Doing it right from start . . . . . .

Abhishek Singh Petro IT Ltd.

GIS based Data Management System for New Pipeline Construction

Page 2: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Agenda

What is an integrated GIS based solution to track and archive new construction ?

How does a CMS help projects and operations teams ? A real life study of such a deployment

The benefits to team by implementing a GIS enabled web based CMS

Page 3: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

What Will You Learn

Using a GIS based solution for construction management and material delivery How GIS based systems can be used for project quality assurance

Traceability during new construction and after How a GIS based CMS helps in regulatory and design compliance How GIS supports the integrity of historical record-keeping

Page 4: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Integrated GIS Based Solution

Pre Construction During Construction

Land Management & Asset Mapping

Alignment Sheets

Engineering Records

Construction Management

Project Certification Management

Material Management

Work Flows

Design Compliance/QA/Traceability

Page 5: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

A  Case  Study…

Pipeline Owner – Indian Oil Corporation Limited

Diameter – 18/14/12/10 Pipeline Length – 670 Miles

Pipeline Contractors – 2

Number Of States – 3

Stations – 8

Districts – 16

Crossings – 1144

Number Of Forests – 590

Page 6: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Project Challenges

Environmental clearances

Meeting Design Compliance Requirement

Traceability of material and work

Quality Assurance of Material and installation

Management of data and information

Capturing field data during execution

Project on-time delivery

Page 7: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

A Case Study -Project Phases

Phase-I GIS Implementation ( Forest Mapping )

DGPS Survey

Delivery

Pre-construction stage

Phase-II Implementation of CMS

till handover

Asset Mapping

Handover to O/M

During Construction

Phase-III

System handover

Special Queries generation

Post Construction

Page 8: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Execution Strategy

Integration of Pre-construction information over GIS Application

Geo-referencing of Digital Map over route

Integration of Land management systems

Integration of Material management system

Implementation of new construction database Asset mapping for entire pipeline route

Integration of Completion and Certification system

Page 9: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Preparation Of Forest Map From Cadastral Sheets

Merging of Cadastral Sheets to get a Complete Village Map

Page 10: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Forest Information

Page 11: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Forest Information

Page 12: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Land Parcels

Page 13: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Deliverables to Authorities-Phase-I Completion

Shape Files

Linked Permit Documents Digital Map with land Parcels Land Usage details

Boundary Information

Page 14: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

GIS Implementation Phase -II

• Spatial Analysis – Query based tools for Disaster Management – Population Density Information – Ground Elevation charting – Focused areas for CSR (Corporate Social Responsibility ) activities – Measurement tools – Risk Analysis Tools – HSE Reporting and alerts

• Data Collection – Ground survey 5 kms on either side of Route with 1 Mtr accuracy – Asset mapping survey (Stations, Police stations, Hospitals etc.) – Kilometer/Weld Joint locations – Pictures/Audio/Videos

• Web based Application – Integration with CMS/MT/PCMS/EDMS/OM/ASM – Alerts and Notification mechanism – Handover of application with editing feature

Page 15: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

GIS Based CMS

• CMS = Construction Management System • Monitoring tool for near real time progress monitoring • Aids project teams in

– Design compliance – Schedule compliance – Maintain Quality assurance – As built documentation

• Critical as-built data is archived and stored alongside construction • Aids Operations teams in

– Availability of an electronic as-built database – Data related to each aspect of the pipeline asset including engineering – The ability to add to this core data to create an inter-linked history over time

• Regulatory requirements can be met at the onset of operations itself

Page 16: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Deployment of CMS

• Deployment stage : Project Execution Stage • Goal : To archive data related all the construction activities and

enhance the project monitoring mechanism • Need – Integrated application which brings together information

related to : – Land & Administration (Cadastral information ) – Materials (Free issue , Bought out materials ) – Pipeline Construction (Kilometer , Weld Information etc.) – Documentation (Engineering documentation ) – Certification (Certification management ) – Asset (Disaster Management ) – Operation and Maintenance

Page 17: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Cadastral Information-Land Management System

Page 18: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Cadastral Information

Page 19: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Managing Permits/Validity

Page 20: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Material Tracking

Page 21: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Material Information

PO Link

Page 22: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Tracing Cut Pipes

Pipe Reconciliation Report

Page 23: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Logistics Reporting

Page 24: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Crossing Information

Page 25: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Stations Progress

Page 26: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Stations Progress

Page 27: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Weld Data

Tabular Report

Graphical Report

Page 28: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Statistics

Page 29: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Welder Performance

Page 30: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Validated Pipebook

Page 31: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Weld Chart

Page 32: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

NDT Information

Page 33: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Progress Chart

Page 34: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Tie-In Chart

Page 35: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Progress Review Report

Page 36: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

S-Curve

Page 37: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Construction Information

Page 38: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Exceptions

Page 39: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Certification Management

Page 40: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Query Based Tools

Page 41: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Content Management

Page 42: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Geo Tagged Information

Page 43: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

As-built Information

Page 44: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Asset Mapping -Information

• Block Valve Stations • Test Lead Points • Turning Points • Private Structural Encroachments • Foreign Pipeline • Crossings • Boundary Marker • HOV/MOV • RCP/CP • KM Post • Land-details • Warning Signs • Hospitals • Fire Stations • Police Station • Retail Petrol Pump

Point Of Interest

Page 45: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Asset Mapping -Information

Page 46: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Benefits to teams

Accurate Land Records : Helps identify and eliminate errors in data and parcel boundaries Less land conflicts: Safeguarding the records and prevent land disputes Record updation: History of property transfer as well as division of land parcels can be visualized Historical data overlaid with current land use data illustrates the impact of development within a community,

areas of greatest environmental pressure can be identified

Land and Administration

Information on critical aspects and events that describe a pipeline (Line pipe, facilities, CP etc.)

Analyzing and visualizing of historical HSE data assists in taking a well-informed decision-making Improves Fire Incidence Response

HSE Team

Page 47: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Benefits to teams

End of Day Progress and Compliance Reporting, enabling efficient project monitoring (over the web) Material Reconciliation

Interlinked Documentation

Real time progress monitoring

Smooth handover of data to operations team

Projects Team

Enables knowledge base to help plan effectively and mitigate risks associated with HSE Alert mechanism for accidents or ill health causation and keep teams in a state of better preparedness

Enhance the emergency response system

Detail information of Demographics available through one interface

Operation & Maintenance Team

Page 48: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Summary

GIS based CMS enables companies to save time , energy , paper , cost and many other impact areas

Regulatory requirements can be met at the onset of operations itself

Quick accessibility of data and information A GIS enabled CMS provides visualization and analysis of project activities, and

supports the more productive execution of work:

Construction activities and material delivery, and associated issues are managed and resolved near real-time

GIS visualization provides transparency of all work and issues to stakeholders Post-commissioning hand-off of documentation is seamless and does not

require months of re-engineering paperwork

Page 49: GIS based Data Management System for New Pipeline · PDF fileDoing it right from start . . . . . . Abhishek Singh Petro IT Ltd. GIS based Data Management System for New Pipeline Construction

Questions to ask during start of project ?

• How the regulatory requirements can be met using such systems?

• How to make use of available data and information ? • What would projects teams like in terms of critical monitoring

aids • What would we like in terms of information critical for

operations and maintenance teams? • What kind of information could help for future Integrity

management plans? • Set up such a system for capturing this relevant data at the

construction stage itself and then build on it