global control & qualification services sl · global control & qualification services sl...
TRANSCRIPT
GLOBAL CONTROL & QUALIFICATION SERVICES SL
reference works on industrial engineering
global control &
BKCN, Espíritu Santo 12, N-VI 15165 Bergondo - A Coruña - EspañaTlf. 902 905 225 - [email protected]
GlobalHANDLING SYSTEMS
1. Transfer Towers O.C.P. - JORF LASFARClient: PHB Weserhütte. Globalcqs.
This engineering project is a system of transfer towers in an installation for operating grain bulks in a port in Morocco.
Initial data and information provided by the client :
• General architectural plans .
• Hypothesis on structure loads.
Works and documentation created by Globalcqs :
• Design of a structural solution.
• Calculation of metallic structure.
• Calculation of screw joints.
• Design of the structure in detail of the transfer system.
• Generation of metalwork workshop plans,lists of materials,etc.
Joint 1
[Note : Connection analyses are based on Eurocode 3 : EN 1993-1-8:2005]
Summary
Right-hand connection
Moment
(MSd) = 5,7 kNm
Most critical combination : - Combination 1 -
-ment (MSd) = 5,7 kNm
Most critical combination : - Combinación 1 -
Graph with work level for all combinations
Client: Duro Felguera Plantas Industriales. Globalcqs
Novopolotsk(Bielorusia).
Initial data and information provided by the client:
• general architectural plans and location.
• Lay-out of the factory.
• Basic calculation outlines of buildings and conveyor belts.
Works and documentation created by Globalcqs :
• Design of structural solutions in consignments not asked by the client:.
• Calculation of metallic structure.
• Calculation of screw joints.
• Design of silos ,hoppers and dust collection systems.
• Calculation of silos ,hoppers and dust collection systems.
• Engineering design project.
• Development of metalwork workshop plans ,list of materials,etc of the whole project.
• Writing of assembly and operation instructions.
3. System for management of a coke TakreerClient: PHB Grupo TSK. Globalcqs
This engineering focuses on a system to manage coke in Takreer Plant (Saudi Arabia).
Initial data and information provided by the client:
• general architectural plans and location.
• Lay-out of the factory.
• Basic calculation outlines of buildings and conveyor belts.
Works and documentation created by Globalcqs :
• Design of structural solutions in consignments not asked by the client:.
• Calculation of metallic structure.
• Calculation of screw joints.
• Design of silos ,hoppers and dust collection systems.
• Calculation of silos ,hoppers and dust collection systems.
• Engineering design project.
• Development of metalwork workshop plans ,list of materials,etc of the whole project.
• Writing of assembly and operation instructions.
4. Client: DURO FELGUERA PLANTAS INDUSTRIALES. CTM
CEO Pedro Bravo
Detail description of the work carried out
• Forklift truck
• Tripper.
• Transfer systems.
• Access and platforms
• Development of 3D models
• Preparation of detailed drawings and documents
for the manufacturing process.
• Implementation control.
• Quality control
SAUDI ARABIAClient: PHB Weserhütte. Globalcqs
This engineering focuses on a system of conveyor belts in an installation for operating bulks of cereals in Saudi Arabia
Initial data and information provided by the client:
• General architecture plans.
• Hipothesis on structure loads
• Works and documentation created by Globalcqs :
• Design of a structural solution.
• Calculation of metallic structure.
• Calculation of screw joints.
• Design of the structure in detail of the transfer system.
• Generation of metalwork workshop plans,lists of materials,etc.
• 013-27 PHB - Transfer Towers TT01 TUFANBEYLI
• 013-43 - PHB Transfer Towers 213003 Endesa As Pontes
• 013-46 - PHB - Transfer Towers 212015 Endesa Litoral.
• 013-53 - MARTIFER - El Brocal
• 013-55 - PHB - Belt Conveyor Systems MA’ADEN
• 014-28 - PHB - Transfer Towers MA’ADEN
• 014-22 - DF - Iron Ore Plant Casa de Pedra
• 014-39 - TAIM WESER - Tower TT01 COKE HANDLING GS
• 014-42 - ENCE - Belt Conveyor Navia Factory
• 014-55 NAVEC - Trasnfer Tower TT03 & Belt Conveyor Asturiana de Cinz.
• 014-59 PHB - Transfer Tower Gowest Voestalpine TEXAS
• 014-65 NAVEC - Transfer Towers 323 MO TWR 001 002 006 Intecsa
• 014-75 NAVEC - Handling Systems Onuba Port
controlpiping
Client: AIR LIQUIDE – Planta de La Coruña. GlobalcqsThis Project is about the authentication of H2 pipeline in the Air Liquide factory in La Coruña.
Initial information and data provided by the client:
• Working diagram (P&I).
Works and documentation generated by Globalcqs :
• Layout of pipeline.
• Making of isometrics for production.
• Design of support structure.
• Quality dossier preparation(Trazability, trials and pressure tests).
Cliente: TECNICAL - TECNICAS REUNIDAS
Initial data and information provided by the client:
• General architecture plans.
• P&D.
Works and documentation created by Globalcqs :
• Pipe Routing.
• 3D Model.
• Stress Analisys with CAESAR II.
• Isometrics Drawings, material lists, etc.
• 012-52 - INCALPESA - Pipe Rack Jorf Lasfar
• 014-47 - AZUCARERA ESPAÑOLA - Steam piping lines
•
• 014-85 ALTAIR - Stress Analisys Boiler Room H.Vigo
• 015-20 FERROATLANTICA - Extraction System
• 015-24 PRAXAIR - Criogenic Lines AVIP Hürth
&industrial projects
Client: EMESA - ISOLUX CORSÁN. Globalcqs
This Project involves the development of detailed engineering of metal structurof a bioethanol plant in El Al-caravan (Colombia). The ítems which were developed correspond to: Pipe-Racks, industrial buildings , storage , etc.
Initial data provided by the client:
• Drawings of the Project.
Works and documentation generated by Globalcqs :
• Creation of a 3D model of the Project.
• Preparation of detailed drawings and documents for the manufacturing process.
Client: INSTRA - INDITEXT. Globalcqs
This Project deals with the development of detail engineering in a very complex architectural work for a metalwork manufacturer.
Initial data and information provided by the client:
• Drawings of the project.
• Calculation of metallic structure.
Works and documentation generated by Globalcqs :
• Design and calculation of screw joints.
• Creation of a 3D model of the project .
• Preparation of detailed drawings and documents for the manufacturing process.
Client: FINSA. Globalcqs
This Project deals with the development of complet engineering for several units of a wood indus-try factory in Nelas Portugal.
Works and documentation generated by Globalcqs :
• Design and calculation
• Creation of a 3D model of the project .
• Preparation of detailed drawings and documents for the manufacturing process.
• Plot Plant
• Construction supervision
• 012-38 - GUERRA - Industrial Plant Celanova
• 012-46 - INTERSTEEL - Industrial Plant Cepsa Huelva
• 012-11 FMC - Platforms Calculation
• 013-05 INTERSTEEL - Compressors Building Repsol A Coruña
• 013-57 - INSTRA - Logistics Centre Mango Barcelona
• 013-60 - INMENOR - Biomass Plant
• 013-65 - PREMONOR IRIS - Heat Exchangers Platforms
• 014-44 - NORTON EI - Ecuatorial Coca Cola Building Sierra Leona
•
• 014-79 MARTIFER - ITER Buildign nº 61
• 014-84 MARTIFER - Hangar AIRBUS Marsella
• 014-87 PREMONOR - Pipe rack CLH Bilbao
• 015-08 FINSA - Installation microwaves oven OREMBER
• 017-21 LUSOFINSA- VYNCKE BIOMASS BOILERR
• 018-12 FINSA OREMBER- VYNCKE BIOMASS BOILER
heat transfer systems
Client: Foster Wheeler Iberia. CTM CEO Pedro Bravo
Globalcqs ,developed this engineering project. Furthermore, they provided and built the hea-ters in Huelva:
• Detail engineering.
• Manufacture and assembly plans.
Detail description of the work carried out
• Pressure parts
• Radiante Circular Horno de Crudo radiant crude oil heater
• Convective unit for crude and vacuum oven.
• Tube and pipe for preheating system.
• Vacuum heater.
• Access and platforms.
• Development of 3D models
• Preparation of detaied drawings and documentation for the manufacturing proccess.
• Implementation control.
• Quality control
• Technical assistance on site.
Client: HEURTEY PETROCHEM.
Detailed description of the work carried out:
• Prssure parts
• Convectives
• Preheating tubes and pipes
• Access and platforms
• Development of 3D models
• Preparation of detailed drawings and documents for the manufacturing process.
• Implementation control.
• Quality control
• Technical assistance on site.
Client: TÉCNICAS REUNIDAS. CTM CEO Pedro Bravo
Detailed description of the work carried out:
• Design and calculation for pressure parts.
• Convective systems.
• Tube and pipe for preheating system.
• Access and platforms.
• Development of 3D models
• Preparation of detailed drawings and documents for the manufacturing process.
• Implementation control.
• Quality control
• Technical assistance on site.
Client: TECNICAL - TECNICAS REUNIDAS Globalcqs
Initial data and information provided by the client:
• General architecture plans.
• Hipothesis on structure loads
Works and documentation created by Globalcqs :
• Design of a structural solution.
• Calculation of metallic structure.
• Calculation of screw joints.
• Generation of metalwork workshop plans,lists of materials,etc.
Client: FOSTER WHEELER IBERIA SAU. in Novopolotsk (Belarus).
Initial data and information provided by the client:
• General architecture plans.
• Hipothesis on structure loads
Works and documentation created by Globalcqs :
• Design of a structural solution.
• Calculation of metallic structure.
• Calculation of screw joints.
• Generation of metalwork workshop plans,lists of materials,etc.
Client: TECNICAL - TECNICAS REUNIDAS Globalcqs
Initial data and information provided by the client:
• General architecture plans.
• Hipothesis on structure loads
Works and documentation created by Globalcqs :
• Design of a structural solution.
• Calculation of metallic structure.
• Calculation of screw joints.
• Generation of metalwork workshop plans,lists of materials,etc.
• 013-32 TECNICAL - Crude Heater1H-3201 Cochabamba
• 013-48 TECNICAL - Steam hydrogren reformer Lukoil Volvogrado
• 013-66 TECNICAL - Fractionator feed Heater
• 014-20 TECNICAL - Heaters KOGAS AKKAS FIELD
•
• 014-89 TECNICAL - Circular heaters Talara
• 015-19 TECNICAL - U-700 CDU REVAMP PROJECT
•
epc - facilities - other projects
Client: CEMSA. GlobalcqsThis Project is a complete design of storage hoppers and a complete system to handle bulk minerals with conveyor belts.
Initial data and information provided by the client:
• Lay – Out of the plant.
• Features of bulk storage.
Works and documentation generated by Globalcqs :
• Installation of equipment in the plant
• Design of structural solutions.
• Preparation of detailed drawings for the manufacture.
• Technical assistance on site.
Client: BTG. Globalcqs
-volving BTG Company.It focuses on the development of a press system for rubber bands.
Initial data and information provided by the client:
• Focus on client’s needs.
• Design and creation of a solution.
Works and documentation generated by Global- cqs :
• Analysis of stress and strain on structural elements.
• Creation of a 3D model of the project.
• Preparation of detailed drawings and documents for the manufacturing process.
Client: MEGASA. This Project is a complete design of Collection and processing of metal waste and scrap system for Steel Plant of Megasa
Initial data and information provided by the client:
• Lay – Out of the plant.
Works and documentation generated by Globalcqs :
• Installation of equipment in the plant
• Design of structural solutions.
• Preparation of detailed drawings for the manufacture.
• Technical assistance on site.
• 013-16 INTERSTEEL - Tanks Valoriza Gijón
• 013-79 - SGL CARBÓN - Additive hopper
• 013-82 - MONESA - Boiler connection Air Liquide A Coruña
• 014-01 FUNGIBLES CONDAL - System for washing machinery and vehicle wheels Alcoa San Ciprián.
• 014-32 - SGL CARBÓN - Stack
• 014-86 PREMONOR - Water Tanks Finland
• 014-85 ALTAIR - Boiler Room Hospital Vigo
• 015-20 M. MOAN - Stairs and suction and ventilation tubes Repsol A Coruña
• 0015-13 ABONOMAR - Reciclyng installation
• 014-81 MACOGA - Expansion joints factory expansion 2014
• 013-37 - INMENOR - Boiler brackets
• 013-54 - INMENOR - Acerlor
BKCN, Espíritu Santo 12, N-VI 15165 Bergondo - A Coruña - EspañaTlf. 902 905 225 - [email protected]