global control & qualification services sl · global control & qualification services sl...

37
GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQNąHFYNTS XJW[NHJX XQ BKCN, Espíritu Santo 12, N-VI 15165 Bergondo - A Coruña - España Tlf. 902 905 225 - [email protected] www.globalcqs.com

Upload: others

Post on 07-Nov-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

GLOBAL CONTROL & QUALIFICATION SERVICES SL

reference works on industrial engineering

global control &

BKCN, Espíritu Santo 12, N-VI 15165 Bergondo - A Coruña - EspañaTlf. 902 905 225 - [email protected]

Page 2: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

GlobalHANDLING SYSTEMS

Page 3: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

1. Transfer Towers O.C.P. - JORF LASFARClient: PHB Weserhütte. Globalcqs.

This engineering project is a system of transfer towers in an installation for operating grain bulks in a port in Morocco.

Initial data and information provided by the client :

• General architectural plans .

• Hypothesis on structure loads.

Works and documentation created by Globalcqs :

• Design of a structural solution.

• Calculation of metallic structure.

• Calculation of screw joints.

• Design of the structure in detail of the transfer system.

• Generation of metalwork workshop plans,lists of materials,etc.

Page 4: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Joint 1

[Note : Connection analyses are based on Eurocode 3 : EN 1993-1-8:2005]

Summary

Right-hand connection

Moment

(MSd) = 5,7 kNm

Most critical combination : - Combination 1 -

-ment (MSd) = 5,7 kNm

Most critical combination : - Combinación 1 -

Graph with work level for all combinations

Page 5: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: Duro Felguera Plantas Industriales. Globalcqs

Novopolotsk(Bielorusia).

Initial data and information provided by the client:

• general architectural plans and location.

• Lay-out of the factory.

• Basic calculation outlines of buildings and conveyor belts.

Works and documentation created by Globalcqs :

• Design of structural solutions in consignments not asked by the client:.

• Calculation of metallic structure.

• Calculation of screw joints.

• Design of silos ,hoppers and dust collection systems.

• Calculation of silos ,hoppers and dust collection systems.

• Engineering design project.

• Development of metalwork workshop plans ,list of materials,etc of the whole project.

• Writing of assembly and operation instructions.

Page 6: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,
Page 7: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

3. System for management of a coke TakreerClient: PHB Grupo TSK. Globalcqs

This engineering focuses on a system to manage coke in Takreer Plant (Saudi Arabia).

Initial data and information provided by the client:

• general architectural plans and location.

• Lay-out of the factory.

• Basic calculation outlines of buildings and conveyor belts.

Works and documentation created by Globalcqs :

• Design of structural solutions in consignments not asked by the client:.

• Calculation of metallic structure.

• Calculation of screw joints.

• Design of silos ,hoppers and dust collection systems.

• Calculation of silos ,hoppers and dust collection systems.

• Engineering design project.

• Development of metalwork workshop plans ,list of materials,etc of the whole project.

• Writing of assembly and operation instructions.

Page 8: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

4. Client: DURO FELGUERA PLANTAS INDUSTRIALES. CTM

CEO Pedro Bravo

Detail description of the work carried out

• Forklift truck

• Tripper.

• Transfer systems.

• Access and platforms

• Development of 3D models

• Preparation of detailed drawings and documents

for the manufacturing process.

• Implementation control.

• Quality control

Page 9: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

SAUDI ARABIAClient: PHB Weserhütte. Globalcqs

This engineering focuses on a system of conveyor belts in an installation for operating bulks of cereals in Saudi Arabia

Initial data and information provided by the client:

• General architecture plans.

• Hipothesis on structure loads

• Works and documentation created by Globalcqs :

• Design of a structural solution.

• Calculation of metallic structure.

• Calculation of screw joints.

• Design of the structure in detail of the transfer system.

• Generation of metalwork workshop plans,lists of materials,etc.

Page 10: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

• 013-27 PHB - Transfer Towers TT01 TUFANBEYLI

• 013-43 - PHB Transfer Towers 213003 Endesa As Pontes

• 013-46 - PHB - Transfer Towers 212015 Endesa Litoral.

• 013-53 - MARTIFER - El Brocal

• 013-55 - PHB - Belt Conveyor Systems MA’ADEN

• 014-28 - PHB - Transfer Towers MA’ADEN

• 014-22 - DF - Iron Ore Plant Casa de Pedra

• 014-39 - TAIM WESER - Tower TT01 COKE HANDLING GS

• 014-42 - ENCE - Belt Conveyor Navia Factory

• 014-55 NAVEC - Trasnfer Tower TT03 & Belt Conveyor Asturiana de Cinz.

• 014-59 PHB - Transfer Tower Gowest Voestalpine TEXAS

• 014-65 NAVEC - Transfer Towers 323 MO TWR 001 002 006 Intecsa

• 014-75 NAVEC - Handling Systems Onuba Port

Page 11: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

controlpiping

Page 12: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: AIR LIQUIDE – Planta de La Coruña. GlobalcqsThis Project is about the authentication of H2 pipeline in the Air Liquide factory in La Coruña.

Initial information and data provided by the client:

• Working diagram (P&I).

Works and documentation generated by Globalcqs :

• Layout of pipeline.

• Making of isometrics for production.

• Design of support structure.

• Quality dossier preparation(Trazability, trials and pressure tests).

Page 13: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,
Page 14: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Cliente: TECNICAL - TECNICAS REUNIDAS

Initial data and information provided by the client:

• General architecture plans.

• P&D.

Works and documentation created by Globalcqs :

• Pipe Routing.

• 3D Model.

• Stress Analisys with CAESAR II.

• Isometrics Drawings, material lists, etc.

Page 15: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

• 012-52 - INCALPESA - Pipe Rack Jorf Lasfar

• 014-47 - AZUCARERA ESPAÑOLA - Steam piping lines

• 014-85 ALTAIR - Stress Analisys Boiler Room H.Vigo

• 015-20 FERROATLANTICA - Extraction System

• 015-24 PRAXAIR - Criogenic Lines AVIP Hürth

Page 16: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

&industrial projects

Page 17: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: EMESA - ISOLUX CORSÁN. Globalcqs

This Project involves the development of detailed engineering of metal structurof a bioethanol plant in El Al-caravan (Colombia). The ítems which were developed correspond to: Pipe-Racks, industrial buildings , storage , etc.

Initial data provided by the client:

• Drawings of the Project.

Works and documentation generated by Globalcqs :

• Creation of a 3D model of the Project.

• Preparation of detailed drawings and documents for the manufacturing process.

Page 18: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: INSTRA - INDITEXT. Globalcqs

This Project deals with the development of detail engineering in a very complex architectural work for a metalwork manufacturer.

Initial data and information provided by the client:

• Drawings of the project.

• Calculation of metallic structure.

Works and documentation generated by Globalcqs :

• Design and calculation of screw joints.

• Creation of a 3D model of the project .

• Preparation of detailed drawings and documents for the manufacturing process.

Page 19: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: FINSA. Globalcqs

This Project deals with the development of complet engineering for several units of a wood indus-try factory in Nelas Portugal.

Works and documentation generated by Globalcqs :

• Design and calculation

• Creation of a 3D model of the project .

• Preparation of detailed drawings and documents for the manufacturing process.

• Plot Plant

• Construction supervision

Page 20: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

• 012-38 - GUERRA - Industrial Plant Celanova

• 012-46 - INTERSTEEL - Industrial Plant Cepsa Huelva

• 012-11 FMC - Platforms Calculation

• 013-05 INTERSTEEL - Compressors Building Repsol A Coruña

• 013-57 - INSTRA - Logistics Centre Mango Barcelona

• 013-60 - INMENOR - Biomass Plant

• 013-65 - PREMONOR IRIS - Heat Exchangers Platforms

• 014-44 - NORTON EI - Ecuatorial Coca Cola Building Sierra Leona

• 014-79 MARTIFER - ITER Buildign nº 61

• 014-84 MARTIFER - Hangar AIRBUS Marsella

• 014-87 PREMONOR - Pipe rack CLH Bilbao

• 015-08 FINSA - Installation microwaves oven OREMBER

• 017-21 LUSOFINSA- VYNCKE BIOMASS BOILERR

• 018-12 FINSA OREMBER- VYNCKE BIOMASS BOILER

Page 21: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

heat transfer systems

Page 22: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: Foster Wheeler Iberia. CTM CEO Pedro Bravo

Globalcqs ,developed this engineering project. Furthermore, they provided and built the hea-ters in Huelva:

• Detail engineering.

• Manufacture and assembly plans.

Page 23: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Detail description of the work carried out

• Pressure parts

• Radiante Circular Horno de Crudo radiant crude oil heater

• Convective unit for crude and vacuum oven.

• Tube and pipe for preheating system.

• Vacuum heater.

• Access and platforms.

• Development of 3D models

• Preparation of detaied drawings and documentation for the manufacturing proccess.

• Implementation control.

• Quality control

• Technical assistance on site.

Page 24: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: HEURTEY PETROCHEM.

Detailed description of the work carried out:

• Prssure parts

• Convectives

• Preheating tubes and pipes

• Access and platforms

• Development of 3D models

• Preparation of detailed drawings and documents for the manufacturing process.

• Implementation control.

• Quality control

• Technical assistance on site.

Page 25: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: TÉCNICAS REUNIDAS. CTM CEO Pedro Bravo

Detailed description of the work carried out:

• Design and calculation for pressure parts.

• Convective systems.

• Tube and pipe for preheating system.

• Access and platforms.

• Development of 3D models

• Preparation of detailed drawings and documents for the manufacturing process.

• Implementation control.

• Quality control

• Technical assistance on site.

Page 26: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: TECNICAL - TECNICAS REUNIDAS Globalcqs

Initial data and information provided by the client:

• General architecture plans.

• Hipothesis on structure loads

Works and documentation created by Globalcqs :

• Design of a structural solution.

• Calculation of metallic structure.

• Calculation of screw joints.

• Generation of metalwork workshop plans,lists of materials,etc.

Page 27: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: FOSTER WHEELER IBERIA SAU. in Novopolotsk (Belarus).

Initial data and information provided by the client:

• General architecture plans.

• Hipothesis on structure loads

Works and documentation created by Globalcqs :

• Design of a structural solution.

• Calculation of metallic structure.

• Calculation of screw joints.

• Generation of metalwork workshop plans,lists of materials,etc.

Page 28: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: TECNICAL - TECNICAS REUNIDAS Globalcqs

Initial data and information provided by the client:

• General architecture plans.

• Hipothesis on structure loads

Works and documentation created by Globalcqs :

• Design of a structural solution.

• Calculation of metallic structure.

• Calculation of screw joints.

• Generation of metalwork workshop plans,lists of materials,etc.

Page 29: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

• 013-32 TECNICAL - Crude Heater1H-3201 Cochabamba

• 013-48 TECNICAL - Steam hydrogren reformer Lukoil Volvogrado

• 013-66 TECNICAL - Fractionator feed Heater

• 014-20 TECNICAL - Heaters KOGAS AKKAS FIELD

• 014-89 TECNICAL - Circular heaters Talara

• 015-19 TECNICAL - U-700 CDU REVAMP PROJECT

Page 30: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

epc - facilities - other projects

Page 31: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: CEMSA. GlobalcqsThis Project is a complete design of storage hoppers and a complete system to handle bulk minerals with conveyor belts.

Initial data and information provided by the client:

• Lay – Out of the plant.

• Features of bulk storage.

Works and documentation generated by Globalcqs :

• Installation of equipment in the plant

• Design of structural solutions.

• Preparation of detailed drawings for the manufacture.

• Technical assistance on site.

Page 32: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,
Page 33: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,
Page 34: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: BTG. Globalcqs

-volving BTG Company.It focuses on the development of a press system for rubber bands.

Initial data and information provided by the client:

• Focus on client’s needs.

• Design and creation of a solution.

Works and documentation generated by Global- cqs :

• Analysis of stress and strain on structural elements.

• Creation of a 3D model of the project.

• Preparation of detailed drawings and documents for the manufacturing process.

Page 35: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

Client: MEGASA. This Project is a complete design of Collection and processing of metal waste and scrap system for Steel Plant of Megasa

Initial data and information provided by the client:

• Lay – Out of the plant.

Works and documentation generated by Globalcqs :

• Installation of equipment in the plant

• Design of structural solutions.

• Preparation of detailed drawings for the manufacture.

• Technical assistance on site.

Page 36: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

• 013-16 INTERSTEEL - Tanks Valoriza Gijón

• 013-79 - SGL CARBÓN - Additive hopper

• 013-82 - MONESA - Boiler connection Air Liquide A Coruña

• 014-01 FUNGIBLES CONDAL - System for washing machinery and vehicle wheels Alcoa San Ciprián.

• 014-32 - SGL CARBÓN - Stack

• 014-86 PREMONOR - Water Tanks Finland

• 014-85 ALTAIR - Boiler Room Hospital Vigo

• 015-20 M. MOAN - Stairs and suction and ventilation tubes Repsol A Coruña

• 0015-13 ABONOMAR - Reciclyng installation

• 014-81 MACOGA - Expansion joints factory expansion 2014

• 013-37 - INMENOR - Boiler brackets

• 013-54 - INMENOR - Acerlor

Page 37: GLOBAL CONTROL & QUALIFICATION SERVICES SL · GLOBAL CONTROL & QUALIFICATION SERVICES SL reference works on industrial engineering global control & VZFQN HFYNTS XJW[NHJX XQ BKCN,

BKCN, Espíritu Santo 12, N-VI 15165 Bergondo - A Coruña - EspañaTlf. 902 905 225 - [email protected]

global control &