gmd visits wen ming sambutan hari gmd activities … · corporate 11 gmd visits wen ming school,...

10
Corporate 11 GMD VISITS WEN MING SCHOOL, FUJIAN PROVINCE, CHINA ff Bina Puri GMD Tan Sri Datuk Tee Hock Seng JP paid a courtesy visit to Wen Ming School, Fujian Province, China. BULLETIN BINA PURI JANUARY 2012 GMD ACTIVITIES VISITORS TO WISMA BINA PURI fffff Tan Sri Datuk Tee Hock Seng with the Delegation from China fffff Thank you for the momento fffff Tan Sri Datuk Tee Hock Seng visited Lahore, Pakistan, and posing in front of the completed project of DHA Housing. fffff Visitors from China fffff Visitors from Saudi Arabia on 8th Dec 2011: Mr Abdulkarim Al Mayouf, Mr Mohamed, Mr Ibrahem Al Mayouf together with BPHB management team. Front row from L - Dato’ Wong Foon Meng, three guests and Tan Sri Datuk Tee Hock Seng fffff Presentation of momento to Tan Sri Datuk Tee Hock Seng from the Delegates of China fffff Visitors from the Youth Assosiation on November, 9th 2011 fffff Maskimi Polyol Team together with GMD receiving the business partner from China SAMBUTAN HARI PAHLAWAN AT DATARAN MERDEKA 31.7.2011

Upload: doanxuyen

Post on 22-Aug-2019

222 views

Category:

Documents


0 download

TRANSCRIPT

Corporate

11

GMD VISITS WEN MINGSCHOOL, FUJIAN PROVINCE,CHINA

ffBina Puri GMD Tan Sri Datuk Tee Hock Seng JP paid a courtesy visit to

Wen Ming School, Fujian Province, China.

BULLETIN BINA PURI JANUARY 2012

GMD ACTIVITIES

VISITORS TO WISMA BINA PURI

fffff

Tan Sri Datuk Tee Hock Seng with the Delegation from China

fffffThank you for the momento

fffff

Tan Sri Datuk Tee Hock Seng visitedLahore, Pakistan, and posing infront of the completed project of

DHA Housing.

fffffVisitors from China

fffff

Visitors from Saudi Arabia on 8th Dec 2011: Mr Abdulkarim Al Mayouf, Mr Mohamed, Mr Ibrahem Al Mayouf together with BPHB management team.Front row from L - Dato’ Wong Foon Meng, three guests and Tan Sri Datuk Tee Hock Seng

fffff

Presentation of momento to Tan Sri Datuk Tee Hock Seng from the Delegates of China

fffffVisitors from the Youth Assosiation on November, 9th 2011

fffffMaskimi Polyol Team together with GMD receiving the business partner from China

SAMBUTAN HARIPAHLAWAN AT DATARAN

MERDEKA 31.7.2011

12 JANUARY 2012 BULLETIN BINA PURI

Project Updates

PROJECTS COMPLETED SINCE JULY 20111. Warehouse Building and Ancillary Facilities at Ladkrabang,

Bangkok, Thailand (YCH)

2. Redevelopment of Apartment Blocks 1A, 1B & 1C at Jalan OngSum Ping into Serviced Apartment in Brunei Darussalam

3. Universiti Malaysia Kelantan (UMK), Kampus Bachok, Kelantan

4. 174 units of Villas at Defence Raya Golf Resort, Lahore, Pakistan

5. Politeknik Sandakan in Sandakan, Sabah - Staff Quartersand Non-Academic Buildings (Package 2)

6. Sekolah Menengah Pendidikan Khas Vokasional Kuantan

7. Eastern Dispersal Link (EDL) Johor Bahru, Johor

UNIVERSITI MALAYSIAKELANTAN (UMK), KAMPUS BACHOK,KELANTAN

EASTERN DISPERSAL LINK(EDL) JOHOR BAHRU, JOHOR

ggg

The project was completed in August 2011. The works includedPiling works, Academic Blocks, Faculty of Creative Technologyand Heritage, Office for Development, Infra and Services as well

as External Works.

ggg

The project consists of approximately 4,000m of 3 lanes dualcarriageway mainline Viaduct and 4 ramps namely, single lanecarriageway Ramp A and Ramp B, and double lanes carriagewayRamp C and Ramp D was successfully completed in September 2011.

By Norpaizah Abd Wahab, Editorial Board

BULLETIN BINA PURI JANUARY 2012

Project Updates

13

The Construction Industry Development Board Malaysia (CIDB Malaysia)paid a courtesy visit to Bina Puri (Thailand) Ltd recently. Its General Managerof International Division, Mr Mohd Zaid Zakaria spent two days there toview the current progress of Bina Puri projects in Thailand.

CIDB MALAYSIA VISITS BINA PURI PROJECT IN THAILANDBy Simaporn Sumklang, Bina Puri Thailand

ggg

Mr. Mohd Zaid Zakaria (left) visited on-going Abstract Phaholyothin Park Projecttogether with Bina Puri Senior Project Manager, Ir. Aruljothy Pahavan.

BINA PURI PAKISTAN STAFFVISITED BRDB DEVELOPMENTIN JOHOR BAHRU

ggg

Housing Development for DefenseHousing Authority (DHA) in Lahore,Pakistan

The Construction of 174 units of Villasat Defence Raya Golf & Country Club,Phase VI for Defense Housing Authority(DHA) in Lahore, Pakistan wascompleted in August 2011.

ggg

The construction of PoliteknikSandakan in Sandakan, Sabahinvolving the Staff Quartersand Non-Academic Buildingswas successfully completed inNovember 2011.

174 UNITS OF VILLASAT DEFENCE RAYAGOLF RESORT, LAHORE, PAKISTAN

POLITEKNIK SANDAKAN IN SANDAKAN, SABAH - STAFFQUARTERS AND NON-ACADEMIC BUILDINGS (PACKAGE 2)

ggg

On 17th August 2011, our Bina Puri Pakistan staff together with GroupManaging Director Tan Sri Datuk Tee Hock Seng JP and ExecutiveDirector, Mr Matthew Tee visited BRDB Development in Johor Bahru,Johor. For the record, BRDB is our JV partner in our recent completedproject in Pakistan.

14 JANUARY 2012 BULLETIN BINA PURI

Project Updates

NEW PROJECTS SECURED

Bina Puri Construction Sdn Bhd recently secureda project for a proposed tourist recreational andcommercial development at KK Times Square(Phase II) in Kota Kinabalu. This project wasawarded by Syarikat Kapasi Sdn Bhd, a companyunder public-listed Asian Pac Holdings Bhd withthe contract value of RM470,337,737.

The development for KK Times Square (Phase II)consists of a four-storey tourist arcade, abasement car park with retail/arcade, five blocksof service apartments comprising 631 units, anda five-storey elevated car park on TL 017533505along the coastal highway at Sembulan, which isin a prime area of Kota Kinabalu.

Bina Puri Construction has been given a timeframe of 26 months to complete this project.

THE DEVELOPMENT OF KK TIMES SQUARE (PHASE II), KOTA KINABALU, SABAH

THE HAVEN, IPOH

By Norpaizah Abd Wahab, Editorial Board

fffffCurrent on going construction activities

fffff

Work in progress

fffff

The interior of the showrooom unit

ggg

The Perspectives of KK Time Square - an artist impression

BULLETIN BINA PURI JANUARY 2012

Project Updates

15

BINA PURI MAJOR ONGOINGPROJECTS STATUS

No. Project Value Progress % (RM ‘Mil) (Dec 11)

1. Kem Batalion 6 (PGA) PDRM, Muar, 300.0 92.0%Johor Darul Takzim

2. Pusat Latihan Polis (Pulapol), K. Lumpur 147.0 96.0%

3. Plaza Merdeka, Kuching - Foundation Works 50.9 96.8%

4. Plaza Merdeka, Kuching – Podium Works 95.7 24%

5. Regalia Service Apartment, Jalan Kuching, 185.0 98.8%Kuala Lumpur

6. UiTM Campus Kampong Pinang, 306.9 29.8%Kota Samarahan, Sarawak

7. New LCC Terminal (KLIA2) 997.2 52.9%

8. Ampang Light Rail Transit (LRT) 702.3 15%Line Extension - Package 1A

9. The Haven, Ipoh 82.3 38%

10. Housing Works in Kampung Lugu, Brunei 158.4 22%

11. Abstract Condominium, Bangkok 58.5 45%

12. Service Apartments and Retail Space at 135.0 9%USJ21 (Taipan Square) - NEW

13. Sabah Administration Centre in 388.7 2.6%Teluk Likas, K.Kinabalu - NEW

14. KK Times Square, K.Kinabalu - NEW 470.3 7.8%

MAHB VISITED KLIA2 SITETan Sri Bashir Ahmad Abdul Majid, the Managing Directorof MAHB and a team from MAHB visited our KLIA2 siterecently to update themselves on the progress of theconstruction activities.

Y.Bhg Tan Sri Datuk Tee Hock Seng, JP, Group ManagingDirector, Bina Puri Holdings and Y.Bhg Datuk Henry Teetogether with our Senior Management team were present athand to welcome the visitors.

A site tour and briefing was conducted by the ProjectDirector. BINA PURI-UEMC Joint Venture is the turnkeycontractor for the KLIA2 project for two packages - PackageTB01 A – Main Terminal Building and Package TB01 B –Satellite Building, Sky Bridge and Piers. This new KLIA2terminal will have the capacity of handling 30 millionpassengers per annum. Currently the progress at site as atDec 2011 is 52.9%.

fffffDatuk Henry Tee Hock Hin (3rd from left) talkingto Tan Sri Bashir Ahmad Abdul Majid, also inthe picture is Tan Sri Datuk Tee Hock Seng.

fffffProject briefing to the visitors.

fffffCurrent on going construction activities

By Norpaizah Abd Wahab, Editorial Board

HOUSING WORKS IN KAMPUNG LUGU, BRUNEI

ABSTRACT CONDOMINIUM, BANGKOK

PUSAT LATIHAN POLIS(PULAPOL), KUALA LUMPUR

Project Updates

By Norpaizah Abd Wahab, Editorial Board

fffffCurrent on going construction activities

fffffCurrent on going construction activities

fffffCurrent on going construction activities

16 JANUARY 2012 BULLETIN BINA PURI

BULLETIN BINA PURI JANUARY 2012

Project Updates

17

PLAZA MERDEKAPODIUM WORKS

KEM BATALION 6 (PGA) PDRM, MUAR, JOHOR DARUL TAKZIM

UiTM CAMPUS KAMPONG PINANG, KOTASAMARAHAN, SARAWAK

fffffCurrent on going construction activities

fffffCurrent on going construction activities

---Current on going construction activities

SABAH ADMINISTRATIONCENTRE IN TELUK LIKAS,K.KINABALU

AMPANG LIGHTRAIL TRANSIT (LRT) LINE EXTENSION -PACKAGE 1A

The project involvesconstruction of a 30-storeyoffice tower and 2 blocks of 9-storey buildings for the newSabah State AdministrativeCentre on a 15 acre land sitealong the shoreline overlookingthe South China Sea. The towerwill also house the Sabah ChiefMinister’s office together withhis cabinet Ministers.

The progress work is almost3% with target completion inFebruary 2014.

The Construction and Completion of FacilitiesWorks (Package A) for the Ampang (AMG) LineExtension Project involves a 17.4km extension ofthe Ampang Line between Sri Petaling to StationNo. 5 (Jalan Kinrara).

The scope of works include all guideway sub-structure and main structure works, foundationwork for stations and traction power sub-stations(TPSS), to launch and install segmental boxgirders and to supply and install parapets andnoise barriers.

It also includes the fabrication and delivery of thesegmental box girders (SBGs).

The project is already 15% in progress with targetcompletion in May 2013.

The Proposed Development of aBusiness Center comprising FourTowers of 33-storey ServicedApartments (including 5-storeycarpark), and 3-storey Retail Podiumwith 2-storey carpark on lot H.S.(D)108340 (PT 3466), Jalan Hicom-

Puchong, UEP Subang Jaya, MukimDamansara, Daerah Petaling,Selangor.

The progress of this development isabout 9% with target completion inOctober 2012.

18 JANUARY 2012 BULLETIN BINA PURI

Project Updates

SERVICE APARTMENTS ANDRETAIL SPACE AT USJ21(TAIPAN SQUARE)

By Norpaizah Abd Wahab, Editorial Board

fffffCurrent on going construction activities

fffffCurrent on going construction activities

fffffCurrent on going construction activities

The proposed development consists of 3 Blockswith 23 units of 4 and 5 storey Pool Villas withunique features such as Private Lift, CourtyardGarden, Koi Pond, Roof Top Lap Pool and Garden.It is serviced by a Clubhouse with facilities suchas a Library, Gymnasium, Dining Area, Yoga Roomand etc.

The development is located very strategicallywithin 2km from the Causeway and Johor Bahrutown centre. Supermarkets, Private Hospitals anda Golf Course are located minutes away.

This project is a joint venture between the JohorState Government and Bina Puri Holdings Bhdwith gross development value approximately RM96 million.

The physical works have already started in August2011 and expected completion by February 2013.Site clearance, Earthworks, Silt Trap, Hoarding andWashing Bay have already been completed andcurrently piling works are in progress.

2 units of Show Houses together with theClubhouse are expected to be ready by April2012.

The built-up area for each unit ranges from 5,587 sq ft to 7,244 sq ft. The units will bemarketed as fully furnished units, priced betweenRM4,000,000 to RM4,800,000; so all you need isyour suit cases to move in.

The target market for this development areforeigners who wish to make Malaysia theirsecond home or for pure investment.

BULLETIN BINA PURI JANUARY 2012

Project Updates

19

PROPERTY DEVELOPMENT

PETRIE VILLA, THE MODERNLIVING JOHOR BAHRU

MASKIMI POLYOL SDN BHD CERTIFIED TO ISO 9001:2008By Low Yoke Lan, Maskimi Polyol

ISO Certification is an important and cost-effective solution that all organisations shouldmake full use of. It brings a significantcompetitive edge over rivals and displays thatquality assurance is of paramount importance. Itwill ensure the benefit of new business as well asa better retention of old that will be invaluable toorganisations in the current economic climate.

Realizing these facts, Maskimi Polyol Sdn Bhdhad decided to implement Quality ManagementSystem complying with ISO 9001 : 2008 into itsdaily operations since early 2010. Finally,Maskimi Polyol succeeded in obtaining the ISO9001 : 2008 certification on 11 October 2011 forthe scopes:

1. Formulation and Production of Natural OilPolyols (NOP) and NOP Based PolyurethaneSystems;

2. Trading of Isocyanates, Based Polyols andPolyurethane Additives.

It is hoped that the ISO guidelines will provide acomprehensive model for quality managementsystems that can make Maskimi Polyol morecompetitive. At the same time to ensure a higherretention rate of existing customers bydemonstrating that Maskimi Polyol operates tothe highest of standards.

By Norpaizah Abd Wahab, Editorial Board

Bina Puri Sport & Social Club (KSSBP) organiseda trip to Zhangjiajie, China from 15th to 20thSeptember 2011. A total of 41 club membersparticipated in the trip. They took a flight toChangsha transit in Guangzhou, thereafter bycoach to Zhangjiajie.

Some of the interesting places visited were TianMen Mountain, Tian Zi Mountain, Yuanjiajie,Phoenix Ancient City, Shaoshan, Xiang River andetc. They also experienced the world’s longestcable car, the world’s highest and fastest outdoorsightseeing elevator – Bailong Elevator and theworld’s fastest High-speed bullet train.

20 JANUARY 2012 BULLETIN BINA PURI

Sports Club Activities

COMPANY TRIP TOZHANGJIAJIE,CHINABy Anne Tan & Hee May Har, Kelab Sukan & SosialBina Puri

KSSBP organized a trip to Jakarta – Bandungfrom 30th September 2011 -3rd October 2011. Atotal of 32 members participated in the trip whichalso included Y.Bhg Dato’ Wong Foon Meng andTo’ Puan Heng Cheng Leng, Y.Bhg Tan Sri DatukTee Hock Seng and Pn Sri, and Dr Tony Tan ChengKiat. Others included Mr Matthew Tee and his

family, Mr Tan Kwe Hee and the rest of othermembers. Upon our arrival, we were welcomedat Novotel Hotel Mangga Dua, Jakarta and themembers had a great time shopping at ManggaDua Complex. The next day (day 2) our groupdeparted for Bandung and arrived at Bandung atabout 3.00pm and proceeded to the next

shopping destination at Factory Outlet, whichwas the higlight of the trip. After the shopping,we put up at Grand Setia Budi Hotel. Othersplaces of interest visited were the Trans Studio inBandung, Taman Miniature, Indonesia in Jakarta,shoppings archades like Pasar Baru, Rumah Modeand others. Everyone had an enjoyable trip.

EXPERIENCING A SHOPPING TRIP IN JAKARTA & BANDUNG,INDONESIA By Editorial Board

SPORTS CLUB ANNUAL TRIP

fffffGroup photo at Indonesia Mini Park

fffff

Group Photo in front of the wonders of Zhang JianJie

fffff

Lights performance ~unique of lights and sounds

fffff

Again, the ladies champion the company trip

fffff

Group photo, in the background is the thousand years lime stones mountain

fffff

The colourful artist performance

fffff

Cabel car connecting to the tourism city ..magnificent view of terrains and mountains

fffff“This is Tran Studio Bandung themepark, we are going to play there’; Mr Tan

Kwe Hee with the grandchildren of Tan Sri Tee and Puan Sri