global business control system
TRANSCRIPT
-
8/8/2019 Global Business Control System
1/13
GLOBAL BUSINESSGLOBAL BUSINESS
CONTROL SYSTEMCONTROL SYSTEM
BYBY
GEM GEORGEGEM GEORGE
-
8/8/2019 Global Business Control System
2/13
DefintionDefintion
Responsible for design and implementation ofResponsible for design and implementation of
whole of a organization working through outwhole of a organization working through out
the world:the world:Eg:global customer supportEg:global customer support
-
8/8/2019 Global Business Control System
3/13
Why do culture differ?Why do culture differ?
-
8/8/2019 Global Business Control System
4/13
Designing a global control systemDesigning a global control system
pointsto remember:pointsto remember: Difference in cultureDifference in culture
BenchmarkingBenchmarking
Additional trainingAdditional training
-
8/8/2019 Global Business Control System
5/13
CUSTOMER SUPPORT SYSTEMCUSTOMER SUPPORT SYSTEM
ORACLEORACLE
-
8/8/2019 Global Business Control System
6/13
Crisis ManagementCrisis Management
Business Impact AnalysisBusiness Impact Analysis
Criticality LevelsCriticalityCriticality
LevelLevel
RestorationRestorationTimeTime
ObjecitiveObjecitive(RTO)(RTO)
AvaiAvail %l %
UnplaUnplannednnedOutagOutag
ee13wk13wk(SLA)(SLA)
PlanPlan
nednedOutOutageage13w13w
kkBudBudgetget
MaintMaintWindowWindow
(Fri(Fri--only)only)
Maint Min.Maint Min.Lead TimeLead Time
ColCold/d/
CmCmpltplt
HHot/ot/RRollolliningg
CL5CL5 -- HighlyHighlyCriticalCritical
RTO< 1hrRTO< 1hr99.999.99%9%
00:1300:13hrshrs
6hrs6hrs99ppmm
9p9pmm
14d14d
CL4CL4 --CriticalCritical
1hr
-
8/8/2019 Global Business Control System
7/13
GCS BCP Watch listGCS BCP Watch list
-
8/8/2019 Global Business Control System
8/13
Business Process Contingency PlansBusiness Process Contingency Plans
Regional Business Process Contingency PlansRegional Business Process Contingency Plans
(BPC(BPC ))
Local Business Process Contingency PlansLocal Business Process Contingency Plans
-
8/8/2019 Global Business Control System
9/13
ListofGCS Local BCP RecoveryDocumentsby RegionListofGCS Local BCP RecoveryDocumentsby Region
`
APAC (Country, CityAPAC (Country, City
(staff))(staff)) EMEA (Country (staff))EMEA (Country (staff))
US, Orlando, FL (513)US, Orlando, FL (513) IN, Bangalore (529)IN, Bangalore (529) United Kingdom (402)United Kingdom (402)
US, Colorado Springs, CO (354)US, Colorado Springs, CO (354) IN, Hyderabad (235)IN, Hyderabad (235) Egypt (230)Egypt (230)
US,Denver, CO (227)US,Denver, CO (227) AU, Melbourne (172)AU, Melbourne (172) Romania (237)Romania (237)
US, Pleasanton, CA (174)US, Pleasanton, CA (174) China (129)China (129) Germany (165)Germany (165)
Chile, Santiago (135)Chile, Santiago (135) AU, Sydney (52)AU, Sydney (52) France (98)France (98)
US, HQ, CA (118)US, HQ, CA (118) Singapore (48)Singapore (48) Netherlands (68)Netherlands (68)
Canada, Mississauga (109)Canada, Mississauga (109) Korea (34)Korea (34) Spain (49)Spain (49)
Brazil, Sao Paulo (70)Brazil, Sao Paulo (70) Italy (37)Italy (37)
US, Eden Prairie, MN (39)US, Eden Prairie, MN (39) Belgium (26)Belgium (26)
US, Santa Clara, CA (36)US, Santa Clara, CA (36) Switzerland (29)Switzerland (29)
US, Stamford, CT (36)US, Stamford, CT (36) Ireland (22)Ireland (22)
-
8/8/2019 Global Business Control System
10/13
Annual Business Continuity Plan TableAnnual Business Continuity Plan Table
Top TestingTop Testing Eachyear there will be a Global Incident Simulation.Eachyear there will be a Global Incident Simulation.
Thesimulation cantake advantageofa planned eventsuchThesimulation cantake advantageofa planned eventsuchas an Orionswitchas an Orionswitch--over toDisaster Recoverysysteminover toDisaster RecoverysysteminSalt LakeData Center or other major maintenanceSalt LakeData Center or other major maintenance
actions.actions.
At a minimum,simulationneedstoinvolvetwomajorAt a minimum,simulationneedstoinvolvetwomajorsupport centers and representativesfromthe deliverysupport centers and representativesfromthe deliveryteams atthesesites.teams atthesesites.
The GCS Core Team will complete a postsimulationThe GCS Core Team will complete a postsimulationreport.report.
-
8/8/2019 Global Business Control System
11/13
System Outage ManagementSystem Outage Management
Planned OutagesPlanned Outages
Standard MaintenanceWindow (SMW)Standard MaintenanceWindow (SMW)
Minimum notification lead timeMinimum notification lead timeGCS BCP communicationsGCS BCP communications
Standard System Outage Instructions (SSOI)Standard System Outage Instructions (SSOI)
GCS BCP Duty Manager (DM)GCS BCP Duty Manager (DM)
-
8/8/2019 Global Business Control System
12/13
Unplanned OutagesUnplanned Outages
Unplanned Outagetriggers and engagementUnplanned Outagetriggers and engagement
GCS BCP communicationsGCS BCP communications All System Unplanned EventsAll System Unplanned Events
Criticality System Unplanned EventsCriticality System Unplanned Events
-
8/8/2019 Global Business Control System
13/13