gillian gillett spur 01-10-12

20
Reenvisioning I280 and the Caltrain Corridor January 10, 2013

Upload: adina-levin

Post on 18-Jan-2015

7.593 views

Category:

Documents


8 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Gillian Gillett SPUR 01-10-12

Re-­‐envisioning  I-­‐280  and  the  Caltrain  

Corridor  

January  10,  2013  

Page 2: Gillian Gillett SPUR 01-10-12

Outline  

1.  Exis@ng  Condi@ons  2.  Project  Impetus  3.  Grade  Separa@on  and  Rail  Alignments  4.  Boulevard  +  Railyards  Proposal  5.  Financing  Opportuni@es  and  Next  Steps  

Page 3: Gillian Gillett SPUR 01-10-12

Exis%ng  Condi%ons  

Page 4: Gillian Gillett SPUR 01-10-12

Exis@ng  Condi@ons  

•  Railyards  and  I-­‐280  freeway  consume  37  acres  

•  Noise,  shadow,  pollu@on  

•  1.2-­‐mile  barrier  separates  Mission  Bay  from  SoMa,  Showplace  Square  and  Potrero  Hill  

 •  Only  two  crossings  

Page 5: Gillian Gillett SPUR 01-10-12

N

Page 6: Gillian Gillett SPUR 01-10-12
Page 7: Gillian Gillett SPUR 01-10-12
Page 8: Gillian Gillett SPUR 01-10-12
Page 9: Gillian Gillett SPUR 01-10-12
Page 10: Gillian Gillett SPUR 01-10-12
Page 11: Gillian Gillett SPUR 01-10-12
Page 12: Gillian Gillett SPUR 01-10-12
Page 13: Gillian Gillett SPUR 01-10-12
Page 14: Gillian Gillett SPUR 01-10-12
Page 15: Gillian Gillett SPUR 01-10-12

PROJECT  IMPETUS  

Page 16: Gillian Gillett SPUR 01-10-12

California  High  Speed  Rail  

Source:    CaHSRA  

Page 17: Gillian Gillett SPUR 01-10-12

Caltrain  Downtown  Extension  (DTX)  

Page 18: Gillian Gillett SPUR 01-10-12

Land  Use  Plans   Eastern  Neighborhoods  

West  SoMa  

Central  Corridor  

UCSF  

Mission  Bay  

Page 19: Gillian Gillett SPUR 01-10-12

An@cipated  Growth  through  2035  

Increase  in  Households   Increase  in  Jobs  

Source:  EN  TRIPS  Final  Study  

Page 20: Gillian Gillett SPUR 01-10-12

Transporta@on  Plans  Mission  Bay  Grid  

Central  Subway  

16th  Street  Bus  Rapid  Transit  

16th  Street  Bus  Rapid  Transit