gilmore fine arts...heating plant - replace 2001 heating plant with new, high efficiency boilers,...

8
Gilmore Fine Arts School Description Original Construction: 1974 Building Additions: None Gross Square Footage: 137,680 ft 2 Site Acreage: 20.4 acres Demographics Assessment Enrollment (students) 743 Facility Capacity (students) 1,056 Facility Utilization 70% Project Scope Masonry repairs • Update auditorium seating & lighting, gym sound system • LED lighting • HVAC Control Integration • Site Work to address drainage issues • Windows to Exterior Classrooms • High priority asphalt and concrete • Add exterior windows to all perimeter classrooms • Interior Refresh finishes in perimeter MS classrooms and performing arts wing (update areas untouched by last project) • Eliminate asbestos floor tile • Renovate 3 science rooms • Convert locker rooms to parent room, fitness center and gym storage • Emergency Power supply for 2 IT closets • Plumbing Fixture Replacements

Upload: others

Post on 14-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gilmore Fine Arts...Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers, Pumps, VFDs, Hydronic Accessories 10-20 years $469,000. X GFA-ME-3 Heating Plant -

Gilmore Fine Arts

School Description Original Construction: 1974 Building Additions: None Gross Square Footage: 137,680 ft2 Site Acreage: 20.4 acres Demographics Assessment Enrollment (students) 743 Facility Capacity (students) 1,056 Facility Utilization 70% Project Scope • Masonry repairs

• Update auditorium seating & lighting, gym sound system • LED lighting • HVAC Control Integration • Site Work to address drainage issues • Windows to Exterior Classrooms • High priority asphalt and concrete • Add exterior windows to all perimeter classrooms • Interior Refresh finishes in perimeter MS classrooms and performing arts wing

(update areas untouched by last project) • Eliminate asbestos floor tile • Renovate 3 science rooms • Convert locker rooms to parent room, fitness center and gym storage • Emergency Power supply for 2 IT closets • Plumbing Fixture Replacements

Page 2: Gilmore Fine Arts...Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers, Pumps, VFDs, Hydronic Accessories 10-20 years $469,000. X GFA-ME-3 Heating Plant -

Gilmore Fine Arts

Educational Adequacy Scorecard Key Program Area Rating Summary

Site

Site Traffic, Safe Routes, Parking G Have separate bus and parent loops. Try to use hardsurface play area for event parking as well. Need visitor stalls. Could build lot on SW land.

Site Size, Outdoor Fields & Greenspace Areas G 20.4 acres. New playground. Underutilized field to east.

Gen

eral

Security/Supervision G Secure entry sequence at remote desk. Office not at front entry. Additional cameras needed. Could add 9 sets of compartmentalization doors.

ADA Accessibility G Have elevator, ramps, powered operators. Many updates with recent remodel.

Administrative/Nurse/Student Support Spaces G Recently remodeled. Well organized. Good size spaces. Not at building

entrance. Noise carries between office (walls not to deck)

Cafeteria/Serving/Kitchen Y Tight at 4,360 sf (At full capacity = 12sf/student for 3 serving periods) but acceptable. Add color and additional acoustical treatment

Staff Planning/Collaboration Areas R No dedicated space.

Restrooms-Student/Staff Y Lower level south restrooms need updates. No unisex. Upper level needs staff restrooms.

Support Spaces (Lockers, Book Room, Storage, Receiving, etc.) G Abundance of lockers. Have book room. Have receiving. Good storage

within classrooms. Circulation/Wayfinding Y Poor site wayfinding. Limited interior directional signage. Community or Parent Room Y No community room but less of a need since a choice school.

Building Aesthetics (Interior & Exterior) Y Most classroom finishes recently updated. Performance & phy ed. spaces need updates. Exterior windows need to be added.

Inst

ruct

iona

l

Classroom Quantity, Size & Suitability Y Good size (850-1200 sf) and quantity of classrooms for enrollment. New finishes & casework. Need daylighting! Could replace exterior panels and introduce windows.

Science/STEM Classrooms Y Interior MS Science recently remodeled. Elementary does not have a STEM lab

Music, Art, Performance Spaces Y Great square footage for the arts (Magnate). Audititorium (431 seats) needs theatrical systems/stage/curtains/rigging updates. Could look to add seats to existing space. This part of building needs finishes updated (ex K-5 drama).

Flexible Learning Spaces, Student Project/Breakout Spaces R No small group breakout areas. Add amenities to utilizie cafeteria as large

group instruction Makers Space/FAB Lab/Career & Tech. Ed. Spaces G Have Maker's Space on 2nd floor. Limited CTE space by choice.

Phy. Ed. & Athletics Spaces Y Gym is 2-station (9,160 sf) May get tight as enrollment grows. Locker rooms need refurbishment.

Library/Media Center/Learning Commons G 4,325 sf. New flexible furniture & bookcases. Nice layout that can broken into multiple uses. Be nice to add daylighting.

Special Education Spaces Y SPED has plenty of space. Have small sensory room on first. 2nd floor needs sensory/calming room by elementary. Many SPED spaces in full-size classrooms. Investigate "right-sizing"

Reu

se Facility Condition Index (FCI) G 12.08% FCI

Suitability for Reinvestment/Expansion/Repurposing G

Good site size and recent remodeling means this building will be in district use long-term. Investigate if field to east could be turned into baseball/softball complex for Horlick HS.

G Adequate - Conforms with design best practices and meets District needs for foreseeable future

Y Questionable - Doesn't meet design best practice but may be considered acceptable based on current usage, enrollment, or programs

R Inadequate - Fails to meet District needs and should be considered highest priority for correction

Page 3: Gilmore Fine Arts...Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers, Pumps, VFDs, Hydronic Accessories 10-20 years $469,000. X GFA-ME-3 Heating Plant -

Phas

e 1

Ref

eren

dum

Phas

e 1

N

on-R

ef.

Phas

e 2

BIM # BIM Description

Total Project Budget

Gilmore Fine Arts K-8Architectural and Interior Systems

X GFA-INT-1Environmental Remediation Associated with Proposed Renovations 0-5 years $174,000

X GFA-INT-2Flooring - 2nd Floor Classrooms and Corridors, 2nd Floor Workroom and 1st Floor Lounge, Cafeteria 0-5 years $430,500

X GFA-INT-3 Flooring - Kitchen Flooring 5-10 years $11,500

GFA-INT-4

Flooring - Auditorium, Classrooms (2018), Corridors (2018), Dance Room, Gym, Library, Administration Suite (2018) 10-20 years $957,000

X GFA-INT-5Walls - Painting at Open Stairways and Spaces Not Renovated in 2018 0-5 years $37,000

X GFA-INT-6Walls - Refresh Burnished Block in Corridors and Stairways Not Renovated in 2018 5-10 years $31,500

X GFA-INT-7

Doors - Replace Interior Doors, Frames, and Accessible Lever Style Hardware in Areas Not Renovated in 2018 (135 Doors) 0-5 years $432,000

X GFA-INT-8Casework - Classrooms - Replace Original Classroom Casework to Match 2018 Casework 0-5 years $73,000

X GFA-INT-9

Casework - Replace Assorted Casework in Nurse Office, Staff Workroom, and Lounge with Standard Casework to Match Rest of Building 5-10 years $39,500

X GFA-INT-10

Ceilings - Replace Ceilings in Auditorium, Cafeteria, Classrooms, Offices, Corridors and Stairways to Match 2018 Ceilings 0-5 years $294,000

GFA-INT-11Ceilings - Kitchen - Remove Painted Gypsum Board and Provide 24"x24" Washable ACT Ceilings 10-20 years $7,000

X GFA-INT-12

Toilet Room Renovations - Renovate 2 Staff Toilet Rooms on 1st Floor to Comply with ADA. Includes Fixtures, Partitions & Finishes 0-5 years $59,000

X GFA-INT-13

Toilet Room Renovations - Renovate 3 Pairs of Student Toilet Rooms and 2 Locker Toilet Rooms to Comply with ADA. Includes Fixtures, Partitions & Finishes 5-10 years $385,500

GFA-INT-14Elevator - Replace or Modernize Existing Elevator as Condition Deteriorates Due to Age 10-20 years $166,500

X GFA-INT-15FF&E - Replace Auditorium Seating with New Upholstered Seating 0-5 years $144,000

X GFA-INT-16

Wall Mounted Items - Replace Wall Mounted Items in Classrooms Not Renovated in 2018 with Marker Boards and Projector to Match 5-10 years $47,500

GFA-INT-17Specialties - Space Dividers - Replace Folding Partitions in Gym and Cafeteria 10-20 years $384,000

Page 4: Gilmore Fine Arts...Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers, Pumps, VFDs, Hydronic Accessories 10-20 years $469,000. X GFA-ME-3 Heating Plant -

X GFA-INT-18

Specialty Sound/Lighting Controls - Replace Stage Lighting System, Auditorium Dimming Panel, and Gymnasium Sound System 0-5 years $217,500

Building Envelope Systems

X GFA-BE-1

Masonry Repairs - Replace Sealants, Repair Deteriorated Joints, Repair or Patch Damaged or Punctured Metal Wall Panels 0-5 years $49,500

X GFA-BE-2

Exterior Door Repairs and Replacements - Replace 4 Exterior Doors and Prime/Paint 1 Exterior Door Near Loading Dock 0-5 years $13,500

GFA-BE-3

Exterior Access Panels - Replace Leaking Metal Access Panels on 2nd Floor with New Panels, Gaskets, and Proper Flashing 0-5 years $55,500

X GFA-BE-4Exterior Door Replacements - Replace 5 Exterior Doors and Frames Showing Signs of Age 5-10 years $16,500

X GFA-BE-5

Storefront Windows - Replace Storefront Windows Adjacent to Main Entrances with New Thermally Efficient Systems 0-5 years $37,000

X GFA-BE-6Storefront Windows - Replace Storefront Windows at Main Entrances with New Thermally Efficient Systems 5-10 years $365,500

Electrical and Safety Systems

X GFA-EE-1

Service and Distribution Equipment - Consolidate Two Electrical Services, Replace Older Distribution Panels and Provide Additional Panels Where Needed 0-5 years $384,000

X GFA-EE-2

Wiring Devices - Add Receptacles as Needed and Remove Unused Electrical Conduits, Wiring, and Equipment 5-10 years $44,000

X GFA-EE-3

Lighting - Provide Interior and Exterior LED fixtures, Dimmable Lighting Controls and Occupancy Sensors, Egress Lighting in Non-Remodeled Spaces 0-5 years $563,500

GFA-EE-4Fire Alarm System – Replacement with Monitored Addressable System to Meet Code 10-20 years $528,500

X GFA-EE-5Electronic Door Access Control - Replace Components as Required as System Ages 5-10 years $25,500

GFA-EE-6

PA/All-call System - Provide New Paging System, Install Ceiling Mounted Speakers if Replaced with Suspended Ceiling 10-20 years $264,500

X GFA-EE-7Video Surveillance System - Provide Cameras to Monitor Interior and Exterior of Building 0-5 years $57,500

X GFA-EE-8Emergency Power - Provide New Emergency Generator, Provide UPS Systems for 2 IT Closets Immediate $124,000

Mechanical & Environmental Systems

X GFA-ME-1HVAC Controls Systems - Integrate Existing DDC System onto Common Network Platform 0-5 years $44,000

GFA-ME-2

Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers, Pumps, VFDs, Hydronic Accessories 10-20 years $469,000

X GFA-ME-3Heating Plant - Addition of Glycol & Feed Station for Freeze Protection, Remove Coil Pumps 0-5 years $88,500

Page 5: Gilmore Fine Arts...Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers, Pumps, VFDs, Hydronic Accessories 10-20 years $469,000. X GFA-ME-3 Heating Plant -

GFA-ME-4

Cooling System - Provide High Efficiency Chilled Water Cooling Plant, Provide Dedicated DX Split System to Serve IT Data Closet 10-20 years $763,000

GFA-ME-5

Rooftop Units - Replace 2001 Multizone Rooftop Units with Heating Water, Chilled Water, and Energy Recovery for Classrooms 10-20 years $2,756,000

X GFA-ME-6

Building General Exhaust Systems - Replace Non-Functional, Aged Fans with Efficient Fans, Provide Thermal Equalizers in Gym 5-10 years $91,500

GFA-ME-7Domestic Water Heating Plant - Replace Water Heaters and Recirculation Pump 10-20 years $98,500

X GFA-ME-8Plumbing Fixtures - Provide Electric Water Coolers with Bottle Fillers at all Drinking Fountains 5-10 years $84,500

X GFA-ME-9Domestic Water Piping System - Replace Galvanized Piping System with Insulated Copper 0-5 years $705,000

X GFA-ME-10

Mechanical System Retro Cx - Provide Commissioning Services to Test 2001 and 2018 Systems 0-5 years $89,500

Site/Civil SystemsX GFA-SC-1 Asphalt - High Priority Asphalt Repairs 0-5 years $295,500

X GFA-SC-2Asphalt - Medium Priority Base Patching, Crack Routing & Filling, Seal Coating & Marking 5-10 years $117,500

GFA-SC-3Asphalt - Low Priority Base Patching, Crack Routing & Filling, Seal Coating & Marking 10-20 years $525,500

X GFA-SC-4Concrete - High Priority - Replace Deteriorated Sidewalks, Pavements, Ramps & Aprons 0-5 years $30,500

X GFA-SC-5Concrete - Medium Priority - Replace Deteriorated Sidewalks, Pavements, Ramps & Aprons 5-10 years $19,000

GFA-SC-6

Concrete - Low Priority - Replace Deteriorated Sidewalks, Pavements, Ramps & Aprons, Repairs to Retaining Wall 10-20 years $56,500

X GFA-SC-7

Grading & Drainage - Install Roof Drainage System to Collect Downspouts Underground, Install New Storm Sewer System from North, Repair Grading Throughout Site, Install Storm Sewer System in West Lawn, Catch Basin to Northwest 0-5 years $291,000

X GFA-SC-8

Athletic Equipment, Fencing, Landscaping - Replace Backstops, Regrade 2 Infields, Drip Edge and Tree Mulch, Replace 6 Trees, Remove Timber Retaining Wall, Remove Trees Within Fence Line and Replace South 6' Fences, Remove Old Concrete Foundation and Restore Greenspace, Install Dumpster Pad, Repair Block Retaining Wall 0-5 years $173,500

GFA-SC-9 Utilities - Install New Water Service 10-20 years $38,500

X GFA-SC-10

Life Safety - Install New Storm Sewer for Drainage, ADA Parking and Ramp Renovations for Compliance, Safety Railings, Install Metal Walkway 0-5 years $74,000

Page 6: Gilmore Fine Arts...Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers, Pumps, VFDs, Hydronic Accessories 10-20 years $469,000. X GFA-ME-3 Heating Plant -

X GFA-SC-11Storm Water Management - Provide Basins or Ponds to Comply with DNR for Major Projects 0-5 years $170,000

Gilmore Fine Arts K-8 - Phase 1 - FCA Selected Total: $3,082,000Gilmore Fine Arts K-8 - Phase 2 - FCA Selected Total: $2,627,500

Educational AdequacyX 0 GFA-EDA-1 Add Windows to Perimeter Classrooms EDA $814,000

X GFA-EDA-2Auditorium Reconfiguration to Add Seating (100), Provide Egress and Remove Divider EDA $349,000

X GFA-EDA-3Convert Locker Rooms to Parent Room, Fitness Room, and Gym Storage EDA $480,500

X 0 GFA-EDA-4 Renovate Three Middle School Science Labs EDA $289,500Gilmore Fine Arts K-8 - Phase 1 - Educational Adequacy Selected Total: $1,933,000Gilmore Fine Arts K-8 - Phase 2 - Educational Adequacy Selected Total: $0

Gilmore Fine Arts K-8 - Phase 1 Selected Total: $5,015,500Gilmore Fine Arts K-8 - Phase 2 Selected Total: $2,627,500

Page 7: Gilmore Fine Arts...Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers, Pumps, VFDs, Hydronic Accessories 10-20 years $469,000. X GFA-ME-3 Heating Plant -

W.B.W.B.

W.B.W.B.

W.B.W.B.

W.B.W.B.

W.B

.W

.B.

W.B

.W

.B.

W.B. W.B.

W.B

.W

.B.

W.B

.W

.B.

W.B.W.B.

W.B.W.B.W.B.W.B.W.B.W.B.

9

20

19

8

17

27

15

18

3

32

25

12

14 28 89288

9

36

23

8

5

3

8

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

4

1

F.E.

5

6

17 48

14 24

41

33

25

13

11

1 1 1

110 19

20 40 20

1

1

20

1

20

1

1

F.E.

F.E

.

F.E.

AID

F.E

.

D.F.

D.F.

D.F.

D.F.

F.E

F.E

TRASH TRASH

MILKCOOLER

DIVIDERDIVIDER

DN DN

O.H. ROLLING DOOR

D.F.

D.F.

DN

F.E

F.E

DIV

IDE

R

D.F.

D.F.

VENT

BL

EA

CH

ER

S

D.F.

D.F.

F.E

.

F.E

.

D.F.D.F.F.E

F.E

DIV

IDE

R

F.E

F.E

DISPLAY

DISPLAY

DISPLAY

TECH ED.DISPLAY

DISPLAY

DISPLAY

F.S.

F.P.

F.P.

F.S.

F.S.

F.S.

CU

BB

IE

F.S.

CHALK CHALK F.E.F.E.F.P.F.P.

HA

LF

WA

LL

HA

LF

WA

LL

HALF WALL

TRASH

F.S. DISPLAY DISPLAY DISPLAYF.S.

DISPLAY

F.S.

D.F.

F.S.F.P.F.S.F.P.

F.S.

F.E

F.E

HALF WALLHALF WALL

FREEZE CABINET

F.S.

F.S.

F.P.

CORRIDOR: RUNNING BONDGROUND FACE CMU WALL

F.E.

4" CURB

ELEV.EQUIP.

FRIG

E.P.

WD. SHELVING

WD

. S

HE

LV

ING

CH

AL

K

CH

AL

K

WH

ITE

BO

AR

D

CH

AL

K

EXIST PIPE

EXISTPIPE

E.P.

E.P.

E.P.

CH

AL

K

E.P.

CH

AL

KW

HIT

EB

OA

RD

CORNERWALL PAD

F.E.

F.E.

F.E.

DN DN

DN

UP

UPUP

UP UP

DN DN

UP

26'-

3"

MODERATE RENOVATION

HEAVY RECONSTRUCTION

T157

T158

T159

T160

T161

T162

T163

T164

T165

T166

HC167

T170

GYM173

DANCE146

AUDTRM181

STAGE176

MUSIC166

BAND172

MECH157

MECH158

MECH158B

MECH159A

RECV183

ST186

K-5 DRAMA164A

K-5 MUSIC163

KIT141

ISS142

STAFF165

BLDG ENG160

ST193

OFF194

CAFETERIA139

6-8 DRAMA105

2-5 STRINGS106

SENSORY198

SPED WC BOUND107

SPED RESOURCE108 1ST

109

1ST114

1ST115

SPED166A

ELL116 K

117

K118

K119

6-8 ART113B

6-8 ART133A

K-5 ART113

CSLR(5-7)

130

SOC126

J214

INST.COACH

129

DATA134

CONF134

OFF136

PRIN122

AP123

NURSE125

WORK121

J225

SOC / CSLR226

CSLR (K-5)227

ELL (K-5)228

PSYCH229

SERVERY230

ST232

SEC DESK233

P234

P235

P236

P237

P238

P239

ENSEMBLE240

ENSEMBLE241

?161

4,391 SF

-ADJUST TIERS AT BACK OF HOUSE TO REACH SECOND FLOOR- ADD 4 NEW ROWS OF SEATING - DASHED LINE (~ 25 SEATS / ROW)

- RELOCATE STAIR FROM FRONT OF STAGE TO SIDE- RECONFIGURE BACK OF HOUSE SPACE TO PROVIDE STORAGE

- CUT IN NEW DOUBLE DOORS TO EXIT OUT TO GRADE AND MID LANDING- LOCATE NEW DOUBLE DOORS AT MID LANDING TO EXIT ONTO FIRST FLOOR

- RECONFIGURE BACK STAIRS TO EXIT ONTO SECOND FLOOR IF REQ

4,453 SF

1432 SF

GYM ST

1093 SF

COMMUNITY RM

1852 SF

FITNESS

GILMORE K-8 FINE ARTS

FIRST FLOOR PLAN

EDUCATIONAL SPACE ADEQUACY PLANS

Original Construction : 1974

0 20 40 80

SCALE: 1" = 40'-0"

Page 8: Gilmore Fine Arts...Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers, Pumps, VFDs, Hydronic Accessories 10-20 years $469,000. X GFA-ME-3 Heating Plant -

SKYLIGHTSKYLIGHT SKYLIGHT

SKYLIGHTSKYLIGHT SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT SKYLIGHT

W.B

.W

.B.

W.B

.W

.B.

W.B

.W

.B.

W.B

.W

.B.

W.B

.W

.B.

W.B

.W

.B.

W.B

.W

.B.

W.B

.W

.B.

W.B.W.B.W.B.W.B.W.B.W.B. W.B.W.B.

W.B

.W

.B.

W.B

.W

.B.

W.B

.W

.B.

W.B

.W

.B.

W.B

.W

.B.

W.B

.W

.B.

A2.1 - AA2.1 - B

A2.1 - A

A2.1 - C

A2.

1 -

CA

2.1

- B

1.1

1.1

3 3

2

5

2

2

5

2

66

44

5

44

4

4

4

4

22

2

2 2

2.1

5

5

5

5

5

4

5

4

4

4

2

2

4

2

7

5.1

5.1

5.1

5.1

5.1

5.1

2

4

4

4

4

4

2

6 4 6

25 5

4

4 4

4

2

2

5

5

5

5

4

55

2

2

4

7

emergency shut -of f

1

A8.2

2

A8.2

5

A7.0

3

A7.0

12

A7.0

4

A8.6

4

A8.5

3

A8.3

5

A8.1

3

A8.4

F.E.

30 7979

4848

5656

1 11

50

30

70

1

1

20

24

verify

Lockers t h is Area =

- Tot al Unit s : 186

- Unit s Do uble St a ck: 372

Lock

ers

this

Are

a =

42 E

xist

ing

9" w

ide

lock

ers

Lockers t his Area = 15 E xist ing 9" w ide lockers

BOOK

12027

1

20

40

42

SKYLIGHT

SKYLIGHT SKYLIGHT

SKYLIGHT SKYLIGHT SKYLIGHT

SKYLIGHT SKYLIGHT

SKYLIGHT SKYLIGHT

EX

IST

LO

CK

ER

S-F

.V.

D.F.

D.F.

1"

EX

PA

NS

ION

JO

INT

W/ A

LU

M.

CO

VE

RW

AL

L &

FL

OO

R

F.E

.

F.E

.

F.E. F.E.

F.E.

D.F.

D.F.

D.F.

D.F.

F.E.

F.E

.

D.F.

F.E

.

F.E.

F.E.

F.E.

D.F.

D.F.

D.F.

F.E.

F.P.

GILMORE MIDDLESCHOOL SIGNAGE(GUARDRAILING)

F.S.

1" EXPANSION JOINT W/ ALUM. FLOOR COVER

1" EXPANSION JOINT W/ ALUM. FLOOR COVER

F.S.

D.F.

F.S.

F.S.

F.S.CUBBIE

F.P.

F.S.

F.S.

EXIST LOCKERS-F.V.

F.S.F.S.

F.S.

F.P.

F.S.

F.S.

GILMOREMIDDLE

SCHOOLSIGNAGE

F.S. CUBBIE

F.P.

F.S.

F.P.

F.S.

F.S.

F.P.

F.S.

F.S.

WALL DISPLAYS

F.S.

EX

PA

NS

ION

JO

INT

W/

ALU

M.

FL

OO

R C

OV

ER

F.P.

F.S.

F.E.

F.P.

F.S.

F.S. F.S.

F.P.

F.S.

EXISTING DATA RACKS

F.E

.

SOFFIT ABOVE

EXISTING DATA RACKS

F.E

.

F.E

.

2,864 sf

122 sf 120 sf

376 sf180 sf

90 sf 30

948 sf(overall)

2,510 sf (overallresource space)

2,615 sf (overall resourcespace)

DRAIN

DN

DNDN

DN DN

DN

DN DN

5'-0"

1' - 1 "4' - 4 "

0"4' - 4 "

1' - 1 "

11 ' - 4 "

6'-1"

4'-11

"

4'-8"

40'-

101_ 2

"

9'-2" 10'-

1"

1' - 1 "4' - 4 "

6"4' - 4 "

11 ' - 4 "

6'-1"

4'-11

"

4'-8"

21'-

5"

9'-2"10'-

1"

1' - 1 " 4' - 4 "

6"

4' - 4 "

11 ' - 4 "

6'-3"

4'-11

"

4'-8"

21'-

5"

9'-2"

10'-

1"

1' - 1 "4' - 4 "

6"

4' - 4 "

11 ' - 4 "

6'-3"

4'-11

"

4'-8"

21'-

5"

9'-2"

10'-

1"

22 ' - 4 "

15 ' - 3 "1' - 5 "

14'-

10"

1'-5"

5'-8"

8"5'-

8"1'-

5"

4' - 7 "10 ' - 1 "6' - 31_ _

1 6"

9' - 2 " 5' - 9 "

4'-0

1 _ 2"

22 ' - 4 "

1' - 5 "

14'-

10"

1'-5"

5'-8"

8"

5'-8"

1'-5"

4' - 7 " 10 ' - 1 " 6' - 31_ _

1 6"

6' - 0 "9' - 2 "5' - 9 "

4'-0

1 _ 2"

1 0 "

1 0 "

21'-5"

14 ' - 4 " 9' - 3 " 6' - 5 "

6' - 2 "9' - 2 "14 ' - 8 "

6'-0"

8"6'-

0"

14 ' - 4 "9' - 3 "6' - 5 "

6' - 2 " 9' - 2 " 14 ' - 8 "

6'-0"

8"6'-

0"

3"3'

-91 _ 4"

4"2"

2"4"

2"2"

3'-9

1 _ 4"

4"2"

2"

3'-9

1 _ 4"

4"2"

2"

3'-9

1 _ 4"3'

-91 _ 4"

5"2"

18'-1

01 _ 4"

22'-3

"

2"3'

-91 _ 4"

4"2"

2"2"

3'-9

1 _ 4"

4"2"

2"

3'-9

1 _ 4"

4"2"

2"

3'-9

1 _ 4"3'

-91 _ 4"

5"2"

18'-1

01 _ 4"

3'-8

1 _ 2"3'

-81 _ 2"

3'-8

1 _ 2"3'

-81 _ 2"

3'-8

1 _ 2"3'

-81 _ 2"

7' -0"

8"

22'-3

"

3"3'

-91 _ 4"

4"2"

2"4"

2"2"

3'-9

1 _ 4"

4"2"

2"

3'-9

1 _ 4"

4"2"

2"

3'-9

1 _ 4"3'

-91 _ 4"

5"2"

18'-1

01 _ 4"

22'-3

"

2"

3'-9

1 _ 4"

4"2"

2"4"

2"2"

3'-9

1 _ 4"

4"2"

2"

3'-9

1 _ 4"

4"2"

2"

3'-9

1 _ 4"3'

-91 _ 4"

5"2"

18'-1

01 _ 4"

3'-8

1 _ 2"3'

-81 _ 2"

3'-8

1 _ 2"3'

-81 _ 2"

3'-8

1 _ 2"3'

-81 _ 2"

73__

16 "7' -0"

8"

22'-3

"

F.E

.

F.E

.

MODERATE RENOVATION

FVELL205

6TH ELA204

6TH MATH203 6-8 SOC

218

6TH SOC216 6-8 MATH

215

6-8 WL217

T110

T111

T112

T113

T114

T115

6-8 ELA206

7TH MATH207

7TH ELA208

7TH SOC209

8TH SOC210

7TH SCI211

8TH SCI212

6-8 SCI123

8TH ELA213

8TH MATH220

6TH SCI219

SCI214

SCI ST128

TITLE K-5227

TITLE 6-8228

SPED229

6-8 CTE230

MAKER SPACE231

CSLR134

AP135

J136

ST137

ST138

LMC139

STAFF / BOOK247

FINE ARTS COOR141

DATA142

SPL258

2ND256

2ND255

2ND241

3RD240

3RD244

3RD242

4TH248

4TH245

4TH246

5TH249

5TH251

5TH253

K-5 RESOURCEOT SPED

254

SPL257

ST224

GILMORE K-8 FINE ARTS

SECOND FLOOR PLAN

EDUCATIONAL SPACE ADEQUACY PLANS

Original Construction : 1974

0 20 40 80

SCALE: 1" = 40'-0"