August 1, 2007 1 GLAST LAT Project Cost/Schedule Slides for Monthly Status Mtg. GLAST LAT Project Cost/Schedule Reports for Presentation July 2007 Month End 4.1.C EPO

Upload: hilary-wright

Post on 21-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GLAST LAT ProjectCost/Schedule Slides for Monthly Status Mtg. August 1, 20071 GLAST LAT Project Cost/Schedule Reports for Presentation July 2007 Month

August 1, 2007 1

GLAST LAT Project Cost/Schedule Slides for Monthly Status Mtg.GLAST LAT Project

Cost/Schedule Reports for Presentation

July 2007 Month End 4.1.C EPO

Page 2: GLAST LAT ProjectCost/Schedule Slides for Monthly Status Mtg. August 1, 20071 GLAST LAT Project Cost/Schedule Reports for Presentation July 2007 Month

August 1, 2007 2

GLAST LAT Project Cost/Schedule Slides for Monthly Status Mtg.

Accomplishments for July 2007• Active Galaxy Pop-up book Teacher’s guide is now 508 compliant

and online. This completes this product.• GLAST Model product review results are in – Recommended for

distribution to limited audience with minor revisions, which are now underway.

• Dr. Kevin McLin was interviewed and is officially hired as GTN director, effective August 1, 2007. David McCall was interviewed and recommended for hire as part-time systems administrator.

• GTN participated in campaign to monitor 3C454.3, which was a multi-wavelength effort.

• GLAST launch bags are printed and sample received. Launch litho now underway.

• Considerable time and effort was spent on understanding and redoing the budget for pre-launch period. Not yet complete, however we are making real progress here.

• GLAST Media day is now being planned. Work on Science Writer’s Guide, and other PR documents.

Page 3: GLAST LAT ProjectCost/Schedule Slides for Monthly Status Mtg. August 1, 20071 GLAST LAT Project Cost/Schedule Reports for Presentation July 2007 Month

August 1, 2007 3

GLAST LAT Project Cost/Schedule Slides for Monthly Status Mtg.

Accomplishments for July 2007

• 3-day College experience for 60 students from Roseland University Prep was a great success. GLAST activities included sky viewing through SSU telescopes as well as PBS NOVA show.

Dr. Kevin McLin with the RUP students outside the SSU Observatory