

PIPING Sc INSTRUMENTATION DIAGRAM

CLOSED COOLING LOOP A

DESIGN BY: S. WOPATA

DRAWN BY: J. MILLER

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 8-21-2008

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P & I D 8

DRAWING NO.

P&ID8 REV.

1 N: \2009 \09140\dwgs \me\09140-PMD8.dwg 9 / 7 / 1 0 1:29pm dalexander

1 REV. DATE DESCRIPTION DWN CHK

0 6-3-10 IN PROCESS DCA SEW

8-19-10 IN PROCESS DCA SEW

9-7-10 ISSUED FOR CONSTRUCTION DCA SEW

D

C

I f ! <*■>■,

Hioo %0-J\

Sealed Only When Signed in Blue Ink

= JiA'sTFVLNE WOPATA i ^ = - or

' " ' / / i in i i^ x N

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

<»► EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT 8= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING & INSTRUMENTATION DIAGRAM

CHEMICAL FEED A

DESIGN BY: S. WOPATA

CHECKED BY: S. WOPATA

DRAWN BY: L. WEST

DATE: 8- ■12-2010

CLIENT I.D. HON00103

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P & I D 9

DRAWING NO.

P&ID9 REV.

2

T7

PIPING KEYPLAN 20 2

40

S C A L E I N F E E T

\ n n n n \ nn i /i n\ _i..._. _ \ _ \ nn i /i n n i nn _i _, cr / r* /1 r\ o .

2 REV.

A DATE

5-6-10

] DESCRIPTION

IN PROCESS

DWN

DCA

CHK

SEW

D

C

Honeywell Sealed Only When Signed in Blue

B

GD Qeaa • \*j

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

< # ^

EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT •> 10-451

KERN ILLINOIS UNIVERSITY RENEWABLE ENERGY CENTER

PIPING KEYPLAN

DESIGN BY: S. WOPATA

DRAWN BY: D. ALEXANDER

CLIENT I.D. H0N00103

CHECKED BY: S. WOPATA

DATE: 4-29-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P 1 0 0 DRAWING NO.

P100 REV.

A

7 4 1

K

o CO CN

O J "co CN

S C A L E I N F E E T

REV.

0

DATE

8-30-10

DESCRIPTION

ISSUED FOR CONSTRUCTION

DWN

DCA

CHK

SEW

D

NOTES:

1. DRAIN PIPING WILL SLOPE 1/8" PER FOOT MINIMUM.

2. FLOOR DRAIN PIPE WILL BE CAST IRON, HUBLESS, UNLESS NOTED OTHERWISE

* PROVIDED BY NEBRASKA BOILER.

Sealed Only When Signed in Blue Ink

H i f f STEVEN E WOPATA : m = %^\ 0C2 049436 > ™ Z

"OFUAxV .«\\\ Y\*

Engineers — Architects — Technicians Design — Construction - Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License § 184-000823

< # ^

EASTERN I L L I N O I S kj &H J V C I \ 3 i I 1

EIU PROJECT ®= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

LOW PIPING PLAN - SHT. 1 A

DESIGN BY: S. WOPATA

DRAWN BY: D. ALEXANDER

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE:

4-29-10 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 0 6

DRAWING NO

P106 REV.

0 N \2009\09140\dwgs\me\09140-P106 dwg 8/31/10 2 33pm dalexander

7

K

CD CM

CD CM

HIGH PIPING PLAN - SHT. 1 0

S C A L E I N F E E T

8

REV.

0 DATE

8-30-10

1_ DESCRIPTION

ISSUED FOR CONSTRUCTION

DWN DCA

CHK

SEW

NOTES:

1. DRAIN PIPING WILL SLOPE 1/8" PER FOOT MINIMUM.

2. ALL FLOOR DRAINS WILL HAVE 4" PIPE CONNECTIONS.

3. FLOOR DRAIN PIPE WILL BE CAST IRON, HUBLESS, UNLESS NOTED OTHERWISE.

LEGEND:

PD FD CO V CO TEE

PROCESS DRAIN

FLOOR DRAIN

CLEAN OUT

VENT

CLEAN OUT TEE

Sealed Only When Signed in Blue Ink

= ui : STEVEN E WOPATA ■ ^ = 5 9 U 062 049436 /OT Z ■£ -

1 *. ♦• ~° C

%;^OFI\^AASS

Engineers - Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

<#y EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT *■• 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

HIGH PIPING PLAN - SHT. 1

DESIGN BY: S. WOPATA

DRAWN BY: D. ALEXANDER

CLIENT I.D. HONOO103

CHECKED BY: S. WOPATA

DATE: 4-29-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 09140-P106A DRAWING NO.

P106A REV.

0 N \ 2009 \09140 \dwgs \me\09140-P106A dwg 8 /31 /10 1 25pm dalexander

7

CO CM

H

CO CM

CO CM

p

1 1 1

I I

I 1

1 1

1 1

I

I 1

I I

I I

I I

I 1

I I

I I

J SEE DWG. P110 FOR CONTINUATION

LOW PIPING PLAN - SHT. 2

S C A L E I N F E E T

REV. DATE 8-30-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION DWN

DCA

CHK

SEW

D

NOTES:

PROVIDED BY NEBRASKA BOILER. C

Of

f%f^^'«^^^-^'Seiird:5Sh1| When Signed in Blue Ink

= S : STEVEN E. WOPATA : S § = O". 062.049436 ; " 7 -

' • i **♦ »** ■? "<• «oA. .♦* So £■

S U > ♦»» „«♦ CVS o

"'//niin^vN

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License § 184-000823

<#y EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT n= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

LOW PIPING PLAN - SHT. 2

DESIGN BY: S. WOPATA

DRAWN BY: D. ALEXANDER

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 5-3-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P 1 0 8

DRAWING NO.

P108 REV.

0 N:\2009\09140\dwgs\me\09140-P108.dwg 8/31/10 2:49pm dalexander

7

S C A L E I N F E E T

I 1 1

I I

I I I

I I 1

I 1 I

I I 1

I § 1

I I I

I I I

I I I

m m ■sJP

REV. DATE

8-30-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION DWN DCA

CHK SEW

D

Sealed Only When Signed in Blue Ink

x<O^ t S S | 0/^ % A V *

~ S : STEVEN E WOPATA-^ = = 9 " . 062 049436 ; £ r Z

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stllwell, Kansas 66085-1000 Illinois License # 184-000823

EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT *• 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

HIGH PIPING PLAN - SHT. 2 A

DESIGN BY: S. WOPATA

DRAWN BY: D. ALEXANDER

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 4-29-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P 1 0 8 A DRAWING NO.

P108A REV.

0 N \2009\09140\dwgs\me\09140-P108Adwg 8/31/10 1 07pm dalexander

7

F n

o J CO CN

to CN

D

CO CN

27-8" 1.3

27-8" 1.7

22-0" 2) (2.1

4 - 0 "

r i i

i

SEE DWG. P108 FOR CONTINUATION

1 I

I 1 I

1 I

I 1

I § 1

1 1 I

I I

\

I I

I I I

I I

I

6-S14-AB1

5-9 3/32"

ro

@S3f-

1 i

i

i i

i i i

i i

i i

5 -4 "

;i i

1 1

o J Tn

J L J W & J L — n mmmmmmmmm*^

3-S142-AB1

o J CD

I I

I I I

O I

To

SEE DWG. P112 FOR CONTINUATION

LOW PIPING PLAN - SHT. 3 0

J 2 - 8 "

S C A L E I N F E E T

REV.

0 DATE

8-30-10

1_ DESCRIPTION ISSUED FOR CONSTRUCTION

DWN DCA

CHK SEW

D

C

Sealed Only When Signed in Blue Ink

= 2 : STEVEN CWOPATA:^ = = 9 " 062 049436 ; C =

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License § 184-000823

< # ^

I L L I N O I S U N I V F R S I T Y

EIU PROJECT *= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

LOW PIPING PLAN - SHT. 3 A

DESIGN BY: S. WOPATA

DRAWN BY: D. ALEXANDER

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 5-3-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 09140-P110 DRAWING NO.

P110 REV.

0 N \2009\09140\dwgs\me\09140-P110 dwg 8/31/10 1 04pm dalexander

7 4

o I

CN

HIGH PIPING PLAN - SHT. 3 SEE DWG. P112A FOR CONTINUATION

8

1

I 1 I

I 1 I

I I 1

I

1 1

I I I

1 I

I 1 1

I I

I I

m m mmmm^S

REV. DATE

8-30-10

2. DESCRIPTION

ISSUED FOR CONSTRUCTION

DWN DCA

CHK SEW

NOTE: * DENOTES ITEMS FURNISHED BY RENTECH.

SHIPPED LOOSE. TO BE INSTALLED IN PIPING.

;.

■i V.

Sealed Only When Signed in Blue Ink

03 : STEVEN E WOPATA ■ f?j S 9 / . 062 049436 •£? 5 »"m -

S C A L E I N F E E T

Engineers — Architects — Technicians Design — Construction - Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

< W ^ EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT n= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

HIGH PIPING PLAN - SHT. 3

DESIGN BY: S. WOPATA

DRAWN BY: D. ALEXANDER

CLIENT I.D. HONOO103

CHECKED BY: S. WOPATA

DATE:

5-3-10 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 1 0 A DRAWING NO.

P110A REV.

0 N \2009\09140\dwgs\me\09140-P110A dwg 8/31/10 12 58pm dalexander

7 6 4

27-8" 1.3

27-8" 1.7

22-0

SEE DWG. P110 FOR CONTINUATION cn

CD CN

B

o J "CD CN

A

3-S143-AB1

I

I I

I I §

I 1

5 - 8 "

CD

ro

a> I

to

I iln I.MBI! JME l i a r 3HE

I I

£/

2.5-S143-AB1

I I

I 1 I

1 I

I I 1

I 1 I

I

I I

I I I

I

LOW PIPING PLAN - SHT. 4 8

S C A L E I N F E E T

REV. DATE

8-30-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION DWN

DCA

CHK

SEW

D

C

Sealed Only When Signed in Blue Ink

= S = STEVEN E WOPATA s S = = 9 1 062 049436 • " * = ■?. ■** *• i? ^

' " / / I I I I U ^ B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

U N I V E R S I T Y

EIU PROJECT *•• 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

LOW PIPING PLAN - SHT. 4 A

DESIGN BY: S. WOPATA

DRAWN BY: D. ALEXANDER

CLIENT I.D. HONOO103

CHECKED BY: S. WOPATA

DATE: 5-3-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P 1 1 2

DRAWING NO.

P112 REV.

0 N \ 2009 \09140 \dwgs \me\09140-P112 dwg 8 /31 /10 12 55pm dalexander

7

2 7 - 8 " 1.3

2 7 - 8 "

2.5-FW29-AB1 3-FW29-AB1

CM

o CD CN

B

CD CN

A

§ I

SEE DWG. P110A FOR CONTINUATION

\ \

I I

1 I

I I

I 1 1

I I 1

I I 1

a , t >r

■ '=£•

5 - 7 15/16"

CD

\ ro en

I to

V

nV

2.5-S143-AB1

1

I §

1 I

1 1

I 1

I I

I I 1

I I

1 I

1 I

I I 1

I 1

HIGH PIPING PLAN - SHT. 4 4 2 0 4 8

S C A L E I N F E E T

REV. DATE

8-30-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

DWN

DCA

CHK

SEW

D

M Q I E L DENOTES ITEMS FURNISHED BY RENTECH. SHIPPED LOOSE. TO BE INSTALLED IN PIPING. C

Q

.uui..Seaed Ony When Signed in Bue Ink

<y^\ - . . 4 / /'s.

u 3 : STEVENE WOPATA;^ = 9 : . 062049436 | C =

' " i J l l i U ^

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

< M ^ EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT *■■ 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

HIGH PIPING PLAN - SHT. 4 A

DESIGN BY: S. WOPATA

DRAWN BY-

D. ALEXANDER CLIENT I.D.

HON00103

CHECKED BY: S. WOPATA

DATE-

5-3-10 SEGA PROJECT NO

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 1 2 A

DRAWING NO.

P112A REV.

0 N \ 2009 \09140 \dwgs \me\09140-P112A dwg 8 /31 /10 12 54pm dalexander

7 4

1.3

<t RO TANK

C_ EL 7 4 6 ' - 2

4 -C45-BA1

C_ EL 715-11

C_ EL. 7 1 4 - 4 1/2"

C_ EL 7 0 9 - 1 3 / 4 " _ i _

f l i

MEZZANINE T.O.C. EL. 7 1 8 - 2 "

C_ EL. 7 1 3 - 7 3 / 4 "

C_ EL. 7 1 2 - 5 "

8 x 4 " CONC. RDCR. C_ EL 7 0 6 ' - 4 "

6 PROCESS DRAIN

8-FP49 (FIRE WATER)

S C A L E I N F E E T

REV.

0

DATE

8-30-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

DWN

DCA

CHK

SEW

D

... Sealed Only When Signed in Blue Ink

i<?> ••%% m". STEVENE,WOPATA-^ = 9 , 1 062.049436 «W C

Mfe- -^/ B

Engineers — Architects — Technicians Design - Construction - Field Service

(913) 681-2881 16041 Foster

P.O. Box 1000 Stilwell, Kansas 66085-1000

Illinois License # 184-000823

mp» EXTERN I L L I N O I S U N I V E R S J T Y

EIU PROJECT ** 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPING SECTIONS

DESIGN BY: S. WOPATA

DRAWN BY: D. ALEXANDER

CLIENT I.D. HON00103

CHECKED BY: S. WOPATA

DATE: 7-13-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P 1 2 5

DRAWING NO.

rlcO REV.

o N: \2009\09140\dwgs\me\09140-P125.dwg 8 /31 /10 12:38pm dalexander

J

COL. ROW 1 WALL OPENINGS ELEVATION LOOKING EAST 4 0 4 8 12

5 S C A L E I N F E E T

D C B

ACCOUSTICALLY LINED 90 DEGREE FAN DISCHARGE ELBOW SEE DWG. HV101 FOR LOCATION

11-0"

1 A

13"0 WALL OPENING FOR 10-S91-BA1 SEE DWG. A525 DETAIL A2 AND A4

A •CONVEYOR NO. 8 OPENING •SEE DWG. S274 FOR STEEL LOCATION

/(FIELD DETERMINE FINAL I WALL OPENING SIZE f AND LOCATION) VSEE DWG. A525 DETAIL A51

LAND C5.

1'-5 3/A 1'-6"

<t EL 737'-0"

6"0 WALL OPENING

►FOR FLOOR DRAIN VENT

ISEE DWG. A525 DETAIL A2 AND A4

A

^ \ :CONVEYOR NO. 9 OPENING SSEE DWG. S274 TOR STEEL LOCATION VFIELD DETERMINE FINAL (WALL OPENING SIZE >AND LOCATION) SEE DWG VA525 DETAIL A5 AND C5

A

EXHAUST DUCT SEE DWG. S274 FOR LOCATION

OPENING

■ 6"0 WALL \OPENING

FOR FLOOR >DRAIN VENT SEE DWG. A525

TAIL A2 AND

DOOR OPENING SEE DWG. S274 FOR DETAIL

COL ROW 1 WALL OPENINGS ELEVATION LOOKING EAST

S C A L E I N F E E T

3

p OPENING FOR ASH CONVEYOR IN STEM WALL SEE DWG. S274 FOR LOCATION

REV. 0 1

DATE 10-7-10 10-29-10

DESCRIPTION ISSUED FOR CONSTRUCTION REVISED

DWN DCA DCA

CHK SEW SEW

NOTES:

1. ELECTRICAL CONTRACTOR WILL FIELD LOCATE PENETRATIONS IN WEST WALL.

Honeywell Sealed Only When Signed in Blue

a> Qeaa ® v»>/

Engineers — Arch i tec ts — Technicians Design — Const ruc t ion — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

<m^ EASTERN I L L I N O I S U N I V E R S I T Y

PROJECT «: 10-4

iASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

COL ROW 1 WALL OPENINGS

ELEVATION LOOKING EAST

DESIGN BY: C. WARD

DRAWN BY: P. ALEXANDER

CLIENT I.D. HONOO103

CADD FILE NAME: 091 40—P1 3 0

DRAWING NO.

CHECKED BY: C. WARD

DATE! 9 - 1 5 - 1 0

SEGA PROJECT NO. 090140

P130 REV.

1 \ i~t r \ r \ r \ \ r \ n i A r \ \ / i / - i r\ i i~t. o *">..

7 4 3 2 1

RENEWABLE ENERGY CENTER PIPE SUPPORT LOCATIONS T.O.C. EL. 703-6" 8 4 0 8 16

S C A L E I N F E E T

REV. DATE

6-29-10

5-17-10

DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink

i °i/ ' y \ / " 062-049436 ' \ I •' REGISTERED '• | l i ( \ PROFESSIONAL : * = \ ■-. ENGINEER .■' I \ ^ ,

V ^ ' ^ - V I V N ^ E X P

- D A T E 11-30-2011

">o,.. OF I V '* 2L.U5*'

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^ik EASTERN 11L I N O LS u N I V !■ R S 1 T Y

EIU PROJECT * 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT LOCATION

DESIGN BY: C. WARD

DRAWN BY: C. HAYTON

CLIENT I.D. HONOO103

CHECKED BY: C. WARD

DATE: 6-22-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P 1 5 0

DRAWING NO.

P150 REV.

N \ 2009 \09140 \dwgs \me \09140-P150 dwg 8/18 /10 11 24am chayton

7 2

PIPE SUPPORT LOCATIONS T.O.C. EL. 703-6"

Z 16

S C A L E I N F E E T

FW28-2 FW29-40 FW28-3

BOILER FEED PUMP AREA PIPE SUPPORT LOCATIONS

16

S C A L E I N F E E T

REV.

0

DATE 8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

DWN

DCA

CHK

SEW

1 ! ' » » , « . . *

Sealed Only When Signed in Blue Ink

/£/' *%" es W! STEVEN E. WOPATA : m = S < & \ 062.049438 ; JgJ =

\<&S :i#V

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

EIU PROJECT n= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT LOCATION

BOILER FEEDWATER DESIGN BY:

C. WARD DRAWN BY:

C. HAYTON CLIENT I.D.

HON00103

CHECKED BY: C. WARD

DATE: 7-1-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P 1 5 1

DRAWING NO.

P151 REV.

0 N:\2009\09140\dwgs\me\09140-P151.dwg 8 /18 /10 11:25am chayton

7 4 3

RENEWABLE ENERGY CENTER PIPE SUPPORT LOCATIONS T.O.C. EL. 703-6"

S C A L E I N F E E T

REV. DATE

8-17-10

I DESCRIPTION ISSUED FOR CONSTRUCTION

DWN

DCA

CHK

SEW

/ i_

Sealed Only When Signed in Blue Ink

m' STEVEN E. WOP ATA: m = Q ; 062.049436 ; £ J =

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

EASTEJ ILLINOIS U N I V E R S I T Y

EIU PROJECT n* 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT LOCATION CONDENSATE SYSTEM

DESIGN BY: C. WARD

DRAWN BY: C. HAYTON

CLIENT I.D. HONOO103

CHECKED BY: C. WARD

DATE: 7-1-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P 1 5 2

DRAWING NO.

P152 REV.

0 N: \2009\09140\dwgs\me\09140-P152.dwg 8 /18 /10 11:27am chayton

7 4

1.3

RENEWABLE ENERGY CENTER PIPE SUPPORT LOCATIONS T.O.C. EL 703-6"

8

S C A L E I N F E E T

REV. DATE

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

DWN

DCA

CHK SEW

D

C

!Uj)/!K!":jvA^f(Dl

Sealed Only When Signed in Blue Ink

i gfsfiVCN'E WOPATA; m = ^ (/ $ Wi 062.049436 ;™ Z |

' / / A v ' V O ^ J

" " / * I I I I I I I ^ N

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^ M ^ EASTERN LUJLNOlS U N I V E R S I T Y

EIU PROJECT 11= 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT LOCATION

NATURAL GAS A

DESIGN BY: C. WARD

DRAWN BY: C. HAYTON

CLIENT I.D. HON00103

CHECKED BY: C. WARD

DATE: 7-1-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 0 9 1 4 0 - P 1 5 3

DRAWING NO.

P153 REV.

0 N: \2009\09140\dwgs\me\09140-P153.dwg 8 /18 /10 11:27am chayton

7 4 1

PIPE SUPPORT LOCATIONS BELOW BOILERS NO. 3 & 4 PLATEORM TOC EL 703-6" 8 4 0 8 16

S C A L E I N F E E T

REV.

0 DATE

8-19-10

DESCRIPTION

ISSUED FOR CONSTUCTION

DWN

DCA

CHK

SEW

D

C

a

«**'

Sealed Only When Signed in Blue Ink ^iiiiiimir//,,,

"'*/,.

/£ V\ # 062-049436 % l REGISTERED ! | * PROFESSIONAL * J I ENGINEER I %ty J?/

'""/, PF \\&y EXP. DATE 11-30-2011 '" 'MIIIIIIIHWW"

B

Engineers — Architects - Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

<#y EASTERN IJLLIM.QJS UN I V E R S ] ! Y

EIU PROJECT #: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT LOCATIONS

BELOW BOILERS NO. 3 & 4 PLATFORM A

DESIGN BY: C. WARD

DRAWN BY: D. ALEXANDER

CLIENT I D HONOO103

CHECKED BY: C. WARD

DATE: 7-12-10

SEGA PROJECT NO 090140

CADD FILE NAME: 0 9 1 4 0 - P 1 5 4

DRAWING NO

P154 REV

0 N \2009 \09140 \dwgs \me \09140 -P154dwg 8 / 2 3 / 1 0 9 06am dalexander

7 4

PIPE SUPPORT LOCATIONS SOOT BLOWING PIPE T.O.C. EL. 703-6" 8 4 0 8 16

S C A L E I N F E E T

1 REV. DATE

8-19-10 DESCRIPTION ISSUED FOR CONSTRUCTION

DWN

DCA

CHK

SEW

D

C

Mi Q#

Sealed Only When Signed in Blue Ink

4^3X = :' 062-049436 ': \

REGISTERED '• I PROFESSIONAL : * 1

ENGINEER / I 1\ %w V5\-

^ O F ^ EXP

- °A T E 1 1

-3 0

-2 0 1 1

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^mp» EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT #: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT LOCATIONS

SOOT BLOWING PIPE A

DESIGN BY: C. WARD

DRAWN BY: D. ALEXANDER

CLIENT I.D. H0N00103

CHECKED BY: C. WARD

DATE: 7- ■30-10

SEGA PROJECT NO. 090140

CADD FILE NAME: 09140-P154A DRAWING NO.

P154A REV.

0 N:\2009\09140\dwgs\me\09140-P154A.dwg 8/23/10 9:16am dalexander

7

PIPE HANGER SKETCH S01-1

5

PIPE HANGER SKETCH S01-2

4 3

PIPE HANGER SKETCH S01-3

BOILER 1 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL 7 4 2 - 6 '

STRUCTURAL STEEL W12x40 J A

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY TYPE

212128

a>^ ^ a • ENGINEERING

STILWELL, KANSAS

S01-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL:398 LBS, HL354 LBS, SR:190 LBS, TM: 0.229 EYE NUT I ^ T l N C " THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS

REF. DWGS.

3.

TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S01-1

SHEET 1 OF 1

REV. n NO. U

BOILER 1 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09 -140

CONTRACT_NO

T.O.S. EL. 7 4 1 - 6 " NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 359 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

_5LEL 7 3 0 - 3 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

GOx^ s% a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 1 - 2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2" UNC W/ HEX NUTS" TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S01-2

SHEET 1 OF 1

REV. A NO. I

BOILER 1 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 "

NOTE: ALL COMPONENTS SHALL BE LOAD GROUP 3

NOTES: SEE DRAWING P150 FOR LOCATIONS.

REV NO.

ITEM NO. QTY TYPE

213228

a>^ ^ a • ENGINEERING

STILWELL, KANSAS

S01-3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL1068 LBS, HL943 LBS, SR:190 LBS, TM: 0.659 EYE NUT 5/8"~UNC" THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS

REF. DWGS.

3.

TEMP. 366 F

REV. DATE BY CHK.

0 6-9-10

CMW SEW

SPEC-AB1

1

INSUL. THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S01-3

SHEET 1 OF 1

REV. NO. 0

PIPE HANGER SKETCH S 0 2 - 2 PIPE HANGER SKETCH S 0 2 - 3 PIPE HANGER SKETCH S03-1

BOILER 2 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 '

A NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 344 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 3 0 - 3 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>^ ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 2 - 2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S02-2

SHEET 1 OF 1

REV. n NO. U

BOILER 2 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

REV NO.

ITEM NO. QTY TYPE

213328

GOx^ s% a • ENGINEERING

STILWELL, KANSAS

S 0 2 - 3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL927 LBS, HL861 LBS, SR:95.2 LBS, TM: 0.691 EYE NUT 5/8"~UNC" THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS

REF. DWGS.

3.

TEMP. 366 F

REV. DATE BY CHK.

0 6-9-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S02-3

SHEET 1 OF 1

REV. n NO. U

BOILER 3 MAIN STEAM Client ID

Job No.

Contract No.

09-140

T<- q_ EL 7 0 6 - 6 "

NOTES: SEE DRAWING P150 FOR LOCATIONS.

4 PIPE

ADD GRAPHITE GREASE TO ALLOW PLATE TO

4 ) SLIDE OVER SUPPORT

REV NO.

ITEM NO. QTY TYPE

212128

a>^ Seg a • ENGINEERING

STILWELL, KANSAS

S03-1

MATERIAL DESCRIPTION CS SQUARE TUBING - 2 1/2"x2 1/2"x1/4" (LENGTH AS REQUIRED) PLATE - 6"x6"x3/8" PLATE - 6"x1"x1/4" LISEGA SPRING CAN - CL323 LBS, HL359 LBS, SR:19Q LBS, TM: - .20 HILTI KWIK BOLT 3 EXPANSION. 3/8"0. 304SS. MIN. EMBEDMENT OF 3"

REF. DWGS.

3.

TEMP. 550 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AC1

1

INSUL. THK. 3.5" PIPE SIZE 4 '

PIPING SYSTEM HGR. NO. S03-1

SHEET 1 OF 1

REV. NO. 0

2

PIPE HANGER SKETCH S02-1

BOILER 2 MAIN STEAM Client ID EIU

Job No. 09-140

Contract No.

T.O.S. EL. 7 4 2 ' - 6 "

JSTT^UCTURAL STEEL W12x40 J / \

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY TYPE

212128

a>^ ^ a • ENGINEERING

STILWELL, KANSAS

S02-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL386 LBS, HL343 LBS, SR:190 LBS, TM: 0.226 EYE NUT ^/2'

rTmC

THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS

REF. DWGS.

3.

TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL. THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S02-1

SHEET 1 OF 1

REV. NO. 0

PIPE HANGER SKETCH S 0 3 - 2

BOILER 3 MAIN STEAM Client ID EIU

Job No. 09-140

Contract No.

T.O.S. EL. 7 2 2 - 0 "

ISC PIPE SUPPORT STEEL

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY TYPE

212228

a>^ ^ a • ENGINEERING

STILWELL, KANSAS

S 0 3 - 2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL388 LBS, HL361 LBS, SR:95.2 LBS, TM: 0.287 EYE NUT ^/2'

rTmC

THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS

REF. DWGS.

3.

TEMP. 550 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AC1

1

INSUL. THK. 3.5" PIPE SIZE 4 "

PIPING SYSTEM HGR. NO. S03-2

SHEET 1 OF 1

REV. NO.

REV. DATE

6-29-10

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,

/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \

■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #

W - ->°> EXP. DATE 11-30-2011

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^Wk JLJJIVJ I XJ1. \ .L .N

N O I S u N I V !■ K

EIU PROJECT «: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

STEAM PIPING DESIGN BY:

S. WOPATA DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

6-24-10 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 0

DRAWING NO.

P160 REV.

1 N \ 2009 \09140 \dwgs \me \09140-P160 dwg 8/18 /10 11 16am dalexander

7

PIPE HANGER SKETCH S 0 3 - 3

BOILER 3 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 4 2 - 6

ROOF TRUSS T1 \ A

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY TYPE

212328

a>r-: m a • ENGINEERING

STILWELL, KANSAS

S03-3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL356 LBS, HL327 LBS, SR:47.6 LBS EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC' THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS THREADED ROD 1/2" UNC FIELD VERIFY LENGHTS

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S03-3 SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S04-1

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 ' NOTES: SEE DRAWING P150 FOR LOCATIONS.

Ir^D

NOTE: LOAD = 173 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 2 8 - 1

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: m a • ENGINEERING

OVERLAND PARK, KANSAS

S04-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1 / 2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-1 SHEET 1 OF 1

REV. n NO. U

5

PIPE HANGER SKETCH S 0 3 - 4

BOILER 3 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

NOTES: LOOKING WEST TOWARD TURBINE

4" PIPE

T.O.C. 7 0 3 - 6 "

NOTES: SEE DRAWING P150 FOR LOCATIONS.

ADD GRAPHITE GREASE TO ALLOW PLATE TO

4 ) SLIDE OVER SUPPORT

REV NO.

ITEM NO. QTY TYPE

212128 212128

a>r-: m a • ENGINEERING

STILWELL, KANSAS

S03-4

MATERIAL DESCRIPTION CS SQUARE TUBING - 2 1/2"x2 1/2"x1/4" (LENGTH AS REQUIRED) PLATE - 6"x6"x3/8" LISEGA SPRING CAN - CL395 LBS, HL394 LBS, SR:190 LBS LISEGA SPRING CAN - CL467 LBS, HL468 LBS, SR:190 LBS HILTI KWIK BOLT 3 EXPANSION 3/8"0, 304SS, MIN. EMBEDMENT OF 3" PLATE 2 1/2" x 2 1/2" x 1/4" PLATE TO CAP TUBING" 1/4" HOLE DRILLED TO ALLOW PRESSURE TO ESCAPE AFTER WELDING

REF. DWGS. TEMP. 550 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AC1

1

INSUL THK. 3.5' PIPE SIZE 4 "

PIPING SYSTEM HGR. NO. S03-4 SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 0 4 - 2

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6

STRUCTURAL STEEL W12x40

NOTES: SEE DRAWING P150 FOR LOCATIONS.

TUT

Ir^D

NOTE: LOAD = 515 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 2 8 - 3 '

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: m a • ENGINEERING

OVERLAND PARK, KANSAS

S04-2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-2 SHEET 1 OF 1

REV. n NO. U

4 3 2

PIPE HANGER SKETCH S 0 3 - 5

BOILER 3 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

REV NO.

ITEM NO. QTY TYPE

213328

a>r-: a • ENGINEERING

STILWELL, KANSAS

S03-5

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL1085 LBS, HL1037 LBS, SR:95.2 LBS, TM: 0.497 EYE NUT 5/8*~UNC" THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC" THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-9-10

CMW SEW

SPEC-AB1

1

INSUL. THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S03-5 SHEET 1 OF 1

REV. A NO. I

PIPE HANGER SKETCH S 0 4 - 3 PIPE HANGER SKETCH S 0 4 - 4

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6

STRUCTURAL STEEL W12x40

NOTES: SEE DRAWING P150 FOR LOCATIONS.

t—<D

NOTE: LOAD = 430 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 3 3 ' - 9 '

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: a • ENGINEERING

OVERLAND PARK, KANSAS

S04-3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL. THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-3 SHEET 1 OF 1

REV. n NO. U

BOILER 4 MAIN STEAM Client ID EIU

Job No. 09-140

Contract No.

T.O.S. EL. 7 4 2 - 6

A NOTES: SEE DRAWING P150 FOR LOCATIONS.

i—<D

NOTE: LOAD = 270 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

Q_EL 7 3 3 - 1 0 '

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: a • ENGINEERING

OVERLAND PARK, KANSAS

S04-4

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL. THK. 2" PIPE SIZE 6'

PIPING SYSTEM HGR. NO. S04-4 SHEET 1 OF 1

REV. n NO. U

REV. DATE

6-29-10

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,

/ A y ' ''■■^y\ / £ y '■??% f / 0 6 2 - 0 4 9 4 3 6 \ \

■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #

W - ->°> EXP. DATE 11-30-2011

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^Wk JLJJIVJ I XJ1.\.L.N

N O I S U N I V !■ K

EIU PROJECT «: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

STEAM PIPING DESIGN BY:

S. WOPATA DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

6-24-10 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 1

DRAWING NO.

P161 REV.

1 N \ 2009 \09140 \dwgs \me\09140-P161 dwg 8/18 /10 11 16am dalexander

7

PIPE HANGER SKETCH S 0 4 - 5

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 "

STRUCTURAL STEEL W10x26 ) / \

NOTES: SEE DRAWING P150 FOR LOCATIONS.

§ ©

NOTE: LOAD = 297 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 3 4 - 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

G>T-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 4 - 5

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. T PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-5

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 0 4 - 9

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 "

STRUCTURAL STEEL W10x26

NOTES: SEE DRAWING P150

A FOR LOCATIONS.

§ ©

NOTE: LOAD = 315 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 3 4 - 6

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

G>T-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 4 - 9

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. T PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-9

SHEET 1 OF 1

REV. n NO. U

5

PIPE HANGER SKETCH S 0 4 - 6

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 4 2 - 6 '

A NOTES: SEE DRAWING P150 FOR LOCATIONS.

TUT

ir^D

NOTE: LOAD = 291 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 3 4 - 1

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

G>T-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 4 - 6

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX "NUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2' PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-6

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S04-10

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 4 2 ' - 6 "

A NOTES: SEE DRAWING P150 FOR LOCATIONS.

TUT

ir^D

NOTE: LOAD = 506 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 3 4 - 8

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

G>T-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S04-10

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX "NUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2' PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-10

SHEET 1 OF 1

REV. n NO. U

4 3

PIPE HANGER SKETCH S 0 4 - 7

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6

STRUCTURAL STEEL W10x26

NOTES: SEE DRAWING P150

A FOR LOCATIONS.

t—<D

NOTE: LOAD = 286 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 3 4 - 3

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: 3% a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 4 - 7

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX'NUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-7

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S04-11

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL 7 4 2 - 6

STRUCTURAL STEEL W10x26

NOTES: SEE DRAWING P150

) A FOR LOCATIONS.

I—<D

NOTE: LOAD = 231 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 3 4 - 1 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

OChri ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S04-11

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2' PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-11

SHEET 1 OF 1

REV. n NO. U

2

PIPE HANGER SKETCH S 0 4 - 8

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 "

A NOTES: SEE DRAWING P150 FOR LOCATIONS.

i—<D

NOTE: LOAD = 306 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 3 4 - 5

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

Q>r-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 4 - 8

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-8

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S04-12

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

NOTES: SEE DRAWING P150 FOR LOCATIONS.

Jr-3 §_ EL. 7 3 5 - 1

NOTE: ALL COMPONENTS SHALL BE LOAD GROUP 3

REV NO.

ITEM NO. QTY TYPE

213128

GO Se9 a • ENGINEERING

OVERLAND PARK, KANSAS

S04-12

MATERIAL DESCRIPTION WELD ON CLEVIS EYE NUT VAR.SPRING HANGER CL938 LBS, HL858 LBS, SR: 381 LBS, TM: 0.211 EYE NUT 5/8" UNC THREE BOLT CLAMP (8" STD PIPE SIZE) HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC - AB1

1

INSUL THK. 2 PIPE SIZE 8"

PIPING SYSTEM HGR. NO. S04-12

SHEET 1 OF 1

REV. n NO. U

REV. DATE

6-29-10

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,

/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \

■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #

W - ->°> EXP. DATE 11-30-2011

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^Wk JLJJIVJ I XJ1.\.L.N

N O I S u N I V !■ K

EIU PROJECT «: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

STEAM PIPING DESIGN BY:

S. WOPATA DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

6 - 2 4 - 1 0 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 2

DRAWING NO.

P162 REV.

1 N \ 2009 \09140 \dwgs \me \09140-P162 dwg 8/18 /10 11 16am dalexander

7

PIPE HANGER SKETCH S04-13

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 4 2 - 6

A NOTES: SEE DRAWING P150 FOR LOCATIONS.

s—<3>

q_ EL 7 3 0 - 6

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY TYPE

212228

CD Se9 a • ENGINEERING

OVERLAND PARK, KANSAS

S04-13

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL420 LBS, HL381 LBS, SR:95.2 LBS, TM: 0.409 EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. T PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-13

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 0 5 - 3

TURBINE EXHAUST Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 4 2 - 6

Z \ STRUCTURAL STEEL WISXSO

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP

REV NO.

ITEM NO. QTY TYPE

213228

CD Se9 a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 5 - 3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL759 LBS, HL667 LBS, SR:190 LBS, TM: 0.483 EYE NUT 5/8" UNC THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGTHS THREADED ROD 5/8" UNC FIELD VERIFY LENGTHS

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. T PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S05-3

SHEET 1 OF 1

REV. n NO. U

5

PIPE HANGER SKETCH S04-14

BOILER 4 MAIN STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 1 - 6 NOTES: SEE DRAWING P150 FOR LOCATIONS.

s—<3L

$_ EL 7 3 0 - 6

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP

REV NO.

ITEM NO. QTY TYPE

213228

GO Se9 a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 4 - 1 4

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL809 LBS, HL728 LBS, SR:190 LBS, TM: 0.426 EYE NUT 5/8" UNC THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS THREADED ROD 5/8" UNC FIELD VERIFY LENGHTS

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2' PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S04-14

SHEET 1 OF 1

REV. A NO. I

PIPE HANGER SKETCH S 0 5 - 4

TURBINE EXHAUST Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 2 2 - 0 ' NOTES: SEE DRAWING P150 FOR LOCATIONS.

TUT

ir^D

NOTE: LOAD = 920 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

q_ EL. 7 1 8 - 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

G>T-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 5 - 4

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5/8 UNC W/ HEXHUTS" THREE BOLT PIPE CLAMP (MATCH TO PIPE SIZE)

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2' PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S05-4

SHEET 1 OF 1

REV. n NO. U

4 3

PIPE HANGER SKETCH S05-1

TURBINE EXHAUST Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL 7 4 2 - 6

A NOTES: SEE DRAWING P150 FOR LOCATIONS.

I—<D

NOTE: LOAD = 123 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 3 0 - 0

REV NO.

ITEM NO. QTY FIG. NO./

OODE NO.

OChri ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S05-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2' PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S05-1

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 0 5 - 5

TURBINE EXHAUST Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6

A ( ROOF TRUSS T1 J

NOTES: SEE DRAWING P150 FOR LOCATIONS.

t—<D

NOTE: LOAD = 477 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 1 8 - 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: 3% a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 5 - 5

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX'NUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S05-5

SHEET 1 OF 1

REV. n NO. U

2

PIPE HANGER SKETCH S 0 5 - 2

TURBINE EXHAUST Client ID

Job No.

Contract No.

EIU

09 -140

NOTES: SEE DRAWING P150 FOR LOCATIONS.

iT^ $_ EL 7 3 0 - 0

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY TYPE

211228

GO Se9 a • ENGINEERING

OVERLAND PARK, KANSAS

S 0 5 - 2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL214 LBS, HL198 LBS, SR:47.6 LBS, TM: 0.337 EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC - AB1 INSUL. THK. 2' PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S05-2

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 0 5 - 6

TURBINE EXHAUST Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL 7 2 2 - 0

MISC PIPE SUPPORT STEEL ) /K

NOTES: SEE DRAWING P150 FOR LOCATIONS.

Sr^D

NOTE: LOAD = 335 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 1 8 - 0

REV NO.

ITEM NO. QTY TYPE

GChri S^e a • ENGINEERING

STILWELL, KANSAS

S 0 5 - 6

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS.

2. 3. 4.

TEMP. 366 F

REV. DATE BY CHK.

0 6-9-10

CMW SEW

SPEC - AB1

1

INSUL. THK. 2' PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S05-6

SHEET 1 OF 1

REV. A NO. I

REV. DATE

6-29-10

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,

/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \

■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #

<9Ll^ EXP. DATE 11-30-2011

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^Wk JLJJIVJ I XJ1. \ .L .N

N O I S u N I V !■ K

EIU PROJECT «: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

STEAM PIPING DESIGN BY:

S. WOPATA DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

6 - 2 4 - 1 0 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 3

DRAWING NO.

P163 REV.

1 N \ 2009 \09140 \dwgs \me \09140-P163 dwg 8/18 /10 11 16am dalexander

7

PIPE HANGER SKETCH S 0 5 - 7

TURBINE EXHAUST Client ID

Job No.

Contract No.

EIU

09-140

NOTES: SEE DRAWING P150 FOR LOCATIONS.

q_ EL. 7 1 8 - 0

XD N l

A

MONORAIL STRUCTURE

REV NO.

ITEM NO. QTY TYPE

292128

acne ^ a • ENGINEERING

STILWELL, KANSAS

S05-7

MATERIAL DESCRIPTION 3" OS PIPE - LENGTH AS REQUIRED PLATE - 6"x6"x3/8" PLATE - 6"x1"x1/4" LISEGA SPRING CAN - CL303 LBS, HL275 LBS, SR:190 LBS 3/8" BOLT, 2 1/2" LONG W/ WASHERS AND NUT I/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING

REF. DWGS.

2.

TEMP. 450 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC - AB1 INSUL THK. 2" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S05-7

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 0 6 - 2

STEAM HEADER Client ID

Job No.

Contract No.

EIU

09-140

W14 (EXISTING)

W14 (EXISTING)

NOTES: SEE DRAWING P150 FOR LOCATIONS.

REV] NO

ITEM NO. QTY TYPE

G > d §pg a • ENGINEERING

STILWELL, KANSAS

S06-2

MATERIAL DESCRIPTION OS SQUARE TUBING - 4 1/2"x 4 1/2"x1/4" - LENGTH AS REQUIRED 3" CS PIPE (LENGTH AS REQUIRED) PLATE - 4 1/2"x4 1/2"x3/8" ANGLE - 2"x2"x1/4", 4" LONG. TRIM TO LEG LENGTHS SPECIFIED PLATE - 4 1/2" x 4 1/2" x 1/4" PLATE TO CAP ENDS OF TUBING 1/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING PLATE - 4 1/2" x 4 1/2" x 1/4" PLATE TO CAP ENDS OF TUBING

REF. DWGS.

2.

4.

TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC - AB1 INSUL. THK. 2.5':

PIPE SIZE 12"

PIPING SYSTEM HGR. NO. S06-2

SHEET 1 OF 1

REV. n NO. U

5

PIPE HANGER SKETCH S 0 5 - 8

TURBINE EXHAUST Client ID

Job No.

Contract No.

EIU

09-140

NOTES: SEE DRAWING P150 FOR LOCATIONS.

({_ EL. 7 1 8 - 0 "

MONORAIL STRUCTURE

REV NO.

ITEM NO. QTY TYPE

292128

OChH ^ a • ENGINEERING

STILWELL, KANSAS

S05-8

MATERIAL DESCRIPTION 3" OS PIPE - LENGTH AS REQUIRED PLATE - 6"x6"x3/8" PLATE - 6"x1"x1/4" LISEGA SPRING CAN - CL339 LBS, HL277 LBS, SR:190 LBS 3/8" BOLT, 2 1/2" LONG W/ WASHERS AND NUT 1/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING

REF. DWGS.

2.

4.

TEMP. 4 5 0 F

REV. DATE BY CHK.

0 6-9-10

CMW SEW

SPEC - AB1

1

INSUL. THK. 2' PIPE SIZE 6'

PIPING SYSTEM HGR. NO. S05-8

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S07-1

STEAM HEADER TO CAMPUS Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 " NOTES: SEE DRAWING P150 FOR LOCATIONS.

Jr^ <$_ EL 7 3 0 - 0

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 5

REV NO.

ITEM NO. QTY TYPE

215228

OChH ^ a • ENGINEERING

STILWELL, KANSAS

S07-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL2388 LBS, HL2186 LBS, SR: 761 LBS TM: 0.247 EYE NUT 1 UNC THREE BOLT CLAMP

UNC HEXAGONAL NUT 1 THREADED ROD 1" UNC FIELD VERIFY LENGHTS THREADED ROD 1" UNC FIELD VERIFY LENGHTS

REF. DWGS.

2.

4.

TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC - AB1

1

INSUL. THK. 2.5' PIPE SIZE 12"

PIPING SYSTEM HGR. NO. S07-1

SHEET 1 OF 1

REV. n NO. U

4 3

PIPE HANGER SKETCH S 0 5 - 9

TURBINE EXHAUST Client ID

Job No.

Contract No.

EIU

09-140

LOOKING EAST TOWARD TURBINE

6" PIPE

1 - 0 " 1 - 0 "

TYP

TYP

NOTES: SEE DRAWING P150 FOR LOCATIONS.

10x6 REDUCER

T.O.C. 7 0 3 - 6

o cn o

A A A A

REV NO.

ITEM NO. QTY TYPE

291128 291128

G>T-: 3% a • ENGINEERING

STILWELL, KANSAS

S05-9

MATERIAL DESCRIPTION CS SQUARE TUBING - 2 1/2"x2 1/2"x1/4" - LENGTH AS REQUIRED PLATE - 6"x6"x3/8" LISEGA SPRING CAN - CL174 LBS, HL173 LBS, SR:95.2 LBS LISEGA SPRING CAN - CL191 LBS HL190 LBS, SR:95.2 LBS HILTI KWIK BOLT 3 EXPANSION, 1/4"0, 304SS! EMBEDMENT OF 3 1/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING PLATE - 2 1/2" x 2 1/2" x 1/4" PLATE TO CAP ENDS OF TUBING

REF. DWGS.

2. 3. 4.

TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2" PIPE SIZE 10"

PIPING SYSTEM HGR. NO. S05-9

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 0 7 - 2

STEAM HEADER TO CAMPUS Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6

/ \ ( STRUCTURAL STEEL W12x30

NOTES: SEE DRAWING P150 FOR LOCATIONS.

t—<D

NOTE: LOAD = 2119 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4

q_ EL. 7 2 0 - 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S07-2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT

THREADED ROD 3/4 UNC W/ HEX NUTS TURNBUCKLE

TIE ROD 3/4 UNC W/ HEX "NUTS' THREE BOLT PIPE CLAMP (MATCH TO PIPE SIZE)

REF. DWGS. EMP. 366 F

REV. DATE BY

CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2.5' PIPE SIZE 12"

PIPING SYSTEM HGR. NO. S07-2

SHEET 1 OF 1

REV. n NO. U

2

PIPE HANGER SKETCH S06-1

STEAM HEADER Client ID

Job No.

Contract No.

EIU

09 -140

3 - 9 1 - 6

NOTES: SEE DRAWING P150 FOR LOCATIONS.

12" PIPE

W14 (EXISTING)

W14 (EXISTING)

■—► A

W14 (EXISTING)

SECTION A - A

REV NO.

ITEM NO. QTY TYPE

GChri S^e a • ENGINEERING

STILWELL, KANSAS

S06-1

MATERIAL DESCRIPTION CS SQUARE TUBING (ASTM A500 GR. 0 - 4 1/2"x4 1/2"x1/4" - LENGTH AS REQUIRED PLATE - 6"x6"x1/2" I/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING PLATE - 4 1/2" x 4 1/2" x 1/4" PLATE TO CAP ENDS OF TUBING 1/4" VENT HOLE DRILLED TO RELEASE PRESSURE DUE TO WELDING

REF. DWGS.

2. 3. 4.

TEMP. 366 F

REV. DATE BY CHK.

0 6-9-10

CMW SEW

SPEC - AB1

1

INSUL. THK. 2.5'1

PIPE SIZE 12"

PIPING SYSTEM HGR. NO. S06-1

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 0 7 - 3

STEAM HEADER TO CAMPUS Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL 7 4 2 - 6

/ \ (STRUCTURAL STEEL W8x10

NOTES: SEE DRAWING P150 FOR LOCATIONS.

Sr^D

NOTE: LOAD = 1340 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4

q_ EL. 7 2 0 - 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

O C h d S g a • ENGINEERING

OVERLAND PARK, KANSAS

S07-3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT

THREADED ROD 3/4 UNC W/ HEX NUTS TURNBUCKLE

TIE ROD 3/4 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP (MATCH TO PIPE SIZE)

REF. DWGS. IMP. 366 F

REV. DATE BY

CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL. THK. 2.5'1

PIPE SIZE 12"

PIPING SYSTEM HGR. NO. S07-3

SHEET 1 OF 1

REV. n NO. U

REV. DATE

6-29-10

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,

/ A y ' ''■■^y\ / £ y '■??% f / 0 6 2 - 0 4 9 4 3 6 \ \

■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #

<9Ll^ EXP. DATE 11-30-2011

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^Wk JLJJIVJ I XJ1. \ .L .N

N O I S U N I V !■ K

EIU PROJECT «: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

STEAM PIPING DESIGN BY:

S. WOPATA DRAWN BY:

C. W A R D CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

6 - 2 4 - 1 0 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 4

DRAWING NO.

P164 REV.

1 N \ 2009 \09140 \dwgs \me \09140-P164 dwg 8/18 /10 11 16am dalexander

7

PIPE HANGER SKETCH S 0 7 - 4

STEAM HEADER TO CAMPUS Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 4 2 - 6

C ROOF TRUSS T1 J /K

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4

REV NO.

ITEM NO. QTY TYPE

214228

G>^-: S ^ a • ENGINEERING

STILWELL, KANSAS

S 0 7 - 4

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL1712 LBS, HL1509 LBS, SR: 381 LBS TM: 0.534 EYE NUT 3/4" UNC THREE BOLT CLAMP HEXAGONAL NUT 3/4" UNC THREADED ROD 3/4" UNC FIELD VERIFY LENGTHS THREADED ROD 3/4" UNC FIELD VERIFY LENGTHS

REF. DWGS.

2.

4.

TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. 2.5'1

PIPE SIZE 12"

PIPING SYSTEM HGR. NO. S07-4

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 0 8 - 4

DA STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 4 2 - 6

( STRUCTURAL! STEEL W10x22 ) A

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY TYPE

212128

a>r-: ^ a • ENGINEERING

STILWELL, KANSAS

S 0 8 - 4

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL422 LBS, HL402 LBS, SR:190 LBS, TM:.103 EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS

REF. DWGS.

2.

4.

TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AM INSUL. THK. T PIPE SIZE 3"

PIPING SYSTEM HGR. NO. S08-4 SHEET 1 OF 1

REV. n NO. U

5

PIPE HANGER SKETCH S08-1

DA STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 "

( STRUCTURAL STEEL W8x10 J A

NOTES: SEE DRAWING P150 FOR LOCATIONS.

^ - ^

<$_ EL 7 3 2 - 1

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

NOTE: ALL COMPONENTS SHALL BE LOAD GROUP 2

f!EV JO.

ITEM NO. QTY TYPE

212228

OChri ^ a • ENGINEERING

STILWELL, KANSAS

S08-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL320 LBS, HL291 LBS, SR:95.2 LBS, TM: 0.314 EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC - AB1

1

INSUL. THK. 2' PIPE SIZE 3'

PIPING SYSTEM HGR. NO. S08-1

SHEET 1 OF 1

REV. A NO. I

PIPE HANGER SKETCH S10-1

SILENCER Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 "

NOTES: SEE DRAWING P150 FOR LOCATIONS.

Jr^ <$_ EL 7 3 2 - 1

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP D

f!EV JO.

ITEM NO. QTY TYPE

21D229

OChri ^ a • ENGINEERING

STILWELL, KANSAS

S10-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL65.8 LBS, HL60.7 LBS, SR:47.6 LBS, TM:.108 EYE NUT 3/8" UNC THREE BOLT CLAMP HEXAGONAL NUT 3/8" UNC THREADED ROD 3/8" UNC FIELD VERIFY LENGTHS THREADED ROD 3/8" UNC FIELD VERIFY LENGTHS

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC - AB1

1

INSUL. THK. 2' PIPE SIZE 4 '

PIPING SYSTEM HGR. NO. S10-1

SHEET 1 OF 1

REV. A NO. I

4 3

PIPE HANGER SKETCH S 0 8 - 2

DA STEAM Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 ' - 6 "

( STRUCTURAL STEEL W10x26A A NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY TYPE

212128

G>T-: 3% a • ENGINEERING

STILWELL, KANSAS

S 0 8 - 2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL344 LBS, HL322 LBS, SR:190 LBS, TM:.116 EYE NUT 1/2" UNC THREE BOLT CLAMP HEXAGONAL NUT 1/2" UNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS

REF. DWGS.

2. 3. 4.

TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AA1

1

INSUL THK. 2" PIPE SIZE 8"

PIPING SYSTEM HGR. NO. S08-2

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S10-2

SILENCER Client ID

Job No.

Contract No.

EIU

09-140

T.O.S._EL 7 4 2 ' - 6 " NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

REV NO.

ITEM NO. QTY TYPE

213128

G>T-: 3% a • ENGINEERING

STILWELL, KANSAS

S 1 0 - 2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL607 LBS, HL550 LBS, SR: 381 LBS EYE NUT 5/8" UNC THREE BOLT CLAMP HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGTHS THREADED ROD 5/8" UNC FIELD VERIFY LENGTHS

REF. DWGS.

2. 3. 4.

TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2" PIPE SIZE 4 "

PIPING SYSTEM HGR. NO. S10-2

SHEET 1 OF 1

REV. A NO. I

2

PIPE HANGER SKETCH S 0 8 - 3

DA STEAM Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL 7 4 2 - 6

STRUCTURAL STEEL W10x26 ^ A

NOTES: SEE DRAWING P150 FOR LOCATIONS.

fc—<&

$_ EL 7 3 2 - 1

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP

REV NO.

ITEM NO. QTY TYPE

211128

a>r-: S^e a • ENGINEERING

STILWELL, KANSAS

S 0 8 - 3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL260 LBS, HL227 LBS, SR:95.2 LBS, TM: 0.344 EYE NUT 3/8" UNC THREE BOLT CLAMP HEXAGONAL NUT 3/8" UNC THREADED ROD 3/8" UNC FIELD VERIFY LENGTHS THREADED ROD 3/8" UNC FIELD VERIFY LENGTHS

REF. DWGS.

2. 3. 4.

TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC - AB1

1

INSUL. THK. 2' PIPE SIZE 3"

PIPING SYSTEM HGR. NO. S08-3

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S14-1

TURBINE BYPASS Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL. 7 2 2 - 0 ' NOTES: SEE DRAWING P150 FOR LOCATIONS.

MISC PIPE SUPPORT STEEL

I—<D

NOTE: LOAD = 1279 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4

q_ EL. 7 1 6 - 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

GChri S^g a • ENGINEERING

OVERLAND PARK, KANSAS

S14-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 3/4 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 3/4 UNC W/ HEXUUTs' THREE BOLT PIPE CLAMP

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. 2' PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S14-1

SHEET 1 OF 1

REV. A NO. I

REV. DATE

6-29-10

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,

/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \

■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #

<9Ll^ EXP. DATE 11-30-2011

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^Wk JLJJIVJ I XJ1. \ .L .N

N O I S u N I V !■ K

EIU PROJECT «: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

STEAM PIPING DESIGN BY:

S. WOPATA DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

6-24-10 SEGA PROJECT NO.

090140 CADD FILE NAME: 09140-P165 DRAWING NO.

P165 REV.

1 N \ 2009 \09140 \dwgs \me \09140-P165 dwg 8/18 /10 11 16am dalexander

7

PIPE HANGER SKETCH S14-2

TURBINE BYPASS Client ID EIU

Job No. 09-140

Contract No.

T.O.S. EL. 7 4 2 - 6 '

ROOF TRUSS T1 ^ / \

NOTES: SEE DRAWING P 1 5 0 FOR LOCATIONS.

MT^D

NOTE: LOAD = 173 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 1 6 - 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S 1 4 - 2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX "NUTS' THREE BOLT PIPE CLAMP (MATCH TO PIPE SIZE)

REF. DWGS. TEMP. 3 6 6 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL. THK. 2' PIPE SIZE 6 "

PIPING SYSTEM HGR. NO. S14-2

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S41-1

BOILER 2 VENT Client ID EIU

Job No. 09-140

Contract No.

NOTES: SEE DRAWING P150 FOR LOCATIONS.

MT^D

NOTE: LOAD = 660 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

q_ EL. 7 2 8 - 7

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S41-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5 / 8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5 / 8 UNC W/ HEXHUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 3 6 6 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0,: PIPE SIZE 6 "

PIPING SYSTEM HGR. NO. S41-1

SHEET 1 OF 1

REV. A NO. I

5

PIPE HANGER SKETCH S14-3

4 3

PIPE HANGER SKETCH S 1 4 - 4

TURBINE BYPASS Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 2 2 - 0

ISC PIPE SUPPORT STEEL

NOTES: SEE DRAWING P150 FOR LOCATIONS.

a—o

NOTE: LOAD = 339 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 1 6 - 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

Q>T-: §pg a • ENGINEERING

OVERLAND PARK, KANSAS

S14-3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX'NUTS' THREE BOLT PIPE CLAMP (MATCH TO PIPE SIZE)

REF. DWGS. TEMP. 3 6 6 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 2" PIPE SIZE 6 "

PIPING SYSTEM HGR. NO. S14-3

SHEET 1 OF 1

REV. A NO. I

TURBINE BYPASS Client ID

Job No.

Contract No.

EIU

09-140

1 - 0 "

ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3 RE NO

vTTTEr NO 1

QTY TYPE

293218

a>r-: 3% a • ENGINEERING

STILWELL, KANSAS

S 1 4 - 4

MATERIAL DESCRIPTION CS SQUARE TUBING - 2 1/2"x2 1/2"x1/4" - LENGTH AS REQUIRED PLATE - 6"x6"x3/8" PLATE - 6"x1"x1/4" LISEGA SPRING CAN - CL569 LBS HL636 LBS, SR:190 LBS HILTI KWIK BOLT 3 EXPANSION, 3/8"0 , 304SS, I EMBEDMENT OF 3 1/4" HOLE DRILLED IN TUBING PLATE - 2 1/2" x 2 1/2" x 1/4" TO CAP TUBING

REF. DWGS.

2. 3. 4.

TEMP. 5 5 0 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL THK. 3.5' PIPE SIZE 4 "

PIPING SYSTEM HGR. NO. S14-4

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S42-1 PIPE HANGER SKETCH S 4 2 - 2

BOILER 3 VENT Client ID

Job No.

Contract No.

EIU

09-140

NOTE: LOAD = 456 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

NOTES: SEE DRAWING P 1 5 0 FOR LOCATIONS.

q_ EL. 7 2 5 - 9

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

413911

achd S% a • ENGINEERING

OVERLAND PARK, KANSAS

S42-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5 / 8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5 / 8 UNC W/ HEXlJUTS" CLEVIS WITH PIN WELD ON L U G ~ W THK

REF. DWGS. TEMP. 3 6 6 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL THK. 0,: PIPE SIZE 6 "

PIPING SYSTEM HGR. NO. S42-1

SHEET 1 OF 1

REV. A NO. I

BOILER 3 VENT Client ID

Job No.

Contract No.

EIU

09 -140

SEE DRAWING P150 FOR LOCATIONS.

I—<D

NOTE: LOAD = 797 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

q_ EL. 7 3 5 - 9

REV NO.

ITEM NO. QTY FIG. NO./

OODE NO.

OChri ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S 4 2 - 2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5 /8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5 / 8 UNC W/ HEXlJUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 3 6 6 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-B

1

INSUL THK. 0,:

PIPE SIZE 6 "

PIPING SYSTEM HGR. NO. S42-2

SHEET 1 OF 1

REV. n NO. U

2

PIPE HANGER SKETCH S40-1

BOILER 1 VENT Client ID

Job No.

Contract No.

EIU

09 -140

NOTES: SEE DRAWING P150 FOR LOCATIONS.

Sr^D

NOTE: LOAD = 637 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

q_ EL. 7 2 8 - 7

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(3>r-: S^e a • ENGINEERING

OVERLAND PARK, KANSAS

S40-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5 /8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5 / 8 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 3 6 6 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0,: PIPE SIZE 6 "

PIPING SYSTEM HGR. NO. S40-1

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 4 2 - 3

BOILER 3 VENT Client ID

Job No.

Contract No.

EIU

09 -140

NOTES: SEE DRAWING P150 FOR LOCATIONS.

Sr^D

NOTE: LOAD = 478 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(3>r-: S^e a • ENGINEERING

OVERLAND PARK, KANSAS

S 4 2 - 3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX~NUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 3 6 6 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0,: PIPE SIZE 6 "

PIPING SYSTEM HGR. NO. S42-3

SHEET 1 OF 1

REV. n NO. U

REV. DATE

6-29-10

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,

/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \

■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #

<9Ll^ EXP. DATE 11-30-2011

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^Wk JLJJIVJ I XJ1.\.L.N

N O I S u N I V !■ K

EIU PROJECT «: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

STEAM PIPING DESIGN BY:

S. WOPATA DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

6 - 2 4 - 1 0 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 6

DRAWING NO.

P166 REV.

1 N \ 2009 \09140 \dwgs \me\09140-P166 dwg 8/18 /10 11 16am dalexander

7

PIPE HANGER SKETCH S43-1

BOILER 4 VENT Client ID EIU

Job No. 09-140

Contract No.

T.O.S. EL. 7 4 2 - 6 ' NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 569 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S43 -1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5/8 UNC W/ HEXHUTS" CLEVIS WITH PIN

ON LUG 1/2"~THK" WELD

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0,:

PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S43-1

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 7 6 - 3

TURBINE EXHAUST VENT Client ID EIU

Job No. 09-140

Contract No.

T.O.S. EL. 7 4 2 - 6 ' NOTES: SEE DRAWING P150 FOR LOCATIONS.

q_ 7 3 3 - 0

NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>r-: ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S 7 6 - 3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX "NUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0,:

PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S76-3

SHEET 1 OF 1

REV. n NO. U

5

PIPE HANGER SKETCH S 4 3 - 2

BOILER 4 VENT Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 NOTES: SEE DRAWING P150 FOR LOCATIONS.

q_ 7 3 7 - 0 "

NOTE: LOAD = 456 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

OChd S% a • ENGINEERING

OVERLAND PARK, KANSAS

S 4 3 - 2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL THK. 0,: PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S43-2

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 7 6 - 4

TURBINE EXHAUST VENT Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6

STRUCTURAL STEEL W18x50 ) A

NOTES: SEE DRAWING P150 FOR LOCATIONS.

q_ 7 3 3 - 0

NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

OChd S% a • ENGINEERING

OVERLAND PARK, KANSAS

S 7 6 - 4

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEXTJUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL THK. 0,: PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S76-4

SHEET 1 OF 1

REV. n NO. U

4 3

PIPE HANGER SKETCH S76-1

TURBINE EXHAUST/BYPASS VENT Client ID

Job No.

Contract No.

EIU

09 -140

1 - 0 1 - 0

NOTES:

A SEE DRAWING P150 FOR LOCATIONS.

TYP

NOTE: LOADS = 600 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

INSTALL 2 NUTS

REV NO.

ITEM NO. QTY FIG. NO./

OODE NO.

OChri ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S76-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5/8 UNC W/ HEXlJUTS' L3x3x1/4, 30" LONG WT2x6.5, 8 LONG THREE BOLT CLAMP 6" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-B

1

INSUL THK. 0,: PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S76-1

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S 7 6 - 5

TURBINE EXHAUST VENT Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL 7 2 2 - 0 NOTES: SEE DRAWING P150 FOR LOCATIONS.

A

NOTE: LOAD = 660 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

REV NO.

ITEM NO. QTY FIG. NO./

OODE NO.

OChri ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S 7 6 - 5

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 5/8 UNC W/ HEXlJUTS' THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-B

1

INSUL THK. 0,: PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S76-5

SHEET 1 OF 1

REV. n NO. U

2

PIPE HANGER SKETCH S 7 6 - 2

TURBINE EXHAUST VENT Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL 7 4 2 - 6 " NOTES: SEE DRAWING P150 FOR LOCATIONS.

q_ 7 3 3 - 0 '

NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(3>r-: S^e a • ENGINEERING

OVERLAND PARK, KANSAS

S 7 6 - 2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX~NUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0,: PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S76-2

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S78-1

DA VENT Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL 7 4 2 - 6 NOTES: SEE DRAWING P150 FOR LOCATIONS.

q_ 7 3 5 - 0

NOTE: LOAD = 320 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(3>r-: S^e a • ENGINEERING

OVERLAND PARK, KANSAS

S78-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX~NUTS" THREE BOLT PIPE CLAMP 6 PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0,: PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S78-1

SHEET 1 OF 1

REV. n NO. U

REV. DATE

6-29-10

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,

/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \

■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #

<9Ll^ EXP. DATE 11-30-2011

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^Wk JLJJIVJ I XJ1. \ .L .N

N O I S u N I V !■ K

EIU PROJECT «: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

STEAM PIPING DESIGN BY:

S. WOPATA DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

3-23-10 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 7

DRAWING NO.

P167 REV.

1 N \ 2009 \09140 \dwgs \me \09140-P167 dwg 8/18 /10 11 16am dalexander

7

PIPE HANGER SKETCH S 7 8 - 2

5

PIPE HANGER SKETCH S91-1

4 3

PIPE HANGER SKETCH S91-2

2

PIPE HANGER SKETCH S91-3

DA VENT Client ID EIU

Job No. 09-140 Contract No.

T.O.S. EL 7 4 2 - 6 '

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 797 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

q_ 7 3 5 - 0 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(jyy, a • ENGINEERING

OVERLAND PARK, KANSAS

S78-2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 5/8 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S78-2

SHEET 1 OF 1

REV. NO. 0

SOUTH VENT HEADER Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 4 2 - 6 '

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 486 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ 7 3 7 - 0 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(jyy a • ENGINEERING

OVERLAND PARK, KANSAS

S91-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 10" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1 INSUL. THK. 0" PIPE SIZE 10"

PIPING SYSTEM HGR. NO. S91-1

SHEET 1 OF 1

REV. NO. 0

SOUTH VENT HEADER Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 '

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 1020 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP

q_ 7 3 7 - 0 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(jyy, a • ENGINEERING

OVERLAND PARK, KANSAS

S91-2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 5/8 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 10" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0" PIPE SIZE 10'

PIPING SYSTEM HGR. NO. S91-2

SHEET 1 OF 1

REV. n NO. U

SOUTH VENT HEADER Client ID EIU

Job No. 09-140 Contract No.

T.O.S. EL 7 4 2 - 6 '

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 778 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP

q_ 7 3 7 - 0 '

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

oiyy, ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S91-3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 5/8 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 10" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0" PIPE SIZE 10"

PIPING SYSTEM HGR. NO. S91-3

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH S115-1 PIPE HANGER SKETCH S115-2 PIPE HANGER SKETCH S115-3 PIPE HANGER SKETCH S115-4

TURBINE BYPASS VENT Client ID EIU

Job No. 09-140 Contract No.

T.O.S. EL 7 4 2 ' - 6 '

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ 7 3 4 - 0 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(jyy, a • ENGINEERING

OVERLAND PARK, KANSAS

S115-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S115-1

SHEET 1 OF 1

REV. NO. 0

TURBINE BYPASS VENT Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 4 2 ' - 6 '

A NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ 7 3 4 - 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(jyy a • ENGINEERING

OVERLAND PARK, KANSAS

S115-2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1 INSUL. THK. 0" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S115-2

SHEET 1 OF 1

REV. NO. 0

TURBINE BYPASS VENT Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL. 7 4 2 - 6 "

STRUCTURAL STEEL W18x50 j /K NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 295 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP

q_ 7 3 4 - 0

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(jyy, a • ENGINEERING

OVERLAND PARK, KANSAS

S115-3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 1/2 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S115-3

SHEET 1 OF 1

REV. n NO. U

TURBINE BYPASS VENT Client ID EIU

Job No. 09-140 Contract No.

T.O.S. EL 7 2 2 - 0 '

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 683 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

oiyy, ^ a • ENGINEERING

OVERLAND PARK, KANSAS

S115-4

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 5/8 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 5/8 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 6" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. S115-4

SHEET 1 OF 1

REV. A NO. I

REV. DATE

6-29-10 8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,

/ A y ' ''■■^y\ / £ y '■??% f / 0 6 2 - 0 4 9 4 3 6 \ \

■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #

<9Ll^ EXP. DATE 11-30-2011

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^Wk J L ^ / \ 3 I XJ1.\.L.N

N O I S u N I V I- K

EIU PROJECT «: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

STEAM PIPING DESIGN BY:

S. WOPATA DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

6 - 2 4 - 1 0 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 8

DRAWING NO.

P168 REV.

1 N \ 2009 \09140 \dwgs \me \09140-P168 dwg 8/18 /10 11 16am dalexander

7

PIPE HANGER SKETCH S117-1

5

PIPE HANGER SKETCH S117-2

4 3 2

PIPE HANGER SKETCH S117-3

NORTH VENT HEADER Client ID EIU

Job No. 09-140

Contract No.

T.O.S. EL 7 4 2 - 6 "

STRUCTURAL STEEL W12x30 j /K NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 1502 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4

q_ 7 2 8 - 7 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(jyy, a • ENGINEERING

OVERLAND PARK, KANSAS

S117-1

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 3/4 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 3/4 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 16" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0" PIPE SIZE 16"

PIPING SYSTEM HGR. NO. S117-1

SHEET 1 OF 1

REV. NO. 0

NORTH VENT HEADER Client ID

Job No.

Contract No.

EIU

09-140

T.O.S. EL 7 4 2 - 6 '

NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 1427 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4

q_ 7 2 8 - 7 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(jyy a • ENGINEERING

OVERLAND PARK, KANSAS

S117-2

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 3/4 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 3/4 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 16" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1 INSUL. THK. 0" PIPE SIZE 16"

PIPING SYSTEM HGR. NO. S117-2

SHEET 1 OF 1

REV. NO. 0

NORTH VENT HEADER Client ID

Job No.

Contract No.

EIU

09 -140

T.O.S. EL. 7 4 2 - 6 '

A NOTES: SEE DRAWING P150 FOR LOCATIONS.

NOTE: LOAD = 1201 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4

q_ 7 2 8 - 7 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

(jyy, a • ENGINEERING

OVERLAND PARK, KANSAS

S117-3

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT THREADED ROD 3/4 UNC W/ HEX NUTS' TURNBUCKLE TIE ROD 3/4 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP 16" PIPE SIZE

REF. DWGS. TEMP. 366 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BA1

1

INSUL. THK. 0" PIPE SIZE 16'

PIPING SYSTEM HGR. NO. S117-3

SHEET 1 OF 1

REV. n NO. U

REV. DATE

6-29-10

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

REVISED

DWN

CMH

CMH

CHK

SEW

SEW

Sealed Only When Signed in Blue Ink ^..inu,,,,,,,,,

/ A y ' ''■■^y\ / £ y '■??% f / 062-049436 \ \

■ REGISTERED '• | : * ■ PROFESSIONAL : * = \ ': ENGINEER .•' #

<9Ll^ EXP. DATE 11-30-2011

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

^Wk JLJJIVJ I XJ1.\.L.N

N O I S u N I V !■ K

EIU PROJECT «: 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

STEAM PIPING DESIGN BY:

S. WOPATA DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

6-24-10 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 6 9

DRAWING NO.

P169 REV.

1 N \ 2009 \09140 \dwgs \me\09140-P169 dwg 8/18 /10 11 16am dalexander

7

PIPE HANGER SKETCH FW28-1

6

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU 0 9 - 1 4 0

CONTRACTJMO

T.O.S. EL 7 1 7 - 6 3 / 4 " NOTES: SEE DRAWING P151

MEZZANINE STRUCTURAL STEEL W18x40 4 -FOR LOCATIONS.

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP

G_ EL. 7 2 7 - 6

REV NO

ITEM NO 1

QTY FIG. NO./ CODE NO

211128

ayy. &3 a ®

ENGINEERING OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL184 LBS, HL180 LBS, SR:95.2 LBS EYE NUT 1/2" UNC THREE BOLT CLAMP 6 PIPE SIZE HEXAGONAL NUT 1/2HJNC THREADED ROD 1/2" UNC FIELD VERIFY LENGTHS"

REF. DWGS. TEMP. 2 2 8 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BG1

1 INSUL. THK. 1' PIPE SIZE 6'1

PIPING SYSTEM HGR. NO. FW28-1 SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH F W 2 9 - 2

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09-140 CONTRACT_NO

T.O.S. EL 7 1 7 - 6 3 / 4 " NOTES: SEE DRAWING P151 FOR LOCATIONS.

NOTE: LOAD = 128 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

G_EL 715'-2"

REV NO.

ITEM NO. 1

QTY FIG. NO./ CODE NO.

ach-; O n a ® m-ENGINEERING

OVERLAND PARK, KANSAS

FW29-2

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNC

REF. DWGS. TEMP. 2 2 8 F

REV. DATE BY CHK.

0

6-09-10 CMW SEW

SPEC-AB1

1

INSUL. THK. 1' PIPE SIZE 3 "

PIPING SYSTEM HGR. NO.

SHEET 1 OF 1

W29-2

REV. n NO. U

PIPE HANGER SKETCH F W 2 8 - 2

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09 -140

CONTRACT_NO

T.O.S EL. 7 1 7 - 6 3 / 4 " NOTES: SEE DRAWING P151 FOR LOCATIONS.

MEZZANINE STRUCTURAL STEEL W14x30

NOTE-ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 3

G_ E L 7 2 7 ' - 6 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

213128

GD-r S^g a • ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL1099 LBS, HL1068 LBS, SR: 381 LBS EYE NUT 5/8MJNC THREE BOLT CLAMP 6" PIPE SIZE HEXAGONAL NUT 5/8" UNC THREADED ROD 5/8" UNC FIELD VERIFY LENGTHS

REF. DWGS. TEMP. 2 2 8 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BG1

1

INSUL. THK. 1' PIPE SIZE 6':

PIPING SYSTEM HGR. NO. F W 2 8 - 2 SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH F W 2 9 - 3

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09 -140

CONTRACTJMO

HOLD

NOTES: SEE DRAWING P151 FOR LOCATIONS.

NOTE: LOAD = 147 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

G_EL 7 1 5 - 2 "

REV NO.

ITEM NO. 1

QTY FIG. NO./ CODE NO.

a>r-: ^ a ®

ENGINEERING OVERLAND PARK, KANSAS

FW29-3

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1 / 2 " UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2"~UNC~

3 PIPE SIZE

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL. THK. 1" PIPE SIZE 3"

PIPING SYSTEM HGR. NO. FW29-3 SHEET 1 OF 1

REV. NO. 0

4 3

PIPE HANGER SKETCH F W 2 8 - 3

BOILER FEEDWATER Client ID

Job No

Contract No.

EIU

0 9 - 1 4 0

CONTRACT_NO

T.O.S EL 7 1 7 - 6 3 / 4 " NOTES: SEE DRAWING P151 FOR LOCATIONS.

MEZZANINE STRUCTURAL STEEL W14x30

NOTE: ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 4

G_ EL 7 2 7 - 6

REV NO.

ITEM NO. QTY FTGTNa/

CODE NO.

214128

GO— £$ a • ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL1918 LBS, HL1847 LBS, SR:761 LBS EYE NUT 3/4" UNC THREE BOLT CLAMP 6 PIPE SIZE I ^AG0 l^TAOuT37 fUNC THREATJEDR0D3^^

REF DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-BG1 INSUL THK. 1" PIPE SIZE 6"

PIPING SYSTEM HGR. NO. F W 2 8 - 3

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH F W 2 9 - 4

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09 -140

CONTRACT_NO

HOLD

NOTES: *SEE DRAWING P151 FOR LOCATIONS.

NOTE: LOAD = 135 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

G E L 7 1 5 - 2 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a>>e a ®

ENGINEERING OVERLAND PARK, KANSAS

FW29-4

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC ~ THREADED ROD 1 / 2 " UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT T72"TJNC"

3 PIPE SIZE

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL. THK. 1" PIPE SIZE 3"

PIPING SYSTEM HGR. NO. FW29-4

SHEET 1 OF 1

REV. n NO. U

2

PIPE HANGER SKETCH FW29-1

BOILER FEEDWATER

Client ID

Job No.

Contract No.

EIU

09-140 CONTRACT__NO

T.O.S. EL 7 1 7 - 6 3 / 4 "

MEZZANINE STRUCTURAL STEEL W14x30

NOTES: SEE DRAWING P151 FOR LOCATIONS.

NOTE: LOAD = 140 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

G_EL 7 1 1 - 1 1 '

REV NO.

ITEM NO 1

QTY FIG. NO./ CODE NO.

GD-c-J ^ a ®

ENGINEERING OVERLAND PARK, KANSAS

FW29-1

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2 UNC THREADED ROD 1 / 2 " UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNO

REF DWGS TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL. THK. 1' PIPE SIZE 3

PIPING SYSTEM HGR. NO. FW29-1

SHEET 1 OF 1

REV. NO. 0

PIPE HANGER SKETCH S 2 9 - 5

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09 -140

HOLD

NOTES: SEE DRAWING P151 FOR LOCATIONS.

NOTE: LOAD = 189 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

G_EL 7 1 5 - 2 "

REV NO.

ITEM NO.

QTY FIG. NO./ CODE NO.

cs>^; a • ENGINEERING

OVERLAND PARK, KANSAS

FW29-5

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1/2 UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNC

REF DWGS TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1

INSUL. THK. 2" PIPE SIZE 3"

PIPING SYSTEM HGR. NO. SHEET 1 OF 1

W29-5

REV. NO. 0

REV. DATE

8-17-10

1_ DESCRIPTION

ISSUED FOR CONSTRUCTION

DWN

DCA

CHK

SEW

D

C

vy/t Jti^'A/ \j\J\yj

Sealed Only When Signed in Blue Ink

| S ? STEVEN E WOPATA*; ff, = 5 g : 062 049436 ; . ' " : ;

% W>f v\"^° vV

B

e a a ® v /

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

<#y Jz#/&1 JbKJNI ILLINOIS U N I V E R S I T Y

ESU PROJECT ®* 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

FEEDWATER PIPING A

DESIGN BY:

C. WARD DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

6- •24-10 SEGA PROJECT NO.

090140

CADD FILE NAME: 0 9 1 4 0 - P 1 6 0

DRAWING NO.

P170 REV.

0 N \2009 \09140 \dwgs \me \09140 -P170dwg 8 /18 /10 1 00pm dalexander

7

PIPE HANGER SKETCH FW29-6

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09 -140

CONTRACTJMO

T.O.S. EL. 7 1 4 - 1 0 "

BOILER 1 ACCESS PLATFORM STEEL

NOTES: SEE DRAWING P151 FOR LOCATIONS.

NOTE. LOAD = 100 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

_G_EL 7 1 2 - 6 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

ao-d; O M Q ® m ENGINEERING

OVERLAND PARK, KANSAS

FW29-6

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2" "UNC"

3 PIPE SIZE

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL THK. 1" PIPE SIZE 3"

PIPING SYSTEM HGR. NO. FW29-6

SHEET 1 OF 1

REV. ^ NO. U

PIPE HANGER SKETCH FW29-10 AND FW30-5

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09 -140

CONTRACTJMO

STRUCTURAL STEEL W12x40 T.O.S. EL 7 4 2 - 6 "

NOTES: SEE DRAWING P151 FOR LOCATIONS.

L3x3x1/4 20" LONG

FW30-5 NOTE: LOAD = 100 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

q_ EL 7 2 7 ' - 6 "

FW29-10

REV NO

ITEM NO. QTY FIG. NO./

CODE NO

a>^ ^ a ®

ENGINEERING OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION NUT WASHER _ _ _ THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2"TJNC"

3 PIPE SIZE

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL THK. 1" PIPE SIZE 3"

PIPING SYSTEM HGR. NO.

SHEET 1 OF 1

REV. NO. 0

PIPE HANGER SKETCH FW29-7

BOILER FEEDWATER Client ID EIU

Job No. : 09 -140

Contract No. CONTRACTJMO

^J-O-S- _EL 71_4'-10"

BOILER 2 ACCESS PLATFORM STEEL

NOTES: SEE DRAWING P151 FOR LOCATIONS.

NOTE: LOAD = 100 LB ALL COMPONENTS SHALL BE LISEGA LOAD GROUP

G_EL 7 1 2 - 6 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

®>S C(*r\Q » & & ENGINEERING

OVERLAND PARK, KANSAS

FW29-7

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1 / 2 " UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNO

REF. DWGS. TEMP. 2 2 8 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. 1" PIPE SIZE 3"

PIPING SYSTEM HGR. NO.

SHEET 1 OF 1

W29-7 REV. n NO. U

PIPE HANGER SKETCH FW29-11 AND FW30-6

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09 -140

CONTRACTJMO

T.O.S. EL 7 4 2 - 6 '

STRUCTURAL STEEL W12x40

NOTES: SEE DRAWING P151 FOR LOCATIONS.

FW30-6 NOTE: LOAD = 300 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

q_ EL. 7 2 7 - 6 "

FW29-11

REV NO

ITEM NO. QTY FIG. NO./

CODE NO.

a>e ^ a ®

ENGINEERING OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC' THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2"

3 PIPE SIZE UNC

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL THK. 1" PIPE SIZE 3"

PIPING SYSTEM HGR. NO. SHEET 1 OF 1

REV. n NO. U

4

PIPE HANGER SKETCH FW29-8 AND FW30-3

3

BOILER FEEDWATER Client ID

Job No.

Contract No

EIU

09 -140

CONTRACTJMO

T.O.S. EL. 7 1 7 - 6 3 / 4 " NOTES: SEE DRAWING P151

MEZZANINE STRUCTURAL STEEL W14x22 FOR LOCATIONS.

FW30-3 NOTE: LOAD = 340 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 2

G_ EL 7 1 3 - 7 . 5 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO

GD-o &3 a ® ENGINEERING

OVERLAND PARK, KANSAS rW29-8

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC " " ~

"THREADED ROD 1 / 2 " UNC W/ HEX NUTS TURNBUCKLE THREADED R0D1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLM^PTPIPESIZE EYE NUT 1/2" UNC

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL. THK. 1' PIPE SIZE 3 "

PIPING SYSTEM HGR. NO. SHEET 1 OF 1

W29-8 REV. NO. 0

PIPE HANGER SKETCH FW29-12 AND FW30-7

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09 -140

CONTRACTJMO

STRUCTURAL STEEL W12x40 T.O.S. EL 7 4 2 - 6 "

NOTES: SEE DRAWING P151 FOR LOCATIONS.

L 3 X 3 X 1 / 4 20" LONG

FW30 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

G_ EL 727 ' -6 ' ;

FW29-12

REV NO.

ITEM NO. 1

QTY FIG. NO./ CODE NO

GD-e ^ a • ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION NUT WASHER THREADED ROD 1/2" UNC W/ HEX NUTS~ TURNBUCKLE THREADED RObl/YLj^CWTHEXNUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT T7zHjNC

REF DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL. THK. PIPE SIZE 3"

PIPING SYSTEM HGR. NO. SHEET 1 OF 1

REV. NO. 0

2

PIPE HANGER SKETCH FW29-9 AND FW30-4

BOILER FEEDWATER Client ID EIU

Job No. 09-140 Contract No. : CONTRACTJMO

T.O.S1 EL. _742'-6"

STRUCTURAL STEEL W12x30

NOTES: SEE DRAWING P151 FOR LOCATIONS.

G_ EL 7 2 7 - 6

FW30-4

NOTE-ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

G_ EL 7 2 7 - 6 "

FW29-9

REV NO.

ITEM NO. QTY

1

FIG. NO./ CODE NO.

211128

211128

GO-e ^ 9 a • ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION WELD-ON CLEVIS EYE NUT VAR.SPRING HANGER CL128 LBS, HL118 LBS, SR-.95.2 LBS EYE NUT 1/2" UNC THREE BOLT CLAMP 3 PIPE SIZE HEXAGONAL NUT 1/2" UNC" THREADED ROD MT UNC FIELD VERIFY LENGTHS VAR.SPRING HANGER CL132 LBS, HL123 LBS, SR:95.2 LBS

REF. DWGS TEMP. 2 2 8 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC- INSUL THK. 1' PIPE SIZE 3 "

PIPING SYSTEM HGR. NO.

SHEET 1 OF 1

REV. NO. 0

PIPE HANGER SKETCH FW29-13 AND FW30-8

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09 -140

CONTRACTJMO

STRUCTURAL STEEL W12x40 T.O.S. EL. 7 4 2 - 6 "

NOTES: SEE DRAWING P151 FOR LOCATIONS.

L3x3x1/4 20" LONG

FW30 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

G,_ EL 727 ' -6 ' i

FW29-13

REV NO.

ITEM NO QTY FIG. NO./

CODE NO.

GD-r5 a • ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION NUT WASHER THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2"~UNC"

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL. THK. 1" PIPE SIZE 3"

PIPING SYSTEM HGR. NO. SHEET 1 OF 1

REV. NO. 0

REV. DATE

8-17-10

]_ DESCRIPTION

ISSUED FOR CONSTRUCTION

DWN

DCA

CHK SEW

D

C

v.\ Off

Sealed Only When Signed in Blue Ink

sE iff-STEVEN E WOPATA-ft = ; 9 , i 062 049436 :jT7 =

y f--:\ yk ^ ' ' " t i n

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

< W ^ EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT m-. 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

FEEDWATER PIPING A

DESIGN BY:

C. WARD DRAWN BY:

C. WARD CLIENT I.D.

H0N00103

CHECKED BY:

S. WOPATA DATE:

6-24- 0 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 7 1

DRAWING NO.

P171 REV.

0 N \2009 \09140 \dwgs \me\09140-P171 dwg 8 /18 /10 1 00pm dalexander

7

PIPE HANGER SKETCH FW29-14 AND FW30-9

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

0 9 - 1 4 0

CONTRACT_NO

STRUCTURAL STEEL W12x40 T.O.S. EL. 7 4 2 - 6 "

FW30 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

NOTES: SEE DRAWING P151 FOR LOCATIONS.

L3x3x1/4 20" LONG

G_ EL. 7 2 7 ' - 6 "

FW29-14

REV NO.

ITEM NO. QTY

1

FIG. NO./ CODE NO.

GD-^ ^ a ®

ENGINEERING OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION NUT WASHER THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1 / 2 UNC W/ HEX NUTS THREE BOLT PIPE CLAMP EYE NUT 1/2"~UNC"

3 PIPE SIZE

REF. DWGS. TEMP. 2 2 8 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL THK. 1" PIPE SIZE 3"

PIPING SYSTEM HGR. NO. SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH FW29-18 AND FW30-12

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

0 9 - 1 4 0

CONTRACT_NO

T.O.S. EL 7 4 2 - 6 NOTES: SEE DRAWING P151 FOR LOCATIONS.

FW30-12 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

G_ EL 7 2 7 ' - 6 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

a> -: S^9 a ® ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1 / 2 UNC W/ HEX NUTS' TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2^

3 PIPE SIZE UNC

REF. DWGS. TEMP. 2 2 8 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL THK. 1" PIPE SIZE 3"

PIPING SYSTEM HGR. NO.

SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH FW29-15 AND FW30-10

BOILER FEEDWATER Client ID EIU

Job No. 09-140

Contract No. : CONTRACT_NO

STRUCTURAL STEEL W12x40 T.O.S. EL. 7 4 2 - 6 "

FW30 NOTE: LOAD = 160 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

NOTES: SEE DRAWING P151 FOR LOCATIONS.

L3x3x1/4 20" LONG

G^EL 7 2 7 ' - 6 "

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

ao-d; S^e a ® ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION NUT WASHER THREADED RODI /Z ' UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNC

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL. THK. 1" PIPE SIZE 3"

PIPING SYSTEM HGR. NO. SHEET 1 OF 1

REV. NO. 0

PIPE HANGER SKETCH FW29-19 AND FW30-13

BOILER FEEDWATER Client ID : EIU

Job No. 09 -140

Contract No. : CONTRACT_NO

T.O.S. EL. 7 4 2 - 6 '1 NOTES:

SEE DRAWING P151 FOR LOCATIONS.

FW30-13 NOTE: LOAD = 120 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

G EL 7 2 7 ' - 6 "

FW29-19

REV NO,

ITEM NO. 1

QTY FIG. NO./ CODE NO.

GD-^: S<29 a ® ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION WELD-ON EYE PLATE CLEVIS WITH PIN 1/2" UNC THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNC

REF. DWGS. TEMP. 2 2 8 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL THK. 1 PIPE SIZE 3

PIPING SYSTEM HGR. NO.

SHEET 1 OF 1

REV. n NO. U

4

PIPE HANGER SKETCH FW29-16 AND FW30-10A

3

BOILER FEEDWATER Client ID : EIU

Job No. : 09 -140

Contract No. : CONTRACT_NO

STRUCTURAL STEEL W12x40 T.O.S. EL. 7 4 2 - 6 "

FW30 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

NOTES: SEE DRAWING P151 FOR LOCATIONS.

L3x3x1/4 20" LONG

q_ EL. 7 2 7 - 6

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

GD-^ ^ a ®

ENGINEERING OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION NUT WASHER THREADED ROD T72" UNC~W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/T"UNC"

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL THK. PIPE SIZE 3"

PIPING SYSTEM HGR. NO. SHEET 1 OF 1

REV. NO. 0

PIPE HANGER SKETCH FW29-20 AND FW30-14

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09 -140

CONTRACT_NO

STRUCTURAL STEEL W10x26 T.O.S. EL. 7 4 2 - 6 "

NIA

NOTES: SEE DRAWING P151 FOR LOCATIONS.

L3x3x1/4 20" LONG

FW30 NOTE: LOAD = 120 LB EACH COMPONENTS SHALL BE LISEGA LOAD GROUP 1

G_ EL 7 2 7 ' - 6 "

REV NO

ITEM NO. QTY FIG. NO./

CODE NO.

GD-d S ^ a ® ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION NUT WASHER _ _ ™ _ THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE TIE ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP 3 PIPE SIZE EYE NUT 1/2" UNC

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1

1 INSUL. THK. 1' PIPE SIZE 3"

PIPING SYSTEM HGR. NO.

SHEET 1 OF 1

REV. NO. 0

PIPE HANGER SKETCH FW29-17 AND FW30-11

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09-140

C0NTRACT_JN0

ROOF TRUSS T1 T.O.S. EL. 7 4 2 ' - 6 "

FW30-11 NOTE: LOAD = 150 LB EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

NOTES: SEE DRAWING P151 FOR LOCATIONS.

L3x3x1/4 20" LONG

G_ EL. 7 2 7 - 6

REV NO

ITEM NO. 1

QTY FIG. NO./ CODE NO.

GD-^ §P9 a • ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION NUT WASHER THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC W/ HEX NUTS TWO BOLT PIPE CLAMP TPIPE SIZE EYE NUT 1/2TJNC"

REF. DWGS. TEMP. 228 F

REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC- INSUL THK. 1 PIPE SIZE 3"

PIPING SYSTEM HGR. NO. SHEET 1 OF 1

REV. n NO. U

PIPE HANGER SKETCH FW29-21 AND FW30-15

BOILER FEEDWATER Client ID

Job No.

Contract No.

EIU

09-140

CONTRACT_NO

STRUCTURAL STEEL W12x30 T.O.S. EL 7 4 2 - 6 "

FW29-21 TEMP =228 F

EACH ALL COMPONENTS SHALL BE LISEGA LOAD GROUP 1

NOTE: LOAD = 150 LB

NOTES: SEE DRAWING P151 FOR LOCATIONS.

L3x3x1/4 20" LONG

G EL 727 ' -6 ':

FW30-15 TEMP=525 F

REV NO.

ITEM NO. QTY FIG. NO./

CODE NO.

G>S 9 a ® ENGINEERING

OVERLAND PARK, KANSAS

MATERIAL DESCRIPTION NUT WASHER „ _ _ _ THREADED ROD 1/2" UNC W/ HEX NUTS TURNBUCKLE THREADED ROD 1/2 UNC^W/ HEX NUTS TWO BOLT PIPE CLAMP EYE NUT 1/2

iT~UNC~

3 PIPE SIZE

TWO BOLT PIPE CLAMP 2.5 PIPE SIZE

REF. DWGS. REV. DATE BY CHK.

0 6-09-10

CMW SEW

SPEC-AB1 INSUL. THK. 1' PIPE SIZE 3"

PIPING SYSTEM HGR. NO. SHEET 1 OF 1

REV. n NO. U

REV.

0

DATE

8-17-10

I DESCRIPTION

ISSUED FOR CONSTRUCTION

DWN

DCA

CHK

SEW

D

C

i_ 11 j) (w

Sealed Only When Signed in Blue Ink

£ 4?/ w -z. £ §: \% c. 5 m - STEVEN E WOPATA • j?j r S f i ' . 062.049436 -*.Ti = 3 . «"■"* # * -4J -*»

W # * * * *«

B

Engineers — Architects — Technicians Design — Construction — Field Service

(913) 681-2881

16041 Foster P.O. Box 1000

Stilwell, Kansas 66085-1000 Illinois License # 184-000823

jm^ EASTERN I L L I N O I S U N I V E R S I T Y

EIU PROJECT *■• 10-4535

EASTERN ILLINOIS UNIVERSITY EIU RENEWABLE ENERGY CENTER

PIPE SUPPORT DETAILS

FEEDWATER PIPING A

DESIGN BY:

C. WARD DRAWN BY:

C. WARD CLIENT I.D.

HON00103

CHECKED BY:

S. WOPATA DATE:

7-8-10 SEGA PROJECT NO.

090140 CADD FILE NAME: 0 9 1 4 0 - P 1 7 2

DRAWING NO.

P172 REV.

0 N \ 2009 \09140 \dwgs \me \09140 -P172 dwg 8 /18 /10 1:00pm dalexander