GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area GLAST Large Area Telescope: Telescope: AntiCoincidence Detector (ACD) Electrical Subsystem Review Gamma-ray Large Gamma-ray Large Area Space Area Space Telescope Telescope

Upload: gwenda-smith

Post on 01-Jan-2016

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 1

GLAST Large Area Telescope:GLAST Large Area Telescope:

AntiCoincidence Detector (ACD) Electrical Subsystem Review

Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope

Page 2: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 2

ACD Electrical Subsystem - OverviewACD Electrical Subsystem - Overview

• 194 Independent electrical channels• Six primary and six secondary Front-End

Electronics (FREE) circuit cards• One High Voltage Bias Supply (HVBS) per

FREE circuit card. Request to change to two HVBS

• Up to 18 Photomultiplier Tube (PMTs) per FREE circuit card

• One resistor network per PMT

Page 3: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 3

ACD Electrical Subsystem - Block diagramACD Electrical Subsystem - Block diagram

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

PM

T&

BIA

SIN

G

DIG

ITA

LA

SIC

AEMINTERCONNECT

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

PM

T&

BIA

SIN

G

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

PM

T&

BIA

SIN

G

AN

AL

OG

AS

IC

VI I/F

AD

CA

DC

I/F

AE

M P

RIM

AR

Y

AE

M S

EC

ON

DA

RY

HIG

H V

OL

TA

GE

BIA

S S

UP

PL

Y #

1

DA

CC

IRC

UIT

HIG

H V

OL

TA

GE

BIA

S S

UP

PL

Y #

2

FREE circuit card

Page 4: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 4

ACD Electrical Subsystem – Component StatusACD Electrical Subsystem – Component Status

Components Function Status

HVBS Requires +28 V supply;

Outputs 0 V to 1500 V

Designed and ready for fabrication;

Awaiting electronics packaging design completion

GAFE Receives PMT signal output;

Generates VETO signals

Track and Holds PMT signal pulse height

1st generation in testing;

2nd generation at the foundry

GARC Processes all commands from ACD Electronics Module (AEM)

Transmits all ACD data to AEM

Provides commands and control to the GAFE and HVBS

1st generation design completely emulated in an FPGA

1st generation at the foundry

Page 5: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 5

GARC DevelopmentGARC Development

Front End Electronics (FREE) emulator. FPGA implementation of GARC

GARC test board

PAD FRAME OFTANNER I/O CELLS

LVDS CELLS

LOGIC CORE

VDD RAIL GND RAIL

SIGNALROUTINGTO PAD FRAME

GARC Layout

Held design review at GSFC in July ’02 – no serious issues

First generation is due August ‘02.

FPGA implementation was tested.

FREE FPGA emulator board is successfully communicating with the AEM at SLAC and GSFC

Page 6: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 6

GAFE DevelopmentGAFE Development

Preliminary test set-up for ACD first-generation analog ASIC (GAFE)

VETO output from a 1 MIP signal input to the GAFE.

Held design review at GSFC in July ’02 – no serious issues

First generation: VETO and noise measurements of the analog section meet specifications. Some problems in the digital section and in the low-gain PHA linearity (secondary function)

Second generation is due in August ‘02.

Page 7: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 7

High Voltage Bias SuppliesHigh Voltage Bias Supplies

OscillatorPlanar

TransformerC-W Voltage

Multiplier

OutputFilter

HV MonitorCircuit

Output ControlCircuit

Power Input Filter, ENABLE,DAC Receiver, Monitor Out

HV

Ou

t

Page 8: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 8

HVBS InterfacesHVBS Interfaces

Page 9: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 9

Electrical Subsystem – ScheduleElectrical Subsystem – Schedule

Components

Completion Date

HVBS• Development Unit

Testing• Engineering Unit testing• Flight Unit ready for I&T

8/26/02

1/21/03

7/14/03

GAFE• 1st Generation fabrication• 2nd Generation fabrication• 3rd Generation fabrication• Flight unit fabrication

10/26/01

5/13/02

9/23/02

3/03/03

GARC• 1st Generation fabrication• 2nd generation fabrication• Flight unit fabrication

5/13/02

9/23/02

3/03/03

Components

Completion Date

Resistor Network• Engineering units testing• Flight units ready for I&T

7/08/02

7/30/03

PMT subassembly• Engineering unit testing• Flight units ready for I&T

8/12/02

10/09/03

FREE Circuit Card• Development Unit

Testing• Engineering Unit testing• Flight Unit ready for I&T

11/06/02

4/24/03

12/01/03

Float 15 weeks

Page 10: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 10

• End of Presentation

Page 11: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 11

ASIC Design Review - GARCASIC Design Review - GARC

Issues/recommendations Status

Power trace width might not meet process specs

G. Haller checked with Agilent and it is OK.

State machine design could be susceptible to SEU. Encode using One-hot or Triple Modular Redundancy (TMR)

Current design is acceptable because the SEU rate is negligible.

LVDS drivers are more sensitive to latch-up because of the higher current. Radiation test should be performed

All ASICs will undergo radiation testing

Page 12: GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence

GLAST LAT Project Delta PDR/Baseline Review July 29-August 1, 2002

Section 7.3 AntiCoincidnce Detector Technical Status 12

ASIC Design Review - GAFEASIC Design Review - GAFE

Issues/ Recommendations Status

Resistors are constructed in N-wells. Use poly resistors for better performance.

Being investigated (need more ASIC area)

High-value resistors that are used for charge splitting should be reduced

Being investigated

Investigate the system level noise Current noise spec is 5x less than 0.1 MIP threshold (400 V). Measured shaping amp output is 1.3 mV.

Pulse height analysis accuracy will vary with temperature, signal level and power

Thermal cycling. Measured 6% to 6.5% variation of gain over temperature range.