  • GMES Space Component Data Access

    Architecture and Operational Scenarios, HMA Implementation Status

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Outline of the presentation

    GSC Data Access and PreGSC Data Access and Pre--Operation ProjectOperation Project–– ScopeScope–– Data Sets DefinitionData Sets Definition

    GSC Coordinated Data Access (CDS) SystemGSC Coordinated Data Access (CDS) System–– Overview Overview –– Major ComponentsMajor Components–– Operational scenariosOperational scenarios–– CDS project status CDS project status

    Focus on Heterogeneous Mission Accessibility (HMA)Focus on Heterogeneous Mission Accessibility (HMA)–– Interfaces implementationInterfaces implementation–– Standardisation and interfaces evolutionStandardisation and interfaces evolution

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Outline of the presentation

    GSC Data Access and PreGSC Data Access and Pre--Operation ProjectOperation Project–– ScopeScope–– Data Sets DefinitionData Sets Definition

    GSC Coordinated Data Access (CDS) SystemGSC Coordinated Data Access (CDS) System–– Overview Overview –– Major ComponentsMajor Components–– Operational scenariosOperational scenarios–– CDS project status CDS project status

    Focus on Heterogeneous Mission Accessibility (HMA)Focus on Heterogeneous Mission Accessibility (HMA)–– Interfaces implementationInterfaces implementation–– Standardisation and interfaces evolutionStandardisation and interfaces evolution

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Integration of GMES Contributing Missions (GCMs) and Sentinels data flows for GMES Service Projects through coordination of operational interfaces.

    GMES Ground Segment and Data Access

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Data System Overview

    From the data requirements collected from the GMES Service Projects, the Data Access Portfolio (DAP) is generated and accordingly theCoordinated Data access System (CDS) shall:

    •Build the data collection across a diversity of Missions product offer •Operate across a diversity of Missions Ground Segments interfaces

  • GSCB WorkShop – ESRIN – June 18th, 2009

    GMES Data Sets Concept

    Data sets definition covers: •Geographical coverage (e.g. European land coverage, pre-defined emergency areas,…)•Product specifications (instrument types or modes, product level..)•Availability specification (timeliness, period of acquisition,…)

    http://gmesdata.esa.int

    http://gmesdata.esa.int/

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Outline of the presentation

    GSC Data Access and PreGSC Data Access and Pre--Operation ProjectOperation Project–– ScopeScope–– Data Sets DefinitionData Sets Definition

    GSC Coordinated Data Access (CDS) SystemGSC Coordinated Data Access (CDS) System–– Overview Overview –– Major ComponentsMajor Components–– Operational scenariosOperational scenarios–– CDS project status CDS project status

    Focus on Heterogeneous Mission Accessibility (HMA)Focus on Heterogeneous Mission Accessibility (HMA)–– Interfaces implementationInterfaces implementation–– Standardisation and interfaces evolutionStandardisation and interfaces evolution

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Coordinated Data Access System (CDS):A large heterogeneous distributed system requiring the integration and coordination of a large number of operational interfaces

    Coordinated Data Access (CDS)

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Coordinated Data Access System components:Service Projects Coordinated Interface:

    •Service Projects interface for data sets and operations advertisement, user management, data ordering interface•Data set production coordination •GCMs interface for mission production coordination

    Core Infrastructure: Products collection and cataloguing for data sets creationReporting and performance: Overall performance continuous measurement

    Coordinated Data Access Overview

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Operations are based on scenarios triggered by GMES Service Projects needs in terms of data sets performances and operational interfaces e.g.:

    •Data streams from global systematic missions scenario•Geographic Area Coverage scenario•Emergency Rush Satellite Tasking scenario

    Operational Scenarios

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Data Streams from Global systematic Missions Scenario•Coordination of data registration and subscriptions

    Global Systematic Missions Scenario

    Acqu

    isiti

    on/

    Proc

    essi

    ng

    Dis

    sem

    inat

    ion

    GM

    ES S

    ervi

    ce P

    roje

    cts

    (GSC

    DA

    Inte

    rfac

    e)

    • Subscription Request

    GC

    Ms

    CDS

    Mission Planning

    User Services

    Post-processing

    Element

    Core InfrastructureService

    Projects Coordinated

    Interface

    Reporting and

    Performances

    GM

    ES S

    ervi

    ce P

    roje

    cts

    (Dat

    a R

    ecip

    ient

    )GCM Products

    L0/L1/L2 Archive

    Delivery Reports

    SubscriptionRequest

    Acqu

    isiti

    on/

    Proc

    essi

    ng

    Dis

    sem

    inat

    ion

    GM

    ES S

    ervi

    ce P

    roje

    cts

    (GSC

    DA

    Inte

    rfac

    e)

    • Subscription Request

    GC

    Ms

    CDS

    Mission Planning

    User Services

    Post-processing

    Element

    Core InfrastructureService

    Projects Coordinated

    Interface

    Reporting and

    Performances

    GM

    ES S

    ervi

    ce P

    roje

    cts

    (Dat

    a R

    ecip

    ient

    )GCM Products

    L0/L1/L2 Archive

    Delivery Reports

    SubscriptionRequest

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Geographical Area Coverage scenario:•Coordination of mission ordering and mission archive interfaces

    Geographical Area Coverage Scenario

    GM

    ES S

    ervi

    ce P

    roje

    cts

    (Dat

    a R

    ecip

    ient

    )

    GCM

    Acqu

    isiti

    on/

    Proc

    essi

    ng

    Dis

    sem

    inat

    ion

    CDS

    • Order or Standing Order

    GSCData Sets

    Mission Planning

    User Services

    • Tasking Reports• Optical Acquisition

    Reports• Circulation Reports• Coverage Reports

    GCMProducts

    CDS-SCICDS-CI

    CDS-SPR

    CDS-PPE

    GM

    ES S

    ervi

    ce P

    roje

    cts

    (GSC

    DA

    Inte

    rfac

    e)

    Archiving Reports

    Delivery Reports

    DAP Management functionDAP Management function

    Dissemination Request

    DataSet definition

    Subscription request

    L0 Archive

    SubscriptionRequest

    DataSet Activation Request and full Definition

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Emergency Rush Satellite Tasking scenario:•Coordination of mission planning interfaces

    Emergency Rush Satellite Tasking Scenario

    GM

    ES S

    ervi

    ce P

    roje

    cts

    (Dat

    a R

    ecip

    ient

    )

    GCM

    Acq

    uisi

    tion/

    Pro

    cess

    ing

    Dis

    sem

    inat

    ion

    • Rush Satellite Tasking Request GCM

    Products

    GCM

    CDS

    Mission Planning

    User Services

    • Acknowledgement• Planning Feedback• Tasking Report• Delivery Report• Circulation Report

    Email notification

    NRTGCM

    Products

    CDS-SCICDS-CI

    CDS-SPR

    CDS-PPE

    GM

    ES S

    ervi

    ce P

    roje

    cts

    (GSC

    DA

    Inte

    rfac

    e)

    Archiving Reports

    DataSet definition

    L0 Archive

    Emergency Request

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Coordinated Data Access System Project Context

    2008/2009: V1 Scope:Establish a coordinated technical baseline for GSCDA data flows“Preliminary” Pre-operations of GMES Services Projects

    2009/2012: V2 Scope:GSP operational interfaces implementationHMA infrastructure initial operations

    2009/2013: V3 Scope:GSP operations evolutionsCDS operations evolutions Integration of Sentinels Ground Segments

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Coordinated Data Access System Project Status

    KO

    GCMs ITT

    CDS System

    Requirements Review

    CDS Preliminary

    Design Review

    DAP-R 1.0 DAP-R 1.1

    Coordinated

    Data A

    ccess System

    Sept 07

    GSCDA IF reqs for GCMs

    Summer 2008

    June 2008 May 2009

    May 2008 March 2009

    Pre-ops KODec. 2008

    KO

    Sept 07

    CDS reviews organised with participation of GMES Service Projects

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Coordinated Data Access System Preliminary Architecture

    Coordinated Data Access System Preliminary Architecture has been defined, including:•CDS sub-components preliminary design•Integration of EO Data Access Integration Layer

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Interfaces with GMES Contributing Missions

    Interface Requirements have been defined for the GMES Contributing Missions concerning•Interface Operational procedures•Service performance monitoring and management•Machine to machine protocols (incl. HMA interfaces)

  • GSCB WorkShop – ESRIN – June 18th, 2009

    GCMs Interface Implementation

    Preparation and implementation

    Integration Readiness Review

    Integration and Verification

    Operations Readiness Review

    KO

    Transfer to Operations

    KO Meeting(ESRIN)

    KO+3 months

    ORR Meeting

    IVRR Meeting

    Progress meeting

    2 Months

    1 Month

    Unified integration process tailored to specific GCM G/S capabilities

    Resulting in:• Qualified GSC operational

    baseline through formal engineering process

    • Documented operational baseline available to all GSC participants

    • Measurable performances against baseline

    • Strong basis for improvements and evolution from both GCM and GSP points of view

    Within challenging constraints:

    • Preliminary operations already on-going

    • Very short development life-l

  • GSCB WorkShop – ESRIN – June 18th, 2009

    KO IVRR

    ImageSat&EUSI

    Summer integration activities with GCMs

    June 09 Dec 09

    ORR

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Outline of the presentation

    GSC Data Access and PreGSC Data Access and Pre--Operation ProjectOperation Project–– ScopeScope–– Data Sets DefinitionData Sets Definition

    GSC Coordinated Data Access (CDS) SystemGSC Coordinated Data Access (CDS) System–– Overview Overview –– Major ComponentsMajor Components–– Operational scenariosOperational scenarios–– CDS project status CDS project status

    Focus on Heterogeneous Mission Accessibility (HMA)Focus on Heterogeneous Mission Accessibility (HMA)–– Interfaces implementationInterfaces implementation–– Standardisation and interfaces evolutionStandardisation and interfaces evolution

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Acqu

    isiti

    on/

    Proc

    essi

    ng

    Dis

    sem

    inat

    ion

    Archive

    GM

    ES S

    ervi

    ce P

    roje

    cts

    (Coo

    rdin

    ated

    Ope

    ratio

    nsIn

    terf

    ace)

    GC

    Ms

    Coordinated Data System

    Mission Planning

    User Services

    Post-processing Element

    Post-processing Element

    Core Infrastructure

    Service Projects

    Coordinated Interface

    Reporting and

    Performances

    Reporting and

    Performances

    OperationalDataSets Definition

    OperationalDataSets Definition

    GM

    ES S

    ervi

    ce P

    roje

    cts

    (Dat

    a R

    ecip

    ient

    )

    The large number of different operational scenarios (~15) combined with the number of different data sets (~40) and the number of different external interfaces (~20) lead to operational risks e.g.•Operational resources involvement•Overall system performance monitoring and management•Reliability

    Interoperability Operational Challenges

    HMA shall provide an integrated layer of mission interfaces allowing streamline of operations and therefore general performance increase.

    implementation and usage is supported within the CDS environment

  • GSCB WorkShop – ESRIN – June 18th, 2009

    HMA Build-upG/S Task Force Recommendation:

    use of standardized interfaces

    ESA/PB-EO(2004)53, rev. 1

    Heterogeneous Mission Accessibility

    EOP-G presentation to DOSTAG 43. April 2005.

    ESA

    HMA Architecture Working Group

    HMA WG Terms of ReferenceRef. GMES-DFPR-EOPG-PR-06-0006

    HMA Implementation

    Standard specifications

    HMA Standards Interfaces Initial Specifications

    DAIL Implementation

    HMA I/F Implementation @ ESA

    HMA I/F Implementation @ HMA Contributing Agencies

    HMA Test Bed

    Prototyping and Testing

    Standards Evolution

    Interoperability standards project

    Operational Implementation Projects

    Standard specifications

    Feedbacks Feedbacks

    EUM

    DLR

    ASI

    CNES

    CSA

    BNSC

    HMA I/F Implementation @ GCMs

    HMA Contributing Agencies

  • GSCB WorkShop – ESRIN – June 18th, 2009

    HMA Implementation Activities

    20102009

    ORRORRKOKO

    CatalogueOrdering

    Programming

    Catalogue

    UMCatalogueOrdering

    Programming

    CatalogueOrdering

    Catalogue

    CatalogueOrdering

    User ManagementWMS

  • GSCB WorkShop – ESRIN – June 18th, 2009

    Impact of HMA on GSC Ground Segment

    • GSC Data Access fully relies on a coordinated approach of the Earth Observation data provision

    • HMA architecture and standards will improve the performance and reliability of operations. Complete availability of this solution depends on GCMs readiness

    • GSC HMA implementation is not specific and can be easily reused within other Earth Observation missions context (e.g. scientific missions and user community)

    GMES Space Component Data Access��Architecture and Operational Scenarios, HMA Implementation Status ��Outline of the presentationOutline of the presentationData System OverviewGMES Data Sets ConceptOutline of the presentationCoordinated Data Access System �Project ContextCoordinated Data Access System �Project StatusCoordinated Data Access System Preliminary ArchitectureInterfaces with GMES Contributing MissionsGCMs Interface ImplementationSummer integration activities with GCMsOutline of the presentationHMA Build-upHMA Implementation ActivitiesImpact of HMA on GSC Ground Segment