Contractor No. of Correction Executive Engineer
GODAVARI MARATHWADA IRRIGATION DEVELOPMENT CORPORATION, AURANGABAD
(A GOVERNMENT OF MAHARASHTRA UNDERTAKING)
TENDER PAPERS FOR
Operation, Maintenance and Management of Sant Dnyaneshwar Udyan Complex, Paithan, Dist. Aurangabad on lease basis
EXECUTIVE ENGINEER,
LOWER DUDHANA PROJECT DIVISION, SAILU, DIST. PARBHANI
2
Contractor No. of Correction Executive Engineer
INDEX
Sr.No. Particulars Page No. From To
Press Notice
1 Section-I:- Detailed Tender
Notice, Information and Instructions to Tenderers
1 Invitation 2 General Information 3 Definition and Interpretations 4 Eligibility 5 Details of Work 6 Issue of Blank Tender Forms 7 Pre Tender Conference
8 Revision or amendments of tender documents
9 Manner of submission of tender and its accompaniments
10 Opening of tenders
11 Instruction for submission of Envelop No.1
12 Instruction for submission of Envelop No.2
13 Corrections 14 Signing of tender documents 15 Acceptance of tender 16 Validity period 17 Completion of tender documents 18 Annexure- "A"
2 Section — II :- Information & present position of Sant Dnyaneshwar Udyan Complex, Paithan
3 Section-Ill:- Maintenance and Repairs to Sant Dnyaneshwar Udyan Complex; Paithan
1 Flower beds in the flower garden 2 Maintenance of lawns and beds 3 Maintenance of small trees inside the
3
Contractor No. of Correction Executive Engineer
Sr.No. Particulars Page No. From To
oval road (Groves)
4 M&R to Sacred and natural Sant Dnyneshwar Udyan
5 Maintenance of water channels and falls
6 Fountain Maintenance and repairs 7 M&R to Musical fountain
8 Internal road in the Sant Dnyaneshwar Udyan Complex, Paithan
9 Supporting walls and steps
10
Oval road, Approach roads, Parking places and road outside the Sant Dnyaneshwar Udyan Complex, Paithan
11 Maintenance and repairs to drainage arrangement
12 Electrification
13 Maintenance and repairs of water supply arrangement and drinking water arrangement
14 M&R to canteens, Toilets and other construction
15 M&R to Children Park No.1
16 Complete installation of Children Park No.2
17 Maintenance and repairs of the Sant Dnyaneshwar Dnyanpith Research institute
18 Maintenance and repairs of the R.C.C. Bridge and approach roads
19 Compound wall around Sant Dnyaneshwar Udyan Complex, Paithan
20 Ticket booking arrangement 21 General protection arrangement
22 General Maintenance f Sant Dnyaneshwar Udyan Complex, Paithan
4. Section- IV :- Condition of Contract
Contractor No. of Correction Executive Engineer
4
Particulars Page No. Sr.No. From To
1 Definitions 2 Common cement of agreement,
duration and completion
3 Security deposit 4 Additional Security Deposit 5 Notice and Instructions 6 Scope of work to be done 7 Supply of material by the GMIDC 8 Establishment 9 Security arrangement and accidents 10 Sub-letting of contract 11 Decision of competent authority 12 Income from Sant Dnyaneshwar
Udyan Complex, Paithan
13 Changes to be made in the Sant Dnyaneshwar Udyan Complex, Paithan
14 Inspection of Sant Dnyaneshwar Udyan Complex, Paithan
15 Auditing 16 Ownership of Sant Dnyaneshwar
Udyan Complex, Paithan
17 Rules and Regulation 18 Liability of Tax 19 Visit to Sant Dnyaneshwar Udyan
Complex, Paithan
20 Right to terminate the contract 21 Facilities to visitors 22 Canteens 23 Insurance 24 Contract Amount 25 Settlement of Disputes 26 Environment 27 Provision of agreement bond 5 Section -V: - Contract offer and
forms.
6 Section - VI:- Drawing
Contractor No. of Correction Executive Engineer
5
SECTION – I DETAILED TENDER NOTICE,
INFORMATION AND INSTRUCTION TENDERERS
Contractor No. of Correction Executive Engineer
6
FOR OFFICIAL USE ONLY
GODAVARI MARATHWADA IRRIGATION DEVELOPMENT CORPORATION,
AURANGABAD (A GOVERNMENT OF MAHARASHTRA UNDERTAKING)
: Name of Circle JAYAKWADI PROJECT
CIRCLE, AURANGABAD
: Name of Division LOWER DUDHANA PROJECT
DIVISION, SAILU, DIST. PARBHANI
: NAME OF WORK
OPRATION, MAINTENANCE,
DEVELOPMENT AND
MANAGEMENT OF SANT
DNYANESHWAR UDYAN
COMPLEX, PAITHAN, DIST.
AURANGABAD
ISSUED TO : M/s --------------------------------------------------
--------------------------------------------------
--------------------------------------------------
----------------
Dated --------------------------------
Divisional Accountant Lower Dudhana Project
Division, Sailu, Dist. Parbhani
Contractor No. of Correction Executive Engineer
7
GODAVARI MARATHWADA IRRIGATION DEVELOPMENT CORPORATION,
AURANGABAD (A GOVERNMENT OF MAHARASHTRA UNDERTAKING)
JAYAKWADI PROJECT CIRCLE, AURANGABAD LOWER DUDHANA PROJECT DIVISION, SAILU.
TENDER NOTICE Online tender in two envelope system are invited by the Executive
Engineer, Lower Dudhana Project Division, Sailu, Dist. Parbhani, for the
work mentioned below from the qualified contractors / firms having
experience in the similar works.
Name : of Work Operation, maintenance development
and management of Sant Dnyaneshwar Udyan Complex, Paithan Rs. 10.00 Lakhs
: Earnest Money Deposit Rs. 03.00 Lakhs : Security Deposit Rs.50.00 Lakhs (Rs.15 Lakhs in form
of D.D & Rs.35 Lakhs in form of Bank solvency of any nationalized bank of Maharashtra.)
: Period of Contract 10 Years
: Cost of blank tender document
Rs.10,000/- Per No
: Period of Issue of Blank Tender forms to Pre Qualified
As informed on website & mail.
: Contractors Date and Place prebid of conference
As informed on website & mail In the Office of the Chief Engineer And Chief
Administrator CAD, ID Aurangabad.
Contractor No. of Correction Executive Engineer
8
: Date, time and place of receipt of sealed tender form
Latest up to 15.00 Hours. On As
informed on website & mail in the
Office of the Superintending Engineer,
Jayakwadi Project Circle,
Aurangabad.
: Date, time and place of
opening of tender form
On ______________ at 16.00
Hours in the office of the
Superintending Engineer, Jayakwadi
Project Circle, Aurangabad (If
possible)
Validity period of Tender 90Days from opening of tender.
1) Detailed tender notice can be seen on the notice board in the
office of Executive Engineer Lower Dudhana Project Division,
Sailu (Copy can be obtained free of cost from the Executive
Engineer, on request.)
2) The application for the purchase of Blank tender form shall be
accompanied with the certified copies of the following documents-
i) Valid registration Certificate of the firm.
ii) Valid Income Tax clearance Certificate.
iii) List of Technical persons.
iv) Bankers Certificate of Financial Capacity.
v) List of similar type of work in hand duly certified and signed by the
Executive Engineer / officer in charge of
vi) Annual turnover for the last five years duly signed by the officer
not below the rank of Executive Engineer or other officer of the
Department concerned.
Contractor No. of Correction Executive Engineer
9
vi)
1)
Copy of-
2)
Registration of sales Tax act 1989 form " Clause 4 (1) in form-2
and
3)
Registration of professional Tax as per Maharashtra State Taxes
of Profession. Business earning and service Act 1975 clause (5)
sub clause (1) form-1 (a).
4)
Blank tender forms will be sent by R.P.A.D. at contractor's risk
Department will not take any responsibility for the loss or delay in
receiving the documents.
5)
Offer shall remain valid up to 90 days from the opening of tenders
and thereafter until it is withdrawn by the contractor.
Right to reject any or all Tenders without assigning any reason
thereof is reserved by the competent authority of GODAVARI
MARATHWADA IRRIGATION DEVELOPMENT CORPORATION,
AURANGABAD
Executive Engineer, Lower Dudhana ProjectDivision
Sailu, Dist. Parbhani
Contractor No. of Correction Executive Engineer
10
DETAILED TENDER NOTICE
GODAVARI MARATHWADA IRRIGATION
DEVELOPMENT CORPORATION AURANGABAD
INVITATION:
Online tenders are invited from registered firms/ contractors or
individuals having experience in the field of operation, maintenance,
development and management of Gardens, amusement parks, water
parks, land scaping hotel and tourism etc., for the work of operation,
maintenance development and management of Sant Dnyaneshwar
Udyan Complex, Paithan, details of which are as per Annexure 'A'.
GENERAL INFORMATION
The function and powers of the Corporation have been listed in
the Maharashtra Act XXIII of 1998. In general it has been entrusted with
the work of investigation planning, designing of Irrigation Projects,
maintenance of completed Irrigation Projects, and construction of
Irrigation Projects and Irrigation Management of the Major. Medium and
Minor Projects in the Godavari River Basin.
DEFINATION AND INTERPRETATIONS:
In this tender document the following terms shall have the
meaning here by assigned to them except where the context otherwise
required.
Contractor No. of Correction Executive Engineer
11
a)
"Corporation" shall mean the GODAVARI MARATHWADA
IRRIGATION DEVELOPMENT CORPORATION, AURANGABAD
acting through its Executive Director, as defined in Maharashtra
Act XXIII of 1998.
GODAVARI MARATHWADA IRRIGATION DEVELOPMENT
CORPORATION, AURANGABAD is
a body corporate constituted under the Maharashtra
Act XXIII of 1998 and has been established by the
notification published in the Gazette of Irrigation Department
dated 17.08.1998. The head quarter of the
GODAVARI MARATHWADA IRRIGATION DEVELOPMENT
CORPORATION, AURANGABAD (GMIDC Aurangabad or
GMIDC in short, and here after referred to only as Corporation)
is at Aurangabad. The official postal address for correspondence
is:
Executive Director, GODAVARI MARATHWADA IRRTGATION DEVELOPMENT
CORPORATION, SINCHAN BHAS/AU, 1st FLOOR, JALNA ROAD, AURANGABAD
b)
- 431 005
The function and powers of the Corporation have been
listed in the Maharashtra Act XXIII of 1998. In general it has
been entrusted with the work of investigation planning,
designing of irrigation
Projects, maintenance of completed
irrigation projects, and construction of irrigation projects and
irrigation management of the Major, Medium and Minor
Projects in the Godavari River Basin,
Contractor No. of Correction Executive Engineer
12
c)
Chief Engineer" shall mean Chief Engineer & Chief
Administrator CAD, Irrigation Department,
Aurangabad.
d)
"Superintending Engineer" shall mean Superintending
Engineer, Jayakwadi Project Circle, Aurangabad, to
whom Superintendence of the work is assigned by
GODAVARI MARATHWADA IRRIGATION
DEVELOPMENT CORPORATION, AURANGABAD.
e)
"Engineer / Engineer-ln-Charge" shall mean, the Executive
Engineer, Lower Dudhana, Project Division, Sailu. In
charge of works duly authorised by GMIDC,
Aurangabad.
f)
"Engineer's Representative" shall mean the sub-Divisional
Engineer / Assistant Executive Engineer / Sub- Divisional
Officer / Assistant Engineer (Grade-I), who has been
assigned specific duties.
g) Contractor shall mean the person, firm or company who
enters into contract, with the Corporation and • shall
include their executors, Administrator's successors and
authorized assignees.
h) "Contract" shall mean and include agreement as below.
Contractor No. of Correction Executive Engineer
13
Section I - Detailed tender notice.
Section II - Information and present position of
Udyan Complex. Section III - Maintenance and repairs to Udyan
Complex
Section IV - Conditions of Contract
Section V - Contract offer and Forms
Section VI - Drawings & Agreement enclosed
as Annexure-B
Eligibility: Online tender will be issued only to those firms / Contractors
who would pre-qualify for tendering the above said work. Details of
Work: Details of work to be executed, EMD, class of contractor,
agreement period and other information is given in Annexure 'A'.
Information regarding the work for which the tenders are invited as well
as online tender forms can be obtained from the site of
ISSUE OF BLANK TENDER FORMS:
http://gmidc.maharashtra.etenders.in. Online tender forms shall be
issued to those contractors who are eligible as explained in para 2
above. online tender forms can be downloaded by web site of
http://gmidc.maharashtra.etenders.in.
PRE-TENDER CONFERENCE:
1) Pre-tender conference open to pre-qualified tenderers will be held
in the office as stated in Annexure 'A of this section wherein the
prospective tenderers will have an opportunity to obtain
clarifications regarding the work and the tender conditions.
2) The prospective tenderers are free to ask any additional
clarifications either in writing or orally and the reply to the same
will be given by the Superintending Engineer in writing and these
clarification referred to as common set of conditions shall form
part of tender documents and which will also be common and
applicable to all tenderers.
Contractor No. of Correction Executive Engineer
14
3) The tender submitted by the tenderer shall be based on the
clarification, additional facility provided (if any) by the Corporation
and this tender shall be unconditional. Conditional tenders will be
summarily rejected as non-responsive.
4) All tenderers are cautioned that the tenders containing any
deviation from the contractual terms and conditions, specification
or other requirements and conditional tenders will be rejected as
non- responsive.
REVISION OR AMENDMENTS OF TENDER DOCUMENTS
Right is reserved to revise or amend the tender documents prior
to last date notified for the issue of tenders and such revisions of
amendments’ or extensions shall be communicated to all concerned by
post and by notice in the press as may be considered suitable.
Tenderer shall be presumed to have carefully examined ail
documents, forms, statements, conditions, schedules, drawing and
specifications of contract and to have fully acquainted himself with ail
details of the site, river and weather characteristics and Labour
conditions in general and with all the necessary information and data
etc. pertaining to and needed for the work prior to tendering of the work.
Contractor No. of Correction Executive Engineer
15
1.0 MANNER OF SUBMISSION OF TENDER AND its ACCOMPANIMENTS:
Tender is to be submitted on line in two separate sealed
envelopes. The tenderer shall submit the tender and documents in two
sealed envelopes as below.
a) ON LINE ENVELOPE NO.1 (T1) :-
I) Attach scan copy of Earnest Money Deposit (EMD) in the
form of Demand Draft of a nationalized / scheduled bank
situated in he state of Maharashtra payables to the
Executive Engineer as stated in Annexure 'A' of this section
shall be enclosed. Certificate of exemption for payment of
earnest money, shall not be accepted.
II) An income Tax Clearance Certificate from Income Tax
Officer of the Circle. (Original or true copy thereof duly
attested by Gazetted officer) valid oh the date fixed for the
receipt of tender
III) Sales Tax Registration Certificate in Form II Rule 4(l).
as provided by Maharashtra State Govt. Sales Tax Act.
(Maharashtra Act No. XXXVI of 1989). The MST on transfer
of property in goods involved in the execution of works
contract. (Reenacted) Act 1989) from Sales Tax
Department.
IV) Deed of partnership or Article of Association and
Memorandum of Association for Limited Company duly
registered.
Contractor No. of Correction Executive Engineer
16
V) Tender has to submit a note covering details of his future
developments such as amusement / water / boating parks
or other developments for beautification of garden
including execution program of such developments.
VI) Details of technical personnel with the tenderer.
VII) Details of similar type of works and magnitude carried out
by the tenderer.
VIII) Details of other works tendered for and in hand with
tenderer and value of work in hand.
IX) Professional tax clearance certificate.
X) Attach scan copy of Main tender Fee D.D.
All documents required to be submitted in Envelope No.1 shall be
attested by gazetted officer and if required original copies shall be kept
ready at the time of opening of tender.
ON LINE ENVELOPE NO.2 (C1): -
The second envelope should be submitted online with .main
tender including the common set of' conditions / stipulations, if any,
issued by the Corporation after the pre-tender conference.
The tenderer should quote his offer yearly for 10 years
in this tender. He should not quote His offer any
Contractor No. of Correction Executive Engineer
17
Where directly or indirectly in Envelope No.1 failing which the Envelope
No.2 shall not be opened and his tender shall stand rejected. The
contractor shall quote for the work as per details given in the main
tender and also based on the common set of conditions
issued/additional stipulations made by the Corporation as informed to
him by a letter from the Superintending Engineer as given in Annexure
'A' of this section after pre-tender conference. This tender shall be
unconditional.
C) SUBMISSION OF ONLINE TENDER:-
Contracors must prepare complete offer during Bid preparation
stage .once the Bid preparation time is over , online system will
not allow to do any change in offer.
All contractors must submit their offer as per online schedule.
Contractors who will complete the download and online Bid Preparation
stage only those contractors will be able to submit their offer.
8 OPENING OF TENDERS:-
On the date specified in the tender notice, following procedure will
be adopted for opening tender.
Envelope No.1:-
First of all, Envelope No.1 of the tenderer will be opened to verify
its contents as per requirements as stated at Sr.No. 7 (a) above
of this section. If the various documents contained in this
envelope do not meet the requirement, a note will be recorded
accordingly by the tender opening authority and the said
tenderer's Envelope No.2 will not be considered for further action
by the same will be recorded. Decision of the tender opening
authority shall be final in this regard.
Contractor No. of Correction Executive Engineer
18
Envelope No.2:-
This envelope shall be opened immediately after opening of
Envelope No.1 only if the contents of Envelope No.1 are found to
be acceptable to the Corporation. The tender offer shall then be
read out.
9) INSTRUCTION FOR SUBMISSION OF ENVELOP NO.1:-
Documents to be submitted in Envelop No.1 shall confirm to the
instructions given below.
9.1.0 EARNEST MONEY DEPOSIT: - . .
9.1.1 Earnest money of Rs.3.00 Lakhs along with the tender shall be in
the shape of D.D. for a period of one year issued by nationalized /
Scheduled Bank branches situated in State of Maharashtra in
favour of Executive Engineer, Lower Dudhana Project Division,
Sailu.
9.1.3
9.1.2 Exemption certificate will not be accepted
Tenders of those who do not deposit earnest money in one of the
above acceptable forms shall be summarily rejected.
9.1.4 The earnest money deposit amount shall not carry any interest
whatsoever. The earnest money will be refunded in the case of
tenderer whose tenders are not accepted, only after completion
of all formalities in respect of the accepted tender or in case of
expiry of validity of offer, when specially withdrawn by the
Contractor No. of Correction Executive Engineer
19
tenderer. In case of the successful tenderer, it will be refunded
on his paying the security deposit and completing the Contract
documents or will be transferred towards a part of security deposit
to be paid after awarding of the work. If the successful tenderer
does not pay the security deposit in the prescribed time limit and
complete the agreement bond, his earnest money will be forfeited
to Corporation.
9.2.0 SECURITY DEPOSIT:-
9.2.1
The Contractor whose offer has been accepted shall, within
15days of the receipt of letter of acceptance of offer, have to
deposit with the GMIDC, a Security Deposit amount as specified
in para 5 of Annexure-A of this section, in the form of D.D. in
favour of Executive Engineer, Lower Dudhana Project Division,
Sailu for 10 years period plus six months.
9.2.2 The earnest money deposited by the contractor with his tender
will be retained by the Corporation as the part of
security deposit,
if tenderer requests in writing to that effect. The balance to make
up this security deposit may, unless otherwise specified, in the
condition, be deposited by the contractor in the form of D.D. The
GMIDC shall not pay any interest on the amount of security
deposit paid by the tenderer.
10) INSTRUCTIONS FOR SUBMISSION OF ENVELOPE NO.2 :
Contractor No. of Correction Executive Engineer
20
Documents to be submitted in envelope No.2 shall confirm to the
instructions given below.
10.1
The tenderer shall be deemed to have fully acquainted himself
with the nature of work and site conditions.
CONTRACTOR TO INFORM HIMSELF FULLY :-
10.2
Conditional tender will be summarily rejected.
CONDITIONAL TENDER :-
10.3
Tenderer should quote his offer to be paid to Corporation as
yearly contract amount after taking into consideration all the
information given in para No.3 of Annexure-A of this tender. He
should quote his offer in the agreement form, in section
TENDERED OFFER :-
-V only at
appropriate place, both in figures as well as in words in English.
Envelope No.2 shall contain only those documents as mentioned
in para 7 (b) above.
11) CORRECTIONS:-
No Corrections should ordinarily be made in the tender
documents. However, any corrections in the entries
made by the tenderer should be by crossing the incorrect portion and
writing the corrected portion above and each correction shall bear the
attestation of the tenderer.
12) SIGNING OF TENDER DOCUMENTS:-
Contractor No. of Correction Executive Engineer
21
The tender shall contain the name, residence and place of
business of person or persons making the tender and each page
of tender document including drawings, shall be assigned by the
tenderer with his full, dated signature.
The tender by partnership firm shall furnish the full names of all
the partners in the forwarding letter. The letter shall be signed by
the partner or by an authorised representative followed by the
name and designation of the person signing.
An attested copy of the partnership deed shall be furnished.
Tender by company, shall be signed with the legal name of the
company and signed by the person authorised to sign in the
matter.
Whenever in the submission of the tender in other matters, the
signature are made by one person on behalf of the company the
tenderer shall supply an attested copy of the power of attorney.
Witness shall be persons of status and probity and their names,
occupations and addresses shall be stated, below their
signatures. All signatures shall be dated.
I)
The tender is also liable to be rejected outright if while submitting,
II)
The tenderer proposed any alteration in the work specified in the
tender or in the time allowed for carrying out the work / in any
other conditions.
Any of the pages of tender are removed and / or replaced.
Contractor No. of Correction Executive Engineer
22
III)
Any erasures are made by the tenderer in the tender.
IV)
All corrections and additions or pasted slips are not signed
by the tenderer and Tender in case of firm, each partner, or
the person holding the power of attorney, authorizing him to
do so thereof, does not sign or the signature is not attested
by the witness in agreement form in Section-ll at the space
provided for the purpose.
13) ACCEPTANCE OF TENDER:-
Acceptance of tender will rest with the authority, as indicated in
Annexure A' of this section, who reserves the right to reject any or
all tenders without assigning any reasons. The acceptance of
tender will be intimated to the contractor by letter. Such intimation
shall be deemed to be an intimation of acceptance of tender: The
tenderer whose tender is accepted will have to complete the
contract form within 15 days of being notified to" do so and shall
be abide by all the rules and regulations and conditions
enumerated therein or attached here with. In the event of failure
Contractor No. of Correction Executive Engineer
23
of the tenderer to sign the agreement within the stipulated time,
the earnest money paid by him shall be liable to be forfeited to
Corporation and the acceptance of the tender shall be liable to be
considered as withdrawn. In that event the work will be awarded
to next or any other contractor, to whom the Corporation deems
to be suitable.
14) VALIDITY PERIOD:-
The offer shall remain valid for a period of 90 (Ninety) days from
the date of opening of tender and therefore until it is withdrawn by
notice in writing by the tenderer, duly addressed to the authority
as stated in Annexure 'A' of this section and sent by R.P.A.D. If
the acceptance of tender is not communicated within 90 days or
before and if the offer is withdrawn by the contractor as
mentioned above earnest money paid in such case shall be
refunded in full.
15) COMPLETION OF TENDER DOCUMENTS:-
While completing tender documents, the contractor must
invariable complete all the formalities included in the tender
documents giving correct information. However,-this information
shall have to be submitted by 'the contractor in the prescribed
formats separately in Envelop No.1 as per provision' of paragraph
7 of the detailed tender notice.
Contractor No. of Correction Executive Engineer
24
16) LANGUAGE:-
The language of all correspondence regarding this work shall be
English only.
17) LICENCE UNDER CONTRACT LABOUR REGULATION
AND ABOLITION) ACT 1970.
The successful tenderer should produce to the satisfaction of the
competent authority accepting the tender a valid and current
license issued in his favour under the provisions of contract
labour (Regulation and Abolition) Act. 1970. Maharashtra
Contract Labour (R & A) Rule 1971, before signing the contract.
On failure to do so the acceptance of the tenderer will be
withdrawn and also the earnest money will be forfeited to
Corporation. The contractor shall submit the certified copy of
registration certificate under E.S.I.S. and P.F. act.
Contractor No. of Correction Executive Engineer
25
A N N E X U R E - 'A' 1. Description of Complex
a) Formal Garden (Including Garden area around Statue of Hon.Late Shankar
Chavan)
: - Sant Dnyaneshwar Udyan Complex
includes i) Sant Dnyaneshwar Udyan ii) Rest House at Nathnagar
(North).
Sant Dnyaneshwar Udyan has been developed on the down
stream side of the Jayakwadi Dam near Paithan town in
Aurangabad District of Maharashtra State. The Garden is
developed in 74 Ha. Area which comprises of
b) Informal Garden
c) Sacred Garden
d) Children Park
e) Dnyaneshwar Dnyan Peeth and Research Institute
f) Stall and Toilets
g) Parking Area
h) River Bank Portion for boating facilities
Brief description of Udyan is as under:-
a) Formal Garden: Formal garden spread over in 28.00 ha of
area;
comprises of different types of flower beds
developed in six terraces with beautiful layout with
various types of lawn, hedges, edges, water pools,
channels, and internal paths. In addition to various
shaped fountains, .waterfalls, cascades. This park also
includes musical fountain, 40 feet high fountain and
Garden area around the statue of Late Shankar Chavan,
which is main attraction to tourists.
Contractor No. of Correction Executive Engineer
26
b) Informal Garden: Informal garden is developed in 18.00 ha of
area which comprises of varieties of forest trees and Children
Park.
c)
Sacred Garden: Sacred garden is developed in 8.00 ha of area
comprising sacred trees of various types.
I)
d) Facilities provided in Sant Dnyaneshwar Udyan:
II)
Tourists can enter in to Sant Dnyaneshwar Udyan by two
main entrances, provided with beautiful entrance gates.
Both entrances are provided with entry fee collection
booths.
III)
All entrances are provided with tar roads.
IV)
Parking facilities inside the Udyan.
V)
Array type stalls and canteens are provided at various
important locations.
Considering the visitors strength at present three toilets are
provided, out of which one well furnished toilet is provided at gate No.1
and other two toilets are located near terrace No.4 and 6.
e) Dnyaneshwar Dnyanpeeth and Research Institute:
Dnyaneshwar Dnyanpeeth and Research Institute Building is
constructed in sacred garden area, where marble statue of Sant
Dnyaneshwar is installed. This building is also equipped with
architectural features to attract the tourist.
Contractor No. of Correction Executive Engineer
27
f) Boating Facilities: i) Udyan Complex also includes river portion
between causeways to Nath Mandir Ghat for development of
boating facilities. This river side portion can be utiliased after
studying the fluctuations during generation, pumping activities of
power house, depth of water available for boating facilities.
Revenue from boating facilities is a part and parcel of revenue
from Udyan Complex, ii) Rest houses at Nathnagar (North) also
named as Nath Vishram Griha Situated at seven K.M. from Sant
Dnyaneshwar Udyan.
This Nath Vishram Griha comprises of furnished five VIP suites
with kitchen room, dining hall and waiting room.
I) Contractor has to maintain the existing facilities
provided in Udyan Complex and if necessary he has
to improve the existing facilities at his own cost.
2) SCOPE OF WORK TO BE DONE:-
II) It is essential to develop existing Udyan Complex, as
per development proposal submitted with the tender
with due approval of competent authority with or
without modification if any at his own cost
Competent authority has a right to change / modify
the development proposal submitted with the tender
for such developments he has to give detail program,
with flow of investment and accordingly after
approval to the same by competent authority he has
to start and finish developments as per program at
his own cost. Delay in such investment / committed
developments shall be treated as bad performance
Contractor No. of Correction Executive Engineer
28
and will be dealt with as per provision made under
"Right to terminate the contract"
III)
The maintenance works as mentioned in Section - IV
shall be done regularly and in time and as per the
necessity.
IV)
As a part of Udyan Complex, rest house is to be well maintained and if
necessary he can provide additional facilities inside or out side the rest
house at his own cost with approval of competent authority.
3) INFORMATION FOR OFFERING THE CONTRACT:
It is proposed to maintain this garden with existing facilities as
well as proposed to develop amusement park, Water Park and other
attraction to tourists at the cost of Contractor.
At present entrance fees to Udyan, boating facilities and rest
house is the source of income to GMIDC. Contractor can add to this
income from development of amusement park in Children Park or he
can utilize the river source for development of Water Park and renovate
the existing boating facilities at his own cost.
Contractor has to take review of yearly expenditure for
maintenance of existing garden with all existing facilities and also he
has to estimate the expenditure for future scope for development of
Essel world type amusement park, Water Park and new generation
fountains and whatever development he planned for by applying his
creative mind.
Contractor No. of Correction Executive Engineer
29
He has to consider for total expenditure on i) Regular
maintenance, operation and management of existing Udyan, ii)
Proposed development plan and iii) Maintenance of rest house which is
also included in Udyan Complex.
He has also to estimate future income from entry fees levied to
tourists for various places of interest.
After estimating net revenue from all sources in Udyan Complex,
pre- qualified tenderer is expected to give his offer of yearly contract
amount to be paid to GMIDC in lieu of providing Sant Dnyaneshwar
Udyan Complex with all existing facilities yearly for a 10 years period as
per terms and conditions of contract. This contract offer is to be given
as per Section - V in OFFER FORM.
4) WORKS AND SITE CONDITIONS:
4.1 Location : At. Paithan, 50 Km from
Aurangabad
4.2 Nearest Railway
Station
: Aurangabad
4.3 Nearest Airport
: Aurangabad (Maharashtra)
4.4 Roads : Approachable by all weather roads
from Paithan Aurangabad state
Highway
4.5 Nearest Telephone
and Telegraph facility
: Paithan
4.6 Nearest Petrol, and
Diesel pump
:
Paithan
Contractor No. of Correction Executive Engineer
30
5) INFORMATION FOR OBTAINING TENDER PAPER AND
ITS SUBMISSION:-
Name of work
: Operation, Maintenance and Management of Sant Dnyaneshwar Udyan Complex, Paithan
Earnest Money Deposit
: Rs.03.00 Lakhs
Security Deposit : Rs.50.00 Lakhs
(Rs.15 Lakhs in form of D.D &
Rs.35 Lakhs in form of Bank
Solvency of any Nationalized bank
of Maharashtra.)
Period of Contract
10 Years.
Period of Issue of Blank Tender forms to pre qualified contractors
: As informed on Mail & Website
Cost of blank tender forms Rs.10,000/- Per No.
Date and Place of pre-Bid conference
: As in form on mail,& website @.in the office of the Chief Engineer and Chief -Administrator CAD, ID. Aurangabad
Date, time and place of receipt of sealed tender form
: Latest up to at 15.00 Hours on As
in form on mail & website in the
office of the Superintending
Engineer Jayakwadi Project Circle,
Aurangabad.
Date, time and place opening of tender form
:
On As in form on mail,& website at
16.00 Hours in the office of the
Superintending Engineer
Jayakwadi Project Circle,
Aurangabad (If possible)
Contractor No. of Correction Executive Engineer
31
Acceptance of Tender Chief Engineer & Chief
Administrator, CAD, I.D.
Aurangabad.
:
Validity period of Tender 90 days from opening of tender. :
Right to revise or amend this tender document fully or partly prior to last
date notified for issue of tenders is reserved. Omission, errors,
deviations or amendments to tender documents if any shall be
communicated by letter.
Right to reject any or all offers without assigning reasons there of is
reserved by Chief Engineer and Chief Administrator CAD, ID,
Aurangabad.
Contractor No. of Correction Executive Engineer
32
SANT DNYANESHWAR UDYAN COMPLEX
PAITHAN DIST. AURANGABAD
Section II INFORMATION AND PRESENT POSITION
OF
Contractor No. of Correction Executive Engineer
33
Section II
INFORMATION AND PRESENT POSITION OF SANT DNYANESHWAR UDYAN COMPLEX PAITHAN
DIST. AURANGABAD Government of Maharashtra vide Government Resolution
No.JAY/67/202/T-3 Sachivalaya Mumbai Dt. 27/08/1975 to perpetrate
the memory of Sant Dnyaneshwar on the occasion of his 7th Centenary
celebration decided to build a glorious Sant Dnyaneshwar Udyan,
Paithan at the foot of the Jayakwadi dam. For the purpose of finalizing
arrangements for quick planning and execution of this Scheme the
Government appointed a State level Committee, under the
Chairmanship of Irrigation Minister.
In order to take regular review of the works under the Sant
Dnyaneshwar Udyan, Paithan and to sort out the day to day difficulties
arising during construction and development works and to suggest
appropriate measures to solve these difficulties, a Standing Committee
was formed under the Chairmanship of Divisional Commissioner,
Aurangabad. As per directives of the Standing Committee and as per
the guidance of State Level Committee, development of Sant
Dnyaneshwar Udyan. Paithan has been practically completed. Layout of
Sant Dnyaneshwar Udyan, Paithan is prepared on the basis of famous
Gardens in India. Viz Shalimar, Vrindivan & Pinjor.
Contractor No. of Correction Executive Engineer
34
Sant Dnyaneshwar Udyan, Paithan is developed on 125.0 Hectors area.
1)
Distribution of this area is as shown below:
Orchard Udyan - 26.50 Hect.
2) (With Horticulture department)
3) Formal Udyan - 28.00 Hect.
4) Informal Udyan - 18.00 Hect.
5) Sacred Udyan - 08.00 Hect. Sant Peeth - 07.00 Hect
6) (With education & Culture department)
7) Build and open space - 03.89 Hect.
8) Tourist Complex - 02.55 Hect. Open space beyond - 10.49 Hect.
compound wall near
9) Boating
10) Oval Road - 04.00 Hect.
Link Road - 01.20 Hect.
1.1.0.
1.0 Brief information and present status of Sant Dnyaneshwar Udyan, Paithan is as below:
Sant Dyaneshwar Udyan, Paithan
1.1.1 EARTHWORK BASE FOR FORMAL GARDEN :
1.1.2
In Formal Garden area, different types of flower plants and lawns are
developed: For this purpose, special type of earthwork base for different
types of flower plants and shapes of lawns are used.
CONSTRUCTION OF RETAINING WALL :
Retaining walls are constructed to maintain different levels and also at
some places for beautification of Sant Dnyaneshwar Udyan Complex,
Paithan.
Contractor No. of Correction Executive Engineer
35
1.1.3
Internal paths as per necessity are constructed in the Formal Garden.
CONSTRUCTION OF INTERNAL PATHS IN FORMAL GARDEN:
1.1.4
For providing attraction to the tourist's two parallels curved water
channels are developed.
CONSTRUCTION OF WATER CHANNELS:
1.1.5
To increase the beauty of the Sant Dnyaneshwar Udyan Complex,
Paithan special types of water pools of different sizes, cisterns and
cascades are constructed.
CONSTRUCTION OF WATER POOLS, CISTERN AND
CASCADE:
1.1.6
To provide additional beauty and demarcation to the lawns, hedges are
developed Flower beds are constructed to add to beauty.
LAWNS HEDGES AND FLOWERS BEDS:
1.1.7
Most of the land in Sant Dnyaneshwar Udyan, Paithan is having natural
slopes and drainage channels are constructed as per requirement to
provide proper drainage arrangement around and inside of the oval
road. Some changes in drainage arrangement are contemplated in due
course. The change shall be done by contractor at his own cost.
DRAINAGE ARRANGEMENT AROUND OVAL ROAD
(EXTERNAL AND INTERNAL):
Contractor No. of Correction Executive Engineer
36
1.1.8
As per the provision in the layout of Sant Dnyaneshwar Udyan
CONSTRUCTION OF OVAL ROAD, EXTERNAL AND INTERNAL ROADS :
1.1.9 CONSTRUCTION OF COMPOUND WALL :
oval road
is constructed. Internal paths are also constructed. Most of these are
now provided with Shahabad flooring.
1.1.10 WATER SUPPLY ARRANGEMENT:
Permanent compound wall is constructed around periphery of the Sant
Dnyaneshwar Udyan to protect Sant Dnyaneshawar Udyan Complex
from animals and from unauthorized persons. Fabricated steel grills are
embedded in compound wall.
Water supply arrangement is made in Sant Dnyaneshwar Udyan
Complex, Paithan for Formal Garden, Orchard Garden, Water
Channels, fountains, drinking water purpose and for toilet, canteen,
ARREY type stalls and for other purposes. One direct outlet is provided
in the body of the dam for the entire water supply form the outlet. For
future distribution 29 cm. dia. 300 meter long A.C. Pipe line is provided
in different parts of Sant Dnyaneshwar Udyan along with controls.
1.1.11 TREATMENT OF EXISTING NALA:
For drinking water facility to tourists, 2 water fountains are constructed.
As per the requirement and necessity the No. of water fountains shall
have to be increased.
Specific plants are to be planted on the bank- and the slope of the Nala
flowing in the Sant Dnyaneshwar Udyan Complex, Paithan to increase
the beauty of the Sant Dnyaneshwar Udyan, Paithan.
Contractor No. of Correction Executive Engineer
37
1.1.12 CONSTRUCTION OF CHILDREN PARK:
Two Children parks are planned to be developed in the Sant Dnyaneshwar Udyan Complex for the attraction of the Tourist. Children Park No.1, is developed near to statue area Common types of playing articles are provided as broadly stated below: 1) Om Shape Climber
2)
1 No.
Snale Shape Climber 1 No.
3) Butterfly Jungle 1 No.
4) Scar Jungle
5)
1 No.
Sliding Chute 1 No.
6) Swings
1 No.
1.1.13 PROPOSED DEVELOPMENTS IN CHILDERN PARK NO.2
In Children Park No.2 proposed to be situated in Informal garden, new
types of amusement rides are proposed to be provided as per "ESSEL
WORLD" situated in Mumbai. This Children Park will be an added
attraction of this Sant Dnyaneshwar Udyan Complex, These
amusements rides are to be provided and fixed in position by the
Contractor at his own cost.
Contractor No. of Correction Executive Engineer
38
1.1.14. DEVELOPMENT OF FOUNTAINS AND ACROSS FOUNTAINS:
At present different types of fountains are provided.
1) Dome shape fountain - 2 Nos
2) Appollo fountain - 1 No
3) Allen fountain - 2 No.
4) Musical fountain - 1 No
5) Sculpture type fountain - Left side of terrace no. 1
6) Sculture type fountain - Right side of terrace No. 2
7) Baby fountain - Left side of terrace No. 3
Every day in the evening different types of songs are being played and
musical scenes are being displayed on the Musical Fountains, in time,
with the five songs which are automatic.
Contractor No. of Correction Executive Engineer
39
1.1.15 ELECTRIFICATION TO SANT DNYANESHWAR UDYAN
COMPLEX, PAITHAN:
On both the sides of the internal path. 600 Nos. of electric lights are
provided. Oval road side electric lights are also provided. In all the
different parts of the Sant Dnyaneshwar Udyan Complex, Paithan
electrification is done.
STALLS AND TOILET FACILITIES:
Following types of Restaurants and Array types of stall are provided.
1) Near gate No.2
(Restaurant)
: 115 Sq.m. construction with 412
Sq.m. open space
2) Array Stall No.2 : Located near terrace No-3
3) Near children Park No.1
Array stall
: 10 Sq.m. Construction 45 Sq.m.
open space
4) Near Terrace No.4
(Restaurant)
:
10 Sq.m. Construction 85 Sq.m.
Constuction
Contractor No. of Correction Executive Engineer
40
TOILETS:
1) Near gate No.1( Toilets) : 38 Sq.m. construction
2) Near gate No. 2 with
(Restaurant)
: 38 Sq.m. construction
3) Near Nalla besides oval
Road
:
38 Sq.m. construction
Temporary Pagoda type sheds are constructed at following places.
Near Terrace No.1 - No
Near Terrace No.2 - No
Near Terrace No.3 - No
Contractor No. of Correction Executive Engineer
41
1.1.16 ORCHARD GARDEN:
1.1.17 INFORMAL GARDEN:
In 26.5 Hect. Areas of the Sant Dnyaneshwar Udyan, Paithan, new
different types of Orchard trees are planted. In this area state level
nursery is developed by Agriculture Department. This Garden area will
not be handed over to the Contractor.
1.1.18 SACRED GARDEN:
In 18 Hectors of the Sant Dnyaneshwar Udyan, Paithan, varieties of
trees are planted.
In consist of various varieties of sacred trees plantation in 8 Hect. At the
time of handing over the actual and number of trees will be verified.
1.1.19 CONSTRUCTION OF DNYANESHWAR DNYANPITH
RESEARCH INSTITUTE :
Approach road is also constructed, with an R.C.C. Bridge on the Nala,
flowing the west side of Sant Dnyaneshwar Udyan, Paithan for
approaching the Sant Dnyaneshwar Dyanpith Research Institute
building.
Sant Dnyaneshwar Dnyanpith Research Institute building is constructed
in the Sant Dnyaneshwar Udyan, Paithan area where in a marble stone
statue of Sant Dnyaneshwar is installed. Behind this marble statue
stained glass mural is fixed. Life sketches of Sant Dnyaneshwar in fiber
glass are displayed on both sides along the passage
of main structure.
Contractor No. of Correction Executive Engineer
42
1.1.20
The land in the Sant Dnyaneshwar Udyan, Paithan is not in level. The
land is developed into terraces having uniform side slope on which
creepers have been planted.
DEVELOPMENT OF TERRACE SLOPES:
1.1.21
On experimental basis G.I. Pipe Arches are constructed in Sant
Dnyaneshwar Udyan, Paithan.
G.I. PIPE ARCHES:
1.1.22
Sant Dnyaneshwar Udyan Complex, Paithan should be kept clean.
Modern type dust bin as per necessity and need have been kept at
different places. At important places benches have been kept for
tourists. No of Bins/Benches will have to be increased suitably.
DUST BIN AND SITTING BENCHES:
1.1.23
Boating facility can be provided in the Godavari River near Sant
Dnyaneshwar Udyan Complex; however this Boating facility will have to
be looked after and developed further by the Contractor as per the
necessity
NAVIGATION AND BOATING ARRANGEMENTS IN
GODAVARI RIVER:
Contractor No. of Correction Executive Engineer
43
1.2.0 REST HOUSE- AT NATH VISHRAM GRIHA
Nath Vishram Griha comprises of well furnished five VIP suits with
kitchen, Dining hall and waiting room.
Contractor No. of Correction Executive Engineer
44
Section-Ill
M & R WORKS IN THE SANT
DNYANESHWAR UDYAN COMPLEX
Contractor No. of Correction Executive Engineer
45
Section-Ill M & R WORKS IN THE SANT DNYANESHWAR UDYAN
COMPLEX (This is illustrative and guidance list)
Following is the list of M & R activities normally required to be carried
out in different part of the Sant Dnyaneshwar Udyan Complex. This list
is only indicative and the contractor may be required to carryout more
activities for maintenance and repairs of different parts of Sant
Dnyaneshwar Udyan Complex. All the Maintenance & Repairs activities
whether included in the list or not, shall have to be carried out by the
contractor at this own expenses and GMIDC will not pay any amount,
whatsoever on the ground that the contractor is required to carryout an
i) Preparing earthen round pits and picking it.
activity not included in the list of maintenance and repair works.
1) Flower beds in the flower garden.
ii) Cleaning and repairing of bunds of replacing them where
necessary.
iii) Cutting of flower plants as per requirements.
iv) Providing fertilizers and spraying insecticides to the flower
plants at the required times.
vi) Plantation of new flower plants as per requirement.
i) Plantation of seasonal flower plants as per requirement.
Contractor No. of Correction Executive Engineer
46
2)
ii) Watering to the plants as per requirements.
Maintenance of lawns and beds:
i)
ii)
Mowing of grass lawns by machine periodically.
iii)
Watering to the lawns and beds periodically.
iv)
Providing fertilizers and spraying insecticides to the lawns and
beds at required times.
v)
Removing of unwanted grass.
vi)
Picking of round pits of bed
vii)
Cutting of bed in proper size
Replacement of old lawns and beds as and when directed.
3) MAINTENANCE OF SMALL TREES INSIDE THE OVAL ROAD:
(GROVES)
i)
ii)
Picking of round pits (Groves).
iii)
Preparing and repairs of bunds for watering.
iv)
Proper watering at proper time as per requirement.
v)
Cutting of trees at proper time.
vi)
Removing of excess grass from the pit.
vii)
Providing fertilizers in proper proportion and spraying.
Replacing old plants as per requirement.
Contractor No. of Correction Executive Engineer
47
4) M & R OF SACRED AND NATURAL SANT DNYAENSHWAR UDYAN.
i)
Taking proper care of trees in natural and sacred Sant Dnyaneshwar
udyan Complex, Paithan
ii)
Providing and applying pesticides required for protection of trees
from termite and insects.
iii)
Collection and disposal of leaves in this area.
iv)
Removing the shrubs, bushes & Babul trees and disposing them
off out of Sant Dnyaneshwar Udyan Complex, Paithan.
v)
Keeping guard for preventing from stealing and unnecessary
cutting of trees
Plantation of new trees and preparing pits for it in the specified
are. Filling manure and suitable soil properly and developing,
vii)
Maintaining new trees.
viii)
Repairing trees ottas and preventing there damages.
Spreading murum on the foot paths.
Contractor No. of Correction Executive Engineer
48
5)
MAINTENANCE OF WATER CHANNELS AND FALLS:
i)
ii)
Removing the weeds and moss and cleaning of water channels.
iii)
Repairing of flooring of water channels and nature falls as per
requirement.
6) FOUNTAIN; MAINTENANCE AND REPAIRS;
Operation maintenance and repair of the arrangement for
circulation of water channels and falls.
i) Cleaning and brushing the area around the fountain once in a
Week and removing the moss and other waste material.
And repairing of flooring around the
ii)
fountains,
Cleaning the rubes of fountains and taking precaution
iii)
for passing
the water properly in the tubes,
iv)
Repairing and replacement of electric bulbs around the fountains
and keeping the colored glasses on the electric bulbs in good condition.
v)
Operating regularly, Repairing and Maintenance of electric motor
of the fountain including Rewinding of Electric Motor as per necessity.
Maintenance of Electric cables so that the same would not be
dangerous to the visitors. Replacement of old cable, if required.
Contractor No. of Correction Executive Engineer
49
7) M&R OF MUSICAL FOUNTAIN;
i)
ii)
Cleaning the tank of Musical fountain once in a week. Removing
the moss and other waste material from it.
iii)
Repairing all the tubes of fountain and cleaning them once in a
week.
iv)
Repairing and replacing where necessary all the bulbs around the
fountain and keeping them in running condition and color.
Glasses in good condition.
Maintaining and repairing the Electric motor of fountain and
Operating it in working condition.
vi)
v) Repairs of rewinding of Electric motor as and when required.
vii)
Maintaining of Electric cable so as not to be dangerous to the
visitors laying the new cable if required.
viii)
M&R to Panel Board of Musical Fountain.
ix)
Running Musical Fountain on automatic Panel. Preparing new
songs on automatic channel items.
x)
M&R of tape recorder and items connected with it.
xi)
Proper Maintenance and Repairs of Loudspeakers.
xii)
Making necessary changes for playing sounds on stereo system.
Maintaining the slope for seating of visitors.
Contractor No. of Correction Executive Engineer
50
xiii)
xiv)
Maintaining the lawns and trees in the area.
xv)
Maintaining the iron railing around the fountain and painting every
year using high quality of paint.
xvi)
Maintenance and Repairs of Control Rooms and Painting every
year using high quality of paint.
M&R to footpath spreading murum and sand.
Contractor No. of Correction Executive Engineer
51
8) INTERNAL ROAD IN THE SANT DNYANESHWAR UDYAN
COMPLEX, PAITHAN
I) Sweeping and cleaning of roads daily where flooring paving is
done.
ii) Spreading murum or sand on other roads in the Sant
Dnyaneshwar Udyan Complex as per necessity.
iii) Cutting of unwanted grass and disposing it out of Sant
Dnyaneshwar Udyan Complex. Paithan.
iv) Replacing and restoration of the flooring, if any breakage occur.
Contractor No. of Correction Executive Engineer
52
9) SUPPORTING WALLS AND STEPS:
i) Maintenance and repairs of the walls and steps.
ii) Repairing and restoration of the flooring, if broken.
iii) Repairs to the pointing.
iv) Providing and applying high quality Snowcap paint as per
requirement.
10) OVAL ROAD, APPROACH ROADS AND PARKING PLACE
i) Maintenance and repairs of roads and parking place. Filling pot
holes with tar topping.
11) Removal of grass, bushes twice in a year from the embankment of
road and disposing it out of Sant Dnyaneshwar Udyan Complex,
iii) Spreading of murum and sand for beautification on the
embankment of road.
iv) White washing the stones along the roads.
v) Providing asphalting to the entire road as per necessity.
vi) Maintaining and repairing drains, removing the grass and silt
from the drains twice in a year or more frequently, if necessary.
Contractor No. of Correction Executive Engineer
53
11)
MAINTENANCE AND REPAIRS TO DRAINAGE
ARRANGEMENT
i)
ii)
Removal and disposal of grass silt in the drains.
iii)
Repairs to the masonry and pitching of drains.
Care should be taken for continuous flow of water in the drains.
12)
ELECTRIFICATION :
i)
ii)
Switching on daily all the Electric lights, when required.
iii)
Replacement of Electric bulbs as per requirement.
iv)
Keeping the beautified parts of Electric lights in good condition.
v)
Painting the Electric poles with high quality paint once in a year
vi)
Replacement of glass of Electric lights, if broken.
vii)
Maintenance of Electric cables properly.
Repairing the Panel Board and keeping it in good condition.
Coloring the panel board with high quality paint once in a year.
viii) Taking proper care of Transformer and Panel Board, repairing it
and painting it once in a year.
ix) Changing the oil of transformer and filtering it as per necessity.
Contractor No. of Correction Executive Engineer
54
13)
Contractor No. of Correction Executive Engineer
55
MAINTENANCE AND REPAIRS OF WATER SUPPLY ARRANGEMENT AND DRINKJNG WATER ARRANGEMENTS. I) M&R to mainline from dam to Sant Dnyaneshwar Udyan
Complex, Paithan and its distribution system
II) Timely checking of existing pipe line and replacement of any
damaged part of pipe line.
iii) Avoiding leakages in main pipe line and its distribution system.
iv) Timely checking and repairs to the main valve at dam and valves
on distribution system.
v) Maintenance of existing drinking water tank by carrying out repairs
as and when required avoiding leakages of taps, and
replacement of leaking taps.
vi) Avoiding damages to decorative part of drinking water tank. Water
tanks repairing if necessary.
vii) Painting water tanks with high quality paint in a year.
viii) Avoiding pounding of water near water tank, accumulation of dirt
etc.
14) M & R TO CANTEENS, TOILETS AND OTHER CONSTRUCTION
i) M & R of the building for Canteens, Toilet, main gates shall be
done regularly.
Contractor No. of Correction Executive Engineer
56
a\)
vi) intensive care should be taken to avoid leakages from any part of
toilets
Timely checking of all construction works ^nd repairs to damaged
and collapsed parts of building.
iii) Painting all construction work with high quality colour once in
two years.
iv) Costly equipment fixed in toilets shall be kept in good condition
broken tiles should be replaced immediately.
v) Intensive care should be taken to keep .the toilets very clean, by
using phenyl and ether cleaning material,
vii) Septic tank of every toilet should be cleaned every three years.
viii) Care should be taken to avoid bad occur in the premises of the
toilet.
Contractor No. of Correction Executive Engineer
57
15) M and R TO CHILDERN PARK NO. 1 :
I) General types of amusement rides have been installed in
Children Park No-1.Care should be taken that no child will injured due
to damaged
ii)
Amusement rides, installed amusement rides should be inspected from
time to time and damaged parts should be repaired immediately.
iii)
15cm. thick layer of fine sand should be spread every year on the
open space of the children park No. 1.
All amusement rides should be painted every .year with high quality
of colour.
16) COMPLETE INSTALLATION OF CHILDERN PARK NO.
2 :
i) 2.5 Ha. Land has been reserved for children park No. 2 in
ii)
Sant
Dnyaneshwar Udyan Complex, Paithan. Rides Similar to those in
"ESSELWORLD" shall be installed on this land.
The layout of installation of rides shall be prepared and got
approved from the competent authority.
Jii)
iv)
Types of rides to be installed shall be got approved from
competent authority. Internal roads shall be constructed in this area.
v)
Separate fencing shall be provided to this park, with one gate each
for Entrance and Exit.
Separate Power supply shall be taken for rides and premises of this
vi)
park.
vii)
Care shall be taken that every ride will be in working condition at all
times.
Utmost care shall be taken to avoid injuries to the tourist from
power supply and rides.
Contractor No. of Correction Executive Engineer
58
viii)
ix)
A Permission for installation of such types of rides as may be
required other departments shall be obtained by the Agency,
17) Fencing and internal roads kept in good condition.
MAINTENANCE AND REPAIRES OF THE SANT
DNYANESHWAR DNYANPITH
i) A building to accodamade in Sant Dnayneshwar Dnyanpith
Research Institute is constructed in Sant Dnyaneshwar Udyan
Complex Paithan h
ii)
aving beautiful architectural view. The
maintenance and repairs of this very important building shall be
done with utmost care.
iii)
Care should be taken to ensure that there should not be any type
of damages to any part of building structure including statue of
Sant Dnyaneshwar.
iv)
Lawns provided in 4 corners of this building shall always be kept
in good condition. Timely cutting by lawn mower machine and
necessary watering of said lawn should be done.
v)
The entire structure and especially the flooring, also the premises
should be kept clean.
vi)
Flooring and Marble cladding of the main building shall be
cleaned two times a day using suitable detergent and water.
vii)
Care should be taken that there should not be any accumulation
of dust on the cement jalli provided in the main building. These
cement jallis should be cleaned daily.
viii)
Pictures in fiber glass fixed in side the verandah of the main
building should be kept in good condition. The glass frames in
front of pictures are to be cleaned at least two times a day.
Breakages, if any, shall be made good.
ix)
All doors, windows, steel grills of Ihe windows and other wooden
materials should be cleaned two times in a day.
Ail inside roofs should be cleaned daily.
x) Leakages .of the building should be strictly prevented
Contractor No. of Correction Executive Engineer
59
xi)
xii)
Kalash installed on the top of the building should be cleaned daily
to maintain its brightness.
xiii)
Care should be taken that no dust gets accumulated on the
Statute and glass murals installed inside the Building. Necessary
arrangement shall be made for cleaning these articles daily.
xiv)
Care should be taken that the tourist can see the Statue by standing sufficiently away from the statue.
xv)
High quality colour should be given once every two years to inside and outside of the buildings and outside cement jalli compound wall.
xvi)
All doors, windows and wooden work be painted with high quality polish, every two years.
Care should be taken to keep all electrical installations in good condition by doing periodically inspection and carrying out necessary repairs and replacement.
Contractor No. of Correction Executive Engineer
60
xvii) MAINTENANCE AND REPAIRS OF THE R.C.C. BRIDGE AND APPROACH ROADS: I) Regular maintenance and repairs of the R.C.C. Bridge should be carriedout.
ii)
ii) Care should be taken that railing of the bridge will stand in good condition.
iii) If the railing is damaged immediate repairs should be done.
iv)
Care should be taken to avoid any damage to the moving tourist during their movements on the R.C.C. Bridge.
v)
Cleaning of the road flooring and R.C.C. Bridge should be done daily to deep them clean.
19)
High quality paint to the railing of the approach roads and R.C.C.
Bridge should be given.
COMPOUND WALL AROUND SANT DNYANESHWAR UDYAN COMPLEX, PAITHAN: I) Care should be taken to keep entire compound wall including steel grill in good condition by repairing the damages, if any, promptly. ii) High quality colour should be given periodically to compound wall and high quality oil paint should be given at every three years to grills, placed all around the compound wall of Sant Dnyaneshwar Udyan Complex, Paithan.
20)
iii) Care should be taken that no unauthorized person enters into the Sant Dnyaneshwar Udyan Complex, Paithan.
TICKET BOOKING ARRANGEMENT:
i) For ticket booking arrangement adequate staff should be engaged
by the Contractor.
ii) Care should be taken that tourists should purchase ticket in a
disciplined and descent manner without causing any disturbance.
iii) Separate account should be maintained for adult, children and
school trips tourists.
Contractor No. of Correction Executive Engineer
61
iv) Ticket should be checked at the entrance Gate for which
necessary staff should be appointed by the contractor at his own
expenses.
v) Separate tickets should be issued for the vehicles.
vi) Ticket should be kept on gate No.1 and gate No.2 separately for
this purpose necessary staff should be appointed by the
Contractor at his own expenses.
21)
GENERAL PROTECTION ARRANGEMENT:
i) Arrangement for parking the vehicles should be made at both the
Entrance gates of the Sant Dnyaneshwar Udyan Complex.
Paithan, in such a way that there shall not be any disturbance to
the tourists visiting the Sant Dnyaneshwar Udyan Complex,
Paithan.
ii) Entry should be permitted to the small vehicles, medium, type
Vehicles arid tourists through gate No.2 only. All heavy vehicles
should be permitted to enter through No.1 of the Sant
Dnyaneshwar Udyan Complex, Paithan.
62
Contractor No. of Correction Executive Engineer
iii)
iv)
The tourists shall not allow to step in to the water channels and
the water falls and also to pluck the flowers.
v)
Care should be taken that tourist shall not enter inside steel railing
of 40 feet fountain.
vi)
Adequate dust bins shall be provided in the Sant Dnyaneshwar
Udyan Complex, Paithan at suitable places for disposal of the
waste materials by the tourists. These dust bins be emptied as
frequently as required.
The tourists shall be prevented from damaging any plants,
electrical provisions and any construction in the Sant
vii)
Dnyaneshwar Udyan Complex. Paithan.
22) GENERAL MAINTENANCE OF SANT DNYANESHWAR
UDYAN COMPLEX, PAITHAN.
Tourists shall not be permitted to linger on in the Sant
Dnyaneshwar Udyan. Paithan. beyond the visiting hours.
i) Sant Dnyaneshwar Udyan Complex, Paithan: Sant Dnyaneshwar
Udyan, Paithan shall be kept in good condition: No trees and
structures and constructions inside -the Sant Dnyaneshwar
Udyan, Paithan shall be damaged in any way. and shall be
maintained properly besides above mentioned works, necessary
works, if requried shall have to be taken up immediately as •
directed. Annual maintenance Programme will have to be
prepared by the Contractor and got approved from the competent
authority.
63
Contractor No. of Correction Executive Engineer
ii) Maintenance of the Rest Houses during service:
iii)
Rest house shall be kept clean and well maintained.
The Contractor shall repair and maintain the project facility
(Furniture, fittings, plantation of species, manure injecting.
iv)
Watering etc.) It is finally handed over to the G.M.I.D.C. at the
end of the contract period. In addition to the existing facilities,
developments/modification done by the contractor shall also be
maintain in good condition by the contractor at his own cost and
handed over to the same to the G.M.I.D.C. at the end of contract
period.
v)
The Contractor in consultation with the Engineer shall evolve a
maintenance manual and supply 10 copies to the G.M.I.D.C.to
ensure systematic maintenance of the facility. Periodicity of both
routine special inspections shall be decided and carried out jointly
by the Resident Engineer and the Executive Engineer.
The maintenance and repairs shall also include maintenance and
repairs of electrical and other installations and payment of
Energy bills and water bills.
Vi) Water: It will be the sole responsibility of the Contractor to lay
pipe lines to storage/distribution system at his own cost and pay
all charges as per prevailing rates in force at that time, vii)
Power: Power supply for the Complex during Maintenance and
operation period will be made arranged from M.S.E.B. from
nearest substation by the Contractor himself at his own cost.
64
Contractor No. of Correction Executive Engineer
SECTION – IV TERMS AND CONDITIONS OF
CONTRACT
65
Contractor No. of Correction Executive Engineer
SECTION - IV
TERMS AND CONDITIONS OF CONTRACT
1) DEFINATIONS :
GMIDC :
Godavari Marathwada irrigation
Development Corporation.
"Government" :
Government of Maharashtra
Competent Authority :
Officer-in-charge of Sant
Dnyaneshwar Udyan Complex,
Paithan (Executive Engineer,
Lower Dudhana Project Division,
Sailu, District : Parbhani or his
authorised Representative)
Establishment :
Man power required for the
work (Experts,Officers, Labours
etc) and appointed by the
contractor for this work
Contractor : Individual/ Firm/Company
whose tender is accepted and
who has signed the Agreement on
bond paper.
66
Contractor No. of Correction Executive Engineer
2 )
COMMENCEMENT OF CONTRACT, DURATION AND
COMPLETION:
2.0 Handing over of Sant Dnyaneshwar Udyan Complex, Paithan on
Contract will start within 30 days of signing the contract. All the handing
over details will be enlisted at the time of handing over. The contract
shall start from the day on which the handing over process is
completed. Maximum period of handing over will be 10 days including
holidays. No land/buildings other than the specified in the drawing
attached with the agreement will be handed over to the/ contractor.
However period will be decreased or increased w.r.t. provision in the
respective clauses in this tender.
2.1 Request to extend the period for starting the handing over process of
Sant Dnyaneshwar Udyan Complex, Paithan shall exceptionally be
considered on the merit for which the Contractor shall have to make
the requisition in writing with due justification
2.2 The process of handing over of the Sant Dnyaneshwar Udyan
Complex, Paithan back to GMIDC shall be started by the
Contractor 15 days prior to the day on which the contract period ends
and this process shall be completed within 15 days so that Complex
will be handed over on the last date of completion of contract period.
On failure to do so the Sant Dnyaneshwar Udyan Complex. Paithan will
be taken in possession
unilaterally by the
67
Contractor No. of Correction Executive Engineer
Corporation and shortages, damages if any shall be made good from
the security deposit and Additional security deposit if
necessary, and
the Contractor shall not be entitled for any claim or any compensation
thereof.
2.3. Neither advance nor Loans shall be made available to the Contractor
for the (development works in the Complex by
GMIDC.
2.4. Agreement deed enclosed as Annexure -B in this booklet shall be
signed on bond paper of appropriate value at the cost of tenderer.
3) SECURITY DEPOSIT:
3.1 The Contractor shall maintain properly all features in the Sant
Dnyneshwar Udyan Complex which includes trees, flower beds,
lawns, plants, Buildings, roads, fountain, water channels and other
equipment etc. So as to boost up general beauty of Sant
Dnyneshwar Udyan Complex.
3.2. Security deposit amounting to Rs.15 Lakhs (Rupees Fifteen Lakhs) for
the period of agreement plus six months, will have-to be
deposited by
the Contractor with the GMIDC within 15 days of letter of acceptance of
offer. The Sant Dnyaneshwar Udyan Complex. Paithan will not be
handed over to the Contractor unless this amount is deposited. If any
damage occurs to any of the components as mentioned in para 3.1
above or to the beauty of the Sant Dnyaneshwar Udyan complex
during the contract period, the
68
Contractor No. of Correction Executive Engineer
Contractor will have to repair the damages by executing the necessary
work to the original form at his own cost. If the contractor fails to do so,
the competent authority will intimate in writing all corrective actions
repairs etc. In the eventuality of non-compliance of such Instructions of
the repair work within 3 days of such notice, the same will be carried
out by the GMIDC. In such case, the amount that will be recovered
from the contractor will be actual expenses incurred by GMIDC+ 40%
extra towards establishment and supervision charges. Amount of
actual expenses certified by the Engineer-in-charge will be final and
binding on the contractor. Also such act of the contractor will be treated
as bad performance and action will be taken according to the provision
made under Right to terminate the contract on.
3.3 Additional Security Deposit
The property of GMIDC, named as Sant Dnyaneshwar Udyan Complex
is to be handed over to successful Contractor after signing the
agreement deed. Till the expiry of this contract period he is
expected to
maintain this property without any loss or damage to the property.
Considering cost of this property, to safe guard against the cost of
damage/loss, Contractor has to submit, before signing the agreement,
in additional security deposit in form of solvency of a
Nationalised/Scheduled bank-branches situated in State of
Maharashtra of Rs.35/- Lakhs as per proforma enclosed.
69
Contractor No. of Correction Executive Engineer
The security deposit and Additional security deposit will remain with
the GMIDC
for the period of agreement plus Six months & will be
returned only after completion of above said period and will not carry
any interest.
The security deposit and additional security deposit will be retained by
the Corporation for the due and faithful fulfillment of the contract by
contractor.
4) NOTICE AND INSTUCTIONS:
4.1.
Site Office of the Contractor should be located in the Sant
"Dnyaneshwar Udyan Complex. Paithan.
4.2
4.3 All communications from Contractor shall be addressed to the
competent authority of the GMIDC
Any notice / Instruction to be given to the Contractor under terms of the
contract, shall be deemed to have been served if it has been- delivered
to his Authorised Agent or his Representatives at Site of work or
sent by registered letter to the site officer or to head Office address
provided by the Contractor
5) SCOPE OF WORK
TO BE DONE
i) Contractor has to maintain the existing facilities provided in Udyan
Complex and if necessary he has to improve the existing facilities at his
own cost.
70
Contractor No. of Correction Executive Engineer
ii) It is essential to develop existing Udyan Complex, as per development
proposal submitted with the tender with due approval of competent
authority with or without modification if any at his own cost.
Competent authority has a right to change/ modify the development
proposed' submitted with the tender.
For development works the contractor has to give details
program, with flow of investment and accordingly after approval to the
same b y competent authority he has to start and finish developments
as per program at his own cost.
Delay in such investments/committed developments shall be
treated as bad performance and will be dealt with as per provision
made under the "Right to terminate the contract"
i
ii) The maintenance works as mentioned in Section -III and any other
maintenance and repairs if required shall be done regularly and in time
and as per the necessity.
iv) As a part of Udyan Complex, rest house is to be well maintained and if
necessary the contractor can provide additional facilities
inside or out side the rest house at his own cost with prior approval of
competent authority.
71
Contractor No. of Correction Executive Engineer
6) SUPPLY OF MATERIAL BY THE GMIDC:
6.1 Neither material nor personnel will be provided by GMIDC for this work.
6.2 Presently water is supplied to the Sant Dnyaneshwar Udyan Complex,
Paithan from Nathsagar reservoir. Necessary application will have to be
furnished by the Contractor to the respective authority of GMIDC to
continue the water supply for the contract period. Water charges as per
rule of the GMIDC as revised from time to time shall be paid by the
Contractor. In the event of paucity of water the GMIDC may be
compelled to stop or reduce the quantum of the water supply to the
Sant Dnyaneshwar Udyan Complex, Paithan. In such cases' the
Contract shall not be entitled for any compensation or concession in
yearly contract amount on account of reduced supply or non supply of
water to the Udyan.
6.3 Electricity is presently supplied by M.S.E.D.C.Ltd for the Sant
Dnyaneshwar Udyan Complex, Paithan. This connection will be
Continued by the Contractor during the contract period. Electricity
charges as per rule of the M.S.E.D.C.Ltd and as per the tariff which
may be made applicable form time to time shall be paid by the
Contractor, regularly.
6.4
The Contractor will be responsible for the loss occurred to
Sant Dnyaneshwar Udyan Complex. Paithan due to disconnection of
electric or water supply due to nonpayment of electric or water charges
in time.
6.5
The Contractor may get increased electric supply if necessary at his
own cost from M.S.E.D.C.Ltd by following the relevant rules.
72
Contractor No. of Correction Executive Engineer
7) ESTABLISHEMENT:
The Contractor shall engage the various types of personnel for
execution and management of various works i.e. experts in gardening, maintaining fountains and water channel. Civil works, Electrical,
Agriculture, Horticulture, Gardening, Hotels, Security arrangements etc.
The Contractor will be responsible for any misbehavior of his
staff with visitors, public representatives. Govt./GMIDC officers on
inspection etc. and also for damage to the Sant Dnyaneshwar Udyan
Complex, Paithan by his staff.
A) The Contractor will have the right to get income from entry-
fees and from Canteen, boating in River Godavari. Entertainments,
Rest houses and other attraction centers in Sant Dnyaneshwar Udyan
Complex. Paithan.
73
Contractor No. of Correction Executive Engineer
B) Entry fees at entrance Gates No.1 & 2
shall be got approved
from competent Authority Prior approval shall be taken for any
increase in the rate of main entree fees. However the
rates will be increased subject to completion of proposed development
works as per agreement.
C) The Contractor shall be bound to inform & shall take the permission of
the competent
Authority of any type of film/video shooting & other
functional activities, events (Excluding the activities mentioned in
clause No-19.1) to be done in Sant Dnyaneshwar Udyan Complex,
Paithan and care must be taken that it will not harm any plantation,
structure, electrical installation etc. in the Sant Dnyaneshwar Udyan
Complex, Paithan. The Contractor will be liable to make good the
damages, if any resulting from such shootings.
12) CHANGES TO BE MADE IN THE SANT DNYANESHWAR UDYAN
COMPLEX, PAITHAN:
A)
Contractor will have no right to change the existing layout and plan of
the Sant Dnyaneshwar Udyan Complex and rest houses at Paithan.
B)
CHILDREN PARK AND MODERN AMUSEMENT PARK :
General types of playing articles are provided in the children
park No.1 besides the terrace No-1, The Contractor shall efficiently
maintain and augment these playing articles and he shall replace the
defective at his own cost.
74
Contractor No. of Correction Executive Engineer
The contractor has to provide modern amusement rides in
proposed children park No.2. He shall arrange, fix such modern rides
(as described in Para 16
of Section-Ill) and maintain the same at his
cost at the time of expiry of contract, all new works of amusement
park/water park or whatever developments carried out during the
period of contract by the contractor for beautification of garden shall be
the property of GMIDC and the same shall be handed over to GMIDC
without any cost. If additional development carried out by contactor
during the period of contract having huge investment & if recovery
period is not sufficient to cover investment then contract period will be
extended subject to prior approval of concerns or if contact period is
not extended contactor will remove the articles & other removable
accessories & equipments.
13) INSPECTION OF SANT DNYANESHWAR UDYAN
COMPLEX,
PAITHAN:
A) The competent authority will appoint an Officer of appropriate Rank to
supervise the M & R
activities of Sant Dnyaneshwar Udyan Complex,
Paithan as per agreement. The Office of this Officer will be located in
the Sant Dnyaneshwar Udyan Complex, Paithan and this Officer and or
his staff will have right to enter in any part of Sant Dnyaneshwar Udyan
Complex. Paithan for inspection.
C)
The members of Government Committee relating to Sant Dnyaneshwar
Udyan Complex, Paithan and officers' and staff of GMIDC shall have
entry at any time in the Sant Dnyaneshwar Udyan at Paithan with their
vehicle without any entry fees.
75
Contractor No. of Correction Executive Engineer
C) Contractor will have to grant free entry to the employees and Officers
of-Irrigation Department on production of specified entry passes.
D) The Contractor shall be bound to implement instructions given by
competent Authority or higher officer after his inspection.
E) Rest house will be inspected by competent authority periodically.
14) AUDITING:-
The detailed record of Receipts and expenditure of all items in
the Sant Dnyaneshwar Udyan Complex. Paithan must be kept and it
shall be audited by recognized Chartered Accountant. This audit report
must be submitted to the Competent Authority within 45 days of
completion of financial year, failing which penalty of Rs. 50/- per day
will be payable by the Contractor to GMIDC. The Contractor shall have
to furnish the details of expenditure / receipts any time in the year, if
the Competent Authority demands it in writing.
15) OWNERSHIP OF SANT DNYANESHWAR UDYAN COMPLEX
15.1 The Contract shall not affect GMIDC's right of Ownership of Sant
Dnyaneshwar Udyan Complex, Paithan.
76
Contractor No. of Correction Executive Engineer
15.2 The contractor will have no right title or interest over the property of
Sant Dnyaneshwar Udyan Complex after the expiry of
the period of
contract. The period of contract shall be deemed to be over on expiry of
period of 10 years from commencement of the contract; or after
termination of the contract as per provision in Para-19 'Right to
terminate the contract', of this section, whichever is earlier.
All the rules and Acts made by Govt, of India/ the Government of
Maharashtra and/ or GMIDC from time to time and Government
recognized institution related to such works as included in this Contract
shall be binding on the Contractor.
16) RULES AND REGULATION:
All the present and future taxes of Government of Maharashtra/
Government of India shall be paid by the Contractor, timely for the
contract period. Since the Income from Sant Dnyaneshwar Udyan
Complex, Paithan is to be directly collected by the Contractor, he shall
be responsible to pay the income tax and any other taxes on it as per
rules prevailing from time to time.
17) LIABILITY OF TAX:
The income tax clearance Certificate shall be submitted to the
competent Authority after completion of each financial year.
77
Contractor No. of Correction Executive Engineer
18) VISIT TO SANT DNYANESHWAR UDYAN COMPLEX,
During the visit of V
PAITHAN :
.I
.P's etc. and Guests of Central and State
Government the Contractor shall co-operate for security arrangement
of such visitors. For V.I.P's/ Guest of Govt./member of Governing
council of GMIDC visiting Sant Dnyaneshwar Udyan Complex. Paithan
minimum two suits must be kept reserved on demand, with minimum 1
day prior information at prevailing Govt, rates for Guest houses.
19.1 In case of bad performance during the period of agreement GMIDC
shall have right to terminate the Contract and take back the Sant
Dnyaneshwar Udyan Complex, Paithan at any time by Written Notice
of ninety days period, by Competent Authority and Contractor shall not
have any claim for compensation for such termination of the contract
and security deposit will be forfeited in such case.
19) RIGHT OF TERMINATE THE CONTRACT:
Misuse of any part/ premises of Sant Dnyaneshwar Udyan Complex
(in brief Dnyaneshwar Udyan) for criminal antisocial/ dangerous
activities by the contractor or his agents, servants and any activities on
their part causing public menace, harm and injury to the property and
reputation of the corporation shall also be grounds to
terminate/rescind-the contract.
19.2 Successful tenderer has to develop Udyan Complex, as per the
proposal of development submitted with the tender document,
78
Contractor No. of Correction Executive Engineer
Developments as per such proposals and creation of amusement park/
Water Park within the specified period and as per the approved
schedule of development shall be the responsibility of the successful
tenderer.
Period of such development, as per approved schedule of
developments, will be watched by the competent authority. If
successful tenderer fails to develop his specific developments projects
as approved by GMIDC. competent authority, within the schedule
period, it will be treated as bad performance.
20) FACILITIES TO VISITORS:
Contractor shall provide all the required facilities to the visitors
visiting Sant Dnyaneshwar Udyan Complex, Paithan at his own cost.
These facilities include pure drinking water facilities, Toilets, Canteen,
quality snacks and soft drinks, Niwara Sheds etc. The Contractor shall
pay more attention to engage employees of polite conduct and of good
moral conduct. In case any negligence or deficiency is noticed by
Competent Authority or pointed out by any visitor. Written Notice of
such complaints will be given ta the Contractor and Contractor shall be
bound to take corrective measures.
79
Contractor No. of Correction Executive Engineer
21) CANTEENS:
Considering the holiness and importance of Sant Dnyaneshwar
Udyan Complex. Paithan. good quality snacks, soft drinks etc. shall be
provided at the conteens. Sale of non vegeterian foods and Alcoholic
drinks shall not be allowed in the canteen or in any part of the Sant
Dnyaneshwar Udyan Complex, Paithan nor shall such items be
permitted to be brought from outside.
22)
The rates of snacks and food stuffs, soft drinks etc. to be served
in the canteen shall be displayed at suitable places in the canteen on
boards kept at clearly visible places.
INSURANCE:
The Contractor shall insure the equipment and other properties
in the Sant Dnyaneshwar Udyan Complex, Paithan for risk of damages
due to natural calamities, visitors etc. with the Govt. Insurance i.e.
Directorate of Insurance, Maharashtra State. He shall keep the
insurance policy alive by payments of premium in due time and
produce the proof of payment to the competent authority. If the
Contractor fails to pay the premium, it will be treated as bad
performance and action will be taken accordingly.
23) CONTRACT AMOUNTS.
The Contract periods will come in to effect from the date of
actual possession of Udyan Complex. Full amount of the offer which is
offered by the contractor for that
particular year should be paid
80
Contractor No. of Correction Executive Engineer
before 30 days of starting of the next year in advance, if the contractor
fails to do so then he shall be penalized Rs.2000/- per day up to 30
days from the starting of the next year & even then the contractor fails
to pay the contract amount, after expiry of 30 days period, action will be
taken as per the clause No- 19 and contractor shall have no right to
claim for the same.
24) SETLEMENT OF
DISPUTES:
In the case of any disputes arising between the contractor and the
competent authority, with respect to the terms & conditions of this
contract the same shall be referred to the Chief Engineer & Chief
Administrator, Command Area Development, ID Aurangabad and his
decision shall be final and binding on both the parties.
25) ENVIRONMENT:
The Contractor shall take proper precaution while working in the
Sant Dnyaneshwar Udyan Complex, Paithan so as not to damage the
Environment of Sant Dnyaneshwar Udyan Complex, Paithan and the
Nathsagar failing which the GMIDC shall have right to take
precautionary measures at the cost of Contractor.
81
Contractor No. of Correction Executive Engineer
25 A) Contactor shall take care of the following points to
a) Existing tree growth except for exotics like eucalypt, if any, will not be
disturbed.
Compliance the conditions imposed by National Board for Wild life
as per the Hon. Supreme court decision on dated 15-07-2011 for
fulfillment of criteria to delete the Sant Dnyaneshwar Udyan complex
from Jayakwadi bird sanctuary.
b) No pesticide or other harmful chemicals will be used within the garden.
c) Use of plastic will be banned within and on the peripheries of the
garden by displaying such instructions on the notice boards and
instructing to the guards & the watchmen.
d) Area of 10 Ha between Entrance Gate No.1 to Entrance Gate No.2 is
to be handed over to Dy.Conservator of Forest Wild Life, Aurangabad
for development of State of Art Interpretation Center.
This portion is not a part of Sant Dnyaneshwar Udyan, Complex.
26) Agreement enclosed as annexure B in section V is to be signed on
Bond paper of appropriate value by the contractor at his cost and will
be treated as a part of contract documents and shall be registered with
the appropriate registering authority. All the expenses for purchasing
bond paper, registration fees etc. necessary for registration of the
agreement shall be borne by the contractor.
82
Contractor No. of Correction Executive Engineer
CONTRACT OFFER FOR OPERATION, MAINTENANCE, DEVELOPMENT
AND MANAGEMENT OF SANT DNYANESHWAR UDYAN COMPLEX,
PAITHAN, DIST. AURANGABAD.
I/We hereby quote our offer for undertaking the specified work of Operation,
Maintenance, development and Management of Sant Dnyaneshwar Udyan
Complex. Paithan at our own cost, on the terms of Maintain. Develop & return
basis. I /We made this offer to the Godavari Marahtwada Irrigation
Development Corporation, (herein before & hereinafter referred to as “The
(AGREEMENT)
G.M.I.D
I/We make out fixed offer of Rs. __________________________ (In
words Rs. _________________________________) per year OR at
increasing rate of Rs. ( In word Rs. ______________________) per year
for 10 year to be paid to GMIDC for the period of Ten years (or as pleased by
the GMIDC) as yearly Contract amount.
.C.")
Year Rupees Rupees
(In figure) (In words)
I Year
II Year
III Year
IV Year
V Year
VI Year
VII Year
VIII Year
IX Year
X Year
Note : In case of variation between words & figure, the amount in words will prevail.
83
Contractor No. of Correction Executive Engineer
I /We certify the following.
iii) THE
DOCUMENTS WITH THE AGREEMENT:
A)
Following documents are included in with Agreement i.e. Annexure-B
and will form the part of the Agreement.
B)
Detailed Tender Notice.
C)
Minutes of the Pre-Tender conference.
D)
Condition of Contract (Section -IV)
E)
Works of Maintenance and Repairs of Sant Dnyaneshwar Udyan
Complex (Section III)
F)
Information of Udyan Complex and its present position (Section -II)
G)
Map of Udyan Complex showing the Contract areas.
Any other document as may be mutually agreed to form a part of the
Contract document.
2)
I/ We undertake-to abide by the Terms and conditions, Which we have
signed in this Booklet.
3)
I/We read the Contract as below:
84
Contractor No. of Correction Executive Engineer
A : Name of Work
Operation, Maintenance development
and Management of Sant Dnyaneshwar
Udyan Complex, Paithan on Develop,
Maintain & Return basis.
B : Earnest Money
Rs .- 03 Lakhs
C : (i) Security Deposit
Rs. 15 Lakhs In the form of DD of
Nationalised Bank situated in
Maharashtra
D : (ii) Additional Security
Deposit
Rs.35 Lakhs in the form of Bank
solvency of Nationalised Bank situated in
Maharashtra
85
Contractor No. of Correction Executive Engineer
PROFORMA - IV
DECLARATION OF THE COTRACTOR
1)
I/We ---------------------------------------------------------------------------------------
-------------------------- Contractor, (s) hereby undertake that I/We shall
pay the labours engaged on the work as indicated in Annexure 'A" to
Section -I Detailed Tender Notice, wages as per minimum wages A
Act. 1948 and amendments there to applicable to the zone in which
work lies and act accordingly. I/We also undertake to a Contract by the
various laws in force and extend necessary facilities and amenities to
the staff and workers employed by me/us.
2)
I/We hereby declare that I/We have made myself /ourselves thoroughly
conversant with the local conditions regarding Udyan Complex to be
handed over to me/ us, all materials and labour and accordingly I / We
have quoted the yearly contract amount. The nature of this work has
been carefully studied and understood by me/ us before submitting this
tender.
3)
I /We here by undertake to indemnify and here by indemnify the
Corporation against all liabilities arising out of application of all labour
laws viz. the minimum wages act. The workman's compensation act,
the payment of wages act, ESIC and PF act with reference to labour
engaged on subject work.
86
Contractor No. of Correction Executive Engineer
APPENDIX 'G'
(Vide para 9 of Detailed Tender Notice)
MODEL FORM OF BANK
GUARANTEE BOND
GUARANTEE BOND
1) This deed of Guarantee is made on the
___________________________ day of __________ Two
Thousand _____________________________ by having his head
office at ____________________________________
(Hereinafter called the said Contractor(s) from the demand under the
terms and conditions of Agreement dated __________
_________________ made
between __________________
__________________ and __________________ for _________
______________________
(Hereinafter called the Agreement) of additional security deposit for the
due fulfillment by the said Contractors of the terms and conditions
contained in the said Agreement on production of a Bank Guarantee
for
87
Contractor No. of Correction Executive Engineer
Rs. ____________________________________________________
(Rs. ______________________________________________ only)
We _______________________ (Herein after referred to as the Bank) at the
request of ________________________________
(Contractor) do hereby undertake to pay to the Godavari Marathwada
Irrigation Development Corporation Aurangabad. hereinafter referred to
as Corporation, an amount not exceeding Rs. _________________
against any loss or damage caused to or suffered by the Corporation
by reasons of any breach by the said Contractor of any of the terms of
conditions contained in the said Agreement)
2) We _________________________________________________
(Indicate the name of bank) do hereby undertake to pay the amount
due and payable under this guarantee without any demur, merely on
demand form the Corporation stating that the amount claimed is due by
way of loss or damage caused to or would be caused to or suffered by
the Corporation by reason of breach by the said contractor (s) of any of
the terms of conditions contained in the said Agreement or any reasons
of the Contractor(s) failure to perform the said agreement. Any such
demand made on
88
Contractor No. of Correction Executive Engineer
APPENDIX "G" (Vide para 9 of Detailed Tender Notice)
MODEL FORM OF BANK GUARANTEE BOND
GUARANTEE BOND
1) This deed of Guarantee is made on the _____________ day of ____ Two
Thousand ____________________ _____ by _________________ having his
head office at ____________ _________________________ hereinafter
called the said Contractor(s) from the demand under the terms and
conditions of Agreement dated ________________ made between i
______________________ and __ for _________________ hereinafter
called the Agreement) of additional security deposit for the due fulfillment by
the said Contractors of the terms and conditions contained in the said
Agreement on production of a Bank Guarantee for Rs.___ ___
(Rs.__________________________Only)
We (here in after referred to as the Bank) at
the request of _______________________________________ (contractor) do
hereby undertake to pay to the Godavan Marathwada Irrigaton Development
Corporation Aurangabad, hereinafter referred to as Corporation, an amount
not exceeding Rs.___________________ against any loss or damage caused
to or suffered by the Corporation by reasons of any breach by the said
Contractor of any of the terms of conditions contained in the said Agreement
We ___________ __________________
(indicate the name of bank) do hereby
undertake to pay the amount due and payable under this guarantee without
any demur, merely on demand from the Corporation stating that the amount
claimed is due by way of loss or damage caused to or would be caused to or
suffered by the Corporation by reason of breach by the said contractor(s) of
any of the terms of conditions contained in the said Agreement or any reasons
of ' the Contractors) failure to perform the said agreement. Any such demand-
made on
89
Contractor No. of Correction Executive Engineer
P R O F O R M A - I
DETAILS OF TECHENICAL PERSONEL WITH THE CONTRACTOR
r. No. Description Name Length
of service
in the firm
alification
Qu Profession
al experience
& details of
work carried
out
Remarks
2 1 3 4 5 6 7
Project manager
Manager Agriculture
Enaineer Elect/Mech
Supervisor
NOTE:- If there is no technical personel with your firm give details as to how
your firm can manage the same in remark column.
90
Contractor No. of Correction Executive Engineer
PROFORMA-II
DETAILS OF WORKS OF SIMILAR TYPE AND
MAGNITUDE CARRIED OUT BY THE TENDERER
Sr.
No Name of work Place
Offer Rs.
In lakhs
Contrac
t Period
Date of
completio
n
Principal
features
1 2 3 4 5 6 7
91
Contractor No. of Correction Executive Engineer
P R Q F O R M A - I l l
DETAILS OF OTHER WORKS TENDERED FOR AND IN HAND ON THE DATE OF SUBMISSION OF TENDER
Sr. No
Name of
work
Place Work In hand Works tender- Kifor Rema
rks
cost of Rs. In Lakhs
Period of contract
Cost of Rs.In Lakhs
Date by which
decision is
expected
Period
of contract
1 2 3 4 5 6 7 R 0
92
Contractor No. of Correction Executive Engineer
P R O F O R M A - I V
DECLARATION OF THE CONTRACTOR
1) I / We Contractor ___________________________ contractor
(s)
hereby undertake that I / We shall pay the labours engaged on the
work as indicated in Annexure 'A' to Section - I, Detailed Tender Notice,
wages as per minimum wages AAct. 1948 and amendments there to
applicable to the zone in which work lies and act accordingly. I/ We.
also undertake to aContracte by the various laws in force and extend
necessary facilities and amenities to the staff and workers employed by
me/ us.
2) I / We here by declare that I / We have made myself / ourselves
thoroughly conversent with the local conditions regarding Udyan
Complex to be handed over to me/us, all materials and labour and
accordingly I/We have quoted the yearly contract amount.The nature of
this work has been carefully studied and understood by me / us before
submitting this tender.
3) I / We here by undertake to indemnify and here by indemnify the
Corporation against all liabilities arising out of application of all labour
laws viz. the minimum wages act, The workman's compensation act,
The payment of wages act, ESIS andPF act. Etc. with reference to
labour engaged on subject work.
Signature of Contractor.
93
Contractor No. of Correction Executive Engineer
CONTRACT OFFER FOR OPERATION, MAINTENANCE. DEVELOPMENT AND
MANAGEMENT OF SANT DNYANESHWAR UDYAN COMPLEX,
PAITHAN.DIST. AURANGABAD
(AGREEMENT)
I/We hereby quote our offer for undertaking the specified work of
Operation, Maintenance, development and Management of Sant
Dnyaneshwar Udyan Complex, Paithan at our own cost, on the terms
of Maintain, Develop & return basis. I/We make this offer to the
Godavari Marathwada Irrigation Development Corporation, (herein
before & hereinafter referred to as 'The G.M.I.D.C)
I/We make our fixed offer of Rs. _____________( (In
words Rs. ________________________________) per year OR at
increasing rate of Rs. ____________________ (In words Rs.
________________________________) per year for 10 years to be
paid to GMIDC for the period of Ten years (or as pleased by the
GMIDC) as yearly contract amount
Year Rupees (In Figure)
Rupees (In Words)
Ist Year
IInd Year
IIIrd Year
IVth Year
Vth Year
VIth Year
VIIth Year
VIIIth Year
IXth Year
Xth Year
94
Contractor No. of Correction Executive Engineer
Note : In case of variation between words and figure, the amount in words bill parwall.
95
Contractor No. of Correction Executive Engineer
I We certify the following III) THE DOCUMENTS WITH THE AGREEMENT :
A)
Following documents are included in with Agreement i.e. Annexure-B and
will form the part of the Agreement.
B) Detailed Tender Notice.
C) Minutes of the Pre-Tender Conference.
D) Condition of Contract (Section - IV)
E)
Works of Maintenance and Repairs of Sant Dnyaneshwar Udyan Complex. (Section - III)
F) Information of Udyan Complex and its present position (Section - II)
G) Map of Udyan Complex showing the Contract areas.
Any other document as may be mutually agreed to form a part of the Contract document.
2)
3)
I / We undertake to abide by the Terms and conditions, which we have signed in this Booklet.
I / We read the Contract as below:
a) : Name ol Work Operation, Maintenance
development and Management of Sant Dnyaneshwar Udyan Complex, Paithan on Developed, Maintain & Return basis
b) : Earnest Money Rs. 5 Lakhs
c) : (I) Security Deposit
Rs. 10 Lakhs
: (ii) Additional Security
Deposit 5 Lakhs
d) Period of Contract :-10 years from the date of handing over. I/ We accept
that the area, structures, gardens and other things existing and
constructed by GIMDC and development carried out by me/us during
contract period in Sant Dnyaneshwar. Udyan Comptex, Paithan will- be
handed over back to the GMIDC after the period of 10 years in good
condition.
96
Contractor No. of Correction Executive Engineer
e) I / We agree that Annual contract amount is to be paid in quarterly installments and first such installment is to be paid on Ihe dale of signing the agreement.
f) I / We agree that our Offer will remain valid for acceptance for a
minimum period of 90 days from the date of opening of the
Contract Offers.
g) I / We agree that the contract period is 10 years
h) I / We agree to sign the Agreement within 15 days after receipt of
notice from GMIDC or within the period extended by the GMIDC
and will deposit the security deposit and Additional security
deposit before signing the contract agreement on bond paper.
I/ We agree that our Offer stands cancelled if the security deposit and
additional security deposit is not deposited in time and Contract
documents are not completed within the specified period. Earnest
Money Deposit deposited by me/us will stand forfeited to the
Corporation in such situation.
(Signed in acceptance of the contract)
( )
(Contractor)
Witness:
4) Name :-
Address :-
4)
Witness:
Name :
Address :-
97
Contractor No. of Correction Executive Engineer
ANNEXURE-B
AGREEMENT
This article of agreement is made and executed on _____this day of the
month _______ 2011 (Two thousand and Eleven).
BY AND BETWEEN
GODAWARI MARATHA WADA IRRIGATION DEVELOPMENT
CORPORATION Aurangabad a statutory body constituted under Maharashtra
Act XXIII of 1998 for and behalf its Executive Director, who has delegated his
power to frame and execute an agreement to The Executive Engineer. Lower
Dudhana Project Division. Sailu (Hereinafter referred to as PARTY OF THE
FIRST PART which expression shall unless repugnant to the context or
contrary to the meaning thereof shall mean and include its executors,
Engineers, successors, assignees etc.)
AND
_________________________________ contractor/firm/company
incorporated
under companies act having its registered office at above address (hereinafter
called THE PARTY OF THE SECOND PART which expression shall unless
repugnant to the context or meaning thereof include its successors and
permitted assignee through its Authorised
Person Shri of the Second Part.)
Where as the party of the First Part owns Sant Dnyaneshwar Udyan Complex
which comprises of Sant Dyaneshwar Udyan in 125 Hectors, area situated at
the foot of the Jayakwadi Dam and two Rest Houses at Nathnagar (North)
and it desires of obtaining specialised services in respect of the Operation.
Development, Maintenance and Management and collection of revenue of
98
Contractor No. of Correction Executive Engineer
above mentioned Udyan Complex. The Party of the Second Part has to
provide these specialised services to 89 Hector part of Sant Dnyaneshwar
Udyan and to two Rest Houses. Hence party of the First Part had published
tender Notice in Daily Lokmat Times and Nawa Maratha vide tender notice
No.___ and invited tenders, according to same the Party of the Second Part,
after pre qualifying to purchase the tender, has submitted his highest offer
vide tender Notice No or Operation, Development, Maintenance &
Management of Udyan Complex .
Under this agreement party of the Second Part has agreed to make payment
to the party of the First Part as below:
1. FOR FIRST YEAR Rs. ----------------------
2 FOR SECOND YEAR Rs. ----------------------.
3. FOR THIRD YEAR Rs. ----------------------
4. FOR FOURTH YEAR Rs. ----------------------
5. FOR FIFTH YEAR Rs ----------------------
6. FOR SIXTH YEAR Rs. Rs. ----------------------
7. FOR SEVENTH YEAR Rs. ----------------------
8. FOR EIGHTH YEAR. Rs. ----------------------
9. FOR NINTH YEAR Rs. Rs. ----------------------
10.FOR TENTH YEAR. Rs. ----------------------
The above Contract period will come in to effect from the date of actual
possession of Udyan Complex. Tender booklet containing the following
documents shall be part and parcel of this agreement.(i) The detailed tender
notice (ii) Information & present position of complex, (iii) Maintenance &
Repairs to complex, (iv) Conditions of contract, (v) Bid offer & relevant
form.(vi) Drawings. Full amount of the offer which is offered by the contractor
for that particular year should be paid before 30 days of starting of the next
year in advance, (contracted year shall start from the date of signing the
agreement)
99
Contractor No. of Correction Executive Engineer
if the contractor fails to do so then he shall be penalized Rs.2000/- per day up
to 30 days from the starting of the next year & even then the contractor fails to
pay the contract amount, after expiry of 30 days period, action will be taken as
per the clause No- 19 and contractor shall have no right to claim for the same.
That the party of Second Part is awarded the contract of operation,
maintenance, development and management Of Sant Dnyaneshwar Udyan
Complex as stipulated here in above as per following terms and condition,
1) That the contract period is of Ten Years starting from —-
date and shall expire on - date,
That the party of the Second Part shall make payment (Considerations)
as follows to the party of the First Part.
1. FOR FIRST YEAR Rs. ----------------------
2. FOR SECOND YEAR Rs. ----------------------
3. FOR THIRD YEAR Rs. ----------------------
4. FOR FOURTH YEAR Rs. ----------------------
5. FOR FIFTH YEAR Rs. ----------------------
6. FOR5IXTH YEAR Rs. ----------------------
7. FOR SEVENTH YEAR Rs. ----------------------
8. FOR EIGHTH YEAR Rs. ----------------------
9. FOR NINTH YEAR Rs. Rs. ----------------------
10.FOR TENTH YEAR Rs.
Rs. ----------------------
2)
Any breach in payment of contract amount as stipulated herein
above shall be treated as breach of agreement and the party of the
First Party shall be at liberty to terminate the contract.
3) The party of the Second Part has deposited Rs.15 Lacks as Security
Deposited D.D.& Rs.35 Lacks as additional Security-Deposit (In the form of
Bank Solvency) both refundable at the expiry of the contract period plus six
Months
without any interest thereto.
100
Contractor No. of Correction Executive Engineer
5)Sam Dyaneshwar Udyan Complex including developments done by the
party of the Second Part during contract period will be the sole property of the
Party of the First Part.
6) The party-of the First Part shall not be liable for any labour problem or
litigation under labour laws in respect of the employees appointed by the party
of the Second Part.
7) The party of the Second Part has to appoint its own staff for operation,
maintenance, management and development work of the Complex
possessing required qualifications.
8)The party of the Second Part has to take care to operate, maintain and
manage the existing facilities & the developments done by him during contract
period with full safety measures & to the satisfaction of customers & to the
party of the First Part. In case of accident of any type arising during operation,
maintenance ' & management or during development work, contractor has to
take care types of liabilities, court matter, matters regarding compensation
due to accident & all expenses should be borne by the party of the Second
Part up to molestation of the cases.
9)The party: of the Second Part has to take insurance of Udyan Complex for
fire, accidents or of natural calamities for the contract period at its own cost
with Government insurance, i.e. Directorate of insurance, Maharashtra State
10) The party of the- Second Part has to acquire all the necessary
provisions-regarding house keeping of the Udyan Complex for good.
hygienic atmosphere.
11) All electrical work should be carried out by the party of the
Second Part as per the provision of Indian Electricity Rules.
101
Contractor No. of Correction Executive Engineer
12) The party of the Second Part shall take care & caution regarding not to
advertise products like tobacco, cigarette, gutka, wine or any vulgar
presentation etc. If any legal matter arises in that case, the sole responsibility
will be of the party of the Second Part up to finalization of the same.
13) All the present and future liabilities and the taxes, levies, etc. for the
contract period including entertainment tax of the contract declared by any
Govt, authorities should be borne by the party of the Second Part.
14) The party of the Second Part is bound to take all necessary permission,
licenses from respective authorities of Govt. Dept. like fire, health, electrical
inspector, police & environment at its own cost and to adopt all the provisions
of public safety suggested by the respective authorities and respective Xerox
copies duly attested should be submitted to the party of the First Part.
15) The party of the Second Part has to carryout good quality painting for all
the rides, machinery, equipments and structures as and when required at its
own cost.
16) Electricity & water charges are to be borne by the party of the Second
Part.
17) Security of the Udyan Complex is the responsibility of the party of the
Second Part.
18)The required all types of amenities like tools, safety measures, sign
boards, first aid box has to be provided by the party of the Second Part.
102
Contractor No. of Correction Executive Engineer
19) The Party of the Second Part shall allow inspection by the officers
appointed by the party of the First Part.
20)Damage due to accident, improper maintenance of workmanship, riots
should be borne by the party of the Second Part.
21)Party of the Second Part can suggest any activity/development proposal,
other than the proposal submitted with the tender and approved by the party
of the First Part to increase the revenue and for applications party of the
Second Part should obtain permission from GMIDC.
22) The party of the Second Part shall take all possible care while facing
natural calamities and see that there is no financial, physical loss to the
property of the Complex of the party of First Part.
23) The party of the Second Part has to submit certificate of good condition of
water park, amusement park & of the facilities provided by The party of the
First Part as well as of the facilities provided by the party of Second part for
every year.
24) The Party of the Second Part shall take care to pay all Govt. Taxes (i.e.
Entertainment tax. Electricity bill etc.) and to take police permission in time
and submit the arrested Xerox copies
of the same to the Party of the First
Part.
25)
The party of the First Part shall not give any guarantee for loans on the
Complex property & the party of the Second Part agrees not to raise any
loans on the Complex property.
26)If the party of the Second Part would like to cancel or withdraw the contract
before the expiry of the contract period. it has to submit in writing, before six
months, his desire, to the party of the First Part with due payment of the
contract amount to be paid for that contracted year.
103
Contractor No. of Correction Executive Engineer
27) The possession of the Complex to be given to the party of the Second
Part is on as is where is basis, the party of the Second Part has agreed to
repair, recondition and if required renovate existing facilities, at its own cost
and after expiry of the agreement the Complex shall be handed over to the
party of the First Part on as is where is basis.
28) Contractor should sale the Entry Ticket through computer slip. The
required software will be provided by GMIDC. Daily sold total computerized
slip should be communicated through E-mail.
29) Extension beyond contract period will be granted by the party of the First
Part on the basis of previous performance during contract period. Right to
extend the period beyond contract period will be absolutely at the sole
discretion of the party of the First part.
30) Drinking liquor will be prohibited in the whole Complex.
31) In case of any dispute of difference arising between the Engineer-in-
charge and party of the Second Part, in respect of this agreement, the same
shall be referred to Chief Engineer & Chief Administrator, Command Area
Development. ID Aurangabad, and his decision shall be final and binding on
the Engineer-in charge & party of the Second Part.
32) Complaint & Suggestion Register shall be maintained by the party of the
Second Part & shall be made available to visitors/ Tourists on demand.
33) Any part/premises of Sant Dnyaneshwar Udyan Complex shall be
deemed to be public place. Misuse of any part / premises of this.
104
Contractor No. of Correction Executive Engineer
34) Party of Second part should follow the conditions imposed by National
Board for Wild life as per the Hon. Supreme court decision on dated 15-07-
2011 (Section No-4, Terms & Conditions of contract) for fulfillment of criteria
to delete the Sant Dnyaneshwar Udyan complex from Jayakwadi bird
sanctuary.
35) Liabilities ,dues & outstanding payments (i.e. Tax, Insurance, Energy Bill,
Water Charges, & other related payments of Sant Dnyeshwar Udyan
,Complex) of old contractor
105
Contractor No. of Correction Executive Engineer
Udyan Complex for any antisocial/criminal activities by the contractor or his
agents, servants shall be a ground to cancel this agreement.
In witness whereof the parties herein have set their hands to these presents in the
presence of witness.
Witness No. 1
Authorised Person
For Party of the Second Part
Witness No
.2
Lower Dudhana Project Division
Accountant
Executive Engineer
Lower Dudhana Project Division
Sailu
For Party of First Party
The seal of the Corporation is to be affixed before us on
Contractor No. of Correction Executive Engineer
106