glast lat system engineering
DESCRIPTION
Gamma-ray Large Area Space Telescope. GLAST LAT System Engineering. ACD Early Integration Test Plan Rich Baun SLAC [email protected] (650) 926-3520. ACD Early Integration Test - Overview. Test Description - PowerPoint PPT PresentationTRANSCRIPT
GLAST LAT Project 28 July 2005
LAT System Engineering ACD Early Integration Test
GLAST LAT GLAST LAT System Engineering
Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
ACD Early Integration Test Plan
Rich [email protected](650) 926-3520
GLAST LAT Project 28 July 2005
2LAT System Engineering ACD Early Integration Test
ACD Early Integration Test - ACD Early Integration Test - OverviewOverview
Test Description– With 8 Towers in the grid and the ACD installed execute
functional, performance, and internal interface testing of the ACD, Trigger, Dataflow, and Tracker subsystems.
– Perform the LAT CPT, augmented to include the ACD, and SVAC testing while the entire configuration is powered.
Entrance criteria– Complete the planned 8 Tower testing of the CAL and
TRK prior to installation of the ACD– Successfully completion of the ACD Pre-Installation
Test
GLAST LAT Project 28 July 2005
3LAT System Engineering ACD Early Integration Test
ACD Early Integration Test - ACD Early Integration Test - PurposePurpose
Reduce the risk of the ACD Integration to the LAT. Specifically, perform the following activities with 8
Towers and the ACD integrated: – Verify and characterize the function and performance
of the Trigger subsystem with respect to the ACD– Verify and characterize the function and performance
of the Dataflow subsystem with respect to the ACD– Verify the ACD performance while integrated to the LAT– Verify CAL and TKR performance is not adversely
effected by the ACD installation– Verify the performance of the LAT as a whole– Validate, to the maximum extent possible, the LAT
Level ACD, Dataflow, and Trigger test scripts and test schemas.
GLAST LAT Project 28 July 2005
4LAT System Engineering ACD Early Integration Test
ACD Early Integration Test - ACD Early Integration Test - ConfigurationConfiguration
GSE Configuration– Current configuration, with the following exceptions
• Latest version of LATTE 4.9.x installed• Upgraded BPU installed
LAT Configuration– Eight Towers in the Grid– EM GASU and PDU installed– GASU flight cables installed– ACD and ACD flight cables installed– EMI shield, ground panel, and Bulkhead bracket
installed• Required to mechanically support ACD/GASU flight cables
GLAST LAT Project 28 July 2005
5LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (1 (1 of 10)of 10)
NOTE: The order of the tests below can be modified and/or executed in parallel as required to accomplish the stated goals of the ACD Early Integration and individual tests.
1. Mechanically and electrically integrate the ACD to the grid– Special Test Request XX
– Author: Rich Baun– Required Procedures:
– ACD Electrical Integration Procedure is TBS by Brian Grist– ACD Mechanical Integration Procedure is TBS by Ken Fouts
– Required Test Scripts– Mechanical: Not applicable– Electrical: TBS by Brian Grist
– Expected Results/Acceptance Criteria– Safe to Mate and EICIT completed successfully– ACD integrated to grid as specified by the above electrical and
mechanical procedures– Expected Duration
– TBS by Brian Grist
GLAST LAT Project 28 July 2005
6LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (2 (2 of 10)of 10)
2. ACD Post-Installation Health Test– Special Test Request XX
– Author: Bob Hartman
– Required Procedure: – ACD CPT, ACD-PROC-000270, paragraph 4.3 items A) thru O)
– Required Test Scripts– AcdInitPwrUpScripts.py, AcdInitCurrent.py, and
AcdGarcRegRdWr.py
– Expected Results/Acceptance Criteria– Specified ACD scripts pass without error as required by the
ACD CPT, ACD-PROC-000270, paragraph 4.3 items A) thru O).– NOTE: AcdGarcRegRdWr.py may fail initially. The proper
setting for the Clock Phase Bits must be determined for each FREE card
– Expected Duration– TBS by Bob Hartman
GLAST LAT Project 28 July 2005
7LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (3 (3 of 10)of 10)
3. AEM/ACD Clock Phase Bit Set/Timing Characterization– Special Test Request XX
– Authors: Rich Baun, Bob Hartman, and Mike Huffer
– Required Procedure: – TBS by Mike Huffer and Bob Hartman
– Required Test Scripts– AcdGarcRegRdWr.py with the remainder identified by Mike
Huffer
– Expected Results/Acceptance Criteria– All Clock Phase Bits are set and the AEM/ACD are
communicating without error– Required timing characterization data is collected and
recorded
– Expected Duration– TBS by Mike Huffer/Bob Hartman
GLAST LAT Project 28 July 2005
8LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (4 (4 of 10)of 10)
4. Dataflow (AEM) Tests– Special Test Request XX
– Authors: Rich Baun and Mike Huffer
– Required Procedure: – Perform Primary AEM Power/On Off, Primary AEM Register
Test, Primary AEM Event Test, Redundant AEM Power/On Off, Redundant AEM Register Test, and the Redundant AEM Event Test sections of the GASU Test Procedure, LAT-TD-01717, para 5.5.
– Required Test Scripts– List of existing scripts TBS by Mike Huffer
– Expected Results/Acceptance Criteria– Specified GASU scripts pass without error as required by
the above sections of the GASU Test Procedure, LAT-TD-01717, paragraph 5.5
– Expected Duration– TBS by Mike Huffer
GLAST LAT Project 28 July 2005
9LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (5 (5 of 10)of 10)
5. ACD Trigger Time-In– Special Test Request XX
– Authors: Su Dong/Martin Kocian
– Required Procedure: – TBS by Su Dong/Martin Kocian
– Required Test Scripts– TBS. Scripts are needed to support ACD TREQ Time-In Test
and TACQ Scan for AEM Test
– Expected Results/Acceptance Criteria– TBS by Su Dong/Martin Kocian
– Expected Duration– TBS by Su Dong/Martin Kocian
GLAST LAT Project 28 July 2005
10LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (6 (6 of 11)of 11)
6. ACD Full Functional– Special Test Request XX
– Author: Bob Hartman– Required Procedure:
– ACD CPT, ACD-PROC-000270, paragraph 4.3– Required Test Scripts
• AcdInitCurrent.py, AcdPwr.py, AcdGarcRegRdWr.py, AcdGafeRegRdWr.py, AcdGarcParityErr.py, AcdLeHeBiasCal.py, AcdHoldDelay.py, AcdHitmapDelay.py, AcdVetoCal.py, AcdGafeNoise.py, AcdHldCal.py, AcdTciRegRange.py, AcdPedestal.py, AcdHitmapTiming.py, AcdVetoHitmapPha.py, AcdVetoAdcXtalk.py, AcdGasuHwdCtrsTci.py, AcdHvbsPmtAlive.py, AcdTriggeredOp.py
• Some modifications to above scripts may be required for LAT Level Test
• Script names for Redundant Interface test TBS Bob Hartman• Scripts needed for full ACD Test on GASU Hardware Counters and
ACD Operations with LAT Trigger– Expected Results/Acceptance Criteria
– All specified ACD scripts pass without error as required by the ACD CPT, ACD-PROC-000270, paragraph 4.3
– Expected Duration– 7 Hours
GLAST LAT Project 28 July 2005
11LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (7 of (7 of 11)11)
7. LAT LPT (without ACD)– Special Test Request XX
– Author: Larry Wai
– Required Procedure: – Current procedures used for existing CAL and TKR LPTs
– Required Test Scripts– Existing CAL and TKR LPT
– Expected Results/Acceptance Criteria– All specified scripts pass without error
– Expected Duration– TBS by Larry Wai
GLAST LAT Project 28 July 2005
12LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (8 (8 of 11)of 11)
8. ACD Threshold Calibration– Special Test Request XX
– Author: Su Dong/Martin Kocian
– Required Procedure: – Procedure is Su Dong/Martin Kocian
– Required Test Scripts– List of scripts Su Dong/Martin Kocian
– New or modified scripts provided by I&T
– Expected Results/Acceptance Criteria– TBS by Su Dong/Martin Kocian
– Expected Duration– TBS by Su Dong/Martin Kocian
GLAST LAT Project 28 July 2005
13LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (9 (9 of 11)of 11)
9. ACD Trigger Tests– Special Test Request XX
– Authors: Su Dong/Martin Kocian
– Required Procedure: – TBS by Su Dong/Martin Kocian
– Required Test Scripts– TBS. Scripts are needed to support ACD Trigger Efficiency
Test and GEM ROI and Tracker Test
– Expected Results/Acceptance Criteria– TBS by Su Dong/Martin Kocian
– Expected Duration– TBS by Su Dong/Martin Kocian
GLAST LAT Project 28 July 2005
14LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (10 (10 of 11)of 11)
10. LAT CPT (with ACD)– Special Test Request XX
– Authors: Rich Baun
– Required Procedure: – TBS by Larry Wai
– Required Test Scripts– calibDAC.py, calibGen.py, muTrg.py, TkrTotGain.py,
TkrThresholdGain.py, TkrThrDispersion.py, TkrReadoutNoise.py, TkrTriggerJitter.py, TkrTreqChk.py,.py, and TkrDataTaking.py
– List of ACD scripts TBS by Bob Hartman/Rich Baun– New or modified scripts provided by I&T
– Expected Results/Acceptance Criteria– All specified scripts pass without error
– Expected Duration– 18 Hours on-line
GLAST LAT Project 28 July 2005
15LAT System Engineering ACD Early Integration Test
ACD Early Integration Test Procedure ACD Early Integration Test Procedure (11 (11 of 11)of 11)
11. SVAC Testing– Special Test Request XX
– Authors: Eduardo do Couto e Silva
– Required Procedure: – TBS by Eduardo do Couto e Silva
– Required Test Scripts– Modifications to the Van de Graff and Cosmic Ray Data
Runs for LAT Integration matrix (LAT-TD-04136), TBS by Eduardo do Couto e Silva
– Expected Results/Acceptance Criteria– Data collection completes without error
– Expected Duration– TBS by Eduardo do Couto e Silva